Practical guide · Lean leadership and employee engagement
Your first 90 days in a new role in manufacturing
Short answer
In the first 90 days in a new plant role, listen before you change anything. Meet people one to one, pull the numbers for your function in week one, walk every shift, pick one problem with your boss, and close the quarter with a one-page report.
Start with a listening tour: in the first two weeks, meet your boss, each direct report, your key peers and a sample of operators and team leads one to one, and ask the same few questions of each. In week one, pull the numbers your function is judged on, with at least a year of history, and find out how each is collected. Walk the floor on every shift, including nights and weekends, to look and ask, not to fix. By day 30, agree with your boss the problems you heard most and the one you will work on first. Spend days 31 to 60 on that one problem and your own daily routine, and days 61 to 90 on making it stick. End with a one-page report: what you found, what you did, what changed and what comes next.
Last reviewed:
The shape of the first 90 days
| When | Focus | By the end you have |
|---|---|---|
| Weeks 1 and 2 | Listening tour, week one numbers, first floor walks | Notes from every one-to-one and a picture of the numbers |
| Weeks 3 and 4 | Sort what you heard, agree priorities with your boss | The top problems ranked and one chosen |
| Days 31 to 60 | One improvement in one area, your own routine | A visible result and a routine running |
| Days 61 to 90 | Make it stick, plan the next quarter | A standard holding and the 90-day report |
General practice. For a role-by-role plan, see the 30 60 90 day plan examples.
The 30 60 90 day plan guide has worked plans for CI, quality, EHS, maintenance and plant managers and production supervisors.
The listening tour
- 1
List the people
Your boss, every direct report, your peers in other functions, the union steward or employee reps if there are any, and a few operators and team leads from each shift. Add a customer or a key supplier if your role touches them.
- 2
Book them in the first two weeks
Thirty minutes each, at their place of work where possible. Operators on the floor, during a quiet spell, with the supervisor's agreement.
- 3
Ask the same questions of everyone
The same five or six questions let you see patterns. Keep it a conversation, not a survey.
- 4
Write it down, then and there
Notes in their words. People notice when you write down what they say, and they notice later if you act on it.
- 5
Do not promise fixes
Say what you will do with what you hear: "I'm meeting everyone first, then I'll share what I heard and what I'll work on." Then do it.
- 6
Sort and share
Group what you heard into themes, rank them with your boss, and tell the people you met what you heard and what you will work on first.
Listening tour questions
- What is going well here that I should not break?
- What gets in the way of doing your job well?
- If you were in my seat, what would you fix first?
- What has been tried before that did not work, and why?
- Who should I make sure I talk to?
- What do you need from me?
- For operators: what is the hardest part of this job, and what would make it easier?
The stakeholder map template puts the people you meet on one page by influence and interest, and the nemawashi plan lists them in talking order with their concerns. The 30 60 90 day plan template holds the plan you agree with your boss.
The numbers to pull in week one, by function
| Function | Numbers to pull | Questions to ask about them |
|---|---|---|
| Production | Schedule attainment, output per shift, OEE or uptime on the bottleneck, overtime hours, absence | Which line is the bottleneck? How is downtime coded? |
| Quality | First pass yield, scrap and rework, customer complaints, open CAPAs and NCRs, audit findings | Which defects reach customers most? Which CAPAs are overdue? |
| Safety | OSHA 300 log, near misses reported, open safety actions, training and inspection due dates | What are the top risks? What is overdue? |
| Maintenance | Downtime by machine, work order backlog, planned versus reactive work, PM compliance, spares stockouts | Which machines fail most? How old is the backlog? |
| Continuous improvement | Projects in the last year and their results, savings signed by finance, suggestions submitted and closed | What happened to the gains after each project? |
| Plant | Profit and loss against budget, customer scorecards, headcount and open roles, turnover | Where is the plant losing money? Which customer is at risk? |
General practice. Ask how each number is collected and who owns it. A number nobody trusts is a finding in itself.
Your first floor walks
- Walk every shift in the first two weeks, including at least one night and one weekend shift. Night shift people notice who comes and who does not.
- Follow the product: from receiving to shipping, so you see how material moves and where it waits.
- Stand at the start-of-shift huddle and the shift handover. Listen; do not run them.
- Ask operators to show you their job, and where it is safe, try the hard part yourself.
- Look at the boards: are they up to date, and does anyone use them?
- Wear the PPE and follow every rule. People watch the new manager for this first.
- Do not fix things on the first walks unless it is a safety risk. If it is, stop it at once.
The gemba walk checklist gives a structure for each walk, and the gemba walk questions guide has questions by area.
