Value added vs non value added: how to classify every element of a job

Short answer

Work is value added when it passes three tests: the customer would pay for it, it changes the product, and it is done right the first time. Everything else is non value added, and that splits in two: work you still need today, and waste you can remove now.

A step is value added only if the customer would pay for it, it changes the form, fit or function of the product, and it is done right the first time. Fail any one test and it is non value added. Non value added work is then split into necessary work (clamping a part, a test the contract requires, a traceability record) and pure waste (walking, waiting, searching, rework). To classify a job, time it element by element, put each element in one of the three classes, and add up the seconds. Value-added ratio = value-added time / cycle time. Process cycle efficiency = value-added time / lead time.

Last reviewed:

What value added and non value added mean

One 90 second cycle, classified

Example numbers

As filmed: 14 elements in the order they happen

Sorted: the same 90 seconds

  • Value added: 29 s (32.2%)
  • Necessary: 25 s (27.8%)
  • Waste: 36 s (40.0%)

A 90 second cycle of 14 elements drawn as a strip in the order the elements happen, each coloured by class, then the same seconds sorted: 29 seconds value added, 25 seconds necessary and 36 seconds waste.

The method in one picture: time the job element by element, give each element a class, then add up the seconds. Here 29 of 90 seconds change the product.

Value-added work is the part of a job the customer is buying: the weld, the torque, the coat of paint. Non value added work is everything else that happens while the job is being done. The labels exist for one reason. A person can be busy for a full shift and add value for a fraction of it, and you cannot see which third until every piece of the job has a label.

Non value added work is not all the same. Some of it has to happen with the equipment and rules you have today: you cannot tighten a bolt without picking up the driver. Some of it does not have to happen at all: the walk to a rack that could stand next to the bench. So there are three classes, not two, and the middle one is where most of the arguments are.

The three classes of work and the names each one goes by

  • Value added

    In plain words
    The customer is paying for this
    Other names
    VA, value-creating work, net work
    Examples at a station
    Seat a gasket, tighten to torque, weld, paint, press, solder
    What to do with it
    Keep it, protect it, make it easier to do right
  • Necessary non value added

    In plain words
    Nobody pays for it, but today the job cannot be done without it
    Other names
    NNVA, business value added, incidental work, semi value added, type one muda
    Examples at a station
    Clamp the part, pick up a tool, load a machine, a test the contract requires, a traceability record
    What to do with it
    Shrink it now, design it out later
  • Waste

    In plain words
    Nobody pays for it and the job can be done without it
    Other names
    NVA, pure waste, type two muda
    Examples at a station
    Walk for parts, wait for a machine, search for a tool, handle a part twice, rework
    What to do with it
    Remove it
Three classes, many names. Whatever your plant calls them, the action in the last row is what separates them. Value-creating, incidental work and waste are the Lean Enterprise Institute's Lean Lexicon terms. Type one and type two muda are from Womack and Jones, Lean Thinking. Business value added is common in Lean Six Sigma.

This page is about one job at one station, classified element by element from a time study. For the same idea at the level of a whole process, with queues and lead time, see cycle time vs lead time. In accounting, value added means something else again, which the questions at the end of this page cover.

The three tests for value-added work

A step is value added only when all three answers are yes. This is the standard Lean Six Sigma wording, and it is strict on purpose.

  1. 1

    Would the customer pay for it?

    Picture the customer watching the step. If they would be happy to see it on the invoice, it passes. If they would ask why they are paying for a walk to the stores or a second inspection, it fails.

  2. 2

    Does it change the product?

    The step must change the form, fit or function of the thing being made: shape it, join it, coat it, assemble it. Moving, counting, checking, storing and recording change nothing about the product, so they fail, however careful the work is.

  3. 3

    Is it done right the first time?

    Doing a step again is never value added, and neither is fixing what an earlier step got wrong. Deburring, touch-up, sorting and retorquing change the product, but only because the first pass did not come out right.

The classification decision tree

  1. Would the customer pay for it?

    Would they accept it on the invoice?

    No: go to 4
  2. Does it change the product?

    Form, fit or function.

