Practical guide · Quality management

Quality vs production: how to hold parts against the ship date

Short answer

Quality and production are not on opposite sides: both are measured on what reaches the customer. When parts are on hold against a ship date, settle it with facts, a clear owner for the decision and options between ship everything and ship nothing.

The fight between quality and production usually happens because nobody agreed in advance who decides on suspect parts, and on what evidence. Agree that before the next hold: quality owns the disposition of nonconforming product, production owns the plan, and the plant manager breaks a tie. On the day, bring the defect, how many parts could be affected, how you know, and the options: sort and ship the good ones, ship a partial, rework, ask the customer for a deviation, or hold. Open with the customer, not with blame. Ask what the order really needs and what it would take to contain. Never ship suspect parts quietly, and never threaten. Afterwards, write down what was decided and why, and fix what let the defect through.

Last reviewed:

When it comes up on the floor

  • Final inspection finds a burr on three housings from a lot of two thousand, and the truck is booked for this afternoon.
  • A gauge is found out of calibration, and everything it checked since the last good calibration is now in question.
  • The first-piece check after a changeover fails, and production wants to keep running while the setter adjusts.
  • A customer calls about a defect, and the same part is on the dock ready to ship again.
  • An operator flags a color mismatch that is inside the drawing tolerance but outside the boundary sample.
  • The month end is two days away and the production manager needs every part out to hit the number.

In each case the quality person has a real concern and the production person has a real commitment. The conversation goes badly when it becomes about who wins. It goes well when both start from the same question: what can we send this customer that we would be happy to defend?

Agree who decides before the next hold

Most quality versus production fights are really a missing rule. If the rule is written down and signed by the plant manager before anything goes wrong, the conversation on the day is about the parts, not about authority.

A simple split of decisions on suspect product
DecisionUsually owned byNotes
Put product on holdAnyone who finds a suspect part; quality confirmsStopping should be easy. Releasing should take evidence.
Disposition: use as is, rework, sort, scrapQuality, or a material review boardSee the material review board guide for a formal process.
Ask the customer for a deviation or concessionQuality, with sales or the account ownerOnly the customer can accept a known nonconformance.
Change the production plan to cover the shortfallProductionOvertime, another line, a partial shipment.
Break a tie between quality and productionPlant managerRare if the rest is clear. Escalate together, not separately.

General practice. ISO 9001:2015 clause 8.7, control of nonconforming outputs, asks a certified site to identify and control nonconforming output and to keep a record of the decision and who made it. Your own quality manual is the rule that applies.

If your plant has no formal process for disposition, the material review board guide shows how a small group decides on held material. The quality alert form gets the hold to every shift on one page.

What to prepare before you talk to production

  • The defect itself: a part in your hand or a clear photo, and the requirement it breaks (drawing, spec or boundary sample).
  • The scope: which lot, which machine, which shift, from when to when. How many parts could be affected, and how you know.
  • What is already contained: where the parts are, which are tagged, and whether anything has shipped.
  • The options between ship and scrap, with how long each one takes: sort, rework, partial shipment, deviation request.
  • What the customer order really needs: the quantity on the truck, the quantity the customer needs this week, and the penalty or line-down risk if it is late. Sales or the scheduler usually knows.
  • Who else must be in it: the shift supervisor, the scheduler, sometimes the account owner.

Ten minutes of scoping changes the conversation. "There is a problem with the lot" invites an argument. "Three of the first two hundred have a burr on the same edge, all from cavity two, and I can sort the rest by one o'clock" invites a plan.

An opening line

"I have a problem with the lot on the dock and I know the truck is at four. I want to get the customer good parts today if we can. Here is what I found and what I think our options are."

It names the shared goal first, shows you know the deadline matters, and puts facts and options on the table before anyone takes a position.

Questions to ask

  • How many does the customer actually need on this truck, and how many can follow tomorrow?
  • Can we put two people on a sort right now, and who can we spare?
  • Has anything from this lot already shipped? If so, where?
  • What changed on this job since the last good lot: material, tool, setter, program?
  • If we ship a partial, who tells the customer, and when?
  • What would you need from me to make the decision easier?

How to settle it on the day

  1. 1

    Contain first

    Tag and move the suspect parts, stop the process that made them if it is still running, and check whether anything has already shipped. Do this before the meeting, not after.

