Hard savings vs soft savings: how CI and finance agree the number

Short answer

A hard saving lowers a cost that shows on the profit and loss: less scrap bought and thrown away, less overtime paid, a contract cancelled. A soft saving frees time, space or capacity that only becomes money if the plant uses it. Agree with finance which is which before you claim either.

Hard savings are reductions you can trace to a line on the profit and loss or the budget: less material scrapped, fewer overtime hours paid, a lower energy bill, a rented warehouse given back. Soft savings are real gains that do not change spending on their own: operator hours freed by a shorter changeover, floor space cleared, capacity gained on a bottleneck. They turn into hard savings only when the plant acts on them, for example by not hiring for a vacancy or bringing outsourced work in house. Cost avoidance, money you would have spent but now will not, is a third category most finance teams track apart. Agree the rules with the plant controller before the project starts, use the same baseline period and cost rates, have finance sign the number, and report hard and soft savings in separate columns.

Last reviewed:

Hard savings, soft savings and cost avoidance

Three kinds of saving a CI project can claim
KindWhat it meansTest finance usually applies
Hard savingSpending goes down against a baseline, on a line you can point toWill the cost show lower on the profit and loss or the budget, and can we see it in the ledger?
Soft savingTime, space or capacity is freed, but spending does not change unless someone actsWhat will the plant do with what was freed, and when?
Cost avoidanceA cost that would have been spent is no longer neededWas the spend approved or certain, or only possible?

Definitions vary by company. Use your finance team's written rules where they exist; this table is a common starting point, not a standard.

Examples from the shop floor

The same kind of project can produce either kind of saving
ProjectHard savingSoft saving
Scrap reduction on a press lineMaterial no longer bought and scrapped, at the standard material costInspector time no longer spent sorting
Shorter changeover (SMED)Overtime hours no longer paid to make up lost outputOperator and machine hours freed for more changeovers or more output
5S in a stores areaA rented trailer or outside warehouse returnedFloor space cleared, less time searching for parts
Downtime reduction on a bottleneckWeekend shifts no longer run, or outsourced work brought back in houseExtra capacity available to sell
Energy kaizen on compressed air leaksA lower electricity bill, against the same production volumeNone usually; this one is hard if metered
Faster training with one-point lessonsFewer temporary staff hired to coverNew operators productive sooner

General examples. Whether a given line counts as hard depends on your finance rules and on what the plant actually does with the gain.

The pattern: a gain in time or capacity is soft until a decision turns it into less spending. A changeover cut from forty minutes to twenty saves nothing on the profit and loss if the same people work the same hours. It becomes hard when the plant stops paying overtime or wins orders it could not have run before.

When it comes up

  • At the project report-out, the controller asks where the savings show in the monthly numbers.
  • The CI program reports a yearly total that finance cannot find in the budget.
  • A kaizen event claims headcount savings, and nobody has left or stopped being hired.
  • Finance cuts a claimed saving in half, and the team that did the work feels cheated.
  • Leadership asks for a payback figure before approving a project.

Most of these arguments come from agreeing the rules too late. The fix is to settle the basis at the charter, not at the report-out.

How CI and finance agree the number

  1. 1

    Meet the controller at the charter

    Before the project starts, show the plant controller the problem, the expected gain and how you plan to measure it. Ask how finance will want to see it.

  2. 2

    Agree the baseline

    Pick the baseline period together, long enough to cover normal swings, and agree how to adjust for volume or product mix changes.

  3. 3

    Agree the cost rates

    Use finance's standard cost for material and their labor rate, not your own estimate. Agree whether overhead is included. Most finance teams do not count absorbed overhead as a hard saving.

  4. 4

    Classify each line

    List every expected saving and mark it hard, soft or avoidance with the controller. For each soft line, write what action would make it hard and who owns that action.

  5. 5

    Measure after, the same way

    Measure the result over an agreed period after the change, with the same method as the baseline. Report what actually happened, not the forecast.

  6. 6

    Have finance sign it

    The controller signs the hard saving before it goes in the CI total. Soft savings and avoidance are reported in their own columns.

