Two-handed process chart: how to build one from video, with a worked example
Short answer
A two-handed process chart records what the left hand and the right hand do at every moment of one cycle, side by side on a time scale. It shows where a hand holds, waits or travels too far, so you can make both hands work together.
A two-handed process chart, also called a left-hand right-hand chart, has two columns, one for each hand, with time running down the page. Each row marks what a hand is doing with one of four symbols: operation, transport, hold or delay. To build one, film a few cycles, replay them once for each hand, then merge the two lists on one time scale. In the example on this page the left hand held for 4.2 of 8.8 seconds. A clamp and a second bin cut the cycle to 6.4 seconds.
Last reviewed:
What is a two-handed process chart?
The four symbols of a two-handed process chart
- OperationThe hand grasps, positions, uses or releases something.Grasp the bolt. Drive the bolt.
- TransportThe hand moves to or from the work, a tool or material.Reach to the bin. Carry the part to the fixture.
- HoldThe hand holds the work, a tool or material while the other hand acts.Hold the bracket while the bolt goes in.
- DelayThe hand is idle, even though the other hand may be working.Wait while the other hand fetches.
Operation is a circle, transport is an arrow, hold is the inverted triangle that means storage on other charts, and delay is a D. Hand inspection is normally charted as an operation.
It is a chart of one operator's hands. The left hand gets a column, the right hand gets a column, and time runs down the page so that anything on the same row happens at the same moment. You read across to see what each hand is doing right now, and down to see how each hand spends the cycle.
It exists because you cannot see two hands at once. Watch an assembly job live and your eye follows the hand that is busy. The other hand, holding a part or waiting for it, drops out of view. The chart forces you to account for every second of both. It is the finest-grained of the process charts: where a flow process chart follows a product through a plant and a spaghetti diagram follows a person across a floor, this one follows the two hands at one workstation.
The method is old. The Gilbreths drew something close to it, the simo chart, from film shot against a clock that showed hundredths of a second. The version taught in work study textbooks, including the ILO's Introduction to Work Study, uses a few process chart symbols instead. It is the practical tool behind the principles of motion economy: those say what a good method looks like, and this chart shows how far yours is from it.
The four symbols
| Symbol | Name | Use it when the hand is | Example |
|---|---|---|---|
| Circle | Operation | Grasping, positioning, using or releasing something | Grasp the bolt. Drive the bolt. |
| Arrow | Transport | Moving to or from the work, a tool or material | Reach to the bin. Carry the part to the fixture. |
| Inverted triangle | Hold | Holding the work, a tool or material while the other hand acts | Hold the bracket while the bolt is started. |
| D | Delay | Idle, even though the other hand is working | Wait while the other hand fetches. |
On other process charts the inverted triangle means storage. On this chart the textbooks reuse it for hold. Hand inspection is normally charted as an operation, so the inspection square is left off unless it matters to the study.
The two symbols to watch are hold and delay. A hold is a hand used as a fixture, and a delay is a hand with nothing to do. Neither adds anything to the product. Most of what you find on a first chart is one of them.
A note on terms. Different books use different symbol sets, and some do not draw hold as a separate symbol. Use one set per study and print the key on the chart. If you also draw therbligs, remember that this chart is coarser: a therblig study splits a grasp into search, select and grasp, while here the whole thing is one operation.
When to use it, and when not to
Use it for short, repeated, hand-paced work at one station: assembly, packing, bench inspection, kitting, data entry, machine loading where the hands do most of the work. The cycle should be seconds to a few minutes, because every second becomes a row.
| Your question | Use | Why |
|---|---|---|
| Are both hands working together at this bench? | Two-handed process chart | It is the only one that shows each hand on the same time scale. |
| How does one operator split time between hands and a machine? | Man-machine chart | It follows the operator and the machine, not each hand. |
| How far does the operator walk and where? | Spaghetti diagram | It draws the path on the floor plan. |
| Is the work area laid out within easy reach? | Reach envelope study | It checks where things sit against the normal and maximum working areas. |
| Where does a product wait and travel across the plant? | Flow process chart | It follows the product, not the hands. |
Do not use it on long, irregular or mostly thinking work, or where the hands are not the limit. If a machine paces the job, the cycle is set by the machine and the hands only need to fit inside it. Chart the operator and the machine together first. It also says nothing about posture or force. A cycle with no holding and no waiting can still be a bad one for the shoulder, and that is a question for an ergonomic assessment.
