Practical guide · Safety management
The golden zone in ergonomics: heights, limits and how to design a rack around it
Short answer
The golden zone is the band of space between knuckle height and shoulder height, close to the front of the body. Hands work there with the back upright and the upper arms low, so it is where people lift the most weight and reach most often with the least strain.
OSHA calls it the power zone and puts it at about mid-thigh to mid-chest. For a mixed workforce in work shoes, the band that sits inside everybody's knuckle to shoulder range runs from about 85 to 125 cm (33 to 49 in) above the floor, and the best lifting height is near 75 to 100 cm. Put the heavy and the frequent parts in that band, within forearm reach, and keep the floor level and the top shelf for light, rare items. The exact numbers depend on who works the station and what they handle, so measure your own people.
Last reviewed:
What is the golden zone?
Where the golden zone sits for a mixed crew
S: shortest regular operator, knuckle to shoulder. T: tallest regular operator. Bands use the Bodyspace 5th percentile woman and 95th percentile man, in work shoes.
A height scale from the floor to 180 centimeters. The shortest operator's knuckle to shoulder range runs from 70 to 125 centimeters and the tallest operator's from 85 to 155. They overlap from 85 to 125 centimeters, the green band. Amber is 70 to 85 and 125 to 155. Red is below 70 or above 155.
Stand upright with your arms hanging. Your knuckles mark the bottom of the golden zone and your shoulders mark the top. Anything you can take with both hands inside that band, with your elbows still near your sides, is in the zone. Below it you bend or squat. Above it your upper arms lift and your shoulders carry the load. Further out, the same weight pulls on your back with a longer lever.
The idea goes by several names. OSHA's materials handling guidance calls it the power zone. Warehouse people call it the golden zone and use it to decide which shelf a product goes on. Lean plants running World Class Manufacturing talk about the strike zone, the small area where the operator's hands meet the part, and rate every part's presentation against it. The body does not care which name is on the slide. All three describe the same band.
It matters for two reasons that usually arrive together. A lift or reach inside the zone loads the back and shoulders least, which is the ergonomics case. It is also the shortest, fastest motion, which is the time study case. A part moved from the floor to waist height saves a bend on every cycle, and the bend was both the risk and the wasted seconds.
What OSHA, NIOSH and the HSE say about height
No regulation defines a golden zone, and the three bodies people quote draw the band a little differently. They agree on the shape: best in the middle, worse toward the floor and above the shoulders, and worse again as the load moves away from the body.
| Source | What it says | Best height | What it is for |
|---|---|---|---|
| OSHA (United States), materials handling eTools | Place materials that are lifted by hand at power zone height, about mid-thigh to mid-chest. Keep lifts between mid-thigh and shoulder height. | Mid-thigh to mid-chest | Guidance, not a standard. OSHA has no rule that sets a lifting height or a weight limit. |
| NIOSH, revised lifting equation (1991, manual 1994) | The vertical multiplier is 1.00 with the hands 75 cm (30 in) above the floor and falls by 0.003 for each centimeter above or below. It is 0.78 at floor level and 0.70 at 175 cm, the highest lift the equation covers. | 75 cm (30 in), about knuckle height | Calculating a recommended weight limit for one two-handed lift. |
| HSE (United Kingdom), manual handling risk filter, INDG143 | Close to the body, the filter weight is 25 kg for men and 16 kg for women between knuckle and elbow height, 20 and 13 kg in the bands either side, and 10 and 7 kg above the shoulders or near the floor. | Knuckle to elbow height | Screening out low-risk lifts. The HSE says these are not safe limits and not legal limits. |
The HSE filter assumes a load that is easy to grip with both hands, a stable posture and no more than about one lift every two minutes. Above that rate, or with twisting, it asks for a fuller assessment.
Read together, the three give a zone with a sweet spot. Knuckle to elbow height is where the heaviest loads belong. Elbow to shoulder height is still inside the zone and is fine for lighter parts and for anything the eyes need to see. That is why a rack built around the golden zone puts the heavy parts on the lower of its good levels, not the upper.
