Practical guide · Standard work, SOPs and training
How to break a job into elements for a time study
Short answer
Cut the work cycle at instants you can see or hear, such as a part touching a fixture or a tool shutting off. Keep each element longer than about 0.04 minutes, and keep manual work apart from machine time, constant work apart from variable work, and every-cycle work apart from occasional work.
An element is a distinct part of a job chosen so it can be observed, timed and rated on its own. To break a job down, watch a few cycles first, fix where the cycle starts and ends, then cut it wherever one motion clearly ends and the next begins. Each cut is a break point, and it should be something you can see or hear so two observers would stop the watch at the same instant. The ILO puts the shortest element a trained observer can time by stopwatch at about 0.04 minutes (2.4 seconds). Machine-controlled time, variable work, occasional work and anything foreign to the job each get their own element.
Last reviewed:
What is an element in a time study?
One cycle of the pump cover job, cut into seven elements
Example numbers- Manual element
- Operator waits on the machine
- Tester running, 0.20 min
- Break point
- 1
Get housing from tote, seat in fixtureEnds when: housing drops onto the locating pins (click)
0.08min
- 2
Fit gasket and coverEnds when: hand leaves the seated cover
0.11min
- 3
Start four bolts by handEnds when: hand touches the nutrunner
0.14min
- 4
Run down four bolts with the nutrunnerEnds when: nutrunner shuts off on the fourth bolt (sound)
0.17min
- 5
Press test start, apply labelEnds when: hand leaves the label
0.07min
- 6
Wait for the leak test to finishEnds when: green lamp comes on
0.13min
- 7
Unload pump to the outbound rackEnds when: pump touches the rack
0.06min
A time line of one 0.76 minute cycle cut into seven elements. Element 1, Get housing from tote, seat in fixture, takes 0.08 minutes and ends at 0.08 when: Housing drops onto the locating pins (click). Element 2, Fit gasket and cover, takes 0.11 minutes and ends at 0.19 when: Hand leaves the seated cover. Element 3, Start four bolts by hand, takes 0.14 minutes and ends at 0.33 when: Hand touches the nutrunner. Element 4, Run down four bolts with the nutrunner, takes 0.17 minutes and ends at 0.50 when: Nutrunner shuts off on the fourth bolt (sound). Element 5, Press test start, apply label, takes 0.07 minutes and ends at 0.57 when: Hand leaves the label. Element 6, Wait for the leak test to finish, takes 0.13 minutes and ends at 0.70 when: Green lamp comes on. Element 7, Unload pump to the outbound rack, takes 0.06 minutes and ends at 0.76 when: Pump touches the rack. The leak tester runs for 0.20 minutes, across elements 5 and 6.
An element is a distinct part of a job, picked out so that it can be observed, timed and rated by itself. A work cycle is the full sequence of elements needed to make one unit. A time study does not time the cycle as a lump. It times the elements, because that is where the useful information is.
Four things depend on the split. You can see which part of the job the time sits in, so improvement has a target. You can rate a fast hand motion and a slow walk separately, which one rating for the whole cycle cannot do. You can spot the cycle where something odd happened and say which element it happened in. And you can reuse an element time on the next job that contains the same motion, which is how standard data gets built.
The split comes before the stopwatch. If you are following the full procedure in how to conduct a time study, this is the step between settling the method and timing the first cycle, and it is the step most often rushed.
Break points: where one element ends
The ILO defines a break point as the instant at which one element in a work cycle ends and another begins. Everything about a good breakdown follows from choosing instants that leave no room for argument. If two observers would press the button at different moments, the element times will differ by observer, and no amount of extra cycles will fix that.
- Pick a sound where there is one. A click as a part seats, a tool shutting off, a clamp closing or a part landing in a bin can be heard while your eyes are on the watch.
- Failing a sound, pick a contact or a release. A hand touching a tool, a part touching a fixture, fingers leaving a part.
- Choose an instant, not a stretch. "Finishes tightening" is a stretch. "Nutrunner shuts off on the fourth bolt" is an instant.
- Choose something that happens the same way in every cycle, whoever is doing the job.
- Write the break point on the study sheet in words. The ILO's own example is as short as: Break point: casting hits table.
| Weak break point | Why it fails | Stronger break point |
|---|---|---|
| Operator is done with the cover | No instant: done by whose judgement? | Hand leaves the seated cover |
| Starts fastening | A start is harder to see than an end | Hand touches the nutrunner |
| Bolts are tight | Tightness cannot be seen | Nutrunner shuts off on the fourth bolt |
| Test is running | Describes a state, not an instant | Green lamp comes on |
| Part is put away | Could be the reach, the release or the walk back | Pump touches the rack |
Illustrative, from the pump cover job worked through below.
The end of one element is the start of the next, so a cycle of seven elements has seven break points and the last one is also the start of the next cycle. Check that the first and last close the loop: the cycle should begin and end at the same point in the work, with the operator's hands in the same place.
How long should an element be?
As short as you can time reliably, and no shorter. The ILO's Introduction to Work Study says elements should be as short as can be conveniently timed by a trained observer, and puts numbers on it.
- About 0.04 minutes (2.4 seconds) is generally taken as the smallest unit a trained observer can time with a stopwatch.
- For a less trained observer the floor is 0.07 to 0.10 minutes (about 4 to 6 seconds).
- A very short element should sit next to a longer one where possible, so the observer has time to read and write between break points.
- A long manual element should be rated about every 0.33 minutes (20 seconds). Past that length, one rating no longer describes the pace, which is a sign the element wants splitting.
How long should an element be?
Example numbers- Under 0.04 min (2.4 s): too short to time by stopwatch
- 0.07 to 0.10 min: the floor for a less trained observer
- 0.33 min (20 s): rate a long manual element about this often
- 3An element of the example, at its mean time
A ruler from 0 to 0.36 minutes. Below 0.04 minutes an element is too short for a trained observer to time with a stopwatch. From 0.07 to 0.10 minutes is the limit for a less trained observer. Long manual elements are rated about every 0.33 minutes. The seven elements of the pump cover job sit between 0.06 and 0.17 minutes.
Those limits are for a person reading a watch. Video moves the floor a long way down, because you can stop on the frame, but it does not change the upper limit. An element that runs for a minute hides whatever happened inside it just as well on video as on paper.
Length is the second test, not the first. Cut at natural break points first, then look at the lengths. If two cuts sit 0.02 minutes apart, merge them. If nothing cuts a 0.60 minute stretch, look harder for a contact or a sound in the middle of it.
The eight types of element
The ILO sorts elements into eight types. They are not eight boxes with one element in each. They are four questions, and every element answers all four.
Four questions that sort every element
1Who does the work?
Manual
A person does it
Fit gasket and cover
Machine
The machine runs on its own
Leak test, 0.20 min
2Does it happen every cycle?
Repetitive
Once in every cycle
Seat the housing
Occasional
Part of the job, but not every cycle
Change the tote, 1 in 24
3Does the time change with the product?
Constant
Same time whatever the part
Apply the label
Variable
Time moves with size, weight or count
Start the bolts: 4 or 6 by model
4Is it part of the job at all?
Yes
It belongs in the standard
All of the above
Foreign
Seen in the study, not part of the job
Supervisor asks a question
| Type | What it means | In the pump cover job |
|---|---|---|
| Repetitive | Occurs in every work cycle | Seat the housing in the fixture |
| Occasional | Part of the job, but not in every cycle; at regular or irregular intervals | Change the empty tote, once every 24 pumps |
| Constant | The basic time stays the same whenever it is done | Apply the label |
| Variable | The basic time varies with some characteristic of the product, equipment or process | Start the bolts by hand: four on one model, six on another |
| Manual | Performed by a worker | Fit gasket and cover |
| Machine | Performed automatically by a power-driven machine or process | The 0.20 minute leak test |
| Governing | Takes longer than any other element being performed at the same time | The leak test governs the label, which is applied while it runs |
| Foreign | Observed during the study but, after analysis, not a necessary part of the job | The supervisor stops to ask about the next order |
Definitions paraphrased from the ILO's Introduction to Work Study, 4th edition, chapter 21.
Three separations matter more than the labels, and the ILO and Barnes both state them as rules.
- Manual apart from machine. The operator controls one and not the other. Machine time is not rated, and it does not get a fatigue allowance, so mixing the two in one element makes both sums wrong.
- Constant apart from variable. A constant element can be timed once and reused. A variable element needs timing across the range of whatever drives it (length, weight, bolt count), and the driver has to be written down next to each reading.
- Every-cycle apart from now-and-then. Occasional and foreign elements are timed separately from the repetitive ones, so they can be spread over the right number of cycles or left out.
How to break a job into elements, step by step
Do this at the workplace, with the operator, before any timing. Twenty minutes here saves a study you would otherwise have to repeat.
- 1
Watch several cycles without the watch
Stand where you can see both hands and the machine. Watch at least five cycles. You are looking for the pattern and for what changes from cycle to cycle. Tell the operator what you are doing and why; how to plan a time study covers that conversation.
- 2
Fix where the cycle starts and ends
Pick one clear instant, such as the finished part touching the rack. The cycle runs from that instant to the same instant on the next part.
- 3
List what the operator does, in order
Write short verb and object phrases: get housing, seat in fixture, fit gasket. Do not judge or group yet. Ask the operator to name any step you cannot see.
- 4
Mark the break points
Go down the list and find the instants you can see or hear. Each one ends an element. Steps with no clear instant between them stay together as one element.
- 5
Check the lengths
Time one cycle roughly. Merge anything under about 0.04 minutes with a neighbour. Look for a cut inside anything over about 0.33 minutes.
- 6
Split off machine-controlled time
Where a machine runs on its own, start an element when the operator presses start and end it when the machine finishes. If the operator does other work while it runs, list that work as its own element and note which one governs.
- 7
Split off variable work and name what drives it
If an element takes longer on some parts than others for a physical reason, keep it separate and add a column for the driver: number of bolts, length of weld, weight of the part.
- 8
List the occasional elements and how often they come
Changing a tote, clearing swarf, filling in a check sheet, fetching material. Write the frequency as a ratio, such as 1 in 24, and say where it comes from (pack size, a count over a shift).
- 9
Write it on the sheet and test it
Give every element a number, a description and a break point. Time three or four cycles as a trial. If you miss a break point twice, it is the wrong break point: change it now, not after 30 cycles.
A worked breakdown: assembling and testing a pump cover
Illustrative example. One operator at one bench assembles a gear pump cover and leak-tests it. The operator takes a housing from a tote, seats it in a fixture, fits a gasket and cover, starts four bolts by hand, runs them down with a nutrunner, presses start on a leak tester, applies a label while the test runs, waits for the green lamp and unloads the pump to a rack. Times are in decimal minutes, read to 0.01.
| No. | Element | Break point (the element ends when) | Type | Time (min) |
|---|---|---|---|---|
| 1 | Get housing from tote, seat in fixture | Housing drops onto the locating pins (click) | Manual, repetitive, constant | 0.08 |
| 2 | Fit gasket and cover | Hand leaves the seated cover | Manual, repetitive, constant | 0.11 |
| 3 | Start four bolts by hand | Hand touches the nutrunner | Manual, repetitive, variable (bolt count) | 0.14 |
| 4 | Run down four bolts with the nutrunner | Nutrunner shuts off on the fourth bolt (sound) | Manual, repetitive, variable (bolt count) | 0.17 |
| 5 | Press test start, apply label | Hand leaves the label | Manual, repetitive, constant | 0.07 |
| 6 | Wait for the leak test to finish | Green lamp comes on | Machine-governed wait | 0.13 |
| 7 | Unload pump to the outbound rack | Pump touches the rack | Manual, repetitive, constant | 0.06 |
| One cycle | 0.76 |
0.08 + 0.11 + 0.14 + 0.17 + 0.07 + 0.13 + 0.06 = 0.76 min, or 45.6 seconds. The leak test itself runs 0.20 min: the 0.07 of element 5 plus the 0.13 of element 6.
Three choices in that table are worth a second look. Starting the bolts and running them down are separate elements even though both are fastening, because one is fiddly hand work that varies a lot and the other is a power tool that does not. Applying the label and waiting are separate, so the 0.13 minutes of waiting is on the sheet as waiting and not buried inside a test element. And the test is not rated or given a fatigue allowance, because the operator cannot make a leak tester go faster.
A coarser split would have been quicker to time. It would also have told you much less, as the before and after below shows from ten timed cycles of this job.
The same job in three lumps and in seven elements
Example numbers- Shortest of ten cycles
- Spread up to the longest
- The widest spread
- Waiting on the machine
Before: 3 elements
Load and assemble0.30 to 0.39 min
Fasten and test0.35 to 0.39 min
Unload0.05 to 0.07 min
After: 7 elements
1. Seat housing0.07 to 0.09 min
2. Gasket and cover0.10 to 0.12 min
3. Start 4 bolts0.12 to 0.19 min
4. Run down bolts0.15 to 0.19 min
5. Start test, label0.06 to 0.08 min
6. Wait for test0.12 to 0.14 min
7. Unload0.05 to 0.07 min
Before: three elements. Load and assemble ranges from 0.30 to 0.39 minutes, Fasten and test ranges from 0.35 to 0.39 minutes, Unload ranges from 0.05 to 0.07 minutes. After: seven elements. The spread sits almost entirely in element 3, start four bolts by hand, which ranges from 0.12 to 0.19 minutes, and element 6 shows 0.13 minutes of waiting on the leak tester in every cycle.
From here the elements go onto a time study sheet, one row each, and the study proper begins. How many cycles to time takes these same seven elements and works out how long the study has to run.
Irregular work: waits, walking, handling, rework and interruptions
Real jobs are not seven tidy elements in a loop. Some of what you see happens only sometimes, and some of it is not the job at all. Decide how each kind will be handled before you start timing, because during the study there is no time to think.
Machine waits
When the operator waits on a machine, make the wait its own element, ending when the machine finishes. Record the machine's run time as well. The wait is not work and is not rated, but it is real time in the cycle, and it is usually the first thing a labor loss review asks about. Drawing the operator and the machine on one time scale, which the ILO calls a multiple activity chart, shows at once who is idle and for how long.
Operator and machine on one time scale
Example numbers0.13 min
Operator waiting each cycle: 17 percent of the cycle
0.20 min
Tester running each cycle: 26 percent of the cycle
A multiple activity chart of one 0.76 minute cycle. The operator works from 0 to 0.57, waits 0.13 minutes for the leak tester, then unloads. The tester is idle until 0.50, runs 0.20 minutes and is idle again.
Walking and material handling
Give walking its own element whenever it is more than a step or two, with break points at the first step away and the arrival. Note the distance. Walking is a variable element driven by distance, so a layout change can be costed from the sheet without a new study. Fetching and returning containers is usually occasional: time it separately and count how often it happens.
Occasional elements
An occasional element is part of the job, so its time belongs in the standard. It does not belong in every cycle at full length. Time it on its own whenever it comes round, establish how often it comes round, and add the per-cycle share. The ILO writes the frequency on the study sheet as a ratio such as 1/10 or 1/50. Make sure the study is long enough to see each occasional element at least a few times, or time it separately.