  2. 2

    Scope with facts

    Check a sample from the start, middle and end of the lot, and from each machine or cavity. Narrow the suspect quantity as far as the evidence allows, and say what you do not know yet.

  3. 3

    Lay out the options

    Ship nothing and ship everything are rarely the only choices. Sort and ship the good parts, ship a partial with the rest to follow, rework, or ask the customer for a deviation. Put a time on each.

  4. 4

    Decide by the agreed rule

    Quality decides on the parts, production decides on the plan. If you cannot agree, take it to the plant manager together, with the same facts, in the same conversation.

  5. 5

    Tell the customer before they find out

    If the shipment will be short or late, or you are asking for a deviation, the account owner and quality call the customer the same day. Customers forgive a late call less than a short truck.

  6. 6

    Write it down

    Record the decision, who made it, the evidence and what happens to the held parts, on the NCR or the hold tag. A decision nobody wrote down gets argued again next month.

What not to say

  • "Quality says no." It makes the decision about a department, not about the parts.
  • "Just ship it, they'll never notice." If they do, the plant loses far more than one truck.
  • "Your people never follow the check sheet." Blame in the moment ends the conversation. Look for the cause afterwards.
  • "I'll go to the plant manager then." Escalate together, as a shared problem, never as a threat.
  • "It's probably fine." Either you have evidence or you do not. Say which.

How to follow up

  • Close the loop on the held parts: sorted, reworked, scrapped or released, with the count and the record.
  • Open a corrective action for how the defect was made and why it was not caught sooner. The 8D guide and the CAPA guide cover the method.
  • At the next daily meeting, the quality and production leads report the decision together. It shows the floor the two functions work as one.
  • If the decision rule was unclear, write it down now and get it signed, so the next hold is shorter.
  • Thank the people who sorted the parts or stayed late. They are the ones who saved the truck.

Worked example: a burr on the last lot before the truck (Illustrative)

An illustrative case, not a customer. At a plant that molds and machines pump housings, final inspection finds a burr on a sealing face. The truck leaves at four. The production supervisor wants the whole lot of 1,200 to go.

  1. 1

    Contain

    The quality engineer tags the pallets on the dock and checks with shipping: nothing from this lot has left. The machining cell is stopped and the tool is checked. One insert is chipped.

  2. 2

    Scope

    She checks parts from the start, middle and end of the lot. The burr only appears after a certain point in the run, which matches the tool counter. About 400 parts are suspect; the first 800 are clean.

  3. 3

    Options

    The scheduler confirms the customer needs 900 this week and 600 on today's truck. Shipping the 800 clean parts covers today. The 400 suspect parts can be sorted and deburred by tomorrow noon.

  4. 4

    Decide

    Quality releases the 800 parts with the check results attached. Production replaces the insert, runs a first piece, and schedules the sort with two operators from the next shift.

  5. 5

    Tell the customer

    The account owner calls the customer's buyer at two o'clock: today's truck carries 800, the rest follows tomorrow. The buyer is fine with it because the call came before the truck.

  6. 6

    Fix the cause

    The corrective action adds a tool life limit for the insert and a sealing face check every hour. The decision and the counts go on the NCR.

Sources

  • ISO 9001:2015, clause 8.7, Control of nonconforming outputs: the requirement to identify and control nonconforming output and to record the decision and the person who made it. Cited by clause number and title only.
  • The rest of this page is general quality and shop-floor practice, not a study. The worked example is illustrative and does not describe a real plant.

FAQ

Questions about quality vs production: the hold against the ship date

  1. Quality, or a material review board, usually decides what happens to suspect parts, and production decides how to cover the plan. The plant manager breaks a tie. Write the rule down before the next hold, so the conversation on the day is about the parts and not about authority.

  2. Sort and ship the good parts, ship a partial with the rest to follow, rework, ask the customer for a deviation, or hold everything. Put a time on each option, narrow the suspect quantity with evidence, and tell the customer before the truck if the shipment will change.

  3. Agree the decision rights in advance, scope every hold with facts, bring options rather than a verdict, and escalate together rather than separately. Report the decision jointly at the daily meeting, and fix the cause so the same hold does not come back.

  4. Both are measured on what reaches the customer. A part that ships on time but fails at the customer costs more than a late part, and a plant that holds everything misses orders. The job is to send what you would be happy to defend, as soon as you can.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.