Stopwatch time study: continuous and snap-back timing, with a worked sheet

Short answer

A stopwatch time study times each element of a job with a watch at the workplace. In continuous timing the watch runs for the whole study and each element time is one reading minus the reading before. In snap-back timing the watch is reset at every break point and read directly.

There are two ways to read the watch. Continuous timing (the ILO calls it cumulative) lets the watch run from the start of the study to the end; you write the reading at each break point and subtract afterwards. It leaves a complete record of the study, including delays, which is why Freivalds calls it the better method for most work. Snap-back timing (flyback) returns the watch to zero at each break point, so every reading is an element time and nothing needs subtracting, but anything that happens between readings can go unrecorded. Either way, check the study afterwards: the times on the sheet should add up to the elapsed clock time within 2 percent.

Last reviewed:

What is a stopwatch time study?

One cycle, two ways to read the watch

Example numbers

Continuous: the watch never stops

ElementWatch readsElement time
10.430.43 minus 0.35 = 0.08
20.540.54 minus 0.43 = 0.11
30.680.68 minus 0.54 = 0.14
40.850.85 minus 0.68 = 0.17
50.920.92 minus 0.85 = 0.07
61.051.05 minus 0.92 = 0.13
71.111.11 minus 1.05 = 0.06

The watch read 0.35 when element 1 began, so that is the first number to subtract.

Snap-back: back to zero at every break point

ElementWatch readsElement time
10.08read directly: 0.08
20.11read directly: 0.11
30.14read directly: 0.14
40.17read directly: 0.17
50.07read directly: 0.07
60.13read directly: 0.13
70.06read directly: 0.06

Nothing to subtract, and nothing on the sheet to show what happened between two readings.

Cycle 1 of the pump cover job, seven elements. Continuous timing: the watch runs from 0.35 and is read at each break point as 0.43, 0.54, 0.68, 0.85, 0.92, 1.05, 1.11; each element time is a reading minus the one before, giving 0.08, 0.11, 0.14, 0.17, 0.07, 0.13, 0.06. Snap-back timing: the watch is reset to zero at each break point, so the readings are the element times themselves.

Both columns end with the same seven element times. Continuous timing gets there by subtraction after the study and keeps a record of every hundredth of a minute, including the ones nobody planned for. Snap-back gives the times at once and trusts the observer's thumb at every break point.

A stopwatch time study is a time study taken live at the workplace. The observer stands where the operator's hands can be seen, holds a board with a watch and a form on it, and records how long each element of the job takes over a number of cycles. Those observed times are later rated and given allowances to become a standard time.

This page is about the timing itself: how the watch is read, what gets written down, and how to tell afterwards whether the readings can be trusted. It assumes the job is already split into elements with clear break points (how to break a job into elements) and that you know how many cycles you need (how many cycles to time). The whole procedure, from choosing the job to filing the standard, is in how to conduct a time study.

The names vary by book. Freivalds says continuous and snapback. The ILO says cumulative timing and flyback timing. Barnes says continuous and repetitive. They are the same two methods.

The watch, the board and the form

Decimal minutes, not seconds

The traditional time study watch is a decimal-minute stopwatch. Barnes describes it: the dial is divided into 100 equal spaces, each 0.01 minute, the large hand goes round once a minute, and a small hand goes round once in 30 minutes. A reading is a number of hundredths, such as 43 for 0.43 minutes.

Reading a decimal-minute stopwatch

Example numbers

0.43 min

The hand is on 43: write it as 43 hundredths

25.8 s

0.43 × 60, if you need seconds

  • Large hand: one turn is 1 minute. The face has 100 divisions, so one division is 0.01 min, or 0.6 s.
  • Small dial: counts whole minutes, up to 30.
  • To go the other way: seconds ÷ 60. A 9 second element is 0.15 min.

A stopwatch face divided into 100 parts. One turn of the hand is one minute, so each division is 0.01 minute, or 0.6 seconds. The hand points at 43, a reading of 0.43 minutes, which is 25.8 seconds.

Decimal minutes exist to make the arithmetic easy. Readings subtract and average like any other number, with no carrying at 60, and a standard in minutes multiplies straight into hours and cost.

