Practical guide · Safety management
Workstation assessment: how to review a station for ergonomics, safety, 5S and material flow in one day
Short answer
A workstation assessment is a structured review of one station against a fixed list of checks, ending in scores and a ranked list of fixes. For a plant it looks at four things together: can a person do the job all shift without strain, is it safe, is the work organized, and do the parts arrive where the hands are.
Film ten cycles of the job from two angles, measure the heights, reaches and weights, and score 24 checks from the video with the operator beside you: six each for ergonomics, safety, 5S and flow, and material presentation. Score each 2 (met), 1 (partly) or 0 (not met). Report four lens percentages as well as the total, give every 0 and 1 an action with an owner and a date, do the same-day fixes the same day, and score again from new video. One station takes one day. The scale and the bands in this guide are one convention, not a standard.
Last reviewed:
What is a workstation assessment?
One station, four questions
Ergonomics
Can a person do this job all shift without strain?
6 checks
Safety
Could this station hurt someone today?
6 checks
5S and flow
Is the work organized so the normal method is the easy one?
6 checks
Material presentation
Do parts arrive where the hands already are?
6 checks
Four cards: ergonomics asks whether a person can do the job all shift without strain; safety asks whether the station could hurt someone today; 5S and flow asks whether the normal method is the easy one; material presentation asks whether parts arrive where the hands are. Each has six checks scored 2, 1 or 0.
It is a review of one place where one person does one job: the bench, the machine or the packing table, the parts around it, the tools in the hands and the way the work moves. The result is not a verdict on the operator. It is a score for the station and a list of things to change, ordered by how much they matter.
The phrase means different things depending on who says it. An office worker means the desk, chair and screen. A safety officer means hazards. A lean engineer means 5S and flow. An ergonomist means posture and force. On a plant floor all four questions land on the same square meter, and a station can pass three and fail the fourth, so a useful assessment asks them together.
If you searched for a display screen equipment assessment
Most UK searches for this term are about office screen work. The Health and Safety (Display Screen Equipment) Regulations 1992 deal with that, and the HSE publishes its own workstation checklist for it. This guide is about stations that make, assemble, pack and move things. For a desk, start with the HSE's DSE guidance and your employer's own process.
Four lenses for a plant station
Each lens asks one plain question and has six checks. Six is a choice of this form, small enough to finish in a morning and large enough to catch the usual faults.
| Lens | The question | Typical checks | Goes deeper with |
|---|---|---|---|
| Ergonomics (E) | Can a person do this job all shift without strain? | Hands between knuckle and shoulder height, frequent items inside forearm reach, work height that fits the task, no heavy hand lifts, no twisting, room to change posture | Golden zone, reach envelope, RULA, REBA, NIOSH lifting equation |
| Safety (S) | Could this station hurt someone today? | Guards and stops working, clear dry floor, pinch and cut points controlled, PPE posted and worn, enough light, exits and extinguishers clear | Risk assessment and your machine safety process |
| 5S and flow (F) | Is the work organized so the normal method is the easy one? | Only what the job needs, marked homes for tools, current standard work, one-way flow, no fetching inside the cycle, abnormal made visible | 5S audit checklist, standard work |
| Material presentation (M) | Do parts arrive where the hands already are? | Parts in the golden zone, oriented for use, containers small enough to pick from, replenishment from outside, a way out for empties, labeled addresses | Line-side material presentation |
The full list of 24 checks is on the [workstation assessment form](/templates/workstation-assessment-form).
Why not only the first lens? Because the fixes interact. Raising a bench helps the back and is useless if the screw box is still at arm's length. Moving the box helps the reach and creates a trip hazard if the cart now blocks the aisle. Looking through all four at once is what turns a list of complaints into a layout.
