Labor cost per unit and quoting: how to turn a time standard into a price you can defend

Short answer

Labor cost per unit is the standard time per unit, in hours, multiplied by the loaded labor rate. Divide by the efficiency you expect to run at, add material, overhead and margin, and the standard has become a quote.

Units per hour = 60 / standard minutes per unit. Labor cost per unit = standard minutes / 60 x loaded labor rate, divided by the efficiency you expect. A job with a standard time of 2.415 minutes makes 24.8 units an hour at standard. At a loaded rate of $28.60 an hour that is $1.151 of labor a unit at 100% efficiency and $1.279 at an expected 90%. Add material, overhead absorbed on the same labor hours, set-up and margin to reach the price. Because overhead rides on labor time, an error in the standard is multiplied: here each 5 points of rating moves the price by 17 cents a unit.

Last reviewed:

Why a time standard is a cost number

What is inside an $8.98 price

Example numbers
Material $4.200
Set by labor time: $2.986
Margin $1.796
$4.200
$1.279
$1.610
$1.796
  • Material: $4.200
  • Direct labor: $1.279
  • Overhead: $1.610
  • Set-up: $0.097
  • Margin, 20% of price: $1.796

Total cost $7.186 / (1 minus 0.20) = price $8.98

Material $4.200, direct labor $1.279, overhead $1.610, set-up $0.097 and margin $1.796 add up to a price of $8.98. Labor, overhead and set-up, $2.986 in all, are driven by the time standard.

Direct labor is only $1.279, but overhead and set-up are charged on the same minutes. The time standard decides $2.986 of the $7.186 cost.

Every price a manufacturer quotes contains an assumption about how long the work takes. Sometimes it is a measured standard time. Often it is a guess based on a similar part, with a little added for safety. Either way the minutes become dollars: they set the labor cost, and in most costing systems they also decide how much overhead the job carries.

That is why a weak standard is expensive in both directions. Quote on a time that is too long and you lose work you could have made money on. Quote on a time that is too short and you win work that loses money on every unit, for the life of the contract. A standard built from a study lets you say where each cent comes from, and change the right input when the customer pushes back.

The same arithmetic runs the other way for buyers. A should-cost is your own estimate of what a supplier's part ought to cost, built from material, labor time, rates and overhead. It turns a price negotiation into a conversation about minutes and methods.

From a standard time to labor cost per unit

Four small sums take you from the stopwatch to a cost. Each one adds an assumption, and each assumption should be written on the quote file.

From observed time to labor cost per unit (example values are illustrative)
StepFormulaExample
Normal timeObserved time x rating / 1002.00 min x 105 / 100 = 2.10 min
Standard timeNormal time x (1 + allowance)2.10 x 1.15 = 2.415 min
Units per hour at standard60 / standard minutes60 / 2.415 = 24.8
Loaded labor rateWage x (1 + fringe rate)$22.00 x 1.30 = $28.60 an hour
Labor cost per unit at standardStandard minutes / 60 x loaded rate2.415 / 60 x $28.60 = $1.151
Expected minutes per unitStandard minutes / expected efficiency2.415 / 0.90 = 2.683 min
Labor cost per unit, expectedExpected minutes / 60 x loaded rate2.683 / 60 x $28.60 = $1.279

The allowance here is a percentage added to normal time. If your plant states allowances as a share of the shift, standard time = normal time / (1 minus allowance).

From the stopwatch to labor cost per unit

Example numbers
  1. 2.00 minObserved time

    Average of the cycles kept in the study

  2. x 105 / 100 rating
    2.10 minNormal time

    The operator was a little faster than normal pace

  3. x 1.15 allowance
    2.415 minStandard time

    24.8 units an hour at standard

  4. / 0.90 expected efficiency
    2.683 minExpected time

    What the department really achieves: 22.4 units an hour

  5. / 60 x $28.60 loaded rate
    $1.279Direct labor cost per unit

Observed time 2.00 minutes, normal time 2.10, standard time 2.415, expected time at 90 percent efficiency 2.683, labor cost $1.279 a unit.

Three adjustments turn 2.00 observed minutes into 2.683 costed minutes, a third more. Each one is a judgment, so each belongs on the quote file.

Two inputs deserve a word. The loaded rate, also called the burdened rate, is the wage plus what the employer pays on top of it: payroll taxes, insurance, paid leave, pension. Use your own finance department's figure. The 30% here is only an example.

Expected efficiency is earned hours over actual hours for work like this. A standard describes a trained person at normal pace on a normal day. If the department has averaged 90% against its standards, quoting at 100% prices in a performance you have not shown you can deliver. Use the proven number, and say so.