The reason is arithmetic. Readings in decimal minutes subtract and average like any other decimals. Readings in minutes and seconds have to be carried at 60, which is where mistakes come from at the end of a long sheet. A standard in decimal minutes also multiplies straight into hours: 0.80 minutes a piece is 0.80 × 1,000 ÷ 60 = 13.3 hours per thousand.

Seconds and decimal minutes
SecondsDecimal minutesSecondsDecimal minutes
0.60.01150.25
30.05300.50
60.10450.75
90.15601.00
120.20901.50

Seconds ÷ 60 = decimal minutes. Decimal minutes × 60 = seconds.

Two other units turn up. A decimal-hour watch reads in 0.0001 hour (0.36 seconds), which suits plants that cost everything in hours. Predetermined time systems use the TMU, 0.00001 hour, or 0.036 seconds. A phone or an ordinary digital stopwatch reads in seconds and hundredths of a second; that works, as long as you convert before you average and say on the sheet which unit you used. Mixing units on one sheet is a classic way to be wrong by a factor of 60.

The board and the form

The study board holds the form and the watch together so that you can hold it in the crook of one arm and write with the other hand. The point of the layout is one line of sight: operator, watch and pencil without turning your head. If you have to look down and away to read the watch, you will be late on every break point.

The form has the elements down the side, written before the study with their break points, and the cycles across. For continuous timing each cell has room for two numbers: the reading and the subtracted time. Barnes labels them R and T. Freivalds's form uses W for the watch reading and OT for observed time, and keeps R for the rating, so check which convention a sheet uses before you read it. Our time study sheet is laid out for ten cycles.

Continuous and snap-back timing compared

Continuous timing

Start the watch at the beginning of the study and do not touch it again until the end. At each break point, read the watch and write the reading. The element times come later, by subtracting each reading from the one after it. In the ILO's words, the watch is only read and not snapped back, so the recorded time and the elapsed time should be identical.

Freivalds gives the main reason to prefer it: the finished study is a complete record of the whole observation period. Every delay and every foreign element is in there somewhere, because the watch never stopped. He adds that it is easier to explain to the people being studied, and that it is better suited to very short elements, since there is no reset to perform between them. The ILO adds that some regard it as the more accurate method, and that it leaves no opportunity to alter times afterwards.

The cost is clerical. A study of 30 cycles and seven elements is 210 subtractions, done after the event, and each one is a chance to slip.

Snap-back timing

At each break point, read the watch and return it to zero in the same motion. The reading is the element time. There is nothing to subtract, which Freivalds gives as its advantage: no clerical time and no clerical errors. You also see the element times as you go, so an odd reading stands out at once and you can note what caused it.

The weakness is the reset. With a mechanical watch a little time passes while the hand flies back, at every break point, and it is never recorded. More seriously, whatever happens between two readings (a pause, a fumble, a word with a neighbour) is simply not on the sheet unless the observer chooses to write it down. The ILO says an electronic watch removes the first problem, since it can hold a reading and restart without losing time. It does not remove the second.

Continuous and snap-back timing side by side
ContinuousSnap-back
Other namesCumulative timing (ILO)Flyback timing (ILO), repetitive timing (Barnes)
The watchRuns from start to end of the studyReturned to zero at every break point
What you writeThe running reading at each break pointThe element time itself
Arithmetic afterwardsOne subtraction for every readingNone
Record of the whole studyComplete: every minute is between two readingsOnly what the observer chose to record
Very short elementsBetter: nothing to do but readHarder: a reset between each one
Seeing an odd time as it happensHard, until you subtractEasy: it is the number you just wrote
Main riskSubtraction errorsLost time at resets and unrecorded delays

Advantages as given by Freivalds (Niebel's Methods, Standards, and Work Design) and the ILO (Introduction to Work Study).

Barnes lists a third method, accumulative timing, which mounts more than one watch on the board so that element times can be read directly without losing the running total. It was a mechanical answer to a problem that electronic watches and video have since solved, and you are unlikely to meet it.

Which to use

  • Use continuous timing by default, and always when the study may be questioned: a standard that affects pay, a union plant, a customer audit. A sheet that accounts for every hundredth of a minute is its own defence.
  • Use continuous timing for short cycles and short elements. Freivalds says short-cycle studies are better suited to it.
  • Snap-back is reasonable for long elements with clear gaps between them, where the reset is a tiny share of each reading, and for a first look at a job when you want to see the element times as they come.
  • With an electronic watch or a phone that has a lap function, you can have both: the lap button records the element time and the total keeps running. Check that your device shows both the lap and the running total before you rely on it.
  • Whichever you use, do the time check at the end. It is the only evidence that the sheet matches the clock.