How to score: 2, 1, 0 and the three bands
| Score | Label | Meaning |
|---|---|---|
| 2 | Met | True for every filmed cycle. |
| 1 | Partly | True for some cycles, some parts or some operators. |
| 0 | Not met | Not true, or nobody could show it. |
| NA | Not applicable | Left out of the total. |
A lens score is its points divided by twice the number of checks that apply. A station score is the same across all four lenses. Then read the band.
| Band | Score | What to do |
|---|---|---|
| Green | 85% or more | Hold the condition. Re-check on the audit cycle. |
| Amber | 60% to 84% | Plan an action for every item scored 0 or 1. |
| Red | Under 60% | Act this month. Start with the items scored 0. |
The 0, 1, 2 scale, the 60% and 85% edges and the six checks per lens are this form's own convention. They are not from OSHA, the HSE, ISO or any standard. Change them if your site has a better rule and keep it the same for every station you compare.
Two rules keep the numbers honest. First, report the four lens scores, not only the total, because an 80% station can hide a lens at 33%. Second, any 0 on an ergonomics or safety check gets an action and an owner whatever the percentage says. A good average does not make an unguarded pinch point acceptable.
How to run an assessment in one day
- 1
Brief the operator and the supervisor
Say what you are doing and why: you are assessing the station, not the person, and the result will be fixes. Ask the operator what hurts, what slows them down and what they would change first. They know the answers already.
- 2
Film ten cycles from two angles
One camera from the front or the side at about chest height, one from above or behind if the layout allows. Ten ordinary cycles at normal pace, including a part change if the job has one. Time study from video uses the same footage, so ask for the camera once.
- 3
Measure heights, reaches and weights
A tape and a scale. For each part, tool, surface and control: weight, how many times an hour, the height of the hands when they take it and the reach from the body. Bench height and the operator's elbow height go on the same sheet.
- 4
Score the four lenses from the video
Sit with the operator and score each item 2, 1, 0 or NA. Where you cannot agree, score the lower number and write why. Note the evidence in one line, for example a cycle number or a measurement. A score with no evidence is an opinion.
- 5
Agree the findings and rank the actions
Write one action for every 0 and every 1: what, who, by when and which type it is (same day, maintenance or toolroom, engineering change, purchase). Rank by two things: how far the fix moves a lens score, and whether it removes a hazard.
- 6
Do the same-day fixes and set the re-score
Remove old fixtures, mark homes, move a printer, label the part addresses. Same-day fixes show the operator the day was not wasted. Set the date to film again and score again, and file both sheets with the standard work.
| Start | Block | Minutes |
|---|---|---|
| 07:30 | Brief the operator and supervisor | 30 |
| 08:00 | Film ten cycles from two angles | 45 |
| 08:45 | Measure heights, reaches, weights | 45 |
| 09:30 | Score the four lenses from the video | 150 |
| 13:00 | Agree findings, rank actions | 60 |
| 14:00 | Do the same-day fixes | 90 |
| 15:30 | Owners, dates, re-score date | 30 |
Lunch from 12:00 to 13:00 is not listed. A simple, repetitive station can take half a day. A station with several variants or a machine cycle may need two.
One station, one day
Seven blocks from 07:30 to 16:00 with lunch from 12:00 to 13:00: 07:30 Brief the operator and supervisor, 30 minutes; 08:00 Film ten cycles from two angles, 45 minutes; 08:45 Measure heights, reaches, weights, 45 minutes; 09:30 Score the four lenses from the video, 150 minutes; 13:00 Agree findings, rank actions, 60 minutes; 14:00 Do the same-day fixes, 90 minutes; 15:30 Owners, dates, re-score date, 30 minutes.
Worked example: a pack-out station
Station 6 on a pump line does final assembly and pack-out of a 7.5 kg transfer pump, 40 an hour. Ten cycles were filmed. The first score was 26 points out of 48, which is 54%, red.
| Lens | Before (points of 12) | Before | After (points of 12) | After |
|---|---|---|---|---|
| Ergonomics | 5 | 42% Red | 11 | 92% Green |
| Safety | 10 | 83% Amber | 11 | 92% Green |
| 5S and flow | 7 | 58% Red | 10 | 83% Amber |
| Material presentation | 4 | 33% Red | 10 | 83% Amber |
| Station | 26 of 48 | 54% Red | 42 of 48 | 88% Green |
The station total hid the spread: safety was at 83% while material presentation was at 33%. Scored from the form's example in the download.