How to build a two-handed process chart
- 1
Pick the job and say where the cycle starts and ends
Choose one operation at one station. Start the cycle at a clear moment, for example when the hand touches the first part, and end it when the same thing is about to happen again. Write the part number and the date on the sheet.
- 2
Film several cycles from above and in front
You need to see both hands, the bins and the fixture in the same shot. Film at least five cycles of the normal job. Ask the operator to work at the usual pace, and say what the film is for.
- 3
Watch one cycle at full speed
Note the fixture, the bins, the tools and anything the operator does that is not on the written method. This tells you what to look for in the slow passes.
- 4
Record the left hand alone, then the right hand alone
Replay the clip slowed, and follow one hand only. Each time that hand changes what it is doing, write the time and the symbol and a short description. Never try to follow both hands in the same pass.
- 5
Merge on one time scale
Cut a new row whenever either hand changes activity. Write the row's duration in the left margin. The rows must add up to the cycle time you measured, and each hand's rows must add up to it on their own.
- 6
Check it with the operator
Show the chart to the person who does the job. They will tell you which holds are needed, which waits are really a part being placed, and what the film did not show.
Use a round, short description for each row, such as "reach to bracket bin" or "hold bracket". Name the object, not the feeling. A time study sheet or a blank grid with two hand columns is enough to start. The element breakdown rules on how to break a job into elements apply here too: start and stop each row at a point you can see on the film.
Building it from video
Video is what makes this chart practical. Charting live by eye is slow and unreliable, because the eye follows one hand. With a clip you can step through frame by frame, play the same cycle again for the other hand and let the operator check the result later. Frame times also give you the row durations, so you are not guessing them.
Plan four passes: a full-speed look, a left-hand pass, a right-hand pass, and a merge. Pause on every change of activity and write down the clock time. The merge is arithmetic: put both lists on one scale and cut a row at every change. Keep the filming setup the same before and after a change, or the two charts are not comparable. More on filming is in time study from video.
Charting from video takes four passes
- 1Watch one cycle at full speedFind where it starts and ends. Note the fixture, bins and tools.
- 2Left hand only, slowedWrite each change of activity with its frame time.
- 3Right hand only, slowedSame again. Never chart both hands in one pass.
- 4Merge on one time scaleCut a new row whenever either hand changes. Check the rows add to the cycle.
Watch one full cycle, then replay for the left hand only, then the right hand only, then merge the two lists on one time scale.
A worked example: fitting a bolt to a bracket
The job is to fit one bolt to a steel bracket in a bench fixture, run it in with a hand driver, and drop the part in a chute. Everything below is illustrative: times are in seconds, from a filmed cycle, and rounded to a tenth. The bolt bin and the bracket bin are on opposite sides of the fixture.
| Row | Seconds | Left hand | Right hand |
|---|---|---|---|
| 1 | 1.2 | Transport: reach to bracket bin | Delay: wait |
| 2 | 0.6 | Operation: grasp bracket | Delay: wait |
| 3 | 1.2 | Transport: move bracket to fixture | Transport: reach to bolt bin |
| 4 | 0.6 | Operation: position bracket | Operation: grasp bolt |
| 5 | 1.2 | Hold: bracket | Transport: move bolt to fixture |
| 6 | 0.6 | Hold: bracket | Operation: position bolt |
| 7 | 2.4 | Hold: bracket | Operation: drive the bolt |
| 8 | 1.0 | Transport: move part to chute | Delay: wait |
Cycle: 1.2 + 0.6 + 1.2 + 0.6 + 1.2 + 0.6 + 2.4 + 1.0 = 8.8 s.
Add up each hand. The left hand holds for 1.2 + 0.6 + 2.4 = 4.2 s, nearly half the cycle, and is working for the other 4.6 s. The right hand waits for 1.2 + 0.6 + 1.0 = 2.8 s and works for 6.0 s. Rows 1 and 2 are the clearest sign: the right hand starts to fetch the bolt only at row 3, when the left hand is already halfway through its job. Two hands, one doing the work at a time.
The bracket and bolt job, charted as it is done now
Example numbers- 1.2Reach to bracket binWait
- 0.6Grasp bracketWait
- 1.2Move bracket to fixtureReach to bolt bin
- 0.6Position bracketGrasp bolt
- 1.2Hold bracketMove bolt to fixture
- 0.6Hold bracketPosition bolt
- 2.4Hold bracketDrive the bolt
- 1.0Move part to chuteWait
Cycle 8.8 s
- Operation
- Transport
- Hold
- Delay
A two-handed process chart, time running down the page, left hand on the left. 1.2 seconds: left hand reach to bracket bin (transport), right hand wait (delay). 0.6 seconds: left hand grasp bracket (operation), right hand wait (delay). 1.2 seconds: left hand move bracket to fixture (transport), right hand reach to bolt bin (transport). 0.6 seconds: left hand position bracket (operation), right hand grasp bolt (operation). 1.2 seconds: left hand hold bracket (hold), right hand move bolt to fixture (transport). 0.6 seconds: left hand hold bracket (hold), right hand position bolt (operation). 2.4 seconds: left hand hold bracket (hold), right hand drive the bolt (operation). 1.0 seconds: left hand move part to chute (transport), right hand wait (delay). The cycle is 8.8 seconds.
Reading the chart and improving the method
Read down each column, then across each row. Four questions find nearly everything. They follow the principles of motion economy: use both hands together, avoid using a hand as a holder, and keep reaches short.
| Question | Found in rows | Change |
|---|---|---|
| Does either hand hold? | 5, 6, 7: left hand holds the bracket | A spring clamp on the fixture holds it. The hand is free. |
| Do the hands start and stop together? | 1, 2: right hand waits while the left fetches | Move the bolt bin to the right of the fixture. Both hands fetch at once. |
| Is a reach longer than it needs to be? | 1 and 3: 1.2 s each | With both bins close, both reaches take 1.0 s. |
| Is a hand idle at the end? | 8: right hand waits 1.0 s | Put the chute within the left hand's reach. The carry shortens to 0.8 s. |
The same job after a clamp and a second bin
Example numbers- 1.0Reach to bracket binReach to bolt bin
- 0.6Grasp bracketGrasp bolt
- 1.0Move bracket to fixtureMove bolt to fixture
- 0.6Position bracketPosition bolt
- 2.4Wait (clamp holds)Drive the bolt
- 0.8Move part to chuteWait
Cycle 6.4 s
- Operation
- Transport
- Hold
- Delay
The improved two-handed process chart. 1.0 seconds: left hand reach to bracket bin (transport), right hand reach to bolt bin (transport). 0.6 seconds: left hand grasp bracket (operation), right hand grasp bolt (operation). 1.0 seconds: left hand move bracket to fixture (transport), right hand move bolt to fixture (transport). 0.6 seconds: left hand position bracket (operation), right hand position bolt (operation). 2.4 seconds: left hand wait (clamp holds) (delay), right hand drive the bolt (operation). 0.8 seconds: left hand move part to chute (transport), right hand wait (delay). The cycle is 6.4 seconds.
The new method has six rows and takes 1.0 + 0.6 + 1.0 + 0.6 + 2.4 + 0.8 = 6.4 s. That is 2.4 s less, a 27.3 percent cut. Before allowances, the bench makes 3,600 divided by 8.8, about 409 pieces an hour, before and 3,600 divided by 6.4, about 562 pieces an hour, after. Read the saving against its source: 0.6 s came from the closer bins and chute (0.2 s in each of rows 1, 3 and 8), and the other 1.8 s from rows 5 and 6, which now overlap the bracket's moves instead of following them. Doing things at the same time is where most of the gain comes from.
The chart also shows what is left. The left hand now waits 2.4 s while the right hand drives the bolt. A free hand is an opportunity but not a result: giving it a second job, such as pre-positioning the next bracket, is the next change to try, and it needs its own trial. Do not fill the gap with a job just to look busy. The target is a shorter, steadier cycle, not a hand that never rests.
