Short answer
A flow process chart lists every step an item goes through, from raw rack to finished rack, using five symbols: operation, transportation, inspection, delay and storage. An operation process chart keeps only the operations and inspections, so you see the shape of the whole product.
Build a flow process chart by following one item through the process and writing down every step in order: what happens, which symbol it is, how far it moves and how long it takes. The operation process chart is the short version, with only operations and inspections, and a line for each part that joins the main line where the parts meet. In the example on this page, 295 minutes of elapsed time hold 25 minutes of actual operations, and the chart shows where the other 270 minutes go.
Last reviewed:
What are a flow process chart and an operation process chart?
A process chart is a record of what happens to one thing as it moves through a process. The thing is a part, a patient, a form or an operator. You follow it, and you write down each step as one of a few standard symbols. The result is a column of symbols down a page that you can count, add up and challenge.
There are two charts, and they answer different questions. The flow process chart records every step, including the moves, the waits and the storage. It answers "where does the time and distance go?" The operation process chart records only the operations and the inspections, and shows how the parts come together. It answers "how is this product made, and in what order do the parts join?" Some books call it an outline process chart.
Method study teaches both as the first step before a detailed look at motions. A flow process chart can follow a worker, a material or a piece of equipment. Most plant studies follow the material, because that is where the waiting shows up. This page is about the material type.
The symbols, and what each one means
The six symbols on a process chart
Operation
Work that changes the item or adds to it.
Turn, drill, weld, assemble, pack
Transportation
The item moves from one place to another.
Forklift to the saw, 40 m
Inspection
The item is checked for quality or quantity.
Gauge the bore, count the pieces
Delay
The item waits and the next step cannot start.
Parts queued at the lathe
Storage
The item is held under control until it is asked for.
Finished goods rack
Combined activity
Two activities done at once, here an operation and an inspection.
Operator machines and gauges in one step
Six symbols. A circle is an operation. An arrow is a transportation. A square is an inspection. A capital D is a delay. An inverted triangle is storage. A circle inside a square is a combined activity, such as an operation and an inspection done together.
The American Society of Mechanical Engineers adopted a standard set of process chart symbols in 1947, built on the work of Frank and Lillian Gilbreth. The standard was revised in later editions, but the symbols are the ones still taught in method study and used on the sheets in the textbooks. Five of them describe what happens to the item. A sixth joins two of them.
| Symbol | Name | Use it when | Do not use it for |
|---|---|---|---|
| Circle | Operation | Work changes the item or adds to it: a cut, a weld, a fill, a label, a form being completed. | Walking to fetch material, or checking the result. |
| Arrow | Transportation | The item moves from one place to another, by hand, by cart, by forklift or by conveyor. | Small moves inside one workstation: those belong inside the operation. |
| Square | Inspection | The item is checked against a standard for quality or quantity. | An operator glancing at the part as part of the work. That is inside the operation. |
| Capital D | Delay | The item waits and the next step cannot start, such as a queue in front of a machine. | Planned storage, where the item is held under control until it is called for. |
| Inverted triangle | Storage | The item is held under control until someone asks for it, such as a rack or a stockroom. | Waiting in a queue between two steps. |
| Circle inside a square | Combined activity | Two activities happen together at one place, such as an operator who machines and gauges in one step. | Two activities done one after the other. Those get two symbols. |
Definitions are restated in plain words. Check your own company's chart standard if it has one, because some plants add a symbol for rework or scrap.
The hard call is delay against storage. A delay is waiting that nobody chose: parts piled up because the next machine is busy. Storage is waiting that someone chose and controls: parts in a rack with a count, taken out on a signal. If you cannot tell which it is, ask whether anybody would notice if the parts were not there. In a rack with a count, they would. In a queue, they would not.
How to build a flow process chart
- 1
Choose one item and fix the start and the end
A single part number, a single order or a single batch. Write where the chart starts and where it ends, for example from the raw rack to the finished goods rack. Charts without a clear start and end cannot be compared later.
- 2
Walk the route and write every step in order
Follow the item, not the layout drawing. Write each step as it actually happens, including the waits and the moves nobody had on the routing. Number the steps.
- 3
Give each step one symbol
Circle, arrow, square, D or triangle. If a step seems to be two things, split it. Use the combined symbol only when two things really happen at once.
- 4
Record distance and time
Measure each move in metres with a tape or a wheel. Time each operation with a stopwatch or from video (see how to conduct a time study). For the waits, note when the item arrived and when it was picked up, not a guess.
- 5
Total by symbol
Count the steps and add the minutes and the metres for each symbol. Put the totals under the chart. Work out what share of the elapsed time was operations.
- 6
Challenge every row, then chart the new way
Ask of each step: why is it done, why there, why then, why this way? Remove what you can, combine what you can, and redraw the chart for the improved flow with the same totals.
Time and distance are what turn the chart into an argument. A list of steps says what happens. A list with 255 minutes of waiting next to 25 minutes of work says what to fix first.