The project savings validation checklist walks through these checks one by one. The cost savings tracker keeps each project's saving with its basis, its kind and who signed it, and the kaizen savings calculator gives a first estimate before you meet finance.

What to prepare for the conversation with the controller

  • The before and after data, from the same source and over comparable periods.
  • The cost rates you used and where they came from.
  • Each saving line marked hard, soft or avoidance, with your reasoning.
  • For soft savings: what the freed time or capacity is now used for, if anything.
  • Anything that changed in the same period that could explain part of the result, such as volume, product mix or a price change.

An opening line

"Before we start the scrap project on line 3, I want to agree with you how we will measure the saving, so the number at the end is one we both stand behind."

Questions to ask finance

  • Which cost rates should I use for material, labor and energy?
  • What do you count as hard, and what would you want to see as evidence?
  • How should we adjust the baseline if volume changes?
  • Do you count overtime avoided as hard if the overtime was budgeted?
  • When in the month will the saving show, and on which line?
  • How do you want soft savings and cost avoidance reported?

What not to say

  • "We saved two heads." Unless two people left, were moved to a funded vacancy or were not hired, that is freed time, not a hard saving. It also frightens the people whose work you improved.
  • "Finance doesn't understand lean." The controller is checking that the number is real. Work with that, not against it.
  • "The saving is the time saved times the labor rate." Only if the plant pays for fewer hours.
  • "It's a yearly saving." Say what was measured, over what period, and how you projected it.

How to follow up

  • Check the saving again after a few months. A hard saving that slips back is a sign the new standard is not holding.
  • For each soft saving, check whether the action that would make it hard has happened, and report the change.
  • Report hard savings, soft savings and avoidance in separate columns in the CI report. Mixing them is the fastest way to lose finance's trust.
  • Credit the area team by name with the result.

Worked example: a changeover project (Illustrative)

An illustrative case, not a customer. The figures are made up for the example. A CI engineer at a plant that stamps brackets runs a SMED project on a press that changes over three times a shift.

  1. 1

    The claim at first

    Changeover time falls from 45 to 20 minutes. The engineer multiplies the saved operator time by the labor rate and reports a large yearly saving.

  2. 2

    The controller's question

    The same crew works the same hours. Where does the saving show? It does not, yet. It is a soft saving: about 75 minutes a shift of press and crew time freed.

  3. 3

    What makes it hard

    The press had run Saturday overtime to keep up. With the freed time, the schedule fits in the week. The Saturday shift stops. That overtime, at finance's rate, is a hard saving the controller can see on the payroll line.

  4. 4

    What stays soft

    The rest of the freed time allows smaller batches. That lowers finished goods stock, which finance records as a one-time cash release, not a yearly saving.

  5. 5

    The report

    The CI report shows the overtime as hard, signed by the controller, the stock reduction as a cash item, and the remaining capacity as soft. Nobody argues at the next review.

Sources

  • This page is general CI and plant finance practice, not a study or an accounting standard. Definitions of hard and soft savings differ between companies; your finance team's written rules apply.
  • The worked example is illustrative, its figures are made up, and it does not describe a real plant.

FAQ

Questions about hard savings vs soft savings

  1. Hard savings lower a cost you can trace on the profit and loss or the budget, such as scrap material, overtime paid or an energy bill. Soft savings free time, space or capacity that only becomes money if the plant acts on it, for example by not hiring or by bringing outsourced work in house.

  2. Most finance teams track cost avoidance apart from hard savings, because the spend never happened, so it does not lower a cost already on the books. Agree with your controller how to report it, and whether the avoided spend had to be approved or certain to count.

  3. Usually soft at first. Freed operator time saves money only when the plant pays for fewer hours, for example by stopping overtime, not filling a vacancy or not hiring temporary staff. Until then, report it as freed capacity.

  4. Meet the controller before the project starts, agree the baseline period and cost rates, classify each expected saving as hard, soft or avoidance, measure afterwards the same way, and have finance sign the hard saving before it goes in the program total.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.