Skip to content
LeanSuite

Practical guide · Standard work, SOPs and training

Train the trainer in manufacturing: how to turn your best operators into floor trainers

Short answer

Train the trainer in manufacturing means teaching your experienced operators how to teach a job, not only how to do it. The method most plants use is TWI Job Instruction: break the job into steps, key points and reasons, then prepare, present, try out and follow up. Trainers practice on real jobs while someone watches.

Pick trainers for patience and accuracy as well as skill. Teach them TWI Job Instruction, the method the US Training Within Industry Service taught to wartime plants from 1940 to 1945: get ready (a timetable of who needs which job, the job broken down into important steps, key points and reasons, everything ready, the station arranged), then four steps: prepare the worker, present the operation, try out performance, follow up. The original course ran ten hours in five two-hour sessions, and each trainer taught a real job while the group watched. After the course, each trainer breaks down the jobs they will teach on a job breakdown sheet, teaches with a coach watching, and is checked again later. Put the training plan on a timetable or cross-training plan so the trainers know who to train next, and give them time off the line to do it. The rule on the Job Instruction card keeps the program honest: if the worker hasn't learned, the instructor hasn't taught.

Last reviewed:

When train the trainer comes up on the floor

The plant hires twenty people for a new line, and each new hire is put next to an experienced operator to watch. Six weeks later, half of them do the job one way and half another, and scrap is up. Or the one setter who knows the old press is retiring, and nobody has written down how he does it. Or the skills matrix shows three people qualified on a job that runs on three shifts, and the same person is always the one training.

In each case the problem is the same: the plant has people who can do the job, but not people who can teach it. "Sit with Joe" passes on Joe's habits, good and bad, and depends on Joe having time.

The method trainers learn: TWI Job Instruction

The Job Instruction card, as the Training Within Industry Service taught it
PartWhat the trainer does
Get ready: have a timetableKnow who needs to learn which job, and by when
Get ready: break down the jobList the important steps, the key points (what makes or breaks the step: safety, quality, a knack) and the reason for each key point
Get ready: have everything readyThe right tools, materials and parts at the station
Get ready: arrange the workplaceThe station set up as the worker will be expected to keep it
Step 1: prepare the workerPut them at ease, find out what they already know, get them interested, place them in the correct position
Step 2: present the operationTell, show and illustrate one important step at a time, stress each key point, go slowly and no more than they can master
Step 3: try out performanceHave them do the job and correct errors, then explain each step and key point, and the reasons, as they do it again
Step 4: follow upPut them on their own, name who to go to for help, check often, encourage questions, then taper off

Paraphrased from the Job Instruction card in The Training Within Industry Report 1940-1945. The card ends: if the worker hasn't learned, the instructor hasn't taught.

The full method is in the guide to TWI Job Instruction, and the TWI job instruction training deck (linked under Related) is ready to teach from. The breakdown goes on the TWI job breakdown sheet.

What to prepare: picking trainers and jobs

  • The jobs to start with: the ones with the most new people, the most scrap or injuries, or a single expert. The skills matrix shows them.
  • Trainers chosen for patience, accuracy and following the standard, not only speed. The fastest operator is not always the best teacher.
  • A trainer per shift for each critical job, so training does not wait for one person.
  • Time off the line for the course and for each training session, agreed with production before you start.
  • A coach who has taught Job Instruction before, from inside the plant or outside.
  • The current standard for each job. If there is no agreed method, agree it first, or the trainers will teach three versions.

How to run the program

  1. 1

    Choose the jobs and the trainers

    Start with three to five jobs and one or two trainers per shift. A small first group lets you coach each trainer properly.

  2. 2

    Teach the method

    Run the Job Instruction course: short sessions over several days, as the original ten-hour course in five two-hour sessions did. Each trainer teaches a real job from their own area to the group and gets feedback.

  3. 3

    Break down each job

    Each trainer writes the job breakdown for the jobs they will teach, with the supervisor and engineering checking the key points. This is often where hidden knacks get written down for the first time.

  4. 4

    Teach with a coach watching

    The trainer teaches a real trainee at the station while the coach watches with the breakdown sheet. Feedback afterwards, never in front of the trainee.

  5. 5

    Put training on a timetable

    A training timetable or cross-training plan lists who learns which job, from which trainer, by which date. Review it in the weekly production meeting.

