Workstation assessment: how to review a station for ergonomics, safety, 5S and material flow in one day

Short answer

A workstation assessment is a structured review of one station against a fixed list of checks, ending in scores and a ranked list of fixes. For a plant it looks at four things together: can a person do the job all shift without strain, is it safe, is the work organized, and do the parts arrive where the hands are.

Film ten cycles of the job from two angles, measure the heights, reaches and weights, and score 24 checks from the video with the operator beside you: six each for ergonomics, safety, 5S and flow, and material presentation. Score each 2 (met), 1 (partly) or 0 (not met). Report four lens percentages as well as the total, give every 0 and 1 an action with an owner and a date, do the same-day fixes the same day, and score again from new video. One station takes one day. The scale and the bands in this guide are one convention, not a standard.

Last reviewed:

What is a workstation assessment?

One station, four questions

E

Ergonomics

Can a person do this job all shift without strain?

6 checks

S

Safety

Could this station hurt someone today?

6 checks

F

5S and flow

Is the work organized so the normal method is the easy one?

6 checks

M

Material presentation

Do parts arrive where the hands already are?

6 checks

Four cards: ergonomics asks whether a person can do the job all shift without strain; safety asks whether the station could hurt someone today; 5S and flow asks whether the normal method is the easy one; material presentation asks whether parts arrive where the hands are. Each has six checks scored 2, 1 or 0.

The four lenses sit on the same square meter and the fixes interact. Each lens has six checks, scored 2 (met), 1 (partly) or 0 (not met), 24 in all.

It is a review of one place where one person does one job: the bench, the machine or the packing table, the parts around it, the tools in the hands and the way the work moves. The result is not a verdict on the operator. It is a score for the station and a list of things to change, ordered by how much they matter.

The phrase means different things depending on who says it. An office worker means the desk, chair and screen. A safety officer means hazards. A lean engineer means 5S and flow. An ergonomist means posture and force. On a plant floor all four questions land on the same square meter, and a station can pass three and fail the fourth, so a useful assessment asks them together.

If you searched for a display screen equipment assessment

Most UK searches for this term are about office screen work. The Health and Safety (Display Screen Equipment) Regulations 1992 deal with that, and the HSE publishes its own workstation checklist for it. This guide is about stations that make, assemble, pack and move things. For a desk, start with the HSE's DSE guidance and your employer's own process.

Four lenses for a plant station

Each lens asks one plain question and has six checks. Six is a choice of this form, small enough to finish in a morning and large enough to catch the usual faults.

The four lenses and what each one catches
LensThe questionTypical checksGoes deeper with
Ergonomics (E)Can a person do this job all shift without strain?Hands between knuckle and shoulder height, frequent items inside forearm reach, work height that fits the task, no heavy hand lifts, no twisting, room to change postureGolden zone, reach envelope, RULA, REBA, NIOSH lifting equation
Safety (S)Could this station hurt someone today?Guards and stops working, clear dry floor, pinch and cut points controlled, PPE posted and worn, enough light, exits and extinguishers clearRisk assessment and your machine safety process
5S and flow (F)Is the work organized so the normal method is the easy one?Only what the job needs, marked homes for tools, current standard work, one-way flow, no fetching inside the cycle, abnormal made visible5S audit checklist, standard work
Material presentation (M)Do parts arrive where the hands already are?Parts in the golden zone, oriented for use, containers small enough to pick from, replenishment from outside, a way out for empties, labeled addressesLine-side material presentation

The full list of 24 checks is on the [workstation assessment form](/templates/workstation-assessment-form).

Why not only the first lens? Because the fixes interact. Raising a bench helps the back and is useless if the screw box is still at arm's length. Moving the box helps the reach and creates a trip hazard if the cart now blocks the aisle. Looking through all four at once is what turns a list of complaints into a layout.

How to score: 2, 1, 0 and the three bands

Scoring each check
ScoreLabelMeaning
2MetTrue for every filmed cycle.
1PartlyTrue for some cycles, some parts or some operators.
0Not metNot true, or nobody could show it.
NANot applicableLeft out of the total.

A lens score is its points divided by twice the number of checks that apply. A station score is the same across all four lenses. Then read the band.

Three bands for a lens or a station
BandScoreWhat to do
Green85% or moreHold the condition. Re-check on the audit cycle.
Amber60% to 84%Plan an action for every item scored 0 or 1.
RedUnder 60%Act this month. Start with the items scored 0.

The 0, 1, 2 scale, the 60% and 85% edges and the six checks per lens are this form's own convention. They are not from OSHA, the HSE, ISO or any standard. Change them if your site has a better rule and keep it the same for every station you compare.

Two rules keep the numbers honest. First, report the four lens scores, not only the total, because an 80% station can hide a lens at 33%. Second, any 0 on an ergonomics or safety check gets an action and an owner whatever the percentage says. A good average does not make an unguarded pinch point acceptable.

