Skip to content
LeanSuite

Free template

Updated

Labor loss tree worksheet, with overall labor effectiveness (OLE)

A labor loss tree breaks a crew's paid hours into parts until each part has a cause someone can fix. This one has two layers. The first is time lost against the standard, which a labor report can see: not working (starving, blocking, changeover, other idle time), working below standard (micro-stops, searching, learning) and working on bad product (rework and scrap). These three branches are the three factors of overall labor effectiveness, and the sheet works out availability, performance, quality and OLE from them. The second layer is waste built into the standard itself, which only a time study finds: movement (walking, reaching and bending, double handling), built-in waiting (machine watching, imbalance) and extra work (over-processing). You type hours for the first layer and seconds per unit for the second; the sheet turns everything into labor hours, ranks the losses, charts the largest and shows the hours left that changed the product. It is a different tool from our loss tree worksheet, which splits a plant's total loss by area, line and machine, and from the six big losses worksheet, which covers one machine.

See the sheet before you downloadPDF, 2 pages. Also Excel

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Page 1 of the labor loss tree worksheetThe shift, an OLE box and six branches of losses in two layers.
Two layers, six branches15 labor lossesOLE calculationUnexplained gapValue-added hoursRanked lossesChartFilled example

Page 1 of the real file. PDF, 2 pages. Also Excel.

When to use it

When to use a labor loss tree

  • When labor efficiency looks acceptable on the report and the line still feels slow.
  • After a time study has classed every element, to put the waste inside the standard next to the losses the report already shows.
  • To choose between projects: rebalancing, a layout change, changeover work or a quality fix all show up in the same unit, labor hours.
  • Before quoting an OLE figure to anyone, so the definition is written down with the number.
  • At the start of a line improvement, as the baseline you will measure against.

How to fill it in

  1. 1

    Fill in the shift

    Operators, paid hours each after breaks, units made, units good first time and the standard labor minutes per unit.
  2. 2

    Enter the idle time by reason

    Branch A takes the idle labor hours from the supervisor's log: waiting for parts, blocked by the next station, waiting out a changeover, other. Paid hours minus branch A is hours worked.
  3. 3

    Enter what you can explain of the speed loss

    Branch B takes the labor hours lost to micro-stops, searching and learning. The sheet works out the rest of the gap between hours worked and standard hours produced, and shows it as unexplained.
  4. 4

    Let the sheet work out the quality loss

    Branch C is units not good first time multiplied by the standard time. If rework has its own routing and standard, it has dropped out of this number: note that.
  5. 5

    Enter the waste inside the standard

    Branches D, E and F take seconds per unit from a time study that classed every element: walking, reaching, double handling, machine watching, imbalance, over-processing. Enter the necessary seconds too. The sheet multiplies by good units.
  6. 6

    Read the tree and the ranking

    Paid hours, what the report can see, what only the study sees, and value-added hours. The three largest losses are highlighted and charted. Write the cause and the next step beside each.

What is in the download

Every page and every sheet of the Labor loss tree worksheet

2 PDF pages and 2 Excel sheets, as they come. The worked examples use made-up numbers.

Excel, 2 sheets

The pictures show the top of each sheet with the formulas worked out; the file keeps every row.

The tree

The six branches and the losses in each

Branches A, B and C are measured against the standard and line up with the three factors of OLE. Branches D, E and F sit inside the standard, so no ratio that uses the standard as its yardstick can see them.

  • A. Not working

    Layer
    Against the standard: availability
    Losses on the sheet
    Starving, blocking, changeover, other idle time
    How it is entered
    Labor hours from the shift log
  • B. Working below standard

    Layer
    Against the standard: performance
    Losses on the sheet
    Micro-stops, searching, learning, unexplained gap
    How it is entered
    Labor hours; the gap is worked out
  • C. Working on bad product

    Layer
    Against the standard: quality
    Losses on the sheet
    Rework and scrap
    How it is entered
    Worked out from the counts
  • D. Movement

    Layer
    Inside the standard
    Losses on the sheet
    Walking, reaching and bending, double handling
    How it is entered
    Seconds per unit from a time study
  • E. Built-in waiting

    Layer
    Inside the standard
    Losses on the sheet
    Machine watching, imbalance
    How it is entered
    Seconds per unit from a time study
  • F. Extra work

    Layer
    Inside the standard
    Losses on the sheet
    Over-processing
    How it is entered
    Seconds per unit from a time study

A filled-in example

Illustrative, not a benchmark

Illustrative example, not a customer: six operators on a filter assembly line for one shift.

  • Each operator is paid for 7.5 hours, 45.0 in all. The line makes 600 filters, 570 good first time, against a standard of 3.6 labor minutes per filter.
  • The log shows 4.5 idle hours: 3.0 waiting for housings, 0.5 blocked and 1.0 in a changeover. Hours worked are 40.5 and standard hours produced are 36.0, so 4.5 hours went on working below standard, of which 3.0 are explained. The 30 filters that were not good cost 1.8 hours.
  • Availability is 90.0%, performance 88.9% and quality 95.0%, an OLE of 76.0%.
  • The time study finds 72 seconds of waste in the 216 second standard: walking 22, machine watching 18, imbalance 14, double handling 12 and over-processing 6. Over 570 good filters that is 11.4 hours, with walking the largest single loss at 3.48 hours.

The report sees 10.8 lost hours and the time study finds another 11.4 inside the standard. Of 45 paid hours, 14.25 changed the product. The line and its numbers are made up; they are the worked example of our labor losses guide.

Common mistakes

  • Stopping at OLE

    OLE measures paid hours against the standard. Walking and machine watching that were there when the job was timed are inside the standard, and OLE counts them as earned hours.

  • Quoting OLE without its definition

    OLE has no single standard and plants count idle time differently. This sheet uses availability on paid hours, performance against the labor standard and first-time quality. Write that down with the number.

  • Adding the two layers into one percentage

    Hours lost against the standard and hours of waste inside it are both real, but they are measured differently. Show both in hours, side by side, and rank them together.

  • Reading it as a grade for the crew

    Starving, blocking, imbalance, long reaches and double handling are designed into the line, the layout and the schedule. The people doing the job did not choose them.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Labor loss tree worksheet: common questions

  1. A labor loss tree splits a crew's paid hours into branches until each branch has a cause someone can fix. The first split is whether a loss is measured against the standard, such as idle time, slow running and rework, or hidden inside the standard, such as walking, machine watching and double handling. The second kind only shows up in a time study.

  2. OLE = availability x performance x quality. Availability is hours worked divided by hours paid. Performance is standard hours produced divided by hours worked. Quality is good units divided by all units made. A crew paid for 45 hours that works 40.5, produces 36 standard hours and gets 570 good units from 600 has an OLE of 76.0%. OLE has no single standard, so write down how you count idle time.

  3. The loss tree worksheet breaks a plant's total loss down by area, line, machine and cause, in money or hours of any kind. The six big losses worksheet sorts one machine's lost time into the OEE factors. This sheet is about people: paid labor hours, the labor standard, OLE and the waste inside the job itself.

  4. From a time study that classes every element of the job as value added, necessary or waste. Add up the waste elements by kind, such as walking or machine watching, across every operator on the line, and enter the labor seconds per unit. A value-added analysis worksheet for each station gives you these numbers.

  5. Then standard hours produced are more than hours worked, performance is over 100% and the unexplained gap shows zero. The check line at the foot of the tree goes below zero by the same amount. It usually means the standard is loose, which is a reason to study the job, not a result to celebrate.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.