    No: go to 4
  3. Is it done right the first time?

    Not a repeat, not a fix.

    No: go to 4
  4. Three yeses

    Value added

    Keep it and make it easier to do right.

Could the job be finished today without it?

Safely, and to the customer's requirements.

No

Necessary

Shrink it now. Write down what would let it go.

Yes

Waste

Remove it.

Three tests in order: would the customer pay for it, does it change the product, is it done right the first time. Three yeses mean value added. A no to any test sends the element to one more question: could the job be finished today without it? If no, it is necessary non value added. If yes, it is waste.

Three yeses on the left and the element is value added. One no anywhere and it drops to the question on the right, which sorts necessary work from waste.

Anything that fails a test is non value added. Then ask one more question to split it: could the job be finished today, safely and to the customer's requirements, if this step were simply skipped? If it could, the step is waste. If it could not, the step is necessary for now.

The words for now matter. Necessary is a statement about today's fixture, today's layout and today's contract. Change the fixture and the clamping step may go. That is why Womack and Jones call this class type one muda: it creates no value but is unavoidable with current technologies and production assets.

Rules for the hard cases

Most elements sort themselves. A dozen do not, and they are the same dozen in every plant. Agree a rule for each one before the study, write the rules down and use them on every study, or two engineers will get two different ratios from the same video.

Where the hard cases usually land

Value added

Passes all three tests

  • Packing and labels the customer specified
  • Cleaning that the next process step needs

Necessary

Fails a test, but the job cannot be done without it today

  • Inspection and gauging
  • A test the contract requires
  • First pick and place of a part
  • Reaching for a tool at the point of use
  • Loading, clamping, unloading
  • Setup and changeover
  • A record the customer or a standard requires

Waste

Fails a test and the job can be done without it

  • Walking
  • Waiting
  • Watching a machine run
  • Handling a part a second time
  • Searching
  • Rework, deburr, touch-up, sort
  • Writing the same thing twice

Three columns. Value added: packing and labels the customer specified, cleaning the next process step needs. Necessary: inspection, a required test, the first pick and place, reaching for a tool, loading and clamping, setup, a required record. Waste: walking, waiting, machine watching, second handling, searching, rework, writing the same thing twice.

The middle column is the one to watch. Anything in it slides to the right the moment it is done twice, duplicates another step or outlives the reason it was added.
Hard cases: the usual class and the rule behind it
ActivityUsual classThe ruleWhen it is plain waste
Inspection and gaugingNecessaryIt changes nothing about the product, so it is never value added. It is necessary while a contract, a regulation or the process's own failure rate requires it.A second check of something already checked, or a check that has not found a defect in years.
A test the customer specifiesNecessaryA leak test or a pressure test does not change the part. Some plants call it value added because the customer pays for the certificate. Pick one answer and write it down.Tests repeated because the first result was not recorded or not trusted.
WalkingWasteWalking with or without a part changes nothing. Treat every step as waste, then accept the few that the layout truly forces.Nearly always. The exception is a walk between machines in a multi-machine cell that is part of the designed route.
Material handlingNecessary for the first touch, waste after itOne pick and one place per part is the minimum. Unwrapping, restacking, turning the part over and moving it between containers are extra touches.Any second handling of the same part: tote to bench, bench to fixture, fixture back to bench.
Reaching for a tool or partNecessaryThe tool has to be in the hand. The reach is necessary; a long reach, a bend or a look around for it is not.Reaches outside easy arm's length, bending to floor level, searching.
Loading, clamping, unloadingNecessaryThe Lean Lexicon's own example of incidental work. The part must be held, but holding it is not what the customer buys.Clamps that need a second try, or loading that waits for a hoist.
Setup and changeoverNecessaryA changeover makes no product. It is necessary while the line runs more than one part number, and every minute of it is a target for SMED.Hunting for tools, waiting for a forklift, trial pieces and adjustments.
Rework, deburr, touch-up, sortWasteIt fails the third test. Time the rework as its own element so it is not hidden inside a value-added one.Always.
WaitingWasteWaiting for a part, a machine, a crane, a signature or an answer. Nothing happens to the product.Always, including the wait that feels like a rest.
Watching a machine runWaste for the operatorThe machine's cycle may be value added. A person standing in front of it adds nothing, unless the method calls for a specific check during the cycle.Whenever the machine would stop itself on a fault.
Paperwork and data entryNecessary if something outside the station requires itA traceability record or a signed check may be required by the customer or a standard. Count it as necessary, then ask whether a scan could capture it.Writing the same number in two places, or filling a form nobody reads.
Packing and labelingValue added for what the customer receivesThe box and label the customer specified pass all three tests in most rule sets. Internal repacking between steps does not.Wrapping for a move inside the plant, then unwrapping at the next step.
Cleaning the part or the stationDepends on what it is forCleaning the part that the next process step needs (degreasing before paint) changes the product. Cleaning up a mess the process makes is necessary until the source is fixed.Cleaning the same spill every cycle.

