Practical guide · Lean leadership and employee engagement
Resistance to change in the workplace: answering "we've always done it this way" on the shop floor
Short answer
Resistance to change on the shop floor is rarely about change itself. People resist what they stand to lose: skill, status, pay, a routine that works, or trust in the last change. Find out what that is, involve the crew in designing the change, try it small, and follow up.
"We've always done it this way" is usually a short way of saying something else: the last change made things worse, the new way will cost me my overtime or my status as the expert, nobody asked us, or the old way works and nobody has shown me a problem with it. Researchers Dent and Goldberg argued in 1999 that people resist losses, not change as such. So treat resistance as information. Before the change, explain the problem it solves with facts from the floor. Ask the crew what they would lose and what they think will go wrong; they are often right about something. Involve them in designing the change: Coch and French's 1948 study at the Harwood pajama factory found groups that took part in designing a job change adapted faster than a group that was simply told. Try it small on one line, fix what goes wrong, and follow up on the floor.
Last reviewed:
When the conversation comes up on the floor
You hear it when a cell layout is about to change, a new SOP is coming, paper check sheets are moving to tablets, 5S is starting in maintenance, a kaizen team is formed, the shift pattern changes, or a new machine replaces one an operator has run for fifteen years. It shows up as "we tried that", "it won't work here", "the engineers don't know the job", silence in the kick-off meeting, the new way on day shift and the old way on nights, or a slow return to the old way a month after the change.
What "we've always done it this way" usually means
| What you hear | What it often means | What helps |
|---|---|---|
| "We tried that before." | The last change failed or made the job harder, and nobody came back to fix it | Ask what happened last time; show what is different now |
| "It won't work here." | They see a problem you have not seen yet | Ask them to show you; build the fix into the design |
| "The engineers don't know the job." | Nobody from the floor was asked | Put operators on the team that designs it |
| "Why are we doing this?" | Nobody has shown them the problem | The facts from the floor: scrap, walking, downtime, near misses |
| Silence | It is not safe to disagree, or they have given up | Talk to people one at a time, before the group meeting |
| The old way, quietly, a month later | Nobody followed up; the new way had a flaw nobody fixed | Be on the floor in the first weeks and fix what does not fit |
Eric Dent and Susan Goldberg (Journal of Applied Behavioral Science, 1999) argued that people do not resist change as such; they resist losing status, pay, comfort or control. Jeffrey Ford, Laurie Ford and Angelo D'Amelio (Academy of Management Review, 2008) went further: what managers call resistance is often a useful reaction, and change agents contribute to it through broken agreements and poor communication. Both point the same way: listen to the objection before you try to overcome it.
What the Harwood study found about involving people
Lester Coch and John French studied job changes at the Harwood Manufacturing Company's pajama factory in Virginia and published Overcoming Resistance to Change in Human Relations in 1948. Some groups of operators were simply told about a change to their jobs. Others sent representatives to help design it, or took part in designing it as a whole group. The groups that took part recovered their output faster after the change, and the group that was simply told showed more conflict with management and more people leaving. It is one of the oldest field studies in management, and its lesson is still the most practical one: involve the people who do the job.
Kurt Lewin, who influenced that work, described change in three stages in Frontiers in Group Dynamics (Human Relations, 1947): unfreeze, change, refreeze. On a shop floor, unfreezing is showing the crew the problem; refreezing is the standard work, training and follow-up that hold the new way in place. John Kotter's Leading Change (1996) and Jeff Hiatt's ADKAR model (awareness, desire, knowledge, ability, reinforcement, 2006) are later versions of the same idea for larger changes.
What to prepare
- The problem the change solves, in facts from the floor that the crew will recognize: the scrap, the walking, the downtime, the near misses. Not "corporate wants it".
- What each person stands to lose: overtime, status as the only one who can run the old machine, a routine, a station they like. Some losses are real; say so.
- What happened with the last change in this area.