Pack-out station: four lens scores, before and after
Example numbersErgonomics
5 of 12
11 of 12
Safety
10 of 12
11 of 12
5S and flow
7 of 12
10 of 12
Material presentation
4 of 12
10 of 12
Station
26 of 48
42 of 48
Bars for each lens before and after. Station total went from 26 of 48 points (54 percent, red) to 42 of 48 (88 percent, green). The cycle fell from 82 to 71 seconds.
Behind the red scores were a handful of plain facts. Pumps were packed into cartons on a floor pallet, so the hands worked between 15 and 60 cm and the 7.5 kg pump was lifted by hand 40 times an hour. The bench top was at 86 cm, 19 cm below the operator's 105 cm elbow height, for light assembly. Flat cartons were stacked at 150 cm, behind and to the left. The screw bin was 30 cm deep at a 55 cm reach. The label printer was 4 m away, and labels were searched for in 3 of 10 cycles. Two old fixtures sat under the bench and the extinguisher was half hidden by empty pallets.
| No. | Action | Type | Due |
|---|---|---|---|
| 1 | Pallet lift table with turntable, top layer held at 75 to 95 cm | Purchase | Day 21 |
| 2 | Raise the bench to 97 cm on adjustable legs | Maintenance or toolroom | Day 7 |
| 3 | Gravity lane for flat cartons at 110 cm, in front and to the side | Maintenance or toolroom | Day 10 |
| 4 | Small two-bin screw supply at 35 cm reach, loaded from the back | Same day | Day 0 |
| 5 | Move the label printer onto the bench shelf | Same day | Day 0 |
| 6 | Remove old fixtures, mark tool homes and part addresses, fit a knife holder | Same day | Day 0 |
| 7 | Reissue the work instruction after the layout change | Engineering change | Day 25 |
| 8 | Water spider stop for cartons and empties, marked pallet position | Engineering change | Day 30 |
After the actions the station scored 42 of 48, 88%, green. Filmed again, the cycle fell from 82 to 71 seconds, 13% shorter, because the walk to the printer and the searches were gone. The ergonomics gain came with the speed gain, which is the usual pattern and the best argument for doing both reviews at once. One amber item remained on purpose: the work instruction lagged the layout change until day 25.
The heavy lift deserves its own number. The pump's weight and frequency would be checked with the NIOSH lifting equation before and after the lift table, not only scored on this form.
Why video does most of the work
Standing with a clipboard, you see the station once and the operator knows you are watching. From ten filmed cycles you see the awkward reach that happens in cycle seven, the search that costs four seconds in three cycles of ten, and the part that arrives upside down every time. You can replay a lift, pause on a posture and let the operator confirm what you saw.
The same footage feeds a time study and a posture score. The guide to doing a time study and an ergonomic study in one pass shows how, and ergonomic assessment in manufacturing shows which scoring method fits which job. A screening form tells you where to look. RULA, REBA or the NIOSH equation tell you how bad it is.
Handling the people side
- Say first that the station is being assessed, not the operator. Say it again at the end.
- Have the operator in the room when you score. Several of the best fixes in the example came from what the operator said before the camera was out.
- Ask before filming and film only the work. Check your site's rules on video, and on keeping footage, before you start.
- Do the same-day fixes the same day. An assessment with no visible result teaches people to hide problems next time.
- Report back in the huddle, with the before and after scores and the name of the fix, not of the person.
What this form does not do
- It screens and ranks. It is not a legal risk assessment and it does not replace RULA, REBA, the NIOSH equation, a machine safety review or a display screen equipment assessment where those apply.
- It scores what you filmed. A job that changes by shift or variant needs the worst variant filmed as well as the usual one.
