Skip to content
LeanSuite

Practical guide · Lean leadership and employee engagement

How to talk to an employee about poor performance

Short answer

Before you talk to an employee about poor performance, find out whether they know the standard, can meet it with the tools and time they have, and know they are missing it. Then open in private with the facts, ask what is getting in the way, and agree one action.

Start with the cause, not the person. Check that the standard is written, trained and possible to meet with the equipment, material and time on the line, and that the person knows they are missing it. Many performance problems are found there. Then meet in private, early in the shift, and say in one sentence what you have seen and what it affects. Ask what is getting in the way and listen. Agree one or two specific actions, from both of you, with a date to look at the result together. Follow up on that date where the work is done. If the gap is still there and it may lead to discipline, check with your HR team and local employment law before the next step.

Last reviewed:

When the conversation comes up on the floor

On a shop floor poor performance usually shows up in a number before anyone says anything: an operator's scrap or rework climbs, a station misses its hour-by-hour count, a changeover runs long every time one setter does it, checks are pencil-whipped, a forklift driver's near misses pile up. Sometimes it is softer: someone who used to raise problems has gone quiet.

The longer you wait, the harder it gets. The person hears about it for the first time at their review, or from a teammate, and the conversation becomes about why nobody said anything. Talk early, while it is still one shift or one week and still small.

First find out whether it is skill, system or will

Robert Mager and Peter Pipe, in Analyzing Performance Problems (1970), ask one question before any other: could the person do it if their life depended on it? If not, it is a skill problem, and the fix is training and practice. If they could, telling them again or sending them back to training will not help; look at what gets in the way and what happens when they do it right or wrong. Thomas Gilbert, in Human Competence (1978), argued that the work environment (the information people get, their tools and materials, and the consequences of doing the job well) is where to look first, before the person's knowledge or motives.

Three kinds of performance gap and where to look
KindSigns on the floorCheck before the conversation
SkillNew to the station, a new product or a new machine; good on the easy jobs, struggles on the hard onesThe skills matrix and training records: were they signed off on this job, by whom, and have they run it since?
SystemThe gap moves with the shift, the material lot, the machine or the gauge; others on the same job struggle tooThe work instruction, the equipment history, material issues, the staffing on the shift and what you are asking them to prioritize
Will or habitKnows the job, has the tools, did it right before; the gap started with something elseWhat changed for them recently, and whether doing it right is noticed and doing it wrong goes unnoticed

The three kinds follow Mager and Pipe's first questions. Most gaps are a mix; the conversation is how you find out which.

What to prepare

  • The facts, with dates and numbers from your own records: the scrap tags, the hour-by-hour board, the audit, the check sheet. Not "you have been slow lately".
  • The standard: the work instruction or SOP, the training sign-off, the target. If it is not written down, the first fix is yours.
  • The effect: on safety, on the customer, on the next station, on the crew covering for them.
  • The one outcome you need, and by when.
  • What you will offer: a second training session, a buddy for a week, a fixed gauge, a different start on the hard job.
  • If this may lead to discipline, a word with HR first about your process and what must be recorded. If your site has a collective agreement, check what it says about these meetings.

How to open the conversation

Pick a private place off the line: the office, a quiet corner of the training room. Early in the shift is better than the last ten minutes. Say why you are there in one sentence, using the Center for Creative Leadership's Situation-Behavior-Impact frame, and then ask a question and stop talking.

  • "Your scrap on the trim press has been about double the rest of the team for the last two weeks. I want to understand what is going on. What are you seeing?"
  • "The last three changeovers you ran took over an hour against the forty minutes on the sheet. Walk me through the last one."
  • "I noticed you stopped raising problems in the huddle. You used to be the one who did. What changed?"

Questions to ask

  • What does a good shift on this job look like to you?
  • Show me how you do the step where the problem shows up.
  • What gets in the way: material, the machine, the gauge, the instruction, people, time?
  • Is anything outside work making this harder right now? (You do not need details; you need to know whether to point them to support.)
  • Who on the team does this well, and what do they do differently?
  • What would help most in the next week?
  • What will you do, and what do you need from me?