  6. 6

    Check the trainers and the results

    Go back to each trainer after a month and watch a session again. Look at what the trainees do: are they doing the key points, is first-time quality holding? Sign off trainees on the skills matrix only after they have shown the job.

How to open with an expert who does not want to train

Some of the best operators resist being made trainers. They are busy, they worry about losing their edge, or they have trained people before and got blamed when it went wrong.

  • "You know this job better than anyone in the plant. I want more people to do it your way, and I want you to be the one who decides what the key points are. What would you need to make that work?"
  • "When you trained Sam last year, you had no time and no method, and that's on us, not you. This time you get the course, time off the line, and a coach. What worries you about it?"

Questions to ask trainers

  • Which step do new people get wrong most often? What is the key point there?
  • Why do you do it that way? Can you say the reason in one line?
  • How much can a new person take in at once on this job?
  • When did you last see a trainee do it alone? What did you notice?
  • What gets in the way of training on your shift?
  • Which of your key points should be in the standard for everyone?

What not to say

Lines to avoid with trainers and trainees
Instead ofSay
"Just show him what you do.""Use the breakdown and teach the key points."
"Train her in between jobs.""You have an hour off the line on Tuesday to train her."
"He's slow, he'll never get it.""If he hasn't learned, how could we teach it differently?"
"Do it however works for you.""This is the standard. If yours is better, let's change the standard."
"You're the trainer now" with no courseThe course, the coach and the time, first

How to keep the program running

  • Recognize the trainers: a visible role, a line on the skills matrix, time on the timetable, and credit when their trainees sign off.
  • Refresh the method once a year, and after any change to the jobs.
  • Update the job breakdowns when the standard changes, and retrain from the new breakdown.
  • Add trainers before you need them: a job with one trainer is a job with one point of failure.
  • Report trainees signed off against the timetable each month, not only hours of training.

Jeffrey Liker and David Meier's Toyota Talent (2007) describes how Toyota uses Job Instruction as the base of its on-the-job training, with leaders expected to be able to teach the jobs they supervise. Donald Dinero's Training Within Industry: The Foundation of Lean (2005) reproduces the original TWI manuals and cards.

One program worked through (Illustrative)

Illustrative: a machining cell with one expert setter

An illustrative case, not a customer. A machining cell runs three shifts, but only one setter can change over the five-axis machine without a scrapped first part. New setters have been learning by watching him for months.

The plant picks him and one operator from each other shift to train as trainers. They take a Job Instruction course over five days, two hours a day, and each teaches a short job from the cell to the group. The expert then writes the changeover breakdown with the cell engineer: eleven important steps, and key points such as the order the clamps are tightened and the probe check before the first cut, each with its reason. Two of the key points were not in the setup sheet; they go into the standard. He teaches the changeover to the two new trainers with the coach watching, and they teach it on their own shifts. The cross-training plan lists four setters to sign off over the quarter. The supervisor watches one session from each trainer after a month and checks that first parts pass.

Templates to use

Sources

  • Job Instruction card, get ready points and four steps, and the ten-hour course in five two-hour sessions: War Manpower Commission, Bureau of Training, Training Within Industry Service, The Training Within Industry Report 1940-1945, 1945.
  • Donald A. Dinero, Training Within Industry: The Foundation of Lean, Productivity Press, 2005.
  • Jeffrey K. Liker and David P. Meier, Toyota Talent: Developing Your People the Toyota Way, McGraw-Hill, 2007.

FAQ

Questions about train the trainer in manufacturing

  1. It is a program that teaches experienced operators, leads and supervisors how to teach a job, not only how to do it. Most plants use TWI Job Instruction: break the job into important steps, key points and reasons, then prepare the worker, present the operation, try out performance and follow up.

  2. People who do the job to the standard and have the patience to teach it, with at least one trainer per shift for each critical job. The fastest operator is not always the best choice. Give trainers the course, a coach and time off the line.

  3. The original Training Within Industry course ran ten hours, in five two-hour sessions, with each trainer teaching a real job to the group. After the course, trainers need practice on their own jobs with a coach watching.

  4. Prepare the worker, present the operation, try out performance and follow up. Before the four steps the trainer gets ready: a timetable of who needs which job, the job broken down, everything ready and the workplace arranged.

  5. Watch them teach with the breakdown sheet in hand, then look at the trainees: do they do the key points, is first-time quality holding, are they signed off on time? The TWI rule applies: if the worker hasn't learned, the instructor hasn't taught.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.