Method guide · Standard work, SOPs and training
Therbligs and the principles of motion economy: the 18 basic motions and how to use them today
Short answer
Therbligs are the 18 basic elements that any manual task can be broken into, such as search, grasp, transport loaded, position and hold. Frank and Lillian Gilbreth defined them. The principles of motion economy are the rules for arranging work so it needs fewer of them.
A therblig is one basic element of hand work. The Gilbreths listed them between 1915 and 1924 and later authors settled on 18: search, find, select, grasp, hold, transport loaded, transport empty, position, assemble, use, disassemble, inspect, pre-position, release load, unavoidable delay, avoidable delay, plan and rest. Only a few of them move the job forward. The rest, such as search, select, hold and position, are signs that the workplace could be arranged better. The principles of motion economy, set out by Ralph Barnes in three groups (the body, the workplace, the tools), say how: fixed places, short reaches, both hands working, fixtures doing the holding. Therbligs are for seeing the motion. Systems such as MTM and MOST are for timing it.
Last reviewed:
What are therbligs?
The 18 therbligs and their symbols
- ShSearch
- FFind
- StSelect
- GGrasp
- HHold
- TLTransport loaded
- TETransport empty
- PPosition
- AAssemble
- UUse
- DADisassemble
- IInspect
- PPPre-position
- RLRelease load
- UDUnavoidable delay
- ADAvoidable delay
- PnPlan
- RRest
The 18 therbligs with their letter symbols: Search (Sh), Find (F), Select (St), Grasp (G), Hold (H), Transport loaded (TL), Transport empty (TE), Position (P), Assemble (A), Use (U), Disassemble (DA), Inspect (I), Pre-position (PP), Release load (RL), Unavoidable delay (UD), Avoidable delay (AD), Plan (Pn), Rest to overcome fatigue (R). 8 of them advance the work; the other 10 are candidates to remove.
A therblig is a basic element of manual work: one of a short list of things a hand, an eye or a mind does while a job gets done. Reaching for a screw is one. Closing the fingers on it is another. Hunting for it in a pile is a third. The word is Gilbreth spelled backwards with the th kept together, and it was coined by Frank and Lillian Gilbreth, who worked out the list.
Their claim was that every manual job, from laying a brick to packing a carton, is a sequence of the same few elements. If that is so, you can study any job the same way: write down the therbligs for each hand, in order, and ask of each one whether it has to be there. A motion study is exactly that. It is a different question from a time study, which asks how long the job takes as it is done now.
The 18 therbligs, with symbols and meanings
Each therblig has a name, a letter symbol for writing on a chart, and a picture symbol the Gilbreths drew as a memory aid. The table groups them the way methods textbooks do: the ones that advance the work, and the ones that only make it possible or hold it up.
| Therblig | Letters | Meaning | Picture symbol | Does it advance the work? |
|---|---|---|---|---|
| Search | Sh | Eyes or hands hunt for the object | An eye turned to one side | No |
| Find | F | The instant the search ends. Rarely charted on its own | An eye looking straight ahead | No |
| Select | St | Choosing one object from several | An arrow pointing at the object | No |
| Grasp | G | Closing the fingers on the object | A hand open to grasp | Yes |
| Hold | H | Keeping the object still while the other hand works on it | A magnet holding a bar | No |
| Transport loaded | TL | Moving the object with the hand. MTM calls it move | A hand with something in it | Yes |
| Transport empty | TE | Moving the empty hand. MTM calls it reach | An empty hand | Yes |
| Position | P | Turning or lining up the object so it will fit | An object being placed by the hand | No |
| Assemble | A | Joining two objects | Several things put together | Yes |
| Use | U | Working a tool or a control for its purpose | The letter U | Yes |
| Disassemble | DA | Taking joined objects apart | One part taken from an assembly | Yes |
| Inspect | I | Comparing the object with a standard | A magnifying lens | No |
| Pre-position | PP | Setting the object down ready for its next use | A ninepin standing in a bowling alley | Yes |
| Release load | RL | Letting go of the object | A hand dropping what it held | Yes |
| Unavoidable delay | UD | Waiting that the operator cannot prevent, such as one hand waiting for the other | A man bumping his nose by accident | No |
| Avoidable delay | AD | Waiting or idling the operator could prevent | A man lying down on the job | No |
| Plan | Pn | Deciding what to do next | A man with his fingers at his brow | No |
| Rest to overcome fatigue | R | A pause to recover | A man sitting down | No |
The Gilbreths' 1915 list had 16 elements and their 1924 list had 17. Hold was split from grasp by later authors, which gives the 18 most books print; some books leave out find and print 17. The yes and no grouping follows Niebel and Freivalds's effective and ineffective therbligs.
