Skip to content
LeanSuite

Practical guide · Lean leadership and employee engagement

Holding supervisors accountable for leader standard work

Short answer

Holding supervisors accountable means checking the same few things every day, at the board and on the floor, and talking about it when they slip. Make sure the routine fits the shift first; then name the gap, ask what got in the way, and agree what changes.

Accountability is a routine, not a speech. Agree with each supervisor what their leader standard work is: the start-of-shift huddle, the board updates, the first-hour walk, the audits, the actions they own. Then check it the same way every day, at the tier 2 meeting and by walking their area, and look at their completed sheet with them each week. When a supervisor skips the routine, check the system before the person: is the routine possible in the time they have, with the meetings, the call-ins and the breakdowns? Then talk in private, with facts: what was missed, what it caused. Ask what got in the way, fix your part, agree what they will do, and look again on a date. Do your own leader standard work in front of them; supervisors do what their manager checks.

Last reviewed:

When it comes up on the floor

It usually shows on the board first. The hour-by-hour count stops being filled in after 10:00. The same red item sits on the board for three weeks. The layered audit for one area is blank. An action due on Friday is still open on Tuesday, and the supervisor says "I'll get to it" again. On the floor, the first-hour walk has quietly stopped, and the huddle on one shift has turned into a reading of the schedule.

David Mann, in Creating a Lean Culture (2005), describes a lean management system with four elements: leader standard work, visual controls, a daily accountability process, and leadership discipline. The last one is the manager's job: checking that the others happen every day. When it stops, supervisors read that the routine is optional.

Check the system before the supervisor

Robert Mager and Peter Pipe (1970) ask whether the person could do it if their life depended on it, and whether doing it is punished or ignored. For a supervisor's routine that turns into a few checks.

Before the conversation: is the routine possible?
CheckSigns it is the system
TimeMeetings you called overlap the first-hour walk; the routine adds up to more than the shift allows
ClarityThe leader standard work is not written, or was written for another area
TrainingNobody showed them how to run the audit or the tier 1 meeting
ConsequencesNobody, including you, has looked at the completed sheet in weeks
LoadCall-ins, breakdowns or a vacancy have them running a station

If it is the system, the first fix is yours. The conversation can still happen; it starts from that.

What to prepare

  • Their leader standard work, and the completed sheets for the last two or three weeks.
  • The facts: dates the walk, the audit or the board update was missed, and the open actions past due.
  • The effect: what the missed check let through, such as a scrap run found at noon, an unsafe condition left open, or the next shift starting blind.
  • Your part: meetings you scheduled over their routine, help you promised and did not give.
  • The one or two things that matter most, so the conversation is not a list of twenty.

How to open the conversation

In private, at the start of their shift or right after your tier 2 meeting, not in front of their crew or the other supervisors. Use the Center for Creative Leadership's Situation-Behavior-Impact frame, then ask.

  • "Your first-hour walk hasn't been signed on six of the last ten shifts. On Tuesday the scrap on the trim press ran until noon before anyone saw it. What's getting in the way?"
  • "Three of your actions from the tier 2 board are two weeks past due. Walk me through where they are."
  • "Your huddle has gone from ten minutes on the board to two minutes on the schedule. I want to understand why."

Questions to ask

  • Which parts of your routine do you get done, and which slip first?
  • What takes the time on the days it slips?
  • Is there anything in your leader standard work that does not help you run the area?
  • What am I doing that gets in the way?
  • What would you drop, change or hand to your team lead?
  • What will you do this week, and how will I know?

What not to say

Lines to avoid with a supervisor
Instead ofSay
"You need to take more ownership.""The walk was missed on these six days. Here is what it let through."
Calling it out at the tier 2 meeting in front of peersAsking the question at the board, and the conversation in private
"Just get it done.""What is getting in the way?"
Adding five new checks after one missAgreeing the one or two that matter most
"I don't care how, just hit the number.""Show me how you're running the area to hit it."

How to follow up

  1. 1

    Fix your part first

    Move the meeting that sits on their first hour, cover the vacancy, or rewrite the routine so it fits the shift. Do it before the next review.

  2. 2

    Check the routine the same way every day

    Ask about the board and the open actions at the tier 2 meeting, and walk their area at least once a week with their leader standard work in your hand.

  3. 3

    Look at the completed sheet together weekly

    Ten minutes: what was done, what slipped, what they learned. John Shook, writing about NUMMI (MIT Sloan Management Review, 2010), argued that you change culture by changing what people do, not first what they think. The weekly look is how you see what they do.

  4. 4

    Say what improved

    Name the specific check that is now happening and what it caught. Supervisors hear about the misses often and the wins rarely.

  5. 5

    Decide the next step

    If it is back on track, keep the weekly look and reduce it later. If it is not, and the system checks are done, treat it as a performance conversation and follow your HR process.

One conversation worked through (Illustrative)

Illustrative: a supervisor who stopped doing the first-hour walk

An illustrative case, not a customer. Karen is the production manager. Dave, first shift supervisor on the molding floor, has not signed the first-hour walk on his leader standard work sheet for six of the last ten shifts. On Tuesday a short-shot run on press 7 went on until a quality tech caught it before lunch.

Karen checks her own side first. Two months ago she moved the daily schedule meeting to 6:30, which sits on Dave's first hour. Opening, after tier 2: "Your first-hour walk hasn't been signed on six of the last ten shifts, and Tuesday's short shots ran till noon. Before you answer, I moved the schedule meeting onto your first hour, so part of this is mine. What else gets in the way?" Dave adds that he has been covering a material handler vacancy most mornings.

Agreement: Karen moves the schedule meeting to 7:15 and asks HR to post the material handler job. Dave hands the board update to his team lead and does the walk from 6:10. They look at his sheet together every Friday. Four weeks later the walk is signed every shift and Dave has caught two process drifts in the first hour. Karen keeps the Friday look, now every second week.

Templates for the routine and the check

Sources

  • Leader standard work, visual controls, the daily accountability process and leadership discipline: David Mann, Creating a Lean Culture: Tools to Sustain Lean Conversions (Productivity Press, 2005; third edition 2015).
  • Changing what people do to change how they think: John Shook, "How to Change a Culture: Lessons From NUMMI," MIT Sloan Management Review, Winter 2010.
  • Could they do it if their life depended on it, and what happens when they do: Robert F. Mager and Peter Pipe, Analyzing Performance Problems (1970).
  • Situation-Behavior-Impact: Center for Creative Leadership, the SBI feedback model.

FAQ

Questions about holding supervisors accountable

  1. Agree each supervisor's leader standard work, check it the same way every day at the tier 2 meeting and on the floor, and look at the completed sheet with them weekly. When they slip, check whether the routine fits the shift, then talk in private with the facts and agree what changes.

  2. Often because the routine no longer fits: meetings overlap it, a vacancy has them running a station, or nobody has looked at the completed sheet in weeks. Check time, clarity, training, load and whether anyone follows up before you treat it as the supervisor's choice.

  3. That the start-of-shift huddle happens, the board is updated through the shift, the first-hour walk and the audits are done, and the supervisor's open actions move. The manager checks at the tier 2 meeting, on a weekly walk of the area and in a weekly look at the sheet.

  4. Ask about the board and the actions there, because that is what the meeting is for. Keep the conversation about a pattern of misses for a private talk afterwards, so they can answer honestly without their peers watching.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.