A time study audit checklist is the list you check a finished study against before its standard time is trusted. It goes through the twelve usual mistakes: the wrong operator, a method not settled or not recorded, mixed products, only the best shift, operators not told, elements too long, too few cycles, abnormal cycles left in or taken out, the observer effect, rating without calibration and forgotten allowances. For each one it says what to look for on the sheet and what the fix is, and you answer Clear, Mistake or Cannot tell. The Excel file counts the answers and gives a verdict. It works on your own study and on someone else's, and takes about fifteen minutes with the study sheet in front of you.

See the sheet before you downloadPDF, 2 pages. Also Excel

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

The time study audit checklistTwelve numbered mistakes with what to look for and the fix, and boxes to answer Clear, Mistake or Cannot tell, then a verdict.
12 mistakes in 3 groupsWhat to look for on the sheetThe fix for eachClear, Mistake or Cannot tellCount and verdictSign-off linesFilled example

Page 1 of the real file. PDF, 2 pages. Also Excel.

Filled-in Time study audit checklist: a study with three of the twelve mistakes
The same sheet filled in with the worked example (page 2 of the PDF, illustrative numbers). Open full size (opens the picture in a new tab)

When to use it

When to use the audit checklist

  • Before a standard time goes into the routing, the quote or the headcount plan.
  • When a standard is challenged by an operator, a supervisor or a customer and you need to see if it holds up.
  • When you inherit studies from another site or an older analyst and do not know how good they are.
  • When you review a colleague's study, as a second pair of eyes before it is issued.

How to fill it in

  1. 1

    Put the study sheet and its method record in front of you

    The header, the readings, the ratings, the allowance and the method sketch or photos. If there is no method record, that is already mistake 3.
  2. 2

    Go through the header: mistakes 1 to 6

    Who was timed, whether the method was settled and recorded, whether products were mixed, how many shifts were covered and whether the operators were told. Answer from the sheet, not from memory.
  3. 3

    Go through the readings: mistakes 7 to 10

    Count elements against cycle time, check the number of cycles against the formula, look for readings that stand apart with no circle or note, and compare the first cycles with the last.
  4. 4

    Check the conversion: mistakes 11 and 12

    Look at the ratings against a benchmark and at the allowance and its source. Redo the arithmetic from the readings to the standard time.
  5. 5

    Read the verdict and decide: repair or redo

    A Mistake means the standard is not safe to use yet. Cannot tell means the sheet does not show it: go and look, or ask the analyst. Repair what the sheet can fix; re-time what it cannot.

A filled-in example

Illustrative, not a benchmark

An illustrative audit of a junction box study from another site, checked against the twelve mistakes.

  • Seven lines are Clear: the operator had 14 months on the job, products were kept apart, one abnormal reading was circled with its cause, and the 15% allowance had a named source.
  • Mistake 3: no sketch, no tool list and no break points written down, so the method cannot be checked.
  • Mistake 5: all readings come from one hour of the day shift. Mistake 8: eight cycles were timed and the check says at least 11.
  • Cannot tell on 6 and 11: no briefing is noted, and every element is rated 100, so the rater needs to be asked.

The verdict reads Fix before use: 3 mistakes found. The next step is to add the method record from the video, time 3 more cycles on the late shift and ask who rated. The study and the findings are made up.

Common mistakes

  • Answering from memory

    Check the sheet. A study you remember as careful may have no briefing note, no circle on the odd reading and a rating of 100 on every line.

  • Treating Cannot tell as Clear

    If the sheet does not show it, it is not shown. Go and look at the job, or ask the analyst, before you accept the standard.

  • Auditing only the arithmetic

    Wrong sums are the easy find. Most of the damage is in the operator, the method, the shifts, the rating and the allowance, which no recalculation will fix.

  • Fixing the number instead of the study

    Adding a few percent to cover a doubt is not a repair. Either the study can be corrected from what is on the sheet or the affected elements must be re-timed.

Download the template

Free to use: print it, copy it and edit it for your team. Enter your name and work email once to download.

Run this template in LeanSuite

LeanSuite's Vision AI does the time study from one phone video of the process: it times every element, splits each operator's time into value-added, semi-value-added and non-value-added, and links each figure to its video frame for you to review and certify.

See it in a 45-minute demo

FAQ

Time study audit checklist: common questions

  1. The wrong operator, timing before the method is settled or recorded, mixing products, timing only the best shift, not telling the operators, elements too long, too few cycles, abnormal readings left in or taken out, ignoring the observer effect, rating without calibration and forgetting allowances.

  2. Check the header for operator, method, products and shifts. Check the readings for element length, number of cycles, unexplained odd readings and drift. Check the ratings and allowances, redo the arithmetic, and compare the standard with real output over a few weeks.

  3. About fifteen minutes if you have the study sheet and the method record in front of you. If the method was never recorded or the sheet cannot answer a line, add the time to walk to the job and compare.

  4. Repair when the sheet can fix it, such as a wrong allowance or an unlisted reading with a known cause. Redo, in whole or for the affected elements, when the problem is in how the readings were taken: wrong operator, one shift, too few cycles or a method that moved.

More free templates

All templates
Browse all 312 templates

Can't find the template you need?

Tell us what you're looking for. We'll make it and send it to your inbox, free.

A shift handover sheet, a red tag log, a changeover checklist for one machine: if your team uses it on the floor, ask.

By sending this form you agree to our Terms of Service and Privacy Policy.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.