- Who the crew listens to. Talk to them first, one at a time, before any group meeting. Toyota's name for this groundwork is nemawashi; the nemawashi plan lists who to see and in what order.
- What is fixed (the safety requirement, the customer date) and what the crew can shape (the layout, the sequence, the trial).
How to open
- One to one, before the group: "We're going to change the layout of cell 2, because the walking and the WIP between stations are costing us the rate. You know this cell better than anyone. Before anything is decided, what do you think will go wrong?"
- When you hear "we've always done it this way": "It might be the best way. Show me why it works, and let's look at the scrap numbers together."
Questions to ask
- What works about the way we do it now?
- What happened the last time something like this changed?
- What would you lose with the new way?
- What will go wrong in the first week?
- If you were designing it, what would you do differently?
- What would you need to see in a trial to believe it works?
- Who else should we ask?
What not to say
| Instead of | Say |
|---|---|
| "Corporate has decided." | The problem it solves here, in this area's own numbers |
| "You just don't like change." | "What would you lose with the new way?" |
| "Get on board or get out of the way." | "Help us design it so it works on nights too." |
| "It's only a small change." | Acknowledge what is changing for them |
| "Trust me, it'll be better." | "Let's try it on one line for two weeks and look at the results together." |
How to overcome resistance to change: six steps
- 1
Show the problem before the solution
Go to the floor with the crew and look at the problem together: the scrap bin, the spaghetti of walking, the downtime log. People accept a change more readily when they agree there is a problem to solve.
- 2
Talk to people one at a time first
Before the group meeting, see the people the crew listens to. Ask what they think will go wrong. A concern raised in private is easier to fix than one raised in front of everyone.
- 3
Design it with the crew
Put operators from each shift on the team that designs the change, as Coch and French's groups did. What is fixed (safety, the customer) stays fixed; the rest is open.
- 4
Try it small
Run it on one line, one cell or one shift first, a model area, with a clear end date and a measure everyone agreed in advance. See the model area guide.
- 5
Fix what goes wrong, fast, and say who found it
Be on the floor in the first shifts. Every problem the crew finds is a reason the change will work; fix it within days and credit the person who raised it.
- 6
Hold the new way in place
Update the standard work and the work instruction, train it at the station, audit it for the first months, and say what improved in the huddle. Without this step the old way comes back.
One change worked through (Illustrative)
Illustrative: a U-shaped cell and the operator who built the old one
An illustrative case, not a customer. A CI engineer plans to move four machining stations into a U-shaped cell to cut walking and WIP. The most senior operator, Frank, set the line up years ago. In the kick-off he says, "We've always done it this way and it works. You'll kill the rate."
The engineer stops the group meeting and sees Frank alone the next morning. She asks what works about the current layout. Frank explains that one station has a long cycle and the WIP in front of it is what keeps the others busy; in a tight U it will starve the cell. He is right, and the plan had missed it. They agree that Frank and an operator from nights join the design team, that the long-cycle station gets a small marked buffer, and that they trial the cell on day shift for two weeks with the hour-by-hour board as the measure. In the first week the crew finds that the tool cart blocks the U; it moves the same day and the engineer says in the huddle that Frank's crew found it. At the end of the trial the board is better than before and night shift asks for the same layout. The new layout goes into the standard work and the work instruction, and is audited for the next two months.
Templates for planning a change
- Nemawashi plan: who to talk to, in what order, before the change is announced.
- 4M change management sheet: what changes in man, machine, method and material, and what to check.
- Kaizen event charter: the problem, the scope and the team, including operators from each shift.
- Start, stop, continue: hear what the crew thinks after the trial.
- Idea suggestion form: give the crew a way to propose the next change themselves.
- Back to the hub: difficult conversations at work.
Sources
- Participation in designing a job change at the Harwood pajama factory: Lester Coch and John R. P. French Jr., Overcoming Resistance to Change, Human Relations 1(4), 1948.