A worked continuous timing sheet

Illustrative example. The job is the pump cover assembly and leak test from the element guide: seven elements in a cycle of about 0.77 minutes. The observer started the watch against the wall clock, and the first element began when the watch read 0.35. Five cycles are shown. After cycle 3 the supervisor stopped to ask the operator a question, which the observer recorded as foreign element A.

Illustrative: the first two cycles, reading by reading
CycleElementWatch reads (R)Minus the reading beforeElement time (T)
11. Seat housing0.430.35 (element 1 began)0.08
12. Gasket and cover0.540.430.11
13. Start 4 bolts0.680.540.14
14. Run down bolts0.850.680.17
15. Start test, label0.920.850.07
16. Wait for test1.050.920.13
17. Unload1.111.050.06
21. Seat housing1.181.11 (end of cycle 1)0.07
22. Gasket and cover1.301.180.12
23. Start 4 bolts1.421.300.12
24. Run down bolts1.581.420.16
25. Start test, label1.661.580.08
26. Wait for test1.781.660.12
27. Unload1.841.780.06

Cycle 1 adds up to 0.76 min (1.11 minus 0.35) and cycle 2 to 0.73 min (1.84 minus 1.11).

A continuous timing sheet, with the subtraction done

Example numbers
Continuous stopwatch readings (R) and subtracted element times (T) in minutes for seven elements over five cycles
ElementRowCycle 1Cycle 2Cycle 3Cycle 4Cycle 5Mean T
1. Seat housingR0.431.181.922.943.69
T0.080.070.080.090.080.080
2. Gasket and coverR0.541.302.023.053.80
T0.110.120.100.110.110.110
3. Start 4 boltsR0.681.422.193.183.95
T0.140.120.170.130.150.142
4. Run down boltsR0.851.582.373.354.14
T0.170.160.180.170.190.174
5. Start test, labelR0.921.662.443.414.21
T0.070.080.070.060.070.070
6. Wait for testR1.051.782.573.554.34
T0.130.120.130.140.130.130
7. UnloadR1.111.842.643.614.39
T0.060.060.070.060.050.060
Foreign element ASupervisor asks about the next order, after cycle 3: 2.85 minus 2.64 = 0.21

Swipe the sheet sideways to see cycles 3 to 5 and the means.

  • Cycle 1, element 1

    0.43 minus 0.35 = 0.08

    The watch read 0.35 when the first element began.

  • Cycle 2, element 1

    1.18 minus 1.11 = 0.07

    Subtract the last reading of the cycle before.

  • Cycle 4, element 1

    2.94 minus 2.85 = 0.09

    Subtract the end of A, or the interruption lands in the element.

R is what the observer wrote during the study. T was worked out afterwards: each R minus the R before it, reading down a column and then on to the top of the next. The one exception is cycle 4, element 1, which starts from the end of foreign element A and not from the end of cycle 3.

Three subtractions catch people out. The first element of the study is subtracted from the reading at which it began, not from zero: 0.43 minus 0.35, not 0.43. The first element of every later cycle is subtracted from the last reading of the cycle before. And the first element after an interruption is subtracted from the reading at which the interruption ended. Cycle 4 began at 2.85, when the supervisor walked away, so its first element is 2.94 minus 2.85 = 0.09. Subtract from 2.64, the end of cycle 3, and the element becomes 0.30, with the supervisor's question inside it.

There is a quick check on the arithmetic. The element times should add up to the last reading, minus the first, minus the foreign elements: 4.39 minus 0.35 minus 0.21 = 3.83 minutes. The 35 element times on the sheet sum to 3.83. If the two differ, a subtraction is wrong somewhere, and you can find the cycle by checking each cycle's total against its first and last readings.

On paper, analysts often write only the hundredths while the minute stays the same (43, 54, 68, 85, 92, then 1.05) to save writing. That is fine during the study. Write the readings out in full before you subtract.

