Practical guide · Value stream mapping and flow
Workstation design in manufacturing: reach zones, working heights and part presentation
Short answer
A good workstation puts every part and tool used each cycle inside the sweep of the forearm, sets the work near elbow height for the task, feeds parts to the point of use, and keeps both hands working. Design it for your smallest and tallest operators.
Design from the operator outward. Put everything touched every cycle in the normal working area, the arc the forearm sweeps with the elbow at the side (about 40 cm for a small woman). Keep occasional items inside the maximum working area, the arc of the straight arm (about 55 cm), and nothing the operator needs beyond it. Set the work surface 5 to 10 cm below standing elbow height for light assembly, a little above the elbow for precision work and well below it for heavy work. Present parts in the order and orientation they are used, let a fixture hold the part so both hands can work, and remove finished parts by a chute or slide. Then mock it up and try it with real people before you build it.
Last reviewed:
What is workstation design?
A designed workstation in one picture
- Work point straight ahead, where both forearms reach, at a height set from the elbow.
- Every-cycle parts one each side, inside the forearm sweep (dashed arcs).
- Tool hung over the work point, ready to grip.
- Both hands working: the fixture holds the part, not a hand.
- Finished parts leave down a chute. Nothing is carried.
- Supply rolls to the pick point and is refilled from behind.
- Light from the front and above, so the hands cast no shadow.
A bench seen from above. The work point is a fixture straight in front of the operator. A bin sits each side inside the forearm sweep. A driver hangs over the fixture. Both hands reach the bins together. A chute takes the finished part away to the right. A gravity rack at the back left is refilled from behind, and a task light runs along the front top.
Workstation design is deciding where the work, the parts, the tools and the person sit in relation to each other, so that the job can be done at the planned pace all shift without strain. It covers distances (how far the hand travels), heights (where the work sits against the body), presentation (how parts arrive and leave) and posture (sitting, standing, seeing).
It matters because layout is where a large share of a manual cycle goes. In a time and motion study, the seconds spent reaching, turning, bending, walking and searching are almost always set by where things were put, not by how the operator works. The same distances and heights also decide the posture scores in an ergonomic assessment. One layout change usually moves both numbers.
The order below is the order to design in: reach first, then height, then how parts are presented, then what each hand does, then posture and seeing. Each step narrows the choices for the next one.
Reach zones: the normal and maximum working areas
Two arcs on the bench decide where things go. The normal working area is what the hand covers when the upper arm hangs relaxed at the side and the forearm swings about the elbow. The maximum working area is what the hand covers when the whole arm swings from the shoulder, without leaning. Each hand has its own pair of arcs, and where the two normal areas overlap in front of the body is the only place both hands can work together with the eyes on the job.
The idea comes from motion study. Ralph Barnes drew the two areas in his textbook Motion and Time Study, and from its fourth edition used figures from a General Motors study by Farley (1955), drawn for an average man and an average woman. Squires (1956) pointed out that the elbow does not stay still as the forearm sweeps, so the real normal area is a little larger and less circular than Farley's arc. Das and Grady compared the two in 1983 