Spreading an occasional element over the cycles it serves
Example numbersChange the empty housing tote: 0.48 min, once every 24 cycles
0.48 ÷ 24 = 0.020 min added to every cycle
Record the leak rate on the check sheet: 0.15 min, once every 10 cycles
0.15 ÷ 10 = 0.015 min added to every cycle
0.766 min
Mean of the seven repetitive elements
+ 0.035 min
Share of the two occasional elements
0.801 min
Observed time a cycle, before rating and allowances
Change the empty housing tote takes 0.48 minutes once every 24 cycles, which adds 0.020 minutes to each cycle. Record the leak rate on the check sheet takes 0.15 minutes once every 10 cycles, which adds 0.015 minutes to each cycle. The repetitive elements average 0.766 minutes, so the cycle with occasional work is 0.801 minutes.
Rework and dropped parts
A fumble, a dropped bolt or a part that has to be re-seated lengthens one reading. Circle that reading and write what happened. Do not open a new element for it and do not quietly average it in. Whether it then counts depends on whether it is a normal part of this job at this workplace. Time study mistakes shows what one unexplained long reading does to a standard.
Foreign elements
A foreign element is something that happens during the study and is not part of the job: a supervisor's question, a visitor, the observer dropping a pencil. Record when it started and ended, label it (Freivalds letters them A, B, C in order), and keep it out of every element time. Keep the record, though. A study with no foreign elements in an hour is either a very quiet workplace or an observer who stopped writing them down.
Long-cycle and non-repetitive work
Maintenance jobs, setups, kitting and large assemblies can run for 20 minutes or several hours, and may never repeat in quite the same way. The idea of an element still holds. What changes is its size and how you get the time.
- Use larger elements: phases of the job measured in minutes, each ending at a visible milestone such as a guard coming off or a die being clamped. Keep the break point rule. Drop the 0.04 minute floor, which is not the constraint here.
- Split anything that varies with the job from anything that does not. In a changeover, fetching the next die is fairly constant; adjusting until the first good part is not. The SMED split into internal and external work is this same idea.
- Expect to time few cycles. The conventional guide the ILO prints, attributed to General Electric, asks for only 3 cycles when a cycle is over 40 minutes, because each one costs so much to observe.
- Consider not using a stopwatch at all. The ILO points to analytical estimating and comparative estimating for long-cycle, non-repetitive work, and work sampling answers the question of where a crew's day goes without anyone following one job from start to finish.
- Film it if you can. A long job on video can be broken down afterwards, at leisure, by someone who was not standing in the way.
Be honest about precision. A standard for a two-hour job built from three observations is an estimate with a method behind it. That is often all a planning decision needs, as long as nobody treats it like a 45 second assembly standard.
Crew and team work
When two or more people work on the same unit, each person has their own sequence of elements, and some elements are shared. One observer with one watch cannot follow three people.
- Break the job down once for each person. Give every operator their own column or sheet, with their own elements and break points.
- Mark shared elements on both lists with the same name and the same break point: a two-person lift ends for both when the part lands.
- Time everyone against the same clock. That means one observer for each operator with watches started together, or one video of the whole crew.
- Record waiting as an element for each person. In crew work a lot of the cycle is one person waiting for another to finish, and that is the reason for doing the study.
- Draw the result on a common time scale. Freivalds calls the crew version a gang process chart; the ILO's name for the general form is the multiple activity chart. Either one shows who is idle while someone else works.
The crew's cycle time is set by the longest chain of dependent elements, not by the sum of everyone's work. Rebalancing that chain, moving an element from the busiest person to an idle one, is line balancing on a small scale.
Common mistakes when splitting a job
- Break points nobody can see. If the description says "finishes" or "is ready", two observers will time two different elements.
- Elements that are too long. The time is right and the study is useless, because it cannot say where the time went or which part varied.
- Elements that are too short to read. Under about 0.04 minutes by stopwatch, the reading error is as large as the element.
- Machine time mixed into manual elements. The mixed element gets rated and allowed for as if a person did all of it.
- Variable elements with no driver recorded. A range of times with nothing to explain them cannot be turned into a standard for the next model.
- Occasional work timed inside whichever cycle it happened to fall in. That cycle looks abnormal, gets thrown out, and the work disappears from the standard.
- Splitting the job from the work instruction at a desk. The instruction says what should happen. The breakdown has to describe what the operator does.
Templates and tools for the breakdown
- Time study sheet: one row for each element, with a column for its break point and ten or more timed cycles.
- Time study sample size calculator: paste the first readings of an element and see how many cycles it needs.
- Standard work combination table: manual, machine and walking time for each step drawn on one time line.
- Video time study filming checklist: where to stand and what to capture so the break points are visible on video.
If you study from video, LeanSuite Time and Motion Study starts the breakdown for you: the AI times every element on a timeline that links to the footage, and you split, merge and correct elements on that timeline before you certify the study. The rules on this page are what you check its elements against.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownWhere the elements go next: the combination sheet, the standard work chart and the job breakdown sheet.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsStacking each operator's elements against takt once they are timed.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPHow a timed sequence of elements becomes the work sequence in standard work.
- The 8 Wastes of Lean Manufacturing: DOWNTIME ExplainedNaming the waiting, motion and handling that a good breakdown makes visible.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyLine Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line Balancing
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about how to break a job into elements
An element is a distinct part of a job, chosen so it can be observed, timed and rated on its own. A work cycle is made of several elements in a fixed order. Timing elements and not the whole cycle shows where the time goes, lets you rate different kinds of work separately and lets you reuse an element time on other jobs.
A break point is the instant at which one element ends and the next begins. The ILO's Introduction to Work Study asks for it to be clearly described on the study sheet. Good break points are things you can see or hear, such as a part hitting a table, a tool shutting off or a hand leaving a part, so that any observer stops the watch at the same instant.
By stopwatch, about 0.04 minutes, which is 2.4 seconds. The ILO gives that as the smallest unit a trained observer can generally time, and 0.07 to 0.10 minutes for a less trained observer. Put a very short element next to a longer one so there is time to read and write. Video analysis can go shorter because the frame can be stopped.
The ILO lists eight: repetitive, occasional, constant, variable, manual, machine, governing and foreign. They overlap. One element can be manual, repetitive and variable at once. In practice three separations matter: manual work apart from machine time, constant work apart from variable work, and work done every cycle apart from work done now and then.
A foreign element is something observed during the study that, after analysis, turns out not to be a necessary part of the job: a supervisor's question, a visitor, a dropped pencil. Record its start and end, label it, and keep it out of the element times. It still appears on the sheet, so the study accounts for all the elapsed time.
Time it separately whenever it occurs, find out how often it occurs, and add its share to each cycle. A tote change that takes 0.48 minutes once every 24 pieces adds 0.48 divided by 24, or 0.02 minutes, to every cycle. Take the frequency from a count over a shift or from the pack size, not from the one sitting of the study.
Yes. Machine-controlled time starts when the machine is started and ends when it finishes, and it is kept apart from manual work. The operator cannot speed it up, so it is not rated and gets no fatigue allowance. If the operator works while the machine runs, list that work as its own element and note that the machine element governs.
Make a separate list of elements for each person, mark shared elements with the same name and break point on every list, and time everyone against the same clock, with one observer for each operator or one video of the whole crew. Record waiting as an element. Then draw the lists on a common time scale to see who is idle while others work.
Related guides and tools
- How to conduct a time study: the full procedure this step belongs to
- How many cycles to time: sizing the study for these seven elements
- Stopwatch time study: continuous and snap-back timing of the same job
- Twelve time study mistakes and how to spot them in a finished study
- Time and motion study: what it is and what it is for
- Standard time: from element times to normal and standard time
- Value-added versus non-value-added: classifying each element once it is timed
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.