Pick one problem with your boss
By the end of the first month you will have more problems than you can fix. Take the themes from the listening tour and the numbers to your boss, rank them together, and pick one problem in one area with a supervisor who wants the help. That is the 1-1-90 method in short, and the 1-1-90 method worksheet scores candidate areas.
The 90-day report to your boss
- What I heard: the top themes from the listening tour, in people's words.
- What the numbers show: the trend since you started on the few measures that matter.
- What I did: the one improvement, with the result in the area's own numbers.
- What is holding and what is not: the standard, the check and who owns it.
- What comes next: the next quarter's priorities and what you need from your boss.
- What I got wrong: one thing you would do differently. It builds trust.
Keep it to one page and present it in person. An A3 works well: the A3 problem solving template fits the format.
Worked example: a new maintenance manager (Illustrative)
An illustrative case, not a customer. A maintenance manager joins a plant that makes corrugated packaging.
- 1
Weeks 1 and 2
He meets all fourteen technicians, the three production supervisors and the planner. The same answer comes up from most of them: the corrugator's glue station breaks down every week and nobody has time to fix it properly.
- 2
Week one numbers
The downtime log confirms it: the glue station is the top downtime cause. The backlog has work orders over a year old, and most work is reactive.
- 3
Floor walks
On night shift he sees technicians patch the same pump seal twice in a week because the right spare is not stocked.
- 4
One problem
With the plant manager he picks the glue station. A technician and an operator do a root cause, the seal is changed to a better type, the spare is stocked and the PM task is rewritten.
- 5
The 90-day report
One page: what the team said, the glue station breakdowns before and after, the backlog plan, and a request for a planner on nights. The plant manager approves the request.
Sources
- This page is general manufacturing leadership practice, not a study. The worked example is illustrative and does not describe a real plant.
- OSHA 300 log: the log of work-related injuries and illnesses kept under OSHA's recordkeeping rule, 29 CFR Part 1904.
Go deeper
This page is the short version. These guides cover each part in full.
- Gemba Walk: 7 Steps, a Checklist and Questions to AskHow to walk the floor so it builds trust rather than feeling like an inspection.
- From Reactive Firefighting to Proactive Operations: a 90-Day PlanA 90-day plan for a plant stuck in daily firefighting.
- Lean Leadership: Developing People in ManufacturingHow a leader builds the team's problem solving rather than doing it for them.
- Communication Breakdowns in ManufacturingWhere information gets lost between shifts and functions, which a listening tour often uncovers.
All our articles on this subject are in the lean leadership and employee engagement topic.
Free templates and tools
- Listening tour questionsThe questions to ask everyone in your first two weeks, extra questions by group, a note sheet per interview and a page to sort the themes.
- 30-60-90 day plan templateA blank 30-60-90 day plan and six example plans for plant roles, each with goals, actions, owners, due dates and status.
- Stakeholder map templateA power-interest grid and a stakeholder list with stance, what each person needs, what they worry about and the next conversation.
- 1-1-90 method worksheetOne page: score areas 1 to 5, write the pain point with a before and target number, check days 30, 60 and 90, and plan the next three areas.
- Nemawashi template (stakeholder plan)Plan the one-to-one conversations before a decision: who to talk to in what order, their concerns, what changed and where they stand.
- Gemba walk checklistA walk plan and route, 30 prompts in six groups and a findings table with owners and due dates.
- Manufacturing KPI dashboard templateWeekly plant numbers in, 14 KPIs out: OEE and its parts, first pass yield, scrap, on-time delivery, recordable rate, cost and absence, each against a target.
- A3 problem solving templateThe standard seven-box A3 from background to follow-up, with a filled-in worked example. PDF and Excel.
Doing this in LeanSuite
Leader standard work
What a supervisor, a production manager and a plant manager check each day, with examples by role and free templates to start from.
See Leader standard workKPI Dashboards
Turns raw shop floor data into dashboards anyone can read, so everyone from operators to the plant manager can act on performance.
See KPI Dashboards
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about first 90 days in a new manufacturing role
Run a listening tour in the first two weeks, pull the numbers for your function in week one, walk every shift, agree one problem with your boss by day 30, fix it in one area by day 60, make it stick by day 90, and report back on one page.
A set of one-to-one conversations a new leader holds in the first weeks with their boss, team, peers and people on the floor, asking each the same few questions, to learn what works, what gets in the way and what to fix first before changing anything.
What is going well that I should not break, what gets in the way of your job, what would you fix first in my seat, what has been tried before, who else should I talk to, and what do you need from me.
Yes, in the first two weeks. Night and weekend shifts often run differently and feel forgotten. Walking them early shows you lead the whole plant and lets you see problems the day shift never sees.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.