These are working rules, not a standard. No published standard fixes the class of each activity, so the rules you write are the rules. What matters is that the same rule is used on every study.

Two habits make the rules stick. First, classify the element, not the person: a skilled operator doing a pointless step fast is still doing a pointless step. Second, when the team cannot agree whether something is necessary or waste, call it necessary and write next to it what would have to change for it to go. The argument is usually about that change, not about the label.

How to classify every element of a job from a time study

A time study already breaks the job into elements and puts a time on each. Classification adds one column to that sheet: the class of each element.

From an element list to a list of changes

  1. 1

    Start from an element list with times

  2. 2

    Split any element that holds two classes

  3. 3

    Put each element through the three tests

  4. 4

    Split the rest into necessary and waste

  5. 5

    Spread occasional elements over the cycle

  6. 6

    Add up the seconds by class

  7. 7

    Work out the ratios

  8. 8

    Review it with the operator

Steps 2 and 5 are the ones that get skipped, and both make the job look better than it is.
  1. 1

    Start from an element list with times

    Use the average time per element over the cycles you timed, from a stopwatch study or from video. If you do not have one yet, the guide to breaking a job into elements covers where to put the break points.

  2. 2

    Split any element that holds two classes

    "Get housing and load fixture" is a walk plus a load. Split it into two elements, because one is waste and the other is necessary. An element should carry one class only. Skip this and the ratio flatters the job.

  3. 3

    Put each element through the three tests

    Customer would pay, changes the product, right the first time. Three yeses make it value added. Use your written rules for the hard cases so the answer does not depend on who is holding the pen.

  4. 4

    Split the rest into necessary and waste

    For each element that failed, ask whether the job could be finished today without it. If not, it is necessary. Write the reason next to it: fixture, layout, contract, regulation.

  5. 5

    Spread occasional elements over the cycle

    Some things do not happen every cycle: a rework on 1 unit in 10, a tote change every 24 parts. Divide the time by how often it happens and add that share to every cycle. Leaving these out is the second way ratios get flattered.

  6. 6

    Add up the seconds by class

    Total the three classes and check that they add up to the cycle time. Then split the waste by type, such as walking, waiting and rework, because each type has a different fix.

  7. 7

    Work out the ratios

    Value-added ratio = value-added time / cycle time. Write the bottom line next to the number every time, so nobody compares a ratio on cycle time with one on lead time.

  8. 8

    Review it with the operator

    Walk through the classified list with the person who does the job. They will know why a step exists, which ones they would drop first, and what the study missed on a bad day. Then pick the changes and study the job again afterwards.

A worked example: one station, 14 elements

Illustrative example. One operator assembles a pump housing and leak tests it. A video time study over 20 cycles gives the average times below. The average cycle is 90 seconds, so the station makes 40 housings an hour.