The last column is the reason anyone still learns these. Eight therbligs do something to the product or move it. The other ten are the price of a workplace that is not arranged yet: the part was not where the hand expected (search, select), it arrived the wrong way round (position), nothing but a hand was there to steady it (hold), or one hand had to wait for the other (unavoidable delay). Inspect, plan and rest are sometimes necessary. They still deserve the question.
The Gilbreths' story
Frank Gilbreth started work in 1885 as a bricklayer's apprentice and noticed on his first days that no two bricklayers taught him the same way, and that each of them used one set of motions when working slowly, another when working fast and a third when teaching. He spent the next years finding the best set. He put the bricks and mortar on an adjustable scaffold at waist height, so nobody bent to the floor, and had labourers stack the bricks with the best face one way, so the bricklayer did not turn and inspect each one. By his own account the motions to lay a brick fell from 18 to about 5, and output rose from 120 bricks an hour to 350.
Gilbreth's bricklaying, before and after
Motions to lay one brick
Bricks laid per hour
By Frank Gilbreth's own account, the motions to lay one brick fell from 18 to about 5 and output rose from 120 to 350 bricks an hour.
Lillian Gilbreth was a psychologist, and from their marriage in 1904 the work was shared. She brought the question of what the work does to the person: fatigue, monotony, skill and how people learn a motion. Together they moved from watching to filming. They put a fast-running clock in the picture so each frame carried its own time and called it micromotion study. They fixed small lamps to a worker's fingers and photographed the path of the light as one continuous line, the cyclegraph, and by making the lamp flash they could read speed and direction from the trail.
Film showed them motions too short to see by eye, and it forced the question of what to call them. A first list of 16 elements appeared in 1915, in a paper on retraining injured soldiers. The fuller system was published as Classifying the Elements of Work in 1924, shortly after Frank's death. Lillian carried the work on for nearly fifty more years, into hospitals, kitchens and workplaces for people with disabilities. Two of their twelve children later wrote Cheaper by the Dozen about growing up in a household run on motion study.
The Gilbreths disagreed sharply with the stopwatch men around Frederick Taylor. Taylor's followers timed the job. The Gilbreths said to fix the method first, because timing a wasteful method only measures the waste. Both halves survive in what is now called time and motion study.
A worked motion study of one hand
Illustrative example. An operator's right hand takes a screw from a loose pile in a tray and starts it in a hole. The cycle was filmed and each therblig timed from the frames. The times are made up for teaching.
- 1
Film a few cycles
Film the hands from the front or above, with the whole reach in view. Tell the operator what the film is for and what it is not for.
- 2
List the therbligs for the hand, in order
Step through one typical cycle. Reach to the tray (TE), hunt for a screw (Sh), pick one out (St), grasp it (G), carry it to the hole (TL), turn it point down and line it up (P), start the thread (A), let go (RL).
- 3
Time each one from the frames
Count frames or read the video's clock at each change. Short therbligs are a few tenths of a second, so use the film, not a stopwatch.
- 4
Mark the ones that do not advance the work
Here: search, select and position. Together they are 1.2 of the 2.9 seconds, 41% of the cycle.
- 5
Ask of each marked therblig: eliminate, combine or shorten?
Search and select exist because the screws lie in a pile. A feeder lip that presents one screw at a time, always in the same place, removes both. Position is long because the screw arrives sideways and the hole has a sharp edge. Presenting screws point down and chamfering the hole cuts it to a touch.
