Short answer

Cut the work cycle at instants you can see or hear, such as a part touching a fixture or a tool shutting off. Keep each element longer than about 0.04 minutes, and keep manual work apart from machine time, constant work apart from variable work, and every-cycle work apart from occasional work.

An element is a distinct part of a job chosen so it can be observed, timed and rated on its own. To break a job down, watch a few cycles first, fix where the cycle starts and ends, then cut it wherever one motion clearly ends and the next begins. Each cut is a break point, and it should be something you can see or hear so two observers would stop the watch at the same instant. The ILO puts the shortest element a trained observer can time by stopwatch at about 0.04 minutes (2.4 seconds). Machine-controlled time, variable work, occasional work and anything foreign to the job each get their own element.

Last reviewed:

What is an element in a time study?

One cycle of the pump cover job, cut into seven elements

Example numbers
  • Manual element
  • Operator waits on the machine
  • Tester running, 0.20 min
  • Break point
  1. 1

    Get housing from tote, seat in fixtureEnds when: housing drops onto the locating pins (click)

    0.08min

  2. 2

    Fit gasket and coverEnds when: hand leaves the seated cover

    0.11min

  3. 3

    Start four bolts by handEnds when: hand touches the nutrunner

    0.14min

  4. 4

    Run down four bolts with the nutrunnerEnds when: nutrunner shuts off on the fourth bolt (sound)

    0.17min

  5. 5

    Press test start, apply labelEnds when: hand leaves the label

    0.07min

  6. 6

    Wait for the leak test to finishEnds when: green lamp comes on

    0.13min

  7. 7

    Unload pump to the outbound rackEnds when: pump touches the rack

    0.06min

A time line of one 0.76 minute cycle cut into seven elements. Element 1, Get housing from tote, seat in fixture, takes 0.08 minutes and ends at 0.08 when: Housing drops onto the locating pins (click). Element 2, Fit gasket and cover, takes 0.11 minutes and ends at 0.19 when: Hand leaves the seated cover. Element 3, Start four bolts by hand, takes 0.14 minutes and ends at 0.33 when: Hand touches the nutrunner. Element 4, Run down four bolts with the nutrunner, takes 0.17 minutes and ends at 0.50 when: Nutrunner shuts off on the fourth bolt (sound). Element 5, Press test start, apply label, takes 0.07 minutes and ends at 0.57 when: Hand leaves the label. Element 6, Wait for the leak test to finish, takes 0.13 minutes and ends at 0.70 when: Green lamp comes on. Element 7, Unload pump to the outbound rack, takes 0.06 minutes and ends at 0.76 when: Pump touches the rack. The leak tester runs for 0.20 minutes, across elements 5 and 6.

Each yellow line is a break point: an instant you can see or hear, where one element ends and the next begins. Six of the seven are the operator's work. Element 6 is the operator waiting on the tester, and it gets its own element so the wait stays visible.

An element is a distinct part of a job, picked out so that it can be observed, timed and rated by itself. A work cycle is the full sequence of elements needed to make one unit. A time study does not time the cycle as a lump. It times the elements, because that is where the useful information is.

Four things depend on the split. You can see which part of the job the time sits in, so improvement has a target. You can rate a fast hand motion and a slow walk separately, which one rating for the whole cycle cannot do. You can spot the cycle where something odd happened and say which element it happened in. And you can reuse an element time on the next job that contains the same motion, which is how standard data gets built.

The split comes before the stopwatch. If you are following the full procedure in how to conduct a time study, this is the step between settling the method and timing the first cycle, and it is the step most often rushed.

Break points: where one element ends

The ILO defines a break point as the instant at which one element in a work cycle ends and another begins. Everything about a good breakdown follows from choosing instants that leave no room for argument. If two observers would press the button at different moments, the element times will differ by observer, and no amount of extra cycles will fix that.