Distance from the body counts as much as height
The zone has depth as well as height. In the NIOSH equation the horizontal multiplier is 25 divided by the distance, in centimeters, from the point between the ankles to the hands. At 25 cm it is 1.00. At 50 cm it is 0.50, so the recommended weight halves. Past 63 cm the equation gives no weight at all. The HSE filter says the same thing in kilograms: 25 kg close to the body becomes 15 kg at arm's length for men, and 16 kg becomes 10 kg for women.
A shelf at a perfect height with the part 60 cm back from its front edge is outside the zone. This is the usual way a good-looking rack fails: the heights were designed, the depth was not. The NIOSH lifting equation guide works through all six multipliers, and the reach envelope guide covers the horizontal reach zones on a bench.
Height matters a little, distance matters a lot
Two curves from the revised NIOSH lifting equation. The vertical multiplier is 1.00 with the hands at 75 centimeters and falls only to 0.78 at the floor and 0.70 at 175 centimeters. The horizontal multiplier is 25 divided by the distance from the body, 1.00 at 25 centimeters, 0.50 at 50 and zero past 63.
Where the golden zone sits, in centimeters and inches
Knuckle and shoulder height differ a lot between people. The table below is from Pheasant and Haslegrave's Bodyspace, the standard British anthropometry text, for adults aged 19 to 65 standing without shoes. Use it to see the spread. Your own workforce may be taller, shorter or less varied.
| Landmark | Women, 5th percentile | Women, 50th | Women, 95th | Men, 5th | Men, 50th | Men, 95th |
|---|---|---|---|---|---|---|
| Shoulder height | 1,215 | 1,310 | 1,405 | 1,315 | 1,425 | 1,535 |
| Elbow height | 930 | 1,005 | 1,085 | 1,005 | 1,090 | 1,180 |
| Knuckle height | 660 | 720 | 780 | 690 | 755 | 825 |
Source: Pheasant and Haslegrave, Bodyspace, 3rd edition. The 5th percentile is the value 5% of people fall below. Add about 25 mm for flat work shoes.
One person's golden zone is easy: a woman of median height in work shoes has hers from about 75 to 134 cm. A station is used by more than one person, so the useful number is the band that sits inside everybody's zone. Its bottom is the knuckle height of the tallest person, because anything lower makes them stoop. Its top is the shoulder height of the shortest person, because anything higher lifts their arms above the shoulder.
With the Bodyspace extremes and 25 mm of shoe, that shared band runs from 85 cm to about 125 cm, which is 33 to 49 in. It is only 40 cm tall. A typical four-level flow rack spans 130 cm or more, so at most two of its levels can be in the band at once. That single fact drives every design rule further down.
Green, amber, red: rating any pick point
To audit a station you need a rule simple enough to apply with a tape measure. The one we use on the golden zone height check sheet has three bands, set by four measurements of the people who work there. It is a layout convention built from the reasoning above, not a published standard, and it rates height only.
| Band | Rule | Default, in work shoes | Use it for |
|---|---|---|---|
| Green | From the tallest operator's knuckles to the shortest operator's shoulders | 85 to 125 cm (33 to 49 in) | The heavy and the frequent parts. Heaviest on the lower green level. |
| Amber | Inside somebody's knuckle to shoulder range, but not everybody's | 70 to 85 cm and 125 to 155 cm (27.5 to 33 in and 49 to 61 in) | Light or occasional picks. Somebody bends a little or reaches up. |
| Red | Below the shortest operator's knuckles or above the tallest operator's shoulders | Below 70 cm or above 155 cm | Nothing heavy, nothing frequent. Empties, spare stock, rarely used items. |
Defaults use the Bodyspace 5th percentile woman and 95th percentile man plus 25 mm, rounded to 5 cm. Replace them with your own measurements.
Measure hand height, not shelf height. The number that matters is where the hands are at the moment they take the load. A deep tote on a shelf at 80 cm can put the hands at 60 cm when it is nearly empty, and a tall part standing on the same shelf can put them at 110 cm.
If one tall and one short person share the station, the green band shrinks. If the difference is large enough it disappears, and that is the signal for height adjustment: a lift table, an adjustable bench or a platform, covered in the guide to standing, seated and sit-stand workstations.
