Skip to content
LeanSuite

Free template

Updated

Time study request form: who asks, why, how big and by when

A time study request form is the one-page request a supervisor or manager fills in to ask industrial engineering for a time study. It names the job, the decision the result feeds and who will use it, the date it is needed and what happens on that date, the yearly volume and labor hours, the current standard and where it came from, what has changed, whether a written method exists, and who has been told. Engineering gets enough to rank the request and plan the study without a meeting. The form has an engineering use box that tracks a request to a result. The Word file is for typing into; the PDF has the form and a filled-in example.

See the sheet before you downloadPDF, 2 pages. Also Word

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The time study request formA request number and date, then sections for who is asking, the job, the decision the result feeds, volume, people informed and approval.
Who is askingDecision the result feedsNeeded byVolume and labor hoursCurrent standardWhat has changedMethod statusPeople informedApprovalEngineering use

Page 1 of the real file. PDF, 2 pages. Also Word.

Filled-in Time study request form: a study asked for before a second shift starts
The same sheet filled in with the worked example (page 2 of the PDF, illustrative numbers). Open full size (opens the picture in a new tab)

When to use it

When to use the time study request form

  • When requests for studies arrive by email, hallway and phone and engineering cannot tell which come first.
  • When a manager asks for a study but not what it is for, so the study answers the wrong question.
  • When you want a rule that no study is booked until supervisors, the union and operators have been told.
  • When you need a record of why each study was done and what it fed.

How to fill it in

  1. 1

    Fill in who is asking and the job

    Name, role and department. Then the operation name and number, the line or station and the part numbers or family. That sets the scope of the study.
  2. 2

    Say what decision the result feeds

    Tick quote or cost, headcount, line balance, layout change, standard update, ergonomic review, incentive or pay, or other, and write one sentence: what will be decided and by whom. This sets how careful the study has to be.
  3. 3

    Give the date, the volume and the current standard

    The date needed, and what happens on it. Units a year and current minutes a unit, which give labor hours a year: units x minutes / 60. The time now in the system and where it came from: study, estimate, history or none.
  4. 4

    Say what has changed and whether the method is settled

    A change in method, tooling, material, layout, product or volume is a reason to study. If nothing changed, ask why now. If there is no written method that operators follow, the first job is method work, not timing.
  5. 5

    Name the people informed and get approval

    The supervisor, the union or works council representative where there is one, and the operators, each with who told them and when. The requester's manager signs that the study is worth the time. Engineering fills in the box at the foot.

A filled-in example

Illustrative, not a benchmark

An illustrative request: the production manager asks for a study of junction box assembly before the second shift starts.

  • Job: operation 30, junction box assembly, line B bench 3, the JB-200 family. Decision: set the second shift headcount and rebalance line B.
  • Volume: 150,000 units a year at 1.20 minutes a unit, which is 150,000 x 1.20 / 60 = 3,000 labor hours a year.
  • The 1.20 minutes is an estimate from 2023, and the tooling changed in January: a new screwdriver and fixture.
  • Supervisor and operators told on Monday; no union on site. Priority 1, this month.

Engineering can rank this on sight: a real date, 3,000 hours a year, a named decision, and a method that is written. The study becomes TS-027. The request, the people and the numbers are made up.

Common mistakes

  • No decision written down

    A request that says time this job gets a number nobody uses. Make the decision the first thing on the form.

  • A deadline that is a preference

    Ask what happens on the date. If nothing does, it is not a deadline, and the study can wait for a slot.

  • Skipping the people line

    A study booked before the supervisor, any union and the operators are told damages the next ten studies. Do not book until each line says yes.

  • Asking for a time study when the method is not settled

    If operators do the job differently, the study will time the differences. The method-status section sends the request to method work first.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Time study request form: common questions

  1. To measure how long a job takes a qualified operator at a normal pace, and set a standard time that feeds quotes, headcount, line balance, scheduling or improvement. The request form asks for the decision first, because the use sets how careful the study must be.

  2. Supervisors, managers, engineers and planners can all ask. What matters is that each request names a decision, a volume and a date, and that the requester's manager approves it, so engineering time goes where it counts.

  3. Rank by labor hours a year, whether a real date depends on the result, and whether something changed. The form gives all three: units x minutes a unit / 60 for hours, the needed-by date and what happens on it, and the what-has-changed tick boxes.

  4. That depends on your agreement and local law, so check yours. General practice is to inform the supervisor and any union or works council before the operators, and to book the study only when each has been told. This is not legal advice.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.