  • Pick a sound where there is one. A click as a part seats, a tool shutting off, a clamp closing or a part landing in a bin can be heard while your eyes are on the watch.
  • Failing a sound, pick a contact or a release. A hand touching a tool, a part touching a fixture, fingers leaving a part.
  • Choose an instant, not a stretch. "Finishes tightening" is a stretch. "Nutrunner shuts off on the fourth bolt" is an instant.
  • Choose something that happens the same way in every cycle, whoever is doing the job.
  • Write the break point on the study sheet in words. The ILO's own example is as short as: Break point: casting hits table.
Weak and strong break points for the same cut
Weak break pointWhy it failsStronger break point
Operator is done with the coverNo instant: done by whose judgement?Hand leaves the seated cover
Starts fasteningA start is harder to see than an endHand touches the nutrunner
Bolts are tightTightness cannot be seenNutrunner shuts off on the fourth bolt
Test is runningDescribes a state, not an instantGreen lamp comes on
Part is put awayCould be the reach, the release or the walk backPump touches the rack

Illustrative, from the pump cover job worked through below.

The end of one element is the start of the next, so a cycle of seven elements has seven break points and the last one is also the start of the next cycle. Check that the first and last close the loop: the cycle should begin and end at the same point in the work, with the operator's hands in the same place.

How long should an element be?

As short as you can time reliably, and no shorter. The ILO's Introduction to Work Study says elements should be as short as can be conveniently timed by a trained observer, and puts numbers on it.

  • About 0.04 minutes (2.4 seconds) is generally taken as the smallest unit a trained observer can time with a stopwatch.
  • For a less trained observer the floor is 0.07 to 0.10 minutes (about 4 to 6 seconds).
  • A very short element should sit next to a longer one where possible, so the observer has time to read and write between break points.
  • A long manual element should be rated about every 0.33 minutes (20 seconds). Past that length, one rating no longer describes the pace, which is a sign the element wants splitting.

How long should an element be?

Example numbers
  • Under 0.04 min (2.4 s): too short to time by stopwatch
  • 0.07 to 0.10 min: the floor for a less trained observer
  • 0.33 min (20 s): rate a long manual element about this often
  • 3An element of the example, at its mean time

A ruler from 0 to 0.36 minutes. Below 0.04 minutes an element is too short for a trained observer to time with a stopwatch. From 0.07 to 0.10 minutes is the limit for a less trained observer. Long manual elements are rated about every 0.33 minutes. The seven elements of the pump cover job sit between 0.06 and 0.17 minutes.

The three limits are the ILO's, from Introduction to Work Study. All seven elements of the example sit above the 0.04 minute floor and far below the point where one rating stops being enough. Elements 5 and 7 are near the floor, so each is placed next to a longer one.

Those limits are for a person reading a watch. Video moves the floor a long way down, because you can stop on the frame, but it does not change the upper limit. An element that runs for a minute hides whatever happened inside it just as well on video as on paper.

Length is the second test, not the first. Cut at natural break points first, then look at the lengths. If two cuts sit 0.02 minutes apart, merge them. If nothing cuts a 0.60 minute stretch, look harder for a contact or a sound in the middle of it.

The eight types of element

The ILO sorts elements into eight types. They are not eight boxes with one element in each. They are four questions, and every element answers all four.

Four questions that sort every element

  1. 1Who does the work?

    Manual

    A person does it

    Fit gasket and cover

    Machine

    The machine runs on its own

    Leak test, 0.20 min

  2. 2Does it happen every cycle?

    Repetitive

    Once in every cycle

    Seat the housing

    Occasional

    Part of the job, but not every cycle

    Change the tote, 1 in 24

  3. 3Does the time change with the product?

    Constant

    Same time whatever the part

    Apply the label

    Variable

    Time moves with size, weight or count

    Start the bolts: 4 or 6 by model

  4. 4Is it part of the job at all?

    Yes

    It belongs in the standard

    All of the above

    Foreign

    Seen in the study, not part of the job

    Supervisor asks a question

An element answers all four questions at once. Starting the bolts is manual, repetitive and variable. The tote change is manual, occasional and constant. When two things run at the same time, the longer one governs: the 0.20 minute leak test governs the 0.07 minute label.
The ILO's eight element types
TypeWhat it meansIn the pump cover job
RepetitiveOccurs in every work cycleSeat the housing in the fixture
OccasionalPart of the job, but not in every cycle; at regular or irregular intervalsChange the empty tote, once every 24 pumps
ConstantThe basic time stays the same whenever it is doneApply the label
VariableThe basic time varies with some characteristic of the product, equipment or processStart the bolts by hand: four on one model, six on another
ManualPerformed by a workerFit gasket and cover
MachinePerformed automatically by a power-driven machine or processThe 0.20 minute leak test
GoverningTakes longer than any other element being performed at the same timeThe leak test governs the label, which is applied while it runs
ForeignObserved during the study but, after analysis, not a necessary part of the jobThe supervisor stops to ask about the next order

Definitions paraphrased from the ILO's Introduction to Work Study, 4th edition, chapter 21.

Three separations matter more than the labels, and the ILO and Barnes both state them as rules.

  • Manual apart from machine. The operator controls one and not the other. Machine time is not rated, and it does not get a fatigue allowance, so mixing the two in one element makes both sums wrong.
  • Constant apart from variable. A constant element can be timed once and reused. A variable element needs timing across the range of whatever drives it (length, weight, bolt count), and the driver has to be written down next to each reading.
  • Every-cycle apart from now-and-then. Occasional and foreign elements are timed separately from the repetitive ones, so they can be spread over the right number of cycles or left out.

How to break a job into elements, step by step

Do this at the workplace, with the operator, before any timing. Twenty minutes here saves a study you would otherwise have to repeat.

  1. 1

    Watch several cycles without the watch

    Stand where you can see both hands and the machine. Watch at least five cycles. You are looking for the pattern and for what changes from cycle to cycle. Tell the operator what you are doing and why; how to plan a time study covers that conversation.

  2. 2

    Fix where the cycle starts and ends

    Pick one clear instant, such as the finished part touching the rack. The cycle runs from that instant to the same instant on the next part.

  3. 3

    List what the operator does, in order

    Write short verb and object phrases: get housing, seat in fixture, fit gasket. Do not judge or group yet. Ask the operator to name any step you cannot see.

  4. 4

    Mark the break points

    Go down the list and find the instants you can see or hear. Each one ends an element. Steps with no clear instant between them stay together as one element.

  5. 5

    Check the lengths

    Time one cycle roughly. Merge anything under about 0.04 minutes with a neighbour. Look for a cut inside anything over about 0.33 minutes.

  6. 6

    Split off machine-controlled time

    Where a machine runs on its own, start an element when the operator presses start and end it when the machine finishes. If the operator does other work while it runs, list that work as its own element and note which one governs.

  7. 7

    Split off variable work and name what drives it

    If an element takes longer on some parts than others for a physical reason, keep it separate and add a column for the driver: number of bolts, length of weld, weight of the part.

  8. 8

    List the occasional elements and how often they come

    Changing a tote, clearing swarf, filling in a check sheet, fetching material. Write the frequency as a ratio, such as 1 in 24, and say where it comes from (pack size, a count over a shift).

  9. 9

    Write it on the sheet and test it

    Give every element a number, a description and a break point. Time three or four cycles as a trial. If you miss a break point twice, it is the wrong break point: change it now, not after 30 cycles.

A worked breakdown: assembling and testing a pump cover

Illustrative example. One operator at one bench assembles a gear pump cover and leak-tests it. The operator takes a housing from a tote, seats it in a fixture, fits a gasket and cover, starts four bolts by hand, runs them down with a nutrunner, presses start on a leak tester, applies a label while the test runs, waits for the green lamp and unloads the pump to a rack. Times are in decimal minutes, read to 0.01.