How to take a continuous study, step by step

  1. 1

    Fill in the header before you time anything

    Operation, part, operator, machine, date, shift, your name, and the list of elements with their break points. Sketch the layout. A reading with no header is a number, not a study.

  2. 2

    Tell the operator you are starting

    Stand where you can see both hands and where the operator can see you. Never time from behind or out of sight. Say how many cycles you plan to watch.

  3. 3

    Start the watch against a clock

    Note the wall-clock time and start the watch at that instant. The clock is your independent record of how long the study took.

  4. 4

    Note the reading when the first element begins

    The watch will have run for a short while before the operator starts a fresh cycle. Write that reading down. Freivalds calls it TEBS, time elapsed before study.

  5. 5

    Read at every break point without stopping the watch

    Listen and watch for the break point, glance at the watch, write the reading in the R row. Keep your eyes on the work between break points, not on the sheet.

  6. 6

    Mark a missed reading, never guess it

    If you miss a break point, write M in that cell, as Freivalds advises, and carry on. The time of that element and the next cannot be separated for that cycle, and an invented reading would corrupt both.

  7. 7

    Record foreign elements as they happen

    Write the reading when the interruption starts and when it ends, give it a letter, and note what it was. Then pick up the cycle at the next break point.

  8. 8

    Circle anything unusual and say why

    A dropped part, a second attempt, a tool that stuck. Circle the reading and write a few words. You will not remember tomorrow which cycle it was.

  9. 9

    Stop the watch against the clock

    After the last break point, note that reading, walk to the clock and stop the watch at a noted clock time. The gap between the last break point and the stop is TEAF, time elapsed after finish.

  10. 10

    Subtract, then run the time check

    Fill in the T row for every cell. Add up the element times, the foreign elements, TEBS and TEAF, and compare the total with the elapsed clock time.

Reading errors and how to keep them small

A stopwatch study has three sources of error before rating is even considered: when you looked, what you read, and what you wrote.

  • Late or early looks. If you look at the watch after the break point, the element gains a hundredth or two and the next one loses it. Sounds help, because you can already be looking at the watch when the click comes. The errors tend to cancel across a cycle, so cycle totals are more reliable than single elements.
  • Anticipating. After a few cycles you start reading the watch when you expect the break point, not when it happens. That hides real variation. If your readings for an element are suspiciously identical, this may be why.
  • The wrong minute. On a continuous study the hundredths are read from the large hand and the minute from the small dial. A reading written as 2.05 when the watch said 3.05 produces one element a minute too short and the next a minute too long; the cycle totals show it at once.
  • Swapped digits. 0.58 written as 0.85. It shows up as one impossible element followed by a negative one.
  • Elements too short for the watch. On a 0.06 minute element, reading to the nearest 0.01 is already a sixth of the time. The ILO puts the floor for a trained observer at about 0.04 minutes. Below that, combine elements, time them in groups, or use video.
  • Parallax. Reading a dial from the side shifts the hand against the scale. Hold the board so the watch faces you squarely.

None of these is fixed by care alone. They are fixed by a layout that keeps the watch in your line of sight, break points you can hear, a trial of three or four cycles before the real study, and a check afterwards that would catch a mistake if you had made one.

Foreign elements and very short elements

Recording a foreign element

A foreign element is anything that happens during the study and is not part of the job. Freivalds's method is to letter them in order (A for the first, B for the second) and to log each one in a separate section of the form with its start reading, its end reading and what it was. The letter goes on the main sheet at the place it happened, so anyone reading the study can see that cycle 4 started late and why.

If it falls between two cycles, as A does in the example, the cycle on either side is untouched. If it falls in the middle of an element, record both readings, subtract its time from that element, and circle the element so the reader knows it was interrupted. If it is too short to catch both readings, Freivalds's advice is to let the element time include it and circle that reading with a note.

The total of the foreign elements is what Freivalds calls ineffective time. It stays on the study. A sheet that shows 0.21 minutes of interruption in 4.66 is more believable than one that shows none.

Timing very short elements in groups

When several elements in a row are each too short to time by watch, time them in overlapping groups and work out the single elements by arithmetic. Illustrative example: a job has three short elements, A, B and C, in a repeating loop. In some cycles time A and B together, in others B and C, in others C and A.