Worked example: a turned housing
This is an invented example, built to show the arithmetic. A small plant makes a turned aluminium housing from bar stock. One batch of parts is followed from the raw rack to the finished goods rack. The clock starts when the bar is taken from the rack and the storage rows carry no time.
The chart has 17 rows. Five are operations (cut, turn, deburr, wash, pack), five are transportations, two are inspections, three are delays and two are storage. The delays are 45 minutes at the saw, 120 at the lathe and 90 waiting for a full wash batch.
A flow process chart, filled in: a turned housing, raw rack to finished rack
Example numbers- 1Bar stock in the raw rack
- 2Forklift to the saw403
- 3Wait for the saw45
- 4Cut to length4
- 5Cart to the lathe122
- 6Wait at the lathe120
- 7Turn the housing9
- 8Check the diameters2
- 9Cart to deburr81
- 10Deburr3
- 11Wait for a full wash batch90
- 12Cart to the washer152
- 13Wash5
- 14Final inspection3
- 15Cart to packing202
- 16Pack4
- 17Finished goods rack
Seventeen steps down a vertical line: 5 operations, 5 transportations over 95 metres, 2 inspections, 3 delays and 2 storages. The three delays are 45, 120 and 90 minutes. Elapsed time from release to packed is 295 minutes, of which 25 are operations.
| Symbol | Steps | Minutes | Metres | Share of elapsed time |
|---|---|---|---|---|
| Operation | 5 | 25 | 0 | 8.5% |
| Transportation | 5 | 10 | 95 | 3.4% |
| Inspection | 2 | 5 | 0 | 1.7% |
| Delay | 3 | 255 | 0 | 86.4% |
| Storage | 2 | 0 | 0 | 0% |
| Total | 17 | 295 | 95 | 100% |
Elapsed time is the sum of every row. The storage rows carry no time because the clock starts when the bar leaves the rack and stops when the packed part is put away.
Read the totals before you read the rows. Operations are 25 of the 295 minutes, 8.5%. Delays are 255. Nobody has to be working slowly for this to happen: the saw, the lathe and the washer each run in batches, so parts queue. The cart move to the lathe (12 m) exists only because the saw is in a different bay from the lathe.
Where the 295 minutes went, before and after
Example numbersBefore: 295 min elapsed, 95 m walked or driven
After: 84 min elapsed, 83 m walked or driven
- Operation
- Inspection
- Transport
- Delay
Two bars on one scale. Before: 25 minutes of operation, 5 of inspection, 10 of transport and 255 of delay, 295 in all, over 95 metres. After the saw moves next to the lathe and the queues shrink: 25, 5, 8 and 46, 84 minutes in all, over 83 metres. Operations go from 8.5 percent of elapsed time to 29.8 percent.
Now the change. Put the saw next to the lathe, which removes the 12 m cart move and its 2 minutes. Cut the queue at the saw to 11 minutes, at the lathe to 15 and at the washer to 20 by releasing smaller batches and washing when 10 pieces are ready rather than a full tray. The chart is redrawn: transportation is now 8 minutes and 83 m, delay 46 minutes. Elapsed time falls from 295 to 84 minutes, 71.5% less. The operations still take 25 minutes. They are now 29.8% of the elapsed time.
That is the most useful thing a flow process chart does. It shows that the elapsed time and the work content are very different numbers, and that the biggest saving is rarely in the operations. The same idea is why a value stream map draws a lead time ladder under the process boxes.
How to build an operation process chart
The operation process chart keeps only two symbols, the circle and the square. It is drawn as a tree. The main line runs down the right side. Each part or sub-assembly gets its own line that comes in from the side and joins the main line at the operation where the parts meet. Material goes in horizontal lines at the top of each line, with a short label such as the stock and size.
Take the same housing and add a stamped steel cover. The housing line has four steps: cut to length (4 min), turn (9), check the diameters (2) and deburr (3). The cover line has two: stamp (2) and deburr (1). They meet at assembly (6), followed by final inspection (3) and pack (4).
- Number the operations in order down the chart (O-1, O-2 and so on) and the inspections separately (I-1, I-2).
- Show time beside each symbol. The chart is not to scale, only to order.
- Add a summary at the bottom: 7 operations (29 minutes), 2 inspections (5 minutes), 34 minutes of work content in all.
- Leave out moves, delays and storage. They belong on the flow process chart.
An operation process chart: housing and cover, joined at assembly
Example numbersHousingAluminium bar, 60 mm
- O-1 Cut bar to length4 min
- O-2 Turn the housing9 min
- I-1 Check diameters2 min
- O-3 Deburr3 min
CoverSteel sheet, 2 mm
- O-4 Stamp the cover2 min
- O-5 Deburr the cover1 min
Both lines join here
- O-6 Assemble cover to housing6 min
- I-2 Final inspection3 min
- O-7 Pack4 min
Summary: 7 operations (29 min), 2 inspections (5 min), 34 min of work content.