How to build a quote from a time standard

A quote from a time standard in eight steps

  1. 1

    Fix the method and the routing

  2. 2

    Get a standard time for each operation

  3. 3

    Add set-up per unit

  4. 4

    Apply expected efficiency

  5. 5

    Price the labor

  6. 6

    Add material and overhead

  7. 7

    Add margin and check the price

  8. 8

    Record the assumptions

Steps 1 to 4 fix the minutes. Steps 5 to 7 turn them into money. Step 8 is what makes the next quote better.
  1. 1

    Fix the method and the routing

    List the operations the part needs and how each will be done: machine, tooling, crew size, batch size. A time only belongs to a method.

  2. 2

    Get a standard time for each operation

    From a time and motion study if the job or a close relative is running. From predetermined times or a comparison with studied parts if it is not. Note which, because the risk differs.

  3. 3

    Add set-up per unit

    Set-up time per batch divided by batch size. On short runs this can be larger than the run time, and it is the first thing forgotten.

  4. 4

    Apply expected efficiency

    Divide standard time by the efficiency the department actually achieves on similar work. For a new product, allow for the learning period as well.

  5. 5

    Price the labor

    Expected hours per unit x the loaded labor rate for the grade of person doing the work.

  6. 6

    Add material and overhead

    Material at quoted prices with a scrap allowance. Overhead at your plant's rate, applied on the base your costing system uses, usually labor hours or machine hours.

  7. 7

    Add margin and check the price

    Price = total cost / (1 minus margin on price). Then test it: against the market, against similar jobs and against your capacity to make it.

  8. 8

    Record the assumptions

    Rating, allowance, efficiency, batch size, rates, volume. When the job runs, compare actual hours with the quote and feed the difference back into the next one.

Worked example: quoting a wiring harness bracket assembly

Illustrative example. A customer asks for a price on 120,000 bracket assemblies a year, run in batches of 500. The job is one manual assembly operation. A study of a pilot run gave an average observed time of 2.00 minutes at a rating of 105, and the plant adds a 15% allowance.

Illustrative: the inputs to the bracket assembly quote
InputValueSource
Observed time2.00 minTime study of the pilot run
Performance rating105The study
Allowance15% of normal timePlant policy
Expected efficiency90%The department's last six months
Wage$22.00 an hourPayroll
Fringe rate30% of wageFinance
Overhead rate$36.00 per direct labor hourFinance
Set-up45 minutes per batch of 500Similar jobs
Material$4.200 a unitSupplier quotes, with scrap allowance
Margin20% of priceCommercial policy
Illustrative: the bracket assembly quote built up per unit
LineSumPer unit
Standard time2.00 x 1.05 x 1.152.415 min
Expected time2.415 / 0.902.683 min
Material$4.200
Direct labor2.683 / 60 x $28.60$1.279
Overhead2.683 / 60 x $36.00$1.610
Set-up, labor and overhead45 / 500 = 0.09 min, x ($28.60 + $36.00) / 60$0.097
Total cost$4.200 + $1.279 + $1.610 + $0.097$7.186
Margin20% of price$1.796
Price$7.186 / (1 minus 0.20)$8.98

Unit costs are carried to three decimals and the price is rounded at the end. At standard the job runs at 24.8 units an hour. At 90% efficiency expect 22.4.

Labor is $1.279 of an $8.98 price, about 14%. It would be easy to conclude that the standard hardly matters. Look again. Overhead is applied on the same minutes, so labor time drives $1.279 + $1.610 + $0.097 = $2.986 of the $7.186 cost, or 42%. Every minute on this job carries $28.60 / 60 = $0.477 of labor and $36.00 / 60 = $0.600 of overhead: $1.077 in all.

Overhead absorption, in general terms

Overhead is the cost of running the plant that cannot be traced to one unit: supervision, maintenance, rent, power, depreciation, quality, planning. Costing systems spread it over products with a rate set in advance. The predetermined overhead rate is the year's estimated overhead divided by the year's estimated activity. Where the activity is direct labor hours, each hour of labor on a job pulls a fixed amount of overhead onto it.

  • This is a convention, not a law of nature. It works where overhead really does rise and fall with labor hours, and it distorts where it does not.
  • A machine-paced job is better costed on machine hours. The machine hour rate calculator builds that rate.
  • Because the rate is cost divided by hours, it is only right at the planned volume. If the plant runs fewer hours than planned, overhead is under-absorbed and somebody's quotes were too low.
  • A high rate on a small labor base magnifies timing errors. At $36.00 on $28.60, each minute of error costs more in overhead than in wages.
  • For a decision about one extra order, look at which costs actually change. Much overhead is fixed in the short run, which is a question for your finance team, not for a rate.