Illustrative: the pump cover job in seven elements, with one cycle timed
No.ElementBreak point (the element ends when)TypeTime (min)
1Get housing from tote, seat in fixtureHousing drops onto the locating pins (click)Manual, repetitive, constant0.08
2Fit gasket and coverHand leaves the seated coverManual, repetitive, constant0.11
3Start four bolts by handHand touches the nutrunnerManual, repetitive, variable (bolt count)0.14
4Run down four bolts with the nutrunnerNutrunner shuts off on the fourth bolt (sound)Manual, repetitive, variable (bolt count)0.17
5Press test start, apply labelHand leaves the labelManual, repetitive, constant0.07
6Wait for the leak test to finishGreen lamp comes onMachine-governed wait0.13
7Unload pump to the outbound rackPump touches the rackManual, repetitive, constant0.06
One cycle0.76

0.08 + 0.11 + 0.14 + 0.17 + 0.07 + 0.13 + 0.06 = 0.76 min, or 45.6 seconds. The leak test itself runs 0.20 min: the 0.07 of element 5 plus the 0.13 of element 6.

Three choices in that table are worth a second look. Starting the bolts and running them down are separate elements even though both are fastening, because one is fiddly hand work that varies a lot and the other is a power tool that does not. Applying the label and waiting are separate, so the 0.13 minutes of waiting is on the sheet as waiting and not buried inside a test element. And the test is not rated or given a fatigue allowance, because the operator cannot make a leak tester go faster.

A coarser split would have been quicker to time. It would also have told you much less, as the before and after below shows from ten timed cycles of this job.

The same job in three lumps and in seven elements

Example numbers
  • Shortest of ten cycles
  • Spread up to the longest
  • The widest spread
  • Waiting on the machine

Before: 3 elements

  • Load and assemble0.30 to 0.39 min

  • Fasten and test0.35 to 0.39 min

  • Unload0.05 to 0.07 min

After: 7 elements

  • 1. Seat housing0.07 to 0.09 min

  • 2. Gasket and cover0.10 to 0.12 min

  • 3. Start 4 bolts0.12 to 0.19 min

  • 4. Run down bolts0.15 to 0.19 min

  • 5. Start test, label0.06 to 0.08 min

  • 6. Wait for test0.12 to 0.14 min

  • 7. Unload0.05 to 0.07 min

Before: three elements. Load and assemble ranges from 0.30 to 0.39 minutes, Fasten and test ranges from 0.35 to 0.39 minutes, Unload ranges from 0.05 to 0.07 minutes. After: seven elements. The spread sits almost entirely in element 3, start four bolts by hand, which ranges from 0.12 to 0.19 minutes, and element 6 shows 0.13 minutes of waiting on the leak tester in every cycle.

Both breakdowns add up to the same cycle. The three lumps say only that loading and assembling moves between 0.30 and 0.39 minutes. The seven elements show that nearly all of that swing is in starting the bolts by hand, and that 0.13 minutes of every cycle is spent waiting.

From here the elements go onto a time study sheet, one row each, and the study proper begins. How many cycles to time takes these same seven elements and works out how long the study has to run.

Irregular work: waits, walking, handling, rework and interruptions

Real jobs are not seven tidy elements in a loop. Some of what you see happens only sometimes, and some of it is not the job at all. Decide how each kind will be handled before you start timing, because during the study there is no time to think.

Machine waits

When the operator waits on a machine, make the wait its own element, ending when the machine finishes. Record the machine's run time as well. The wait is not work and is not rated, but it is real time in the cycle, and it is usually the first thing a labor loss review asks about. Drawing the operator and the machine on one time scale, which the ILO calls a multiple activity chart, shows at once who is idle and for how long.

Operator and machine on one time scale

Example numbers

0.13 min

Operator waiting each cycle: 17 percent of the cycle

0.20 min

Tester running each cycle: 26 percent of the cycle

A multiple activity chart of one 0.76 minute cycle. The operator works from 0 to 0.57, waits 0.13 minutes for the leak tester, then unloads. The tester is idle until 0.50, runs 0.20 minutes and is idle again.

Drawn this way the two questions answer themselves. The operator is idle for 0.13 of 0.76 minutes (17 percent), and the tester runs for only 0.20 (26 percent). The wait is where the next improvement is: unload the last pump or prepare the next housing while the test runs.

Walking and material handling

Give walking its own element whenever it is more than a step or two, with break points at the first step away and the arrival. Note the distance. Walking is a variable element driven by distance, so a layout change can be costed from the sheet without a new study. Fetching and returning containers is usually occasional: time it separately and count how often it happens.

Occasional elements

An occasional element is part of the job, so its time belongs in the standard. It does not belong in every cycle at full length. Time it on its own whenever it comes round, establish how often it comes round, and add the per-cycle share. The ILO writes the frequency on the study sheet as a ratio such as 1/10 or 1/50. Make sure the study is long enough to see each occasional element at least a few times, or time it separately.

Spreading an occasional element over the cycles it serves

Example numbers

Change the empty housing tote: 0.48 min, once every 24 cycles

0.48 ÷ 24 = 0.020 min added to every cycle

Record the leak rate on the check sheet: 0.15 min, once every 10 cycles

0.15 ÷ 10 = 0.015 min added to every cycle

0.766 min

Mean of the seven repetitive elements

+ 0.035 min

Share of the two occasional elements

0.801 min

Observed time a cycle, before rating and allowances

Change the empty housing tote takes 0.48 minutes once every 24 cycles, which adds 0.020 minutes to each cycle. Record the leak rate on the check sheet takes 0.15 minutes once every 10 cycles, which adds 0.015 minutes to each cycle. The repetitive elements average 0.766 minutes, so the cycle with occasional work is 0.801 minutes.

Time an occasional element on its own, count how often it comes round, and divide. The frequency is a fact you count over a shift or take from the pack size, not something to guess from one sitting.

Rework and dropped parts

A fumble, a dropped bolt or a part that has to be re-seated lengthens one reading. Circle that reading and write what happened. Do not open a new element for it and do not quietly average it in. Whether it then counts depends on whether it is a normal part of this job at this workplace. Time study mistakes shows what one unexplained long reading does to a standard.

Foreign elements

A foreign element is something that happens during the study and is not part of the job: a supervisor's question, a visitor, the observer dropping a pencil. Record when it started and ended, label it (Freivalds letters them A, B, C in order), and keep it out of every element time. Keep the record, though. A study with no foreign elements in an hour is either a very quiet workplace or an observer who stopped writing them down.

Long-cycle and non-repetitive work

Maintenance jobs, setups, kitting and large assemblies can run for 20 minutes or several hours, and may never repeat in quite the same way. The idea of an element still holds. What changes is its size and how you get the time.

  • Use larger elements: phases of the job measured in minutes, each ending at a visible milestone such as a guard coming off or a die being clamped. Keep the break point rule. Drop the 0.04 minute floor, which is not the constraint here.
  • Split anything that varies with the job from anything that does not. In a changeover, fetching the next die is fairly constant; adjusting until the first good part is not. The SMED split into internal and external work is this same idea.
  • Expect to time few cycles. The conventional guide the ILO prints, attributed to General Electric, asks for only 3 cycles when a cycle is over 40 minutes, because each one costs so much to observe.
  • Consider not using a stopwatch at all. The ILO points to analytical estimating and comparative estimating for long-cycle, non-repetitive work, and work sampling answers the question of where a crew's day goes without anyone following one job from start to finish.
  • Film it if you can. A long job on video can be broken down afterwards, at leisure, by someone who was not standing in the way.

Be honest about precision. A standard for a two-hour job built from three observations is an estimate with a method behind it. That is often all a planning decision needs, as long as nobody treats it like a 45 second assembly standard.

Crew and team work

When two or more people work on the same unit, each person has their own sequence of elements, and some elements are shared. One observer with one watch cannot follow three people.