- Unfreeze, change, refreeze: Kurt Lewin, Frontiers in Group Dynamics, Human Relations 1(1), 1947.
- People resist losses, not change as such: Eric B. Dent and Susan Galloway Goldberg, Challenging "Resistance to Change", Journal of Applied Behavioral Science 35(1), 1999.
- Resistance as a useful reaction that change agents contribute to: Jeffrey D. Ford, Laurie W. Ford and Angelo D'Amelio, Resistance to Change: The Rest of the Story, Academy of Management Review 33(2), 2008.
- Larger change programs: John P. Kotter, Leading Change (Harvard Business School Press, 1996); Jeff Hiatt, ADKAR: A Model for Change in Business, Government and Our Community (Prosci, 2006).
Go deeper
This page is the short version. These guides cover each part in full.
- How to Foster a Continuous Improvement Culture: 7 StepsBuilding a culture where change is expected and the floor proposes it.
- What is a Continuous Improvement Culture (CIC)?What a continuous improvement culture is and how it shows on the floor.
- Employee Empowerment: Definition and BenefitsGiving the people who do the work a real say in how it changes.
- Kaizen Teian: Individual Improvement SuggestionsSmall changes proposed by operators themselves.
All our articles on this subject are in the lean leadership and employee engagement topic.
Free templates and tools
- Start / Stop / ContinueA team retrospective board: what to start doing, what to stop and what to keep, voted and turned into actions.
- Difficult conversation plannerOne page to prepare a hard conversation and write down what was agreed, with a filled-in example.
- Difficult conversation cards58 situation cards, four to a page: with your manager, your team, operators, other functions and outside the plant.
- Nemawashi template (stakeholder plan)Plan the one-to-one conversations before a decision: who to talk to in what order, their concerns, what changed and where they stand.
- 4M change management sheet (change point)A shift log of every change to Man, Machine, Material, Method or Design, the extra checks after it and when normal checks resume, with a change point board.
- Kaizen event charter templateProblem, goal, scope in and out, boundaries, metrics from baseline to target, team and roles, and sign-off before day one.
- Idea suggestion formA one-page idea form with the supervisor's answer and points, and an idea log that tracks days to answer.
- Lean transformation roadmapA plant-wide lean program on one sheet: six phases with exit criteria, six workstreams by quarter over 24 months, the model line, metrics with baseline and target, cadence and risks.
Doing this in LeanSuite
Kaizen & Projects
Manage every improvement project in one visual hub, from a small kaizen event to a full DMAIC project, and track each one through to results.
See Kaizen & ProjectsIdea Management
Operators submit an idea from the shop floor on a phone with a photo, a reviewer approves it, and an approved idea gets an implementor or becomes a Kaizen project.
See Idea Management
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about resistance to change on the shop floor
Usually what people stand to lose: skill, status, pay, overtime, a routine that works, or trust after a past change that failed. Dent and Goldberg argued in 1999 that people resist losses, not change as such. Not being asked, and not being shown the problem, add to it.
Treat it as information. Ask what works about the current way and what happened with the last change. Show the problem with facts from the floor, involve the person in designing the new way, and agree a small trial with a measure you both accept.
Show the problem before the solution, talk to the people the crew listens to one at a time, design the change with operators from each shift, try it small, fix what goes wrong fast and credit who found it, then hold the new way with standard work, training and audits.
In Overcoming Resistance to Change (Human Relations, 1948), Coch and French found that groups of operators at the Harwood pajama factory who took part in designing a change to their jobs recovered their output faster than a group that was simply told, which showed more conflict and more people leaving.
No. Ford, Ford and D'Amelio argued in 2008 that resistance is often a useful reaction that shows problems with the change or the way it was introduced. Operators who resist often see a flaw the planners missed.
Unfreeze, change, refreeze, from Kurt Lewin's 1947 paper Frontiers in Group Dynamics. On a shop floor, unfreezing is showing the crew the problem, and refreezing is the standard work, training and follow-up that hold the new way in place.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion