Free tool
TMU to seconds converter
A TMU, time measurement unit, is the unit that MTM, MOST and most other predetermined time systems count in. 1 TMU = 0.00001 hour = 0.0006 minute = 0.036 second, so an hour is 100,000 TMU and a second is 27.8. To convert TMU to seconds, multiply by 0.036: a 380 TMU cycle is 13.68 seconds, or 0.228 minutes. MODAPTS counts in MODs of 0.129 second.
TMU to seconds formula
SecondsequalsTMU × 0.036
MinutesequalsTMU × 0.0006
HoursequalsTMU divided by 100,000
TMUequalsseconds divided by 0.036
SecondsequalsMODs × 0.129
Standard timeequalsnormal time × (1 + allowance)
The total for one cycle, or for one element
Added to normal time, to get a standard time and units per hour. Leave blank to skip.
Pre-filled with the worked example below: a 380 TMU cycle with a 15% allowance. Motion times from a predetermined system are normal times: they hold no allowance until you add one.
380 TMU is
13.68 s
380 × 0.036 = 13.68 seconds.
In minutes
0.228 min
1 min = 1,666.7 TMU
In hours
0.0038 h
1 h = 100,000 TMU
In MODs
106.05 MODs
1 MOD = 0.129 s, normal time (MODAPTS)
Cycles per hour
263.2
3,600 ÷ seconds, before any allowance
The working
380 TMU × 0.036 s = 13.68 s.
13.68 s ÷ 60 = 0.228 min.
13.68 s ÷ 3,600 = 0.0038 h.
13.68 s ÷ 0.129 = 106.05 MODs.
Standard time
0.2622 min
13.68 s × (1 + 0.15) = 15.732 s
Units per hour at standard
228.8
3,600 ÷ 15.732 s, one operator
Next step
Want to track this every week?
Bring this result to a 45-minute demo and we will show where it fits in LeanSuite's Time and Motion Study.
How to use it
Convert a motion analysis into time you can plan with
1. Enter the total. Add the TMU or MOD values of the motions first, each multiplied by how often it happens per piece. Then type the total for the element or the cycle.
2. Pick the unit it is in. The converter shows the same time in the other four. It works from seconds, minutes or hours back to TMU too.
3. Add your allowance if you want a standard. Enter it as a percentage added to normal time. Leave it blank to convert only. If you need to build the figure, use the allowance calculator.
4. Add machine time separately. A drill's run time or an oven's cure time is not in any motion table. Take it from the equipment and add it to the cycle after converting.
TMU conversion example
Illustrative numbers, not a benchmarkA motion analysis of fastening a bracket with two screws adds up to 380 TMU for one cycle. The site adds a 15% allowance to normal time. Illustrative numbers.
Step 1
Seconds = 380 × 0.036 = 13.68 s.Step 2
Minutes = 380 × 0.0006 = 0.228 min. Hours = 380 ÷ 100,000 = 0.0038 h.Step 3
In MODs, the same time is 13.68 ÷ 0.129 = 106.05.Step 4
Standard time = 13.68 × (1 + 0.15) = 15.732 s = 0.2622 min.Step 5
Units per hour = 3,600 ÷ 15.732 = 228.8.
TMU conversion table
| TMU | Seconds | Minutes |
|---|---|---|
| 1 | 0.036 | 0.0006 |
| 10 | 0.36 | 0.006 |
| 27.8 | 1 | 0.0167 |
| 100 | 3.6 | 0.06 |
| 500 | 18 | 0.3 |
| 1,000 | 36 | 0.6 |
| 1,666.7 | 60 | 1 |
| 5,000 | 180 | 3 |
| 100,000 | 3,600 | 60 |
27.8 and 1,666.7 are rounded: a second is 27.78 TMU and a minute is 1,666.67.
Why the unit is so small
A reach or a grasp takes a fraction of a second. Counting in hundred-thousandths of an hour lets a data card give each motion as a whole number or one decimal, and it makes the last step easy: hours are TMU with the decimal point moved five places.
- MTM and MOST count in TMU. BasicMOST index values are multiplied by 10 to get TMU.
- MODAPTS counts in MODs of 0.129 second, about 3.58 TMU. A movement is a whole number of MODs, sized by the body part that moves.
The guide to predetermined motion time systems compares the systems and works a job from motions to a standard.
What a TMU total leaves out
- Allowances. The tables give normal time. Personal needs, fatigue and unavoidable delays are added afterward.
- Machine and process time. Tool run time, cure time and travel of an automatic slide come from the equipment.
- Learning. The times assume a trained operator. A new line takes weeks to reach them.
- The method on the floor. The total is only as good as the motion list. If the operator works a different method, time that method.
Sources and how this converter was checked
- Harold B. Maynard, G. J. Stegemerten and John L. Schwab, Methods-Time Measurement (McGraw-Hill, 1948): the TMU as 0.00001 hour.
- Kjell B. Zandin, MOST Work Measurement Systems (Marcel Dekker): index values converted to TMU.
- G. C. Heyde, MODAPTS (1966), and the International MODAPTS Association: 1 MOD = 0.129 second, normal time.
Every unit converts through seconds with the same constants, so a conversion and its reverse agree. Unit tests check the constants, the 380 TMU example and a round trip between every pair of units.
Embed this calculator
Teaching this, or writing about it? Paste this code into your site, course page or intranet and the calculator works right there. It is free, with no sign-up.
<iframe src="https://www.theleansuite.com/tools/tmu-to-seconds-converter/embed" title="TMU to seconds converter by LeanSuite" width="100%" height="1500" style="border:0;max-width:1000px" loading="lazy" allow="clipboard-write"></iframe>
<p style="font:13px/1.4 sans-serif"><a href="https://www.theleansuite.com/tools/tmu-to-seconds-converter">TMU to seconds converter</a> by LeanSuite</p>How LeanSuite helps
LeanSuite's AI time and motion study times every element from one phone video of the process, and its study report gives cycle time, standard time, takt and units per hour, each linked to the video it came from. Use this converter when a time arrives in TMU or MODs from a motion analysis and you need it in seconds or minutes.
See Time and Motion StudyRead more
- Free template: Time study sheet
- Predetermined motion time systems: MTM, MOST and MODAPTS compared
- Allowance calculator: build the personal, fatigue and delay allowance
- Standard time calculator: from observed times to a standard
- Time study in the lean glossary
- Standard time: how normal time and allowances make a standard
FAQ
TMU to seconds converter: common questions
1 TMU is 0.036 seconds. A TMU, time measurement unit, is defined as 0.00001 hour, which is 0.0006 minute or 0.036 second. Going the other way, one second is 27.8 TMU, one minute is 1,666.7 TMU and one hour is exactly 100,000 TMU. MTM, MOST and most other predetermined time systems give their motion times in TMU.
Multiply TMU by 0.036 to get seconds and by 0.0006 to get minutes. Divide by 100,000 to get hours. A cycle of 380 TMU is 380 × 0.036 = 13.68 seconds, or 380 × 0.0006 = 0.228 minutes. To go from seconds back to TMU, divide by 0.036: a 45 second cycle is 1,250 TMU.
The same unit as in MTM: 0.00001 hour, or 0.036 second. In BasicMOST you add the index values of a sequence model and multiply by 10 to get TMU, so a sequence whose indexes add to 12 is 120 TMU, or 4.32 seconds. MiniMOST multiplies the index total by 1 and MaxiMOST by 100. The result is a normal time, with no allowance in it.
A MOD is the time unit of MODAPTS, the predetermined time system G. C. Heyde published in Australia in 1966. One MOD is 0.129 second, the time the system gives a single finger move, and every other movement is a whole number of MODs. One MOD is about 3.58 TMU, and there are about 7.75 MODs in a second.
No. Motion times from MTM, MOST or MODAPTS are normal times: the time a trained operator takes at normal pace with no breaks and no interruptions. To get a standard time, add your allowance for personal needs, fatigue and unavoidable delays. 380 TMU is 0.228 minutes; with a 15% allowance added, the standard is 0.2622 minutes, about 229 units an hour.
Convert to seconds, add the allowance, then divide 3,600 by the result. For 380 TMU: 380 × 0.036 = 13.68 seconds of normal time. With a 15% allowance that is 15.732 seconds, and 3,600 ÷ 15.732 = 228.8 units an hour for one operator. Without an allowance the figure would be 263.2, which no one can hold for a shift.
More free lean tools
All tools- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Downtime cost calculatorWhat an hour, an event and a year of unplanned downtime cost, from lost output, idle labour, scrap and overtime.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
- First pass yield (FPY) calculatorFirst pass yield at each step and rolled throughput yield (RTY) across the whole process.
- Cost of poor quality (COPQ) calculatorTotal COPQ and cost of quality, and each as a share of revenue, from the four quality cost categories.
- Process capability (Cp, Cpk) calculatorCp and Cpk against your specification limits, plus Pp and Ppk from pasted measurements, with a distribution chart.
- DPMO and sigma level calculatorDPMO, defects per unit, yield and sigma level from the defects found, units checked and opportunities per unit.
- MTBF and MTTR calculatorMean time between failures, mean time to repair and availability from operating time, failures and repair time.
- Lead time calculatorManufacturing lead time from WIP and throughput (Little's Law), and the share of it that adds value.
- Throughput time calculatorThroughput time from process, inspection, move and wait time, the share of it that adds value, and units per hour.
- Kaizen savings calculatorYearly savings, payback in months and first-year ROI of an improvement, from time saved, scrap avoided and its costs.
- TEEP calculatorTotal effective equipment performance: OEE multiplied by how much of all calendar time you plan to run.
- Overall labor effectiveness (OLE) calculatorHow well paid labor hours turn into good output: availability, performance and quality of the crew.
- Inventory turnover and days on hand calculatorHow many times stock turns over in a period and how many days of it you hold, from COGS and average inventory.
- Safety stock calculatorSafety stock and reorder point from the service level you want, average demand and lead time, and how much each varies.
- Scrap rate calculatorScrap rate, the cost of scrap per period and per year, and what reaching a target rate would save.
- TRIR and DART rate calculatorOSHA recordable and DART incident rates from your 300A case counts and hours, and what one more case does to them.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
- Production capacity calculatorMachine and labor steps in; each step's capacity per shift, the bottleneck, line capacity, takt time and utilization against demand out, with the working.
- Work sampling observations calculatorThe number of random observations a work sampling study needs for the accuracy you want, with the working, the rounds and the days it takes.
- Allowance calculator: personal, fatigue and delayPersonal, fatigue and delay allowances for one job added up, applied under either allowance formula, with the standard time and the minutes per shift.
- Maintenance strategy selectorAnswer the RCM questions for one failure mode and get the maintenance strategy, the reasoning and the check or test interval.
- Noise dose and TWA calculatorDose and 8-hour TWA for a shift of noise levels under OSHA and NIOSH, which limits are reached and how much loud time to cut.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
- Repair or replace calculatorEquivalent annual cost of keeping and repairing an old machine against buying a new one, with each one's economic life and the break-even figures.
- Compressed air leak cost calculatorAir lost, kW and cost a year for each tagged leak from its size and the pressure, ranked so the biggest gets fixed first.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Total manufacturing cost calculatorTotal manufacturing cost, cost of goods manufactured, cost per unit and the overhead rate from materials, labor and overhead.
- Acceptance sampling calculatorRead the OC curve and the real risks of a sampling plan, find the plan for your AQL and LTPD, or size a zero-defect test.
- Shift schedule plannerTen shift patterns on real dates: calendar for each crew, hours a week, weekends off, coverage and the weeks over 40 hours.
- Pareto chart makerPaste categories and counts: sorted bars, cumulative percentage line and the vital few at the 80% line, as a PNG or SVG.
- Histogram makerPaste measurements: the histogram with automatic or chosen bins, plus mean, median and standard deviation, as a PNG or SVG.
- Box plot makerPaste one or more groups of numbers: box plots with quartiles, IQR, whiskers and outliers by the 1.5 IQR rule, as a PNG or SVG.
- Fishbone diagram makerName the problem, list causes under the 6M bones, and download the Ishikawa diagram as a PNG or SVG.
- 5 Whys canvasWrite the problem, answer up to five whys, state the root cause and countermeasure, then print the one-page canvas.
- Lean maturity self-assessmentScore 27 statements across nine dimensions and get a band for each, an overall band, where to start and the guides to read.
- Lean method navigatorSix questions about one problem, then the lean method to start with, the two that follow, why each fits, five steps for Monday and what it will not solve.
- Manufacturing ROI calculatorAnswer a few questions about your shop floor, shifts and downtime to estimate your potential ROI with LeanSuite.