  • Break the job down once for each person. Give every operator their own column or sheet, with their own elements and break points.
  • Mark shared elements on both lists with the same name and the same break point: a two-person lift ends for both when the part lands.
  • Time everyone against the same clock. That means one observer for each operator with watches started together, or one video of the whole crew.
  • Record waiting as an element for each person. In crew work a lot of the cycle is one person waiting for another to finish, and that is the reason for doing the study.
  • Draw the result on a common time scale. Freivalds calls the crew version a gang process chart; the ILO's name for the general form is the multiple activity chart. Either one shows who is idle while someone else works.

The crew's cycle time is set by the longest chain of dependent elements, not by the sum of everyone's work. Rebalancing that chain, moving an element from the busiest person to an idle one, is line balancing on a small scale.

Common mistakes when splitting a job

  • Break points nobody can see. If the description says "finishes" or "is ready", two observers will time two different elements.
  • Elements that are too long. The time is right and the study is useless, because it cannot say where the time went or which part varied.
  • Elements that are too short to read. Under about 0.04 minutes by stopwatch, the reading error is as large as the element.
  • Machine time mixed into manual elements. The mixed element gets rated and allowed for as if a person did all of it.
  • Variable elements with no driver recorded. A range of times with nothing to explain them cannot be turned into a standard for the next model.
  • Occasional work timed inside whichever cycle it happened to fall in. That cycle looks abnormal, gets thrown out, and the work disappears from the standard.
  • Splitting the job from the work instruction at a desk. The instruction says what should happen. The breakdown has to describe what the operator does.

Templates and tools for the breakdown

If you study from video, LeanSuite Time and Motion Study starts the breakdown for you: the AI times every element on a timeline that links to the footage, and you split, merge and correct elements on that timeline before you certify the study. The rules on this page are what you check its elements against.

Time and motion study software

Run a time study in LeanSuite

Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.

FAQ

Questions about how to break a job into elements

  1. An element is a distinct part of a job, chosen so it can be observed, timed and rated on its own. A work cycle is made of several elements in a fixed order. Timing elements and not the whole cycle shows where the time goes, lets you rate different kinds of work separately and lets you reuse an element time on other jobs.

  2. A break point is the instant at which one element ends and the next begins. The ILO's Introduction to Work Study asks for it to be clearly described on the study sheet. Good break points are things you can see or hear, such as a part hitting a table, a tool shutting off or a hand leaving a part, so that any observer stops the watch at the same instant.

  3. By stopwatch, about 0.04 minutes, which is 2.4 seconds. The ILO gives that as the smallest unit a trained observer can generally time, and 0.07 to 0.10 minutes for a less trained observer. Put a very short element next to a longer one so there is time to read and write. Video analysis can go shorter because the frame can be stopped.

  4. The ILO lists eight: repetitive, occasional, constant, variable, manual, machine, governing and foreign. They overlap. One element can be manual, repetitive and variable at once. In practice three separations matter: manual work apart from machine time, constant work apart from variable work, and work done every cycle apart from work done now and then.

  5. A foreign element is something observed during the study that, after analysis, turns out not to be a necessary part of the job: a supervisor's question, a visitor, a dropped pencil. Record its start and end, label it, and keep it out of the element times. It still appears on the sheet, so the study accounts for all the elapsed time.

  6. Time it separately whenever it occurs, find out how often it occurs, and add its share to each cycle. A tote change that takes 0.48 minutes once every 24 pieces adds 0.48 divided by 24, or 0.02 minutes, to every cycle. Take the frequency from a count over a shift or from the pack size, not from the one sitting of the study.

  7. Yes. Machine-controlled time starts when the machine is started and ends when it finishes, and it is kept apart from manual work. The operator cannot speed it up, so it is not rated and gets no fatigue allowance. If the operator works while the machine runs, list that work as its own element and note that the machine element governs.

  8. Make a separate list of elements for each person, mark shared elements with the same name and break point on every list, and time everyone against the same clock, with one observer for each operator or one video of the whole crew. Record waiting as an element. Then draw the lists on a common time scale to see who is idle while others work.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.