Skip to content
LeanSuite

Free template

Updated

Two-handed process chart template (left hand, right hand chart)

A two-handed process chart, also called a left-hand right-hand chart, records what each hand does at every moment of one cycle, side by side, so that what the two hands do at the same time sits on the same row. Each hand's activity gets one of four symbols: operation (grasp, position, use or release), transport (the hand moves), delay (the hand is idle) and hold (the hand holds the work still). On this chart the storage triangle is read as hold. Holds and delays are the hands doing no work, and most of what a first chart finds is one of them. This template has a chart of 25 rows for the present method and one for the proposed method, with a space to describe the workplace layout. You pick a symbol for each hand and the mark appears in its column. The sheet counts each symbol for each hand, shows holds and delays as a share of all hand activities, and works out the hand activities for each finished unit, so a method that makes two parts a cycle can be compared fairly.

See the sheet before you downloadPDF, 2 pages. Also Excel

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Page 1 of the two-handed process chartA layout box, a summary, and rows with four symbols for each hand.
Left hand and right handOperation, transport, delay, holdLayout sketchCounts for each handHolds and delays sharePresent and proposedFor each finished unitFilled example

Page 1 of the real file. PDF, 2 pages. Also Excel.

When to use it

When to use a two-handed process chart

  • For short, repetitive bench work, where the gains are inside the cycle and not between stations.
  • When one hand is being used as a fixture, holding a part while the other does all the work.
  • Before designing a fixture, a nest or a bin layout, to see what each hand needs and when.
  • When training people to analyze work: it is the simplest chart that forces you to watch both hands.
  • To record a method in enough detail to teach it and to check it later.

How to fill it in

  1. 1

    Watch, then sketch the workplace

    Watch several cycles before writing anything, or film them. Describe or sketch where the bins, the fixture, the tools and the finished parts are.
  2. 2

    Chart one hand at a time

    Start at the pick-up of a new part and follow one hand through the cycle. Then go back and follow the other.
  3. 3

    Line the two hands up

    What the hands do at the same moment goes on the same row. If one hand does three things while the other holds, the hold is written on all three rows.
  4. 4

    Pick a symbol for each hand

    Operation, transport, delay or hold. A check done by hand is charted as an operation. The sheet marks the column and turns holds and delays pink.
  5. 5

    Read the summary

    Counts for each hand, and holds and delays as a share of all hand activities. Both hands should have the same number of rows.
  6. 6

    Chart the proposed method and compare

    A fixture can take over a hold, and an idle hand can be given work. Enter the units made in one cycle so the comparison is for each finished unit.

What is in the download

Every page and every sheet of the Two-handed process chart template

2 PDF pages and 6 Excel sheets, as they come. The worked examples use made-up numbers.

Excel, 6 sheets

The pictures show the top of each sheet with the formulas worked out; the file keeps every row.

A filled-in example

Illustrative, not a benchmark

Illustrative example, not a customer: fitting a seal and a nut to a cable gland body at a seated bench.

  • In the present method the left hand picks up the body and then holds it for five rows while the right hand fetches and fits the seal, then fetches and starts the nut.
  • The left hand then carries the finished gland to a tote while the right hand waits. The chart has 10 rows: left hand 2 operations, 3 transports and 5 holds; right hand 4 operations, 4 transports and 2 delays.
  • That is 7 holds and delays in 20 hand activities, 35% of the hands' work.
  • The proposed method uses a nest that holds two bodies, bins in pairs on each side and a drop chute. Both hands do the same thing at the same time for 13 rows and make two glands a cycle, with no holds or delays.

Hand activities for each gland fall from 20 to 13. The counts are not times, so the new method still has to be timed. The job is made up to show how the chart is used.

Common mistakes

  • Charting each hand's column separately

    If the rows do not line up in time, the chart cannot show that one hand waits while the other works. Fill in both hands row by row once you have followed each.

  • Recording a hold as an operation

    Holding a part is not work on the part. Mark it as a hold every row it lasts, even when it feels like part of the assembly.

  • Too little or too much detail

    Get and fit seal hides a reach, a grasp, a carry and a position. But charting every finger movement makes the chart unreadable. One row per reach, grasp, carry, position or use is about right.

  • Treating the counts as times

    A method with fewer hand activities is usually faster, but not always. Time the proposed method before changing the standard.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Two-handed process chart template: common questions

  1. A two-handed process chart records what the left hand and the right hand each do during one cycle of a job, in two columns, with what happens at the same moment on the same row. Each activity is marked as an operation, a transport, a delay or a hold. It shows where a hand is idle or is being used as a fixture, so the work can be shared between both hands.

  2. Four: a circle for an operation (grasp, position, use or release), an arrow for a transport (the hand moving to or from the work), a letter D for a delay (the hand is idle) and an inverted triangle for a hold. On other process charts the triangle means storage. An inspection done by hand is normally charted as an operation.

  3. In a hold, the hand is keeping a part or a tool still, usually while the other hand works on it. In a delay, the hand is doing nothing at all. Both mean the hand is not doing productive work. A hold is usually removed with a fixture or a nest, and a delay by giving the idle hand part of the other hand's work.

  4. A left-hand right-hand chart, an operator process chart or a workplace chart. When the same chart is drawn against a time scale with very fine motions, timed from film, it is called a simo chart, short for simultaneous motion cycle chart.

  5. Divide by the units made in one cycle. The template has a cell for it on each chart, and the summary shows hand activities for each finished unit. In the example, a present method with 20 hand activities for one gland is compared with a proposed method with 26 for two glands, which is 13 each.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.