- 6
Chart the new method and compare
Reach, grasp, carry, a short position, assemble, release: 1.7 seconds. The assemble time has not changed. Everything saved came from the therbligs that added nothing.
| Therblig | Before (s) | After (s) | What changed |
|---|---|---|---|
| Transport empty (reach to tray) | 0.4 | 0.3 | The feeder lip is nearer than the tray was |
| Search | 0.3 | 0 | One screw is presented in a fixed place |
| Select | 0.3 | 0 | Nothing to choose from |
| Grasp | 0.2 | 0.2 | |
| Transport loaded (carry to hole) | 0.5 | 0.4 | Shorter path |
| Position | 0.6 | 0.2 | Screw arrives point down; hole is chamfered |
| Assemble (start the thread) | 0.5 | 0.5 | |
| Release load | 0.1 | 0.1 | |
| Total | 2.9 | 1.7 | 1.2 s saved, 41% |
Before, search, select and position took 1.2 s (41% of the cycle). After, position alone takes 0.2 s (12%).
One hand, one screw: the therbligs before and after
Example numbersBefore: screws in a loose pile
2.9 s
Search, select and position: 1.2 s, 41% of the cycle.
After: one screw presented point down, hole chamfered
1.7 s
Search, select and position: 0.2 s, 12% of the cycle.
- TE transport empty
- Sh search
- St select
- G grasp
- TL transport loaded
- P position
- A assemble
- RL release load
advances the workadds nothing
Before: Transport empty 0.4 s, Search 0.3 s, Select 0.3 s, Grasp 0.2 s, Transport loaded 0.5 s, Position 0.6 s, Assemble 0.5 s, Release load 0.1 s; total 2.9 seconds. After a feeder lip and a chamfered hole, search and select are gone and position is shorter; total 1.7 seconds.
Do the same for the left hand and put the two columns side by side on a common time scale, and you have what the Gilbreths called a simo chart, for simultaneous motion. Its most common finding is a left hand that shows one long hold while the right hand does everything. A hand is an expensive vise. A fixture that holds the part frees it to do half the work.
The principles of motion economy
Therbligs tell you what the hands are doing. The principles of motion economy tell you what they should be doing. The Gilbreths wrote the first rules. Ralph M. Barnes, whose Motion and Time Study was the standard textbook for decades, tested and arranged them into 22 principles in three groups. They are given here in our own words, grouped his way.
Use of the human body
- Both hands start and finish their motions together.
- Both hands are not idle at the same time, except during rest.
- The arms move in opposite, mirror-image directions, at the same time.
- Use the smallest part of the body that can do the work well: fingers before wrist, wrist before forearm, forearm before upper arm, upper arm before shoulder.
- Let momentum help where it can, and keep it small where muscle has to stop it.
- Smooth, curved paths beat straight lines with sharp changes of direction.
- Free-swinging movements are quicker and easier than movements that are held back or guided all the way.
- Arrange the work so it has an easy, natural rhythm.
- Keep the places the eyes must look few and close together.
The five classes of motion: use the lowest one that does the job
Class 1 is finger motion. Class 2 adds the wrist. Class 3 adds the forearm. Class 4 adds the upper arm. Class 5 adds the shoulder and trunk. Higher classes are slower and more tiring.
Arrangement of the workplace
- Every tool and material has one fixed place.
- Tools, materials and controls sit close to where they are used.
- Gravity-feed bins and containers bring material to the point of use.
- Finished parts leave by drop delivery wherever possible, so no hand carries them away.
- Materials and tools are laid out in the order they are used.
- The light is good enough to see the work without strain.
- Bench and chair heights allow sitting and standing by turns.
- The chair is of a type and height that supports a good posture.
Normal and maximum working areas, seen from above
A bench seen from above with the operator at the front edge. The normal working area is the pair of arcs each forearm sweeps with the elbow at the side. The maximum working area is the larger pair of arcs each straight arm sweeps from the shoulder. Parts and the tool used every cycle sit inside the normal area; nothing in regular use sits outside the maximum area.
Design of tools and equipment
- Take holding work away from the hands: use a jig, a fixture or a foot-operated device.
- Combine two or more tools into one where you can.
- Pre-position tools and materials, so they are picked up the way they will be used.
- Where each finger does its own job, as on a keyboard, share the load according to the strength of each finger.
- Place levers, handles and handwheels so they can be worked with the least change of body position and the best mechanical advantage.