Illustrative: three short elements timed in pairs
Timed togetherMean (min)Element foundWorkingResult (min)
A + B0.05CCycle minus (A + B) = 0.09 minus 0.050.04
B + C0.06ACycle minus (B + C) = 0.09 minus 0.060.03
C + A0.07BCycle minus (C + A) = 0.09 minus 0.070.02

The three pairs add up to twice the cycle, so the cycle is (0.05 + 0.06 + 0.07) ÷ 2 = 0.09 min. Check: 0.03 + 0.02 + 0.04 = 0.09.

It works, and it multiplies the number of cycles you need by the number of groupings. If a job has many elements this short, a stopwatch is the wrong instrument for it.

The time check

The time check asks one question: does everything on the sheet add up to the time that passed on the clock? It is the difference between a study and a list of numbers.

Illustrative: the time check on the five-cycle pump cover study
LineWhat it isContinuous sheet (min)Snap-back sheet (min)
Elapsed timeWall clock, from watch start to watch stop4.664.66
Time beforeWatch start to the first element (TEBS)0.350.35
Effective timeSum of all the element times3.833.77
Ineffective timeSum of the foreign elements0.210.21
Time afterLast break point to watch stop (TEAF)0.270.27
Recorded timeThe four lines above added together4.664.60
Unaccounted timeElapsed minus recorded0.000.06
Recording errorUnaccounted ÷ elapsed0.0%1.3%

The snap-back column is the same five cycles as a second observer might have recorded them with a mechanical watch, losing a little at each of the 35 resets.

The time check: does the sheet add up to the clock?

Example numbers
  • Wall clock

    Watch started and stopped against the clock: 4.66 min

  • Continuous sheet

    0.35 + 3.83 + 0.21 + 0.27 = 4.66 min. Nothing missing.

  • Snap-back sheet

    0.35 + 3.77 + 0.21 + 0.27 = 4.60 min. 0.06 min is unaccounted for.

  • Time before and after the study
  • Sum of the element times
  • Foreign element
  • Unaccounted time

Wall clock: Watch started and stopped against the clock: 4.66 min Continuous sheet: 0.35 + 3.83 + 0.21 + 0.27 = 4.66 min. Nothing missing. Snap-back sheet: 0.35 + 3.77 + 0.21 + 0.27 = 4.60 min. 0.06 min is unaccounted for. The snap-back recording error is 1.3 percent of the elapsed time, inside the 2 percent limit.

0.06 ÷ 4.66 = 1.3 percent. Both the ILO and Freivalds put the limit at 2 percent, so this snap-back study passes. A continuous sheet passes by construction, which is the main argument for it.

Both books set the same limit. The ILO says exact agreement is not expected with flyback timing but the discrepancy should be within 2 percent, and that some departments discard a study that fails and take another. Freivalds says the recording error should be less than 2 percent and that a study over the limit should be repeated.

A continuous study passes by construction, as long as the subtraction is right, because the watch never stopped. That is not a reason to skip the check. Adding the lines up is how you find the subtraction that went wrong.

How video changes stopwatch timing

Film the job and the timing moves from the workplace to a desk. That changes more than the convenience.

  • The timing is continuous by nature. The video's own clock runs through the whole recording, so every element time is one timestamp minus another and the complete record comes free.
  • Break points can be placed on a frame. At 30 frames a second a frame is a thirtieth of a second, against 0.6 seconds for one division of a decimal-minute watch. The 0.04 minute floor on element length is a limit of the watch and the eye, and it no longer applies.
  • A reading can be checked. Anyone can replay cycle 17 and see whether the break point is where the sheet says it is. A stopwatch reading cannot be audited after the event.
  • Missed readings mostly disappear. If you miss a break point you rewind.
  • The observer is not standing over the operator with a board for an hour, though a camera is its own kind of presence and needs the same honesty about what it is for.

One watch division against the video frames inside it

Stopwatch: 1 division = 0.01 min = 0.6 s

Video at 30 frames a second: 18 frames in the same 0.6 s

0.6 s

Smallest step a decimal-minute watch shows

0.033 s

One frame at 30 frames a second

72 frames

In 0.04 min (2.4 s), the shortest element a trained observer times by watch

One division of a decimal-minute stopwatch is 0.01 minute, or 0.6 seconds. Video at 30 frames a second records 18 frames in that time, one every 0.033 seconds.