Illustrative: the pump housing job classified element by element
#ElementTime (s)ClassWhy
1Walk to rack, pick housing, walk back7WasteWalking. The rack could stand at the bench.
2Load housing in fixture and clamp4NecessaryThe part must be held. Nothing about it changes.
3Seat gasket in groove5Value addedAssembly. Passes all three tests.
4Position cover on housing4Value addedAssembly.
5Start four bolts by hand8Value addedAssembly.
6Pick up torque driver2NecessaryA short reach to a tool hung at the point of use.
7Tighten four bolts to torque12Value addedThe joint the customer is buying.
8Unclamp and carry to leak tester5NecessaryHandling the layout forces today.
9Wait for tester to finish the part before9WasteWaiting.
10Load tester and press start4NecessaryThe contract requires the test.
11Stand and watch the test run15WasteThe tester stops itself on a fail. Watching adds nothing.
12Unload, read result, place in tote4NecessaryFirst and only handling into the tote.
13Write serial number on traveler6NecessaryTraceability the customer requires.
14Reseat gasket and retorque after a failed test5WasteRework: 50 s on 1 unit in 10, spread over every cycle.
Total90

Element 14 does not happen every cycle. It takes 50 seconds on 1 unit in 10, so it adds 50 / 10 = 5 seconds to the average cycle.

Illustrative: the pump housing cycle by class
ClassElementsSecondsShare of the cycle
Value added3, 4, 5, 72932.2%
Necessary non value added2, 6, 8, 10, 12, 132527.8%
Waste1, 9, 11, 143640.0%
Total14 elements90100%

Waste by type: watching the tester 15 s, waiting for the tester 9 s, walking 7 s, rework 5 s.

From cycle time to value-added time

Example numbers
  • Cycle time90 s
  • minus watching the tester15 s
  • minus waiting for the tester9 s
  • minus walking7 s
  • minus rework5 s
  • minus necessary work25 s
  • Value-added time29 s
  • Waste: 36 s
  • Necessary: 25 s
  • Value added: 29 s

A waterfall from the 90 second cycle: minus 15 seconds watching the tester, 9 waiting for it, 7 walking and 5 on rework leaves 54 seconds; minus 25 seconds of necessary work leaves 29 seconds of value-added time, 32.2% of the cycle.

Read down. The four yellow steps are waste, largest first, and they take the cycle from 90 to 54 seconds. The lavender step is work the job still needs today. What is left, 29 seconds, is 32.2% of the cycle.

The operator works without a pause for 90 seconds, and 29 of them are the product being built. The biggest single loss is not walking or rework. It is 24 seconds of waiting for and watching a machine, which nobody on the floor would have called a problem.

The percentages: value-added ratio and process cycle efficiency

Two ratios use the same top line and different bottom lines. Mixing them up makes one of them look broken: in the example on this page the first is 32 percent and the second is 0.17 percent, for the same part.

Value-added ratio and process cycle efficiency side by side

  • Value-added ratio of a job

    Formula
    Value-added time / cycle time
    Scale
    One operator, one station, one cycle
    Where the numbers come from
    A classified time study
    What the rest of the time is
    Necessary work and waste inside the job
    Use it to
    Redesign the job and the workstation
  • Process cycle efficiency (PCE)

    Formula
    Value-added time / lead time
    Scale
    One unit through the whole process, queues included
    Where the numbers come from
    A value stream map or a lead time worksheet
    What the rest of the time is
    Mostly waiting between steps
    Use it to
    Cut queues, batches and lead time
Same top line, different bottom line, different use. Process cycle efficiency is also called the value-added ratio in some books, and manufacturing cycle efficiency in accounting. Say which bottom line you used.
Illustrative: both ratios for the pump housing
StepWorkingResult
Value-added time at the station5 + 4 + 8 + 1229 s
Cycle time at the stationSum of all 14 elements90 s
Value-added ratio of the job29 / 9032.2%
Value-added time across all operationsMachining, coating, this station and final assembly10 min
Lead time, casting received to pump shipped4 days x 24 h x 60 min5,760 min
Process cycle efficiency10 / 5,7600.17%

Use the same clock on both lines of a ratio. Lead time here is calendar time, which is how the customer counts it.

Same top line, two bottom lines

Example numbers

Value-added ratio of the job

29 s / 90 s = 32.2%

Bottom line: cycle time at one station.

Process cycle efficiency

10 min / 5,760 min = 0.17%

Bottom line: lead time through every step. The 10 value-added minutes are 0.17% of this bar, less than the width of its left edge.