Two pictures carry most of this. The first is the five classes of motion in the fourth principle: every time a reach is long enough to bring in the shoulder or the trunk, the motion is slower and more tiring than it needs to be. The second is the pair of working areas Barnes drew on the bench. The normal working area is what the forearm sweeps with the elbow hanging at the side. The maximum working area is what the straight arm sweeps from the shoulder. Everything used every cycle belongs inside the first. Nothing used regularly belongs outside the second. The workstation design guide gives dimensions and heights.
A modern motion economy checklist
Stand at the station, or watch a video of ten cycles, and answer each question yes or no. Every no is a candidate improvement.
- Does every part, tool and container have one marked place, and is it there every cycle?
- Is everything used every cycle inside the forearm's sweep, with no reach above the shoulder or behind the body?
- Does either hand hold a part while the other works on it? Could a fixture hold it?
- Is either hand idle for part of the cycle?
- Does the operator search, sort or untangle parts? Could they arrive one at a time?
- Do parts arrive the way round they will be used, or does the hand turn each one?
- Does the operator carry finished parts away, or could they drop into a chute?
- Do the eyes have to leave the work to find the next part or read a label?
- Is there a bend, a twist of the trunk or a step in every cycle? What is on the floor that could be on a stand?
- Do hand tools hang or sit where they are used, already the right way up?
- Could one tool do the job of two that are swapped every cycle?
- Can the operator change posture during the shift: sit, stand, shift weight?
- Is the same small motion repeated thousands of times with no variation? Speed is not the only test. Check force, posture and repetition as well.
The last question is the one Barnes's generation did not ask often enough, and it leads to the next section.
Where this still helps, and where it is dated
Still useful
- As a vocabulary for looking. Search, select, hold and position are four of the most common wastes at a bench, and having names for them is half of seeing them.
- For any manual station: assembly, packing, kitting, inspection, a changeover done by hand. The rules about fixed places, short reaches and fixtures cost little and pay every cycle.
- With video. The Gilbreths needed a special camera and a clock in the frame. A phone does the same job now, and stepping through ten cycles frame by frame is within anyone's reach.
- As the root of everything that came after. Reach, grasp, move, position and release in MTM are therbligs with times attached. The motion waste in lean is the same idea under another name.
Dated, or incomplete
- Nobody charts all 18 therbligs for every job any more. It is too slow. Use the handful that matter, or a predetermined time system if you need times.
- The principles aim at speed and low fatigue. They say little about the injuries that come from repeating one small motion all day, from force or from a fixed posture. A method can satisfy all 22 and still fail an ergonomic assessment.
- They assume bench work by one person. They do not cover walking routes, machine tending, team work or thinking work.
- Some examples have aged, such as the typewriter keyboard. The principle behind them usually has not.
- The fastest method is not automatically the best one. Quality, safety and whether a person can keep it up for a shift come first.
There is a people side as well. Filming someone's hands and then telling them a third of their motions are wasted is a quick way to lose them. The waste belongs to the workplace, not to the person: they search because the parts come in a pile. Say so, show them the film, and ask what they would change. The operator has usually wanted that fixture for years.
Which system for which job: MTM, MOST, MODAPTS, stopwatch or video
Therbligs help you see a motion. To put a time on a job you need one of five tools. Three are predetermined motion time systems, which build the time from the method. Two measure the job as it runs. The ratings below are our reading of where each is strong, workable or weak.
Which tool for which need
StrongWorkableWeak
A time for a job that is not running yet
A short cycle in very high volume
A long or varied cycle
A standard this week for a running job
Finding wasted motion
What really happens: delays and variation
Evidence others can check later
Usable with little training
A time for a job that is not running yet: MTM strong, MOST strong, MODAPTS strong, Stopwatch weak, Video weak. A short cycle in very high volume: MTM strong, MOST workable, MODAPTS workable, Stopwatch workable, Video strong. A long or varied cycle: MTM workable, MOST strong, MODAPTS workable, Stopwatch workable, Video strong. A standard this week for a running job: MTM weak, MOST workable, MODAPTS workable, Stopwatch strong, Video strong. Finding wasted motion: MTM strong, MOST workable, MODAPTS strong, Stopwatch weak, Video strong. What really happens: delays and variation: MTM weak, MOST weak, MODAPTS weak, Stopwatch strong, Video strong. Evidence others can check later: MTM workable, MOST workable, MODAPTS workable, Stopwatch weak, Video strong. Usable with little training: MTM weak, MOST workable, MODAPTS strong, Stopwatch workable, Video workable.