How to run an assessment in one day

  1. 1

    Brief the operator and the supervisor

    Say what you are doing and why: you are assessing the station, not the person, and the result will be fixes. Ask the operator what hurts, what slows them down and what they would change first. They know the answers already.

  2. 2

    Film ten cycles from two angles

    One camera from the front or the side at about chest height, one from above or behind if the layout allows. Ten ordinary cycles at normal pace, including a part change if the job has one. Time study from video uses the same footage, so ask for the camera once.

  3. 3

    Measure heights, reaches and weights

    A tape and a scale. For each part, tool, surface and control: weight, how many times an hour, the height of the hands when they take it and the reach from the body. Bench height and the operator's elbow height go on the same sheet.

  4. 4

    Score the four lenses from the video

    Sit with the operator and score each item 2, 1, 0 or NA. Where you cannot agree, score the lower number and write why. Note the evidence in one line, for example a cycle number or a measurement. A score with no evidence is an opinion.

  5. 5

    Agree the findings and rank the actions

    Write one action for every 0 and every 1: what, who, by when and which type it is (same day, maintenance or toolroom, engineering change, purchase). Rank by two things: how far the fix moves a lens score, and whether it removes a hazard.

  6. 6

    Do the same-day fixes and set the re-score

    Remove old fixtures, mark homes, move a printer, label the part addresses. Same-day fixes show the operator the day was not wasted. Set the date to film again and score again, and file both sheets with the standard work.

A day for one station
StartBlockMinutes
07:30Brief the operator and supervisor30
08:00Film ten cycles from two angles45
08:45Measure heights, reaches, weights45
09:30Score the four lenses from the video150
13:00Agree findings, rank actions60
14:00Do the same-day fixes90
15:30Owners, dates, re-score date30

Lunch from 12:00 to 13:00 is not listed. A simple, repetitive station can take half a day. A station with several variants or a machine cycle may need two.

One station, one day

07:30Brief the operator and supervisor30 min
08:00Film ten cycles from two angles45 min
08:45Measure heights, reaches, weights45 min
09:30Score the four lenses from the video150 min
13:00Agree findings, rank actions60 min
14:00Do the same-day fixes90 min
15:30Owners, dates, re-score date30 min

Seven blocks from 07:30 to 16:00 with lunch from 12:00 to 13:00: 07:30 Brief the operator and supervisor, 30 minutes; 08:00 Film ten cycles from two angles, 45 minutes; 08:45 Measure heights, reaches, weights, 45 minutes; 09:30 Score the four lenses from the video, 150 minutes; 13:00 Agree findings, rank actions, 60 minutes; 14:00 Do the same-day fixes, 90 minutes; 15:30 Owners, dates, re-score date, 30 minutes.

450 minutes of work in a 510-minute day, and scoring from the video is the longest block. The fixes are on the afternoon of the same day, while the operator still remembers the findings.

Worked example: a pack-out station

Station 6 on a pump line does final assembly and pack-out of a 7.5 kg transfer pump, 40 an hour. Ten cycles were filmed. The first score was 26 points out of 48, which is 54%, red.

Illustrative: lens scores before and after
LensBefore (points of 12)BeforeAfter (points of 12)After
Ergonomics542% Red1192% Green
Safety1083% Amber1192% Green
5S and flow758% Red1083% Amber
Material presentation433% Red1083% Amber
Station26 of 4854% Red42 of 4888% Green

The station total hid the spread: safety was at 83% while material presentation was at 33%. Scored from the form's example in the download.

Pack-out station: four lens scores, before and after

Example numbers

Ergonomics

Before42% Red
5 of 12
After92% Green
11 of 12

Safety

Before83% Amber
10 of 12
After92% Green
11 of 12

5S and flow

Before58% Red
7 of 12
After83% Amber
10 of 12

Material presentation

Before33% Red
4 of 12
After83% Amber
10 of 12

Station

Before54% Red
26 of 48
After88% Green
42 of 48

Bars for each lens before and after. Station total went from 26 of 48 points (54 percent, red) to 42 of 48 (88 percent, green). The cycle fell from 82 to 71 seconds.

The station total was 54% and hid the spread: safety was at 83% while material presentation was at 33%. The thin lines mark 60% and 85%. The cycle fell from 82 to 71 s.

Behind the red scores were a handful of plain facts. Pumps were packed into cartons on a floor pallet, so the hands worked between 15 and 60 cm and the 7.5 kg pump was lifted by hand 40 times an hour. The bench top was at 86 cm, 19 cm below the operator's 105 cm elbow height, for light assembly. Flat cartons were stacked at 150 cm, behind and to the left. The screw bin was 30 cm deep at a 55 cm reach. The label printer was 4 m away, and labels were searched for in 3 of 10 cycles. Two old fixtures sat under the bench and the extinguisher was half hidden by empty pallets.