Two feeder lines run down and join. The housing line has cut to length 4 minutes, turn 9, check diameters 2 and deburr 3. The cover line has stamp 2 and deburr 1. They join at assemble 6, then final inspection 3 and pack 4. In all there are 7 operations, 29 minutes, and 2 inspections, 5 minutes.
Its main use is early. When you plan a new product, the chart shows how many operations it needs, which parts can be made in parallel, where the parts join and where the inspections sit. It is the starting point for the process planning of a new product, and for splitting the work into stations in line balancing.
Process charts compared with other flow tools
| Tool | Follows | Shows | Best question |
|---|---|---|---|
| Flow process chart | One item, step by step | Every operation, move, check, wait and store, with time and distance | Where do the minutes and the metres go for this item? |
| Operation process chart | One product and its parts | Operations and inspections, and where parts join | How is this product made, in what order? |
| Flowchart (decision flow) | A procedure or a decision | Steps and yes or no branches, with no standard time or distance columns | What are the rules and who does what? |
| Value stream map | One product family, with the information that triggers it | Process boxes, inventory between them, the lead time ladder | How long does an order take across the whole stream? |
| Spaghetti diagram | One item or person on a floor plan | The actual path walked or driven, drawn on the layout | Which routes are long, and where do they cross? |
They work together. The flow process chart gives the list of moves and the total distance. The spaghetti diagram draws those moves on the floor plan so you can see the crossings and the backtracking. A flowchart, as in the flowchart guide, documents a decision procedure. A value stream map takes the view across the whole stream, and the process chart zooms in on one stretch of it.
Common mistakes
- Charting the routing instead of the item. The routing leaves out the waits and the unplanned moves, which are most of what you are looking for.
- Following a different part each time. Pick one part number and one batch. Mix them and the totals mean nothing.
- Guessing the delays. A queue is timed from when the item arrives to when it is picked up. Recorded waits are usually the number people argue about, so have them on paper.
- Using the circle for everything. Walking to fetch a tool is not an operation. Checking is not an operation. The chart only helps if the symbols are used strictly.
- Stopping at the chart. The totals only show where to look. The next step is to ask why each move and each wait exists, and to draw the improved flow.
- Treating the chart as the whole picture. It follows one item. It does not show the capacity of a machine, the mix of products or what the operator does with their hands. For hands and motions, use a two-handed process chart or a time study.
Be careful with the people side. A chart that follows a worker records what one person did in the hour you watched. Say what it is for before you start, show the chart to the people on it, and chart the material first, not the operator.
Tools and templates
- Process flow diagram template: a ready sheet for the steps, the symbols and the totals.
- Spaghetti diagram template: draw the moves from your chart on the floor plan.
- Time study sheet: time the operations before they go into the chart.
Go deeper
This page is the short version. These guides cover each part in full.
- VSM Symbols and Icons: Complete Reference GuideThe icon set used on a value stream map, which is a different language from the process chart symbols.
- Value Stream Mapping: Beginner's Complete GuideThe whole-stream view that a process chart zooms into.
- Cell Design in JIT: Flow Layout PlanningMoving machines together so the transports and the waits on the chart disappear.
- Common VSM Mistakes and How to Avoid ThemMapping traps that apply equally to process charts, such as charting the routing instead of the real flow.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Process flow diagram templateA squared sheet to draw the flow with a symbol key, and a step table that counts operations, moves, checks, waits and storage.
- Spaghetti diagram templateSquared paper to trace every trip, a trip log that turns grid squares into feet, meters and walking time, and a before and after comparison.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Upload one process video and get time and motion, SMED, ergonomic and line balancing studies to review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about flow process chart and operation process chart
Five ASME symbols describe what happens to an item. A circle is an operation, an arrow is a transportation, a square is an inspection, a capital D is a delay and an inverted triangle is storage. A circle inside a square marks a combined activity, such as an operation and an inspection done together at one place.
A flow process chart records every step one item goes through, including moves, delays and storage, with distance and time. An operation process chart records only operations and inspections, and shows how the parts of a product join. Use the first to find where time and distance go, and the second to understand how a product is made.
Pick one item and fix where the chart starts and ends. Follow it and write every step in order, give each step one symbol, and record the distance and time of each. Total the steps, minutes and metres by symbol, work out what share of elapsed time is operations, then challenge each step and chart the improved flow.
A process flow chart usually means a general flowchart of steps and decisions, often drawn with boxes and diamonds. A flow process chart is the method study tool: one item, ASME symbols, and columns for distance and time. Only the second gives you totals of delay and travel, which is what you need to improve a flow.
A flow process chart follows one item through one stretch of the process in detail, with every move and wait. A value stream map shows a whole product family from supplier to customer, including the information that triggers each step and the inventory between them. Start with the map to find the stretch, then use the chart to study it.
Related guides and tools
- Spaghetti diagram: draw the moves from the chart on the floor plan
- Flowchart: the decision and procedure diagram, and how it differs from a process chart
- How to conduct a time study: timing the operations on the chart
- Process planning for a new product: where the operation process chart is used
- Line balancing: splitting the operations into stations
- Therbligs and motion economy: the level below the process chart
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.