What one minute on this job carries

Example numbers
$0.477
$0.600
  • Labor: $28.60 / 60: $0.477
  • Overhead: $36.00 / 60: $0.600

One minute, labor and overhead

$1.077

per unit

0.1 minute x 120,000 units

$12,920

a year

5 points of rating x 120,000 units

$16,509

a year

One minute carries $0.477 of labor and $0.600 of overhead, $1.077 in all. At 120,000 units a year, a tenth of a minute is $12,920 and five points of rating is about $16,509.

With overhead absorbed on labor hours, more than half of what a minute costs is overhead. That is why small errors in a time standard are large errors in a quote.

You do not need to redesign the costing system to quote well. You need to know which base your plant uses, apply it the same way every time, and understand that on a labor-hour base the time standard is doing double duty.

How sensitive the price is to rating, allowance and efficiency

Rating and allowance are the two judgment calls inside a standard. Efficiency is the judgment call outside it. Test what each does to the price before you send the quote.

Illustrative: how the bracket assembly price moves when one input changes
Input changedFromToStandard timePrice per unitChange
Nothing (base quote)2.415 min$8.98
Rating1051002.300 min$8.81minus $0.17
Rating1051102.530 min$9.15plus $0.17
Allowance15%10%2.310 min$8.83minus $0.16
Allowance15%20%2.520 min$9.14plus $0.16
Expected efficiency90%95%2.415 min$8.79minus $0.19
Expected efficiency90%85%2.415 min$9.19plus $0.21
Wage$22.00$23.002.415 min$9.06plus $0.07

Each row changes one input and holds the rest. Changes are rounded from unrounded prices.

Which input moves the price most

Example numbers

Expected efficiency

95%: $8.7985%: $9.19

Performance rating

100: $8.81110: $9.15

Allowance

10%: $8.8320%: $9.14

Hourly wage

$21.00: $8.91$23.00: $9.06

Base quote: $8.98 a unit. Lavender is a lower price, ink a higher one.

Expected efficiency: price from $8.79 at 95% to $9.19 at 85%. Performance rating: price from $8.81 at 100 to $9.15 at 110. Allowance: price from $8.83 at 10% to $9.14 at 20%. Hourly wage: price from $8.91 at $21.00 to $9.06 at $23.00

Each bar changes one input and holds the rest, around the base price of $8.98. The three judgment calls inside and around the standard each outweigh a dollar on the wage.

Five points of rating is a difference two trained observers can easily have on the same cycle. Here it is worth 17 cents on the price and about $16,500 a year in cost at 120,000 units. A dollar on the hourly wage, the number everyone argues about, moves the price by 7 cents. The quiet inputs are the big ones.

  • Rate with more than one observer where the job matters, or rate from video so the pace can be reviewed.
  • Take allowances from a written policy, not from the mood of the day. See the standard time guide for how allowances are built.
  • Use a proven efficiency for the department and the type of work, not the plant's best month.
  • Quote a range internally. Knowing the price at rating 100 and 110 tells you how much room you have in a negotiation.

Should-cost, new products and closing the loop

A should-cost model is the worked example above done from the buyer's chair. You estimate the supplier's material, the minutes each operation should take with a sensible method, a labor rate and overhead typical for their region and process, and a fair margin. The result is not the price you demand. It is a list of assumptions you can compare with theirs, line by line, to find where the difference is.

  • Time the operations you can see. A teardown, a plant visit or a video of a similar process gives you minutes that are far better than a percentage of material cost.
  • Be honest about what you do not know. Their scrap, their batch sizes and their overhead structure are estimates. State the range.
  • Use it to improve the part, not only the price. If one operation is 40% of the labor, ask what in your design makes it slow.

For a product that does not exist yet there is nothing to time. Build the estimate from predetermined times or from studied elements of similar parts, add a learning allowance for the early batches, and mark the quote as estimated. The new product time study playbook covers how to do this and when to replace the estimate with a study. A learning curve workbook helps price the first runs.

Then close the loop. Once the job runs, compare actual hours per unit with the quoted hours, by operation. A quote that is never checked against the floor teaches nobody anything, and the same error goes into the next price. Standards also go stale: restudy when the method, tooling, material or batch size changes. With LeanSuite's Time and Motion Study the study is a video with each element timed on a timeline, so the evidence behind a quoted minute stays on file.

Piece rates and incentive pay: use a standard with care

The oldest use of a time standard is to set pay. Under straight piecework a person is paid a rate per good unit, and the rate is the base hourly wage divided by the standard output per hour. For the bracket job that is $22.00 / 24.8 = $0.886 a unit. Most plans guarantee the base wage, so earnings are the higher of the base and pieces x rate: someone making 28 an hour earns $24.79, and someone making 20 still earns $22.00.