Illustrative: the eight actions, ranked
No.ActionTypeDue
1Pallet lift table with turntable, top layer held at 75 to 95 cmPurchaseDay 21
2Raise the bench to 97 cm on adjustable legsMaintenance or toolroomDay 7
3Gravity lane for flat cartons at 110 cm, in front and to the sideMaintenance or toolroomDay 10
4Small two-bin screw supply at 35 cm reach, loaded from the backSame dayDay 0
5Move the label printer onto the bench shelfSame dayDay 0
6Remove old fixtures, mark tool homes and part addresses, fit a knife holderSame dayDay 0
7Reissue the work instruction after the layout changeEngineering changeDay 25
8Water spider stop for cartons and empties, marked pallet positionEngineering changeDay 30

After the actions the station scored 42 of 48, 88%, green. Filmed again, the cycle fell from 82 to 71 seconds, 13% shorter, because the walk to the printer and the searches were gone. The ergonomics gain came with the speed gain, which is the usual pattern and the best argument for doing both reviews at once. One amber item remained on purpose: the work instruction lagged the layout change until day 25.

The heavy lift deserves its own number. The pump's weight and frequency would be checked with the NIOSH lifting equation before and after the lift table, not only scored on this form.

Why video does most of the work

Standing with a clipboard, you see the station once and the operator knows you are watching. From ten filmed cycles you see the awkward reach that happens in cycle seven, the search that costs four seconds in three cycles of ten, and the part that arrives upside down every time. You can replay a lift, pause on a posture and let the operator confirm what you saw.

The same footage feeds a time study and a posture score. The guide to doing a time study and an ergonomic study in one pass shows how, and ergonomic assessment in manufacturing shows which scoring method fits which job. A screening form tells you where to look. RULA, REBA or the NIOSH equation tell you how bad it is.

Handling the people side

  • Say first that the station is being assessed, not the operator. Say it again at the end.
  • Have the operator in the room when you score. Several of the best fixes in the example came from what the operator said before the camera was out.
  • Ask before filming and film only the work. Check your site's rules on video, and on keeping footage, before you start.
  • Do the same-day fixes the same day. An assessment with no visible result teaches people to hide problems next time.
  • Report back in the huddle, with the before and after scores and the name of the fix, not of the person.

What this form does not do

  • It screens and ranks. It is not a legal risk assessment and it does not replace RULA, REBA, the NIOSH equation, a machine safety review or a display screen equipment assessment where those apply.
  • It scores what you filmed. A job that changes by shift or variant needs the worst variant filmed as well as the usual one.
  • Percentages invite arguing about the number. Use the items scored 0 and 1 as the real output.
  • Six checks a lens will miss site-specific hazards such as noise, heat, chemicals and vibration. Add a check for any you know about.
  • It does not say who may do an assessment. Requirements and certifications differ by country and employer, so check your own rules. This page is general guidance, not legal or medical advice.

Tools and templates

The workstation assessment form holds the 24 checks, the measurements sheet, the action list and the example in this guide, in Excel and as a printable PDF. The golden zone height check sheet goes deeper on the ergonomics and material presentation heights. For 5S on its own, use the 5S audit checklist.

LeanSuite's Ergonomic Study maps 18 body joints from video and scores REBA and RULA automatically, which covers the posture part of the first lens. The Time and Motion Study takes the same video and returns element times and cycle time. Neither fills in this form: the checks on safety, 5S and material presentation are still scored by people at the station.

FAQ

Questions about workstation assessment

  1. An ergonomic assessment looks at how a job fits the person doing it: postures, force, repetition, reach, heights, tools and the pace of work. It ends in findings and fixes. In a plant it can be a quick screening of a station, a scored posture method such as RULA or REBA, or a lifting calculation. A workstation assessment usually starts with the screen and goes deeper where it finds a problem.

  2. OSHA's ergonomics guidance names awkward postures, forceful exertions, repetition, static or sustained postures, contact stress, vibration and cold. Risk comes from the combination, how often it happens and for how long, not from any one alone. A workstation assessment looks for these in the filmed work, and measures the weights, heights and reaches behind them.

  3. Anyone whose job is repetitive, forceful, awkward or sustained is worth assessing, and so is anyone returning to work after an injury, a new starter on a demanding station, or a station that has just changed. In the UK, employers must assess the workstations of regular display screen users. In a plant the usual trigger is a complaint, an incident, a layout change or a new product.

  4. There is no single rule that applies everywhere. Professional certifications exist, such as the Certified Professional Ergonomist from the BCPE, and a complex or disputed case may call for one. Many plants have trained engineers and safety staff run screening assessments like this one and bring in a specialist for harder jobs. Check what your employer, insurer and local law require.

  5. One simple station takes about a day with this method: a half-hour briefing, 45 minutes to film ten cycles, 45 minutes to measure, about two and a half hours to score from the video, an hour to agree the actions and an afternoon for the same-day fixes. Several variants, a long machine cycle or a station with heavy lifting can take two days.

  6. On a plant floor it should also cover safety (guards, floor, light, PPE), 5S and flow (what is at the station, where tools live, whether the operator leaves it mid-cycle) and material presentation (where parts arrive and how). Those faults slow the job and add risk, and they are often the cheapest to fix. Posture scoring alone would miss them.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.