At 30 frames a second, a common setting on a phone camera, a break point can be placed to within one frame. The bigger change is that the reading is no longer made live: you can stop on the frame, go back, and have a second person check the same cycle.

What video does not change: the job still has to be split into elements with break points that can be seen in the frame, the pace still has to be rated, and the operator still has to know they are being filmed and why. A camera also sees only what it is pointed at. Hands hidden behind the part, a walk out of frame or a machine display the lens cannot read are all lost, which is why the filming guide and the video time study filming checklist spend their time on where to stand.

In LeanSuite Time and Motion Study the subtraction and the sheet are done for you: the AI times every element and cycle from the video and lays them on a timeline that links back to the footage, and you correct and certify it. The time check idea carries over. A timeline has no unaccounted time, because every second of the video belongs to some element or to none, and you can see which.

The person being timed

A stopwatch is the part of a time study people remember, and not fondly. Someone stands beside you with a board and writes down how long you take. How you handle that affects the readings as well as the relationship.

  • Never time anyone without their knowledge. Stand in plain view, slightly to one side and in front, where you can see the work and be seen.
  • Explain before you start what is being measured (the job, not the person), what the result will be used for, and how many cycles you will watch.
  • Show the sheet if asked. A continuous sheet is easy to explain, which Freivalds counts as one of its advantages: every minute of the study is on it.
  • Do not react to individual readings. No comments on a fast cycle or a slow one.
  • Expect the first few cycles to be different. People speed up or slow down when watched, and settle after a while. Treat the opening cycles as a warm-up and say so in your notes.
  • Agree foreign elements out loud when they happen. "I am leaving that one out, the supervisor interrupted you" builds more trust than any briefing.

This is general practice, not legal advice. Plants with a union agreement or a works council often have written rules on who may be timed, with what notice and with whom present. Read them before the study, not after.

Templates and tools

Time and motion study software

Run a time study in LeanSuite

Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.

FAQ

Questions about stopwatch time study

  1. A stopwatch time study is a time study taken live at the workplace with a watch, a board and a form. The observer times each element of a job over a number of cycles, either by letting the watch run and subtracting successive readings or by resetting it at each break point. The observed times are then rated and given allowances to set a standard time.

  2. In continuous timing the watch runs for the whole study; you write the reading at each break point and subtract afterwards to get element times. In snap-back timing you reset the watch to zero at each break point, so each reading is already an element time. Continuous keeps a full record of the study. Snap-back saves the subtraction but can lose time between readings.

  3. Continuous, for most studies. Freivalds calls it superior mainly because the study is a complete record of the whole observation period, and says it is easier to explain and better for very short elements. Snap-back is reasonable for long elements or a quick first look. With either method, the recorded time should match the elapsed clock time within 2 percent.

  4. A stopwatch whose dial is divided into 100 parts, each 0.01 minute, with the large hand going round once a minute. Readings are in hundredths of a minute, not seconds, so they subtract and average as ordinary decimals. To convert, divide seconds by 60: 9 seconds is 0.15 minutes, and one division of 0.01 minute is 0.6 seconds.

  5. Subtract each reading from the one after it. If the watch read 0.43 at the end of element 1 and 0.54 at the end of element 2, element 2 took 0.54 minus 0.43 = 0.11 minutes. The first element is subtracted from the reading at which the study began, and the first element after an interruption from the reading at which the interruption ended.

  6. Mark it and move on. Freivalds advises writing an M in the cell at once. Do not estimate the reading, because a guess corrupts two element times. In a continuous study the missed break point means that element and the next cannot be separated for that cycle, but the cycle total is still good. Leave those two cells out of the averages.

  7. The share of the elapsed time that the sheet does not account for. Add the element times, the foreign elements and the time before and after the study, subtract the total from the elapsed clock time, and divide by the elapsed time. Freivalds and the ILO both set the limit at 2 percent. Above that, repeat the study.

  8. Yes, for the timing. A phone stopwatch with a lap function gives each element time while the total keeps running, which is continuous and snap-back at once. It reads in seconds, so convert to decimal minutes or keep the whole sheet in seconds. What a phone timer does not give you is the form, the element list or any record you can check afterwards, which filming the job does.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.