Designing racks, bins and line-side supply around the zone
- Rank parts by load, not by size. Multiply each part's weight by its picks an hour. The parts at the top of that list get the green levels first. Then place the most frequent light parts, because a hundred small reaches above the shoulder add up too.
- Heavy low, light high, inside the green band. Knuckle to elbow height takes the heaviest loads. Elbow to shoulder height takes lighter parts and anything read or inspected.
- Shrink the container before you add a level. Two green levels hold far more part numbers when the totes are narrow and hold an hour or two of parts in place of a shift. Smaller containers also keep the hands from diving into a deep box.
- Bring the part to the front edge. Use gravity flow lanes, angled shelves and tilted totes so the next part presents itself within 40 cm of the operator's body.
- Do not store on the floor at a workstation. A pallet on the floor puts its bottom layer at ankle height. A pallet lift table or a stand holds the working layer in the green band as the stack goes down.
- Use the amber and red levels on purpose. The top level suits light bulk items picked a few times an hour. The bottom level suits empty containers on their way back.
- Load from the back. If the material handler fills lanes from behind the rack, the front can stay close to the operator and nobody has to step aside for a delivery.
- Leave room for the hands. A level that is in the zone but has 8 cm of clearance above the tote forces a bent wrist and a slow pick. Check that a gloved hand and the part come out together.
These rules cover storage and supply. For where the parts should sit around the point of assembly, see line-side material presentation, and for the bench itself see workstation design.
How to run a golden zone check
A check on one rack takes under an hour with a tape measure, a scale and the operator. Do it with the operator, not around them: they know which pick hurts by the end of the shift.
- 1
Measure your people
Take knuckle height and shoulder height, in work shoes, of the tallest and the shortest person who regularly works the station. Those four numbers set your green, amber and red bands.
- 2
List every hand pick and place
Parts, tools, containers, finished goods, empties. For each, write the weight and how many times an hour it is handled. Count from a ten-minute video if nobody knows.
- 3
Measure hand height at each pick
Floor to the hands at the moment they take the load. For a pallet or a deep tote, record the lowest and the highest and use the worse one.
- 4
Rate each line and work out the load
Green, amber or red from the bands. Load is weight times picks an hour. Add up the picks and the kilograms that fall in each band.
- 5
Move the biggest loads first
Sort by load. Give the green levels to the top of the list, then to the most frequent light picks. Change container size, level pitch and shelf angle before you buy anything.
- 6
Measure again and write it down
Repeat the measurements after the change and keep both sheets with the station's standard work. Any lift that is still heavy or frequent gets a proper assessment with the NIOSH equation or REBA.
Worked example: a line-side flow rack, before and after
A gearbox sub-assembly station builds 30 units an hour from eight parts on a four-level flow rack. The check used the default bands: green 85 to 125 cm, amber 70 to 85 and 125 to 155 cm, red outside those.
| Part | Weight (kg) | Picks an hour | Hand height (cm) | Band | Load (kg an hour) |
|---|---|---|---|---|---|
| Housing | 9.0 | 30 | 20 | Red | 270.0 |
| Gear set | 3.2 | 30 | 60 | Red | 96.0 |
| Cover | 2.4 | 30 | 145 | Amber | 72.0 |
| Bracket | 1.1 | 30 | 60 | Red | 33.0 |
| Bearing | 0.4 | 60 | 100 | Green | 24.0 |
| Gasket | 0.1 | 30 | 145 | Amber | 3.0 |
| Seal | 0.05 | 60 | 100 | Green | 3.0 |
| Bolts (handful) | 0.02 | 30 | 145 | Amber | 0.6 |
Totals: 300 picks and 501.6 kg an hour. Green holds 120 picks (40%) but only 27.0 kg (5%). Red holds 399.0 kg (80%).
The rack looks reasonable if you count picks: 40% are in the zone. Count kilograms and it is upside down. The one good level was given to the two lightest parts, because bearings and seals come in small boxes that fit there, and the 9 kg housing went to the bottom because its container was the biggest. That is the usual history of a rack: parts were placed by container size on the day it was installed.
The team made four changes. They re-pitched the levels to 65, 95, 118 and 150 cm so that two of them sit in the green band. They swapped the housing container for a gravity roller lane at 95 cm that presents one housing at a time. They halved the tote width for covers, brackets and bearings so all three share the 118 cm level. And they moved the bolts to a small bin on the bench at 105 cm. The 65 cm level now takes empty containers going back.
| Part | Weight (kg) | Picks an hour | Hand height (cm) | Band | Load (kg an hour) |
|---|---|---|---|---|---|
| Housing | 9.0 | 30 | 95 | Green | 270.0 |
| Gear set | 3.2 | 30 | 95 | Green | 96.0 |
| Cover | 2.4 | 30 | 118 | Green | 72.0 |
| Bracket | 1.1 | 30 | 118 | Green | 33.0 |
| Bearing | 0.4 | 60 | 118 | Green | 24.0 |
| Gasket | 0.1 | 30 | 150 | Amber | 3.0 |
| Seal | 0.05 | 60 | 150 | Amber | 3.0 |
| Bolts (handful) | 0.02 | 30 | 105 | Green | 0.6 |
Totals: 300 picks and 501.6 kg an hour. Green holds 210 picks (70%) and 495.6 kg (99%). Nothing is in red.
One flow rack, parts by hand height, before and after
Example numbersAs found
In green: 120 of 300 picks (40%), 27.0 of 501.6 kg an hour (5%).
After the change
In green: 210 of 300 picks (70%), 495.6 of 501.6 kg an hour (99%).
Heights are where the hands are at the pick, in cm. Part boxes take the color of their band. Bands as on the check sheet: Green 85 to 125, Amber 70 to 85 and 125 to 155, Red outside.
A four-level flow rack drawn against the green, amber and red height bands. Before, 120 of 300 picks and 27.0 of 501.6 kilograms an hour were in the green band. After, 210 picks and 495.6 kilograms were in green and nothing was in red.
Seals and gaskets went up to 150 cm on purpose. They weigh almost nothing, and something had to give up the good levels. Amber is the right place for them.
Checking the heavy lift with the NIOSH equation
The band rating is a screen. The housing is heavy enough to deserve a number. Before the change it was lifted from 20 cm to a fixture at 95 cm, hands 45 cm out, once every two minutes over a full shift, with a fair grip. The recommended weight limit works out at 7.2 kg, so the 9 kg housing has a lifting index of 1.25, above the 1.0 that NIOSH treats as the point where risk starts to rise. After the change it slides off the roller lane at 95 cm, hands 35 cm out, with no vertical travel. The limit rises to 12.5 kg and the index falls to 0.72. You can repeat the sum in the NIOSH lifting equation calculator.
The golden zone in warehouse picking
In a warehouse the same band decides slotting: which product goes at which height in a pick face. Petersen, Siu and Heiser, who studied it in 2005, define golden zone storage as putting the highest-demand items between the picker's waist and shoulders. In their simulation of a bin-shelving pick area, slotting by the golden zone cut order fulfillment time compared with policies that ignored height, even when it added some walking.
Two cautions before you re-slot a building on that basis. The result came from a simulation, and later field studies of real picking have not always found the same time saving. And in a warehouse the fastest movers are not always the heaviest. Slot by picks alone and you can end up with fast, light items in the zone and slow, heavy cases at ankle height, which is the worst outcome for backs. Use both numbers, as the check sheet does: picks an hour to find the frequent items, weight times picks to find the load.
What the golden zone does not tell you
- It is not a weight limit. A 30 kg part at perfect height is still a 30 kg part. Heavy loads need a lifting aid or a second method, wherever they sit.
- It ignores repetition, grip, twisting and duration. A light part picked 600 times an hour from inside the zone can still injure a wrist. Those need RULA, REBA or a strain assessment.
- It is drawn for standing, two-handed work in front of the body. Seated work, one-handed lifts and work done to the side have smaller envelopes.
- The numbers move with the people. Bands built from one country's survey, or from last year's crew, can be wrong for the person on the station today.
- It can clash with other goals. The zone is small, and quality checks, tooling and displays want the same space. Decide by load and frequency, and accept that something light goes to amber.
Treat the zone as the first screen in a longer chain. The guide to ergonomic assessment in manufacturing shows which scoring method fits which job, and the RULA and REBA guides cover posture scoring. This page is general guidance, not a legal or medical opinion.
Tools and templates
The golden zone height check sheet is the form used in the example: enter your four body measurements, list the parts, and it bands each pick and totals picks and kilograms by band, in Excel and as a printable PDF. The workstation assessment form puts the same check inside a wider review of ergonomics, safety, 5S and material presentation, described in the workstation assessment guide.
Height on a tape measure does not show how the body gets there. LeanSuite's Ergonomic Study maps 18 body joints from ordinary video and scores REBA and RULA on every frame, so the bends and the reaches above the shoulder that a red or amber pick causes show up as the worst frames. It does not measure rack heights for you. The tape is still part of the job.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Ergonomic Practices for Manufacturing TeamsThe everyday ergonomic habits that sit around a well laid out station.
- Top Five Common Manufacturing HazardsWhere ergonomic hazards rank next to electrical, chemical, machine and slip hazards.
- 7 Preventable Shop Floor Incidents Most Plants MissSlow-building strain injuries and the other incidents that reporting tends to miss.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- REBA worksheet (Rapid Entire Body Assessment)Score up to six postures with REBA: body-part drop-downs, Tables A, B and C as lookups, final score and action level, and a before and after comparison.
- Plan for every part (PFEP) templateOne row per part: supplier, pack, container, usage, lead time and locations, with ABC classes, market and line kanban counts and a lineside space check.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
Doing this in LeanSuite
Ergonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic StudyTime and Motion Study
Film a station on a phone and get element times, cycle time, standard time and a Yamazumi chart.
See Time and Motion StudyAI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about golden zone (power zone)
The power zone is the space close to the front of your body between about mid-thigh and mid-chest height. That is how OSHA's materials handling guidance describes it. Lifting there keeps the back upright and the upper arms low, so the arms and back can handle the most weight with the least effort. It is the same band that warehouses and lean plants call the golden zone or strike zone.
For one person it runs from knuckle height to shoulder height. For a station shared by a mixed workforce in work shoes, the band inside everybody's range is about 85 to 125 cm, or 33 to 49 in, above the floor. The heaviest loads belong in the lower half of it, between knuckle and elbow height. These figures come from a British anthropometric survey, so measure your own operators before you fix shelf heights.
Between knuckle and shoulder height and close to the body, with the best lifting height near knuckle to elbow level. The NIOSH lifting equation gives its highest weight at 75 cm (30 in) with the hands 25 cm from the body, and the UK HSE filter allows the most weight between knuckle and elbow height. No height makes a lift safe by itself: weight, frequency, twisting and grip still count.
In general, yes, but it needs assessing. The 25 kg figure is the UK HSE filter weight for men lifting close to the body between knuckle and elbow height, and the HSE says it is not a legal or safe limit. OSHA sets no weight limit in the United States. The NIOSH equation starts from 23 kg under ideal conditions and reduces it for height, reach, twisting and frequency. Check your own rules and local law.
It is the range of shelf heights between a picker's waist and shoulders, where items can be picked without bending or reaching up. Golden zone slotting puts the highest-demand products at those heights. A 2005 simulation study found it shortened order fulfillment time. For injury prevention, rank items by weight times picks as well as by picks, so heavy cases are not left near the floor.
They describe the same band of comfortable reach. Strike zone is the term used in World Class Manufacturing plants, and it often means the small area where the operator's hands meet the part at the point of use. Golden zone is more common for storage and picking heights, and power zone is OSHA's term for lifting. The design rule is the same under each name.
Related guides and tools
- Golden zone height check sheet: band every pick green, amber or red in Excel or on paper
- Workstation assessment: ergonomics, safety, 5S and material presentation in one day
- Reach envelope: the normal and maximum working areas on a bench
- Line-side material presentation: containers, flow racks and replenishment
- NIOSH lifting equation: the recommended weight limit for one lift
- Ergonomic assessment in manufacturing: which method for which job
- NIOSH lifting equation calculator
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.