- Percentages invite arguing about the number. Use the items scored 0 and 1 as the real output.
- Six checks a lens will miss site-specific hazards such as noise, heat, chemicals and vibration. Add a check for any you know about.
- It does not say who may do an assessment. Requirements and certifications differ by country and employer, so check your own rules. This page is general guidance, not legal or medical advice.
Tools and templates
The workstation assessment form holds the 24 checks, the measurements sheet, the action list and the example in this guide, in Excel and as a printable PDF. The golden zone height check sheet goes deeper on the ergonomics and material presentation heights. For 5S on its own, use the 5S audit checklist.
LeanSuite's Ergonomic Study maps 18 body joints from video and scores REBA and RULA automatically, which covers the posture part of the first lens. The Time and Motion Study takes the same video and returns element times and cycle time. Neither fills in this form: the checks on safety, 5S and material presentation are still scored by people at the station.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Ergonomic Practices for Manufacturing TeamsThe everyday habits that keep a station comfortable after the assessment.
- Top Five Common Manufacturing HazardsThe hazards the safety lens is looking for.
- 7 Preventable Shop Floor Incidents Most Plants MissThe incidents a station review is meant to catch earlier.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- 5S audit checklist template25 checks, five per S, scored 1 to 5, with a score summary and a chart of the five S's.
- REBA worksheet (Rapid Entire Body Assessment)Score up to six postures with REBA: body-part drop-downs, Tables A, B and C as lookups, final score and action level, and a before and after comparison.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
Doing this in LeanSuite
Ergonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic StudyTime and Motion Study
Film a station on a phone and get element times, cycle time, standard time and a Yamazumi chart.
See Time and Motion StudyAI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about workstation assessment
An ergonomic assessment looks at how a job fits the person doing it: postures, force, repetition, reach, heights, tools and the pace of work. It ends in findings and fixes. In a plant it can be a quick screening of a station, a scored posture method such as RULA or REBA, or a lifting calculation. A workstation assessment usually starts with the screen and goes deeper where it finds a problem.
OSHA's ergonomics guidance names awkward postures, forceful exertions, repetition, static or sustained postures, contact stress, vibration and cold. Risk comes from the combination, how often it happens and for how long, not from any one alone. A workstation assessment looks for these in the filmed work, and measures the weights, heights and reaches behind them.
Anyone whose job is repetitive, forceful, awkward or sustained is worth assessing, and so is anyone returning to work after an injury, a new starter on a demanding station, or a station that has just changed. In the UK, employers must assess the workstations of regular display screen users. In a plant the usual trigger is a complaint, an incident, a layout change or a new product.
There is no single rule that applies everywhere. Professional certifications exist, such as the Certified Professional Ergonomist from the BCPE, and a complex or disputed case may call for one. Many plants have trained engineers and safety staff run screening assessments like this one and bring in a specialist for harder jobs. Check what your employer, insurer and local law require.
One simple station takes about a day with this method: a half-hour briefing, 45 minutes to film ten cycles, 45 minutes to measure, about two and a half hours to score from the video, an hour to agree the actions and an afternoon for the same-day fixes. Several variants, a long machine cycle or a station with heavy lifting can take two days.
On a plant floor it should also cover safety (guards, floor, light, PPE), 5S and flow (what is at the station, where tools live, whether the operator leaves it mid-cycle) and material presentation (where parts arrive and how). Those faults slow the job and add risk, and they are often the cheapest to fix. Posture scoring alone would miss them.
Related guides and tools
- Workstation assessment form: 24 scored checks, measurements and actions in Excel and PDF
- Golden zone: the heights where lifting and reaching cost least
- Reach envelope: the normal and maximum working areas on a bench
- Line-side material presentation: containers, flow racks and replenishment
- Standing, seated and sit-stand work: bench height and mats
- Ergonomic assessment in manufacturing: which method for which job
- Workstation design: laying out a station from scratch
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.