What each hand does with the cycle
Example numbersLeft hand, before4.6 working, 4.2 holding, 0.0 waiting
Left hand, after4.0 working, 0.0 holding, 2.4 waiting
Right hand, before6.0 working, 0.0 holding, 2.8 waiting
Right hand, after5.6 working, 0.0 holding, 0.8 waiting
- Working (operation, transport)
- Holding
- Waiting
Seconds of working, holding and waiting for each hand. Left hand, before: 4.6 working, 4.2 holding, 0.0 waiting. Left hand, after: 4.0 working, 0.0 holding, 2.4 waiting. Right hand, before: 6.0 working, 0.0 holding, 2.8 waiting. Right hand, after: 5.6 working, 0.0 holding, 0.8 waiting.
Common mistakes
- Charting both hands in one pass. You will miss the quieter hand. Do one hand at a time from video.
- Charting the written method, not the real one. Film what the operator does, then compare with the document.
- Calling a part-holding grasp a delay. A hand that holds is holding. Use the hold symbol so the number shows up.
- Removing every hold or delay on principle. Some holds are needed, and a rest is not waste. Ask the operator before you change it.
- Judging the operator, not the method. Take the chart to the person as a picture of the bench and ask what gets in their way. Operators who see it as a check on them will change how they work on the day of the film.
- Forgetting what the chart cannot see: posture, force, quality and the time for tasks such as replenishing bins. Check those separately.
When the improved method is proved, write it down as standard work and retime it. The chart gives you the method, and the time study gives you the standard time.
LeanSuite's Time and Motion Study times every element from one phone video and links each time to its frame, which is the raw material for the left-hand and right-hand passes. The charting itself you still do with the operator.
Tools and templates
- Time study sheet: record the elements and their times before you split them by hand.
- Cycle time calculator: pieces per hour from a cycle time, for the before and after comparison.
- Standard time calculator: from the observed cycle to a standard with rating and allowances.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work in Manufacturing: A Complete GuideWriting the improved method down so the motions you removed stay removed.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe charts that show hand work, walking and machine time for one operator.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPFixing the work sequence once the motions are settled.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsStacking each operator's elements against takt once the hand work is balanced.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Upload one process video and get time and motion, SMED, ergonomic and line balancing studies to review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about two-handed process chart
A two-handed process chart records what the left hand and the right hand do in one work cycle, in two columns with time running down the page. Each row uses a symbol for operation, transport, hold or delay. It shows where a hand holds, waits or travels too far, and it is used to improve repetitive bench work.
A flow process chart follows a product or a person through a whole process, listing operations, transports, inspections, delays and storage. A two-handed process chart follows only the operator's two hands at one workstation, on a time scale, and uses hold instead of storage. Use the flow chart for a plant-wide view and the two-handed chart for one bench.
Four: an operation circle for grasping, positioning, using and releasing, a transport arrow for hand movement, a D for delay when a hand is idle, and the inverted triangle for hold when a hand holds the work or a tool. Textbooks reuse the triangle that means storage elsewhere. Hand inspection is normally charted as an operation.
Film several cycles with both hands in view. Replay once at full speed, then once for the left hand only and once for the right hand only, noting the time and symbol at every change of activity. Merge the two lists on one time scale, cutting a row whenever either hand changes. Check that the rows add up to the cycle, then review it with the operator.
Look for holds and delays on the chart. Replace holding with a clamp or fixture, put bins and tools so both hands can fetch and place at once, and keep reaches inside the normal working area. Then check whether a free hand can take a real task. The aim is a shorter, steady cycle, not busy hands. Trial the change and retime it before you write it down.
Related guides and tools
- Therbligs and motion economy: the 18 basic motions and the rules for a good method
- Man-machine chart: the operator and the machine on one time scale
- Workstation design: laying out the bench so both hands reach what they need
- How to break a job into elements: where to start and stop each row
- Time study from video: filming and frame-by-frame timing
- Spaghetti diagram: the walking path, where this chart shows the hands
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.