Earnings under piecework with a guaranteed base

Example numbers

Earnings per hour

Hourly earnings against output under piecework with a guaranteed baseEarnings are flat at $22.00 an hour up to the standard output of 24.8 units an hour, then rise by $0.886 for each extra unit, reaching $24.79 at 28 units an hour. A dashed line shows what pure piecework without a guarantee would pay below standard: $17.71 at 20 units an hour.$16$20$24$2820242832Good units per hour20 an hour:$22.00 (base)No base:$17.71Standard24.8 an hour28 an hour:$24.79
Piece rate = $22.00 / 24.8 = $0.886 a unit. Everything about this picture hangs on where the dashed standard line sits. Move it and every operator's pay moves, which is why the standard has to be fair and be seen to be fair.

The arithmetic is simple. The consequences are not. Once money hangs on a standard, every weakness in it becomes a dispute, and people respond to the plan as it is written, not as it was meant.

  • The standard has to be fair and be seen to be fair. That means a documented method, a study the operators knew about, a normal pace that a trained person can hold all shift, and allowances from a written policy.
  • Never cut a rate because people are earning well on it. Change a standard only when the method, tooling or material changes, and say so in advance. Where workers expect rates to be cut, they hold output back and hide better methods.
  • Guard quality and safety. Pay per piece rewards speed. Pay only for good units, keep inspection independent, and do not put an incentive on work where rushing can injure someone.
  • Pay for what the operator cannot control. Waiting for material, machine stops and trials should be paid at an agreed rate, not left to drag earnings down.
  • Watch what it does between people. Individual incentives discourage helping, training a new starter or moving to another station. Group plans avoid some of that and bring problems of their own.
  • Give people a way to challenge a standard and get a restudy with someone they trust present. A standard nobody may question will not be believed.

Check the rules before you design anything. Many countries require that piece workers receive at least the minimum wage for the hours they work, and overtime rules still apply. In a unionized plant, time standards, the right to observe studies and any incentive plan are usually matters for the collective agreement. This is general guidance, not legal advice: involve HR, the union where there is one, and counsel.

Plenty of plants decide the trouble is not worth it. They pay by the hour, use standards for planning, costing and improvement, and manage output through daily targets and problem solving. That is a legitimate choice, and it keeps the time study out of the pay argument.

Common mistakes

  • Quoting at 100% efficiency. The standard is the target, not the forecast.
  • Using the wage instead of the loaded rate. The employer's on-costs are real money.
  • Forgetting set-up, handling, inspection and packing. Indirect minutes on a short run can exceed the direct ones.
  • Timing the best operator on a good day and calling it the standard. Rate the pace and add allowances, or quote on a time nobody can hold.
  • Applying a standard to a different method. A change in fixture, batch size or crew makes it a different job.
  • Treating overhead as free precision. The rate is an average for the plant at a planned volume, so three decimals of overhead are not three decimals of truth.
  • Never comparing the quote with the actual. The feedback is the only thing that makes the next quote better.

Tools and templates

FAQ

Questions about labor cost and quoting with time standards

  1. Labor cost per unit = standard time per unit in hours x loaded labor rate, divided by expected efficiency. A job with a standard time of 2.415 minutes, a loaded rate of $28.60 an hour and 90% expected efficiency costs 2.415 / 60 x 28.60 / 0.90 = $1.279 a unit. The loaded rate is the wage plus employer on-costs such as payroll taxes and benefits.

  2. Units per hour = 60 / standard minutes per unit. A standard time of 2.415 minutes gives 60 / 2.415 = 24.8 units an hour for one person at standard performance. Multiply by the efficiency you expect, such as 90%, for a realistic rate: 22.4 units an hour. Multiply by available hours for the output of a shift.

  3. A should-cost analysis is a buyer's own bottom-up estimate of what a part ought to cost to make. It adds up material, the labor time each operation should take at a suitable rate, overhead and a fair margin. Buyers use it to compare assumptions with a supplier's quote line by line and to find design features that make the part expensive.

  4. Finance sets a predetermined overhead rate: estimated annual overhead divided by estimated annual direct labor hours. Each job is then charged that rate for every labor hour it uses. At $36.00 per direct labor hour, a unit that takes 2.683 minutes carries 2.683 / 60 x 36 = $1.61 of overhead. Machine-paced work is better costed on machine hours.

  5. More than most people expect, because labor and overhead both scale with the standard time. In the example on this page, moving the rating from 105 to 100 lowers the standard from 2.415 to 2.300 minutes and the price by 17 cents a unit, worth about $16,500 a year in cost at 120,000 units. A $1 change in the hourly wage moves the price by 7 cents.

  6. Under straight piecework the rate per unit is the base hourly wage divided by the standard output per hour. With a base of $22.00 and a standard of 24.8 units an hour, the rate is about $0.886 a unit. Most plans guarantee the base wage, and many countries require at least the minimum wage for hours worked. Check local law and any union agreement.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.