Two bars. The first is the 90 second cycle with 29 seconds value added, a ratio of 32.2%. The second is the lead time of 5,760 minutes with 10 minutes value added, a process cycle efficiency of 0.17 percent, too thin to draw to scale.

Both bars are drawn to their own scale. At the station a third of the bar is value added. Across the process the value-added part is thinner than the outline of the bar, because nearly all of the lead time is the part waiting between steps.

Neither number has a universal target. A value-added ratio depends on how strict your hard-case rules are, and a PCE depends on whether lead time is counted in calendar or working hours. Compare a job with itself before and after a change, or with another job classified under the same rules. The lead time calculator works out the process-level ratio from your own numbers.

What to do with each class

  • Waste: remove it. Start with the largest type by seconds, not the most visible one. Walking goes with layout and parts presentation, waiting with sequence and line balance, rework with the cause of the defect.
  • Necessary: shrink it now and design it out later. A quicker clamp, a tool on a balancer, a scan in place of a handwritten number. Each one stays on a list with the change that would remove it.
  • Value added: keep it and make it easier to do right. Do not ask for it to be done faster. A value-added element gets shorter through a better tool or a better design, not through effort.

On the pump housing station, three changes need no capital. Move the housing rack to the bench. Have the operator start the next housing while the tester runs, which removes both the watching and the wait for the tester. The rework stays until the cause of the failed tests is found.

Illustrative: the pump housing cycle before and after the first changes
BeforeAfter
Value added29 s29 s
Necessary non value added25 s25 s
Waste36 s5 s
Cycle time90 s59 s
Value-added ratio32.2%49.2%
Housings an hour4061

Waste removed: walking 7 s, waiting 9 s and watching 15 s, 31 s in all. Output per hour = 3,600 / cycle time, before allowances.

The cycle before and after, on one scale

Example numbers

Before: 90 s cycle

32.2% value added, 40 an hour

After: 59 s cycle

49.2% value added, 61 an hour

  • Value added, seconds
  • Necessary
  • Waste

Before: 90 seconds, of which 29 value added, 25 necessary and 36 waste, 40 housings an hour. After: 59 seconds, of which 29 value added, 25 necessary and 5 waste, 61 housings an hour.

The dark and lavender blocks are the same width in both bars. Only the yellow block shrank, from 36 to 5 seconds, and the cycle went from 90 to 59 seconds with nobody working faster.

Value-added time did not move. Nobody worked faster. The cycle dropped by a third because 31 seconds that were never work were taken out. Whether that becomes more output or fewer labor hours depends on demand; the guide to labor losses covers how the gain shows up in the labor numbers, and standard time covers turning the new cycle into a standard.

Typical traps

Traps in value-added analysis and what to do about each

  • Trap

    Elements that are too big

    What goes wrong: "Assemble cover" gets one label, value added, and hides a walk, two reaches and a rework inside it.

    Do this

    Split at every change of class. When an element is long, look for a second class inside it.

  • Trap

    Calling everything necessary

    What goes wrong: The middle class becomes the place where every awkward step is parked, and the waste total looks small.

    Do this

    For each necessary element, write what would have to change for it to go. No reason, no necessary.

  • Trap

    Leaving out occasional work

    What goes wrong: Rework, tote changes and jams are not in the cycles that were timed, so the ratio is too good.

    Do this

    Time them when they happen, note how often, and spread them over the cycle.

  • Trap

    Timing only the best operator on a good hour

    What goes wrong: The study shows a tidy cycle that the other two shifts never see.

    Do this

    Film more than one operator and more than one time of day. The guide to time study mistakes has the full list.

  • Trap

    Counting machine time as operator value

    What goes wrong: A 15 second machine cycle is added to the operator's value-added time while the operator stands still.

    Do this

    Classify the person and the machine on separate lines.

  • Trap

    Comparing ratios with different bottom lines

    What goes wrong: A 32 percent station ratio is set against a 0.2 percent process figure and one of them looks broken.

    Do this

    Write the bottom line next to every ratio: cycle time or lead time.

  • Trap

    Chasing the percentage

    What goes wrong: The ratio rises because necessary work was relabeled, not because anything changed on the floor.