What not to say

Lines to avoid in a performance conversation
Instead ofSay
"You're not pulling your weight.""Your count was under the board on four of the last five shifts."
"Everyone has noticed."What you saw, and only that
"Just try harder.""Let's look at the step where it goes wrong."
"I'm going to have to write you up" (before you have heard them)"I want to understand what's happening first."
Comparing them by name to a teammate in front of othersAsking who does it well and pairing them up, in private
Guessing at health, family or personal reasons"Is there anything you want me to know?" and the employee assistance program if your site has one

How to follow up

  1. 1

    Write down the agreement before you leave

    Two or three lines: what they will do, what you will do, and the date you will look at it together. Give them a copy or read it back.

  2. 2

    Do your part first

    If you promised the second gauge, the buddy or the corrected instruction, deliver it before the review date. If you do not, the follow-up is about you.

  3. 3

    Look at the work, not just the number

    On the date, go to the station. Look at the board or the scrap tags together and watch the step that was the problem.

  4. 4

    Say what improved

    Name the specific change. A conversation that only happens when something is wrong teaches people to dread you coming.

  5. 5

    Decide the next step

    If it is fixed, close it and keep an eye on it. If it is better but not there, agree the next action and date. If nothing has moved and the skill and system checks are done, check with your HR team and local employment law about the formal process before the next meeting.

In the US, an employee in a union has the right to ask for a representative at an investigatory interview they reasonably believe could lead to discipline (NLRB v. J. Weingarten, Inc., 1975). Rules differ elsewhere and by agreement, which is one more reason to involve HR before a conversation turns formal. This is not legal advice.

One conversation worked through (Illustrative)

Illustrative: an operator whose scrap rose on the trim press

An illustrative case, not a customer. Dev has run the trim press for three years. For two weeks his scrap has been well above the other two shifts. The supervisor checks first: Dev is signed off on the job, the die was not changed, but a new resin lot came in at the start of the two weeks and Dev's shift runs the thin-wall part the others rarely run.

Opening, in the office at the start of shift: "Your scrap on the trim press has been much higher than the other shifts for two weeks. I want to understand it. What are you seeing?" Dev says the parts are flashing and he has been trimming harder to clean them up, which tears the thin walls. He did not raise it because the last time he raised flash he was told to run it anyway.

Agreement: the supervisor raises the resin lot with quality that day and asks process engineering to check the settings for the thin-wall part; Dev tags every flashed part instead of trimming harder, and raises it in the huddle. Follow-up on Friday at the press: the settings were adjusted for the new lot, scrap is back near the other shifts, and the supervisor thanks Dev in the huddle for the tags. The real fix was a system one, and the conversation found it. The supervisor also notes that the earlier "run it anyway" taught Dev to stay quiet.

Templates for the conversation and the follow-up

Sources

  • Could they do it if their life depended on it, and the skill and non-skill paths: Robert F. Mager and Peter Pipe, Analyzing Performance Problems, or You Really Oughta Wanna (1970; later editions 1984 and 1997).
  • Look at the environment (information, resources, incentives) before the person: Thomas F. Gilbert, Human Competence: Engineering Worthy Performance (McGraw-Hill, 1978), the Behavior Engineering Model.
  • Situation-Behavior-Impact: Center for Creative Leadership, the SBI feedback model.
  • Union representative at an investigatory interview in the US: NLRB v. J. Weingarten, Inc., 420 U.S. 251 (1975).
  • Not legal advice. Check with your HR team and local employment law; rules differ by country, state and collective agreement.

FAQ

Questions about how to talk to an employee about poor performance

  1. In private, early in the shift, with one sentence of fact: what you saw, over what period, and what it affects. Then ask what is getting in the way and listen. Agree one or two actions from both of you and a date to look at the result together.

  2. That the standard is written and trained, that the person is signed off on the job, and that the equipment, material, staffing and time make it possible to meet. Look at whether the gap moves with the shift, the machine or the material lot. If it does, the cause is likely the system.

  3. What does a good shift on this job look like to you, show me the step where it goes wrong, what gets in the way, who does it well and what do they do differently, what would help most this week, and what will you do and what do you need from me.

  4. Yes: write the agreed actions and the follow-up date while you are together, and keep your own note of the facts. If the gap may lead to discipline, follow your HR process and local employment law for what must be recorded.

  5. Check you delivered your side of the agreement and that the skill and system causes are ruled out. If they are, agree a final clear action and date, and check with your HR team and local employment law about the formal process before the next meeting.

  6. In the US, a union employee may ask for a representative at an investigatory interview they reasonably believe could lead to discipline, under NLRB v. J. Weingarten, Inc. (1975). Rules differ elsewhere and by agreement, so check with HR. This is not legal advice.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.