Flow process chart template: symbols, distance, time and a present against proposed summary

A flow process chart lists every step that a worker, a material or a piece of equipment goes through, in order, and marks each one with a symbol: operation, transport, inspection, delay or storage. Distance is recorded for each move and time for each step. The chart exists to be questioned: once every step is on one page, you ask of each one why it is done, and whether it could go, be combined, change place or be made simpler. This template has a chart for the present method and one for the proposed method, 30 steps each, with columns for quantity, distance, time, symbol and remarks. You pick the symbol and a mark appears in its column, as on the paper form. A summary sheet counts each symbol and adds up the distance and the time for both methods, and shows the saving. The header follows the classic form: chart and sheet number, subject charted, activity, location, and whether the chart follows the worker, the material or the equipment.

See the sheet before you downloadPDF, 2 pages. Also Excel

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Page 1 of the flow process chartA header, a summary box, and rows with distance, time and the five symbols to mark.
Five process chart symbolsWorker, material or equipmentQuantity, distance, timeCounts of each symbolPresent and proposedSaving summarySymbol keyFilled example

Page 1 of the real file. PDF, 2 pages. Also Excel.

When to use it

When to use a flow process chart

  • When a part travels a long way between a few minutes of real work, and you want the moves and waits counted.
  • Before a layout change, with a spaghetti diagram, so the proposed layout can be compared on steps, distance and time.
  • When you study a job that moves around, such as a material handler's or a setter's, and follow the person.
  • At the start of a method study, as the record of the present method that every later idea is tested against.
  • To explain to a team why lead time is long when cycle times are short.

How to fill it in

  1. 1

    Decide what the chart follows

    The worker, the material or the equipment. Pick one and keep to it: a chart that follows the part in one row and the operator in the next cannot be added up.
  2. 2

    Walk the job and write every step

    One row per step, in order, at the place it happens. Include the waits and the put-downs: they are the steps people leave out.
  3. 3

    Give each step one symbol

    Operation, transport, inspection, delay or storage. If a step seems to be two things, split it into two rows.
  4. 4

    Add distance and time

    Distance for every transport, time for every step you can time, quantity where the step handles a batch. Say in the header what the units are.
  5. 5

    Question every step

    Why is it done, why there, why then, why by that person, why that way. Write the idea under remarks: eliminate, combine, rearrange or simplify.
  6. 6

    Chart the proposed method and read the summary

    The summary counts each symbol for both methods and shows the saving in steps, distance and time.

What is in the download

Every page and every sheet of the Flow process chart template

2 PDF pages and 6 Excel sheets, as they come. The worked examples use made-up numbers.

Excel, 6 sheets

The pictures show the top of each sheet with the formulas worked out; the file keeps every row.

The symbols

The five process chart symbols

The symbols are those recommended by the American Society of Mechanical Engineers, as the ILO's Introduction to Work Study uses them. The Excel file marks the column for the symbol you pick; the PDF prints all five in every row for you to mark.

  • Operation

    Shape
    Circle
    What it means
    A main step: the part or material is changed, assembled or prepared.
  • Transport

    Shape
    Arrow
    What it means
    The subject moves from one place to another.
  • Inspection

    Shape
    Square
    What it means
    A check of quality or quantity. It does not move the work forward.
  • Delay

    Shape
    Letter D
    What it means
    Waiting between steps, or laid aside for a while with no record.
  • Storage

    Shape
    Inverted triangle
    What it means
    Kept under control and released only with authority.

A filled-in example

Illustrative, not a benchmark

Illustrative example, not a customer: a material-type chart that follows a tote of 40 brackets from the saw to assembly.

  • The present method has 12 steps: 2 operations (drill, then deburr at a separate bench), 5 transports, 1 inspection, 3 delays and 1 storage. The tote travels 121 m and the timed steps add up to 139.3 minutes.
  • Only 52 of those minutes are drilling and deburring. The tote waits 30 minutes at the saw, 20 for the drill press and 25 for the inspector.
  • The proposed method puts the deburr tool and the gauge at the drill press, has the cart come every 10 minutes, and sends the tote straight to an assembly supermarket.
  • It has 6 steps: 1 operation, 2 transports, 1 inspection, 1 delay and 1 storage, over 46 m and 60.0 timed minutes.

The summary shows 6 fewer steps (3 transports, 2 delays and 1 operation), 75 m less travel and 79.3 minutes less time, almost all of it waiting. The parts, distances and times are made up to show how the chart is used.

Common mistakes

  • Mixing what the chart follows

    Halfway down, the rows stop describing the part and start describing the operator. Decide at the top and check each row against it.

  • Charting the procedure, not the floor

    The written route leaves out the waits, the put-downs and the walk to find a cart. Chart what you see, at the place it happens.

  • Leaving out delays because they are not steps

    On most charts the delays hold most of the time. A chart with no delay symbols was drawn from memory.

  • Stopping at the present method

    The chart is a record to question, not a result. Without a proposed chart beside it, nothing has been improved.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Flow process chart template: common questions

  1. A flow process chart is a list of every step a worker, a material or a piece of equipment goes through, in order, with each step marked as an operation, a transport, an inspection, a delay or a storage. Distance is noted for moves and time for each step. It is used in method study to find steps that can be removed, combined, rearranged or simplified.

  2. A circle for an operation, an arrow for a transport, a square for an inspection, a letter D for a delay and an inverted triangle for storage. They are the symbols recommended by the American Society of Mechanical Engineers. A circle inside a square is sometimes used for an operation and an inspection done together.

  3. An operation process chart shows only the operations and inspections, so you see the shape of the whole product and where parts join. A flow process chart follows one subject and records everything that happens to it, including every move, wait and storage, with distances and times. Use the first for the overview and the second for the detail.

  4. Worker type, which records what the person does; material type, which records what happens to the part or material; and equipment type, which records how a tool or machine is used. The form is the same for all three. The header of this template has a box to say which one the chart is.

  5. A flowchart shows the logic of a process, with decisions and branches. A flow process chart is a straight list of what physically happens to one subject, with a fixed set of five symbols, distances and times, built so the steps can be counted and compared before and after a change.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.