Element breakdown sheet: split a job into timeable elements, with break points

An element breakdown sheet is the list of the smallest steps of a job, in order, that you will time one by one in a time study. Each element ends at a break point, an instant you can see or hear, such as a click or a hand leaving the part, so any observer calls it at the same moment. This sheet gives each element a row and sorts it four ways: who does the work (manual, walk, machine or wait), whether it happens every cycle or only now and then, whether its time is constant or varies with the product, and whether it belongs in the job at all. Page 2 of the PDF and the Example tab show a gear pump cover cycle of 0.76 minute broken into nine elements.

See the sheet before you downloadPDF, 2 pages. Also Excel

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The element breakdown sheetColumns for element, starts when, ends when the break point, see or hear, who, how often, constant or variable and trial time.
Start and break point per elementSee or hear cueManual, walk, machine, waitRepetitive or occasionalConstant or variableForeign elementsFilled example

Page 1 of the real file. PDF, 2 pages. Also Excel.

Filled-in Element breakdown sheet: a pump cover job cut into seven elements
The same sheet filled in with the worked example (page 2 of the PDF, illustrative numbers). Open full size (opens the picture in a new tab)

When to use it

When to use the element breakdown sheet

  • Before any time study, to turn a job into a list of elements that can be timed the same way twice.
  • When two analysts time the same job and the numbers will not match, usually because they cut it differently.
  • When a job mixes hand work with a machine cycle and the machine time must be kept out of the rating.
  • When a job has work that comes up once in so many cycles, like a tote change, that needs its own treatment.

How to fill it in

  1. 1

    Watch five cycles first and write when the cycle starts and ends

    Fill in the header and the two lines that define the cycle. Every cycle starts the same way and ends the same way, so the study counts the same thing each time.
  2. 2

    Write each element in order, ending at a break point

    One row per element: what is done, when it starts, and the break point where it ends. The end of one element is the start of the next, so the cycle has no gaps. Mark whether you see the break point or hear it.
  3. 3

    Sort each element

    Who does it: manual, walk, machine or wait. How often: repetitive, or occasional with the number of cycles between occurrences. Constant or variable, and what it varies with, such as the bolt count by model.
  4. 4

    Put in a trial time and add the totals

    Use a rough time for each element from the pilot cycles. In the Excel file the cycle time of the repetitive elements and the occasional work per cycle add up for you.
  5. 5

    Log the foreign elements and try the list on five cycles

    Anything seen that is not part of the job, like a question from a supervisor, goes in the foreign element box with its time and is kept out of the element times. If you cannot call a break point the same way twice, rewrite it.

A filled-in example

Illustrative, not a benchmark

An illustrative cycle: assembling and leak-testing a gear pump cover, one cycle of 0.76 minute.

  • Seven elements happen every cycle, from getting the housing to unloading the pump, and total 0.76 minute.
  • The leak test takes 0.20 minute from the press of start. The operator labels for the first 0.07 and waits for the other 0.13, so the wait is its own element and stays visible.
  • Changing the empty housing tote takes 0.48 minute once every 24 pumps, and recording the leak rate takes 0.15 once every 10. They add 0.020 and 0.015 minute to each cycle.
  • The supervisor's question after cycle 3, 0.21 minute, is logged as a foreign element and left out.

The time per cycle across all elements is 0.795 minute. The two bolt elements are marked variable, since the bolt count is 4 or 6 by model, so they get timed for each model. The job and the numbers are made up.

Common mistakes

  • Elements with no break point

    If the observer is unsure where an element ends, the times drift. Write the sight or sound that ends it and test it on five cycles.

  • Elements too long to show where the time goes

    Three lumps hide which motion swings. Cut at every break point you can see or hear, and merge only what is too short to time, about 0.04 minute (2.4 seconds) with a stopwatch.

  • Hand work and machine time in one element

    Machine time is not rated. If it sits inside a hand element, the rating is wrong. Keep machine time and waiting as their own elements.

  • Timing a once-in-24-cycles task as if it happened every cycle

    An occasional element timed in a few cycles and averaged over all of them overstates the job. Record how often it comes up and spread its time over the cycles it serves.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Element breakdown sheet: common questions

  1. An element is one distinct step of a job, such as getting the housing or driving the screws, that has a clear start and a clear end and can be timed by itself. A job is a list of elements in order, and the standard time is built from their times.

  2. A break point is the instant that ends one element and starts the next, chosen so an observer can see or hear it: a click, a hand leaving the part, a lamp coming on. A good one is called at the same moment every time.

  3. Long enough to time and short enough to show where the time goes. The ILO puts the floor at about 0.04 minute for a stopwatch. Video lets you go shorter. A one minute job split into three or four elements is usually too coarse.

  4. A constant element takes the same time whatever the product, such as placing a part in a tote. A variable element changes with size, weight or count, such as running down four bolts or six. Time variable elements for each variant.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.