    Do this

    Track seconds removed and where they went. The ratio is the summary, not the goal.

Most of these make the ratio look better than the job is.

The people side: what the labels mean to an operator

Tell an operator that 68 percent of their work is non value added and you have told them, as they hear it, that two thirds of their effort is worthless. That is not what the number says. It says the job as designed asks them to walk, wait and handle for two thirds of the cycle. The design is being judged, and the designer was usually an engineer or a layout nobody chose.

  • Say before the study what is being classified: the steps of the job, not the pace or the person.
  • Classify with the operator in the room. They know why each step exists and which ones they would drop.
  • Say what happens to the time saved before anyone asks. If the honest answer is not decided yet, say that.
  • Show the result as seconds by type of waste, with the fix next to each, not as a single percentage.

This is general practice, not legal or labor relations advice. Where a union agreement or works council covers work measurement, follow it.

Where value-added analysis is the wrong tool

  • It says nothing about pace. A job can be 60 percent value added and still slow. Rating and allowances belong to standard time.
  • It does not see strain. A value-added element done with a bent back and a raised arm is still a problem; that needs an ergonomic assessment.
  • It is weak on knowledge work and long, irregular jobs such as maintenance, where elements do not repeat. Work sampling gives the shares of time there.
  • It treats the customer's view as the only view. Safety steps and legal records fail the customer test and still stay. The middle class exists so they are counted honestly, not so they can be cut.
  • One station's ratio says little about the plant. A station can reach 50 percent while the part still waits four days between steps.

Templates and tools

LeanSuite's time and motion study does the classification from video: every element is timed on a timeline that links back to the footage and split into value-added, necessary and waste, with the shares of each, for an engineer to check and certify. Two studies can be put side by side with their value-added percentages.

FAQ

Questions about value added vs non value added

  1. Non-value-added activities are steps that fail at least one of three tests: the customer would pay for it, it changes the product, and it is done right the first time. They split into two groups. Necessary ones, such as clamping a part or a test the contract requires, stay for now. Pure waste, such as walking, waiting, searching and rework, can be removed without the customer noticing anything except a shorter lead time.

  2. Value added is the part of the work the customer is actually buying. In a factory it is the step that changes the product into what the customer ordered: the cut, the weld, the assembly, the coat of paint. Moving the part, checking it, storing it and fixing it may all be needed today, but none of them is what the customer is paying for.

  3. Tightening four bolts to the specified torque on a pump housing is value creation: it changes the product, the customer needs the joint, and it is done once. Walking to fetch the housing, clamping it, waiting for the leak tester and reworking a failed gasket are not. In the worked example on this page, 29 seconds of a 90 second cycle create value.

  4. Inspection is non value added, because it does not change the product. It is usually classed as necessary non value added while a contract, a regulation or the process's own defect rate requires it. It becomes plain waste when it repeats a check already made or checks something that never fails. Removing an inspection is a decision about process capability and customer requirements, not about a label.

  5. Add up the time of the value-added elements and divide by the total time. For one job, divide by the cycle time: 29 seconds of value-added work in a 90 second cycle is 32.2 percent. For a whole process, divide by the lead time, which gives process cycle efficiency: 10 minutes of value-added work in a 5,760 minute lead time is 0.17 percent. Always say which bottom line you used.

  6. There is no universal target, because the number depends on your classification rules and on the bottom line. A station ratio on cycle time will always be far higher than a process figure on lead time, because lead time includes every queue. The useful comparison is the same job before and after a change, or two jobs classified under the same written rules.

  7. In accounting and economics, value added is the value of what a business sells minus the cost of the goods and services it bought in to make it. It is a money measure of a whole business or a whole economy. It has nothing to do with classifying steps in a job. A step can be non value added in the lean sense inside a business with high value added in the accounting sense.

  8. No. In accounting, value added is sales minus bought-in materials and services. Profit is what is left of that value added after wages, depreciation, interest and taxes are paid. A business can have high value added and no profit. In lean, value added is a different idea again: the work the customer would pay for, measured in time, not money.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.