- New product, nothing to film: a predetermined system. Which one depends on what your company and customers already use. See MTM and MOST and MODAPTS.
- Running job, standard needed: a time study, by stopwatch or from video. The standard time guide covers rating and allowances.
- Running job, method looks wasteful: film it and do the motion study on this page first. Then time the improved method.
- Long irregular work across a shift: none of the five. Use work sampling.
- Not sure which question you are asking: the comparison of time study, motion study and method study sorts that out.
Video earns its column because it does two jobs. It is a timing method, and it is the record that lets a second person check the timing or run a motion study on the same cycles later. LeanSuite's Time and Motion Study works this way: it times every element from one phone video and links each time to its frame. For the posture and repetition questions the motion economy rules leave open, the Ergonomic Study scores REBA and RULA from the same kind of video.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work in Manufacturing: A Complete GuideWriting down the improved method so the motions you removed stay removed.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe charts that show hand work, walking and machine time for one operator.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPFixing the work sequence once the motions are settled.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsSorting each operator's elements into value-added and waste and stacking them against takt.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
Doing this in LeanSuite
Time and Motion Study
Times every element from one phone video of the process and reports cycle time, standard time, takt and units per hour, each linked to its video frame.
See Time and Motion StudyErgonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about therbligs and motion economy
Search, find, select, grasp, hold, transport loaded, transport empty, position, assemble, use, disassemble, inspect, pre-position, release load, unavoidable delay, avoidable delay, plan and rest to overcome fatigue. They are the basic elements Frank and Lillian Gilbreth said every manual task is made of. Their own 1924 list had 17; hold was separated from grasp by later authors, which gives the 18 in most textbooks.
A therblig is one basic element of manual work, such as reaching for a part, grasping it, positioning it or holding it. The word is Gilbreth spelled backwards with the th kept together. In a motion study you list the therbligs each hand performs in a cycle and question every one, especially search, select, hold and position, which add nothing to the product.
Frank Bunker Gilbreth and Lillian Moller Gilbreth, American pioneers of motion study. Frank began by studying bricklaying in the 1880s, and the couple later filmed work to see motions too fast for the eye. A first list of 16 elements appeared in 1915 and the full system in 1924, in a two-part article called Classifying the Elements of Work.
Rules for arranging manual work so it takes fewer and easier motions. Ralph Barnes set out 22 in three groups. Use of the human body: both hands working together, in mirror-image paths, using the smallest body part that can do the job. Arrangement of the workplace: fixed places, short reaches, gravity feed and drop delivery. Design of tools and equipment: fixtures that hold, combined tools and pre-positioned tools.
Search, find, select, hold, position, inspect, plan, unavoidable delay, avoidable delay and rest. They do not change or move the product. Some are sometimes needed, but each is a prompt: search and select point to parts without a fixed place, position to parts that arrive the wrong way round, and hold to a missing fixture. Grasp, transport, assemble, use, disassemble, pre-position and release are the effective ones.
Rarely as a full 18-symbol chart, which is slow to draw. They live on in two ways. Predetermined time systems such as MTM use the same elements, renamed reach, grasp, move, position and release, with times attached. And the habit of spotting search, select, hold and position at a workstation is still one of the quickest ways to find motion waste, especially from video.
It depends on whether the job is running. For a job that does not exist yet, use a predetermined system: MTM-1 for short, high-volume cycles, MOST or MTM-UAS for general assembly, MODAPTS for bench work. For a running job that needs a standard soon, a stopwatch or video time study is faster and captures real delays. Video adds a record others can check.
Related guides and tools
- Time and motion study: the whole method, from Taylor and the Gilbreths to video
- Time study, motion study and method study: which question each answers
- Workstation design: reach zones, heights and layout
- Predetermined motion time systems: timing the motions
- MTM: reach, grasp, move, position and release with times
- MOST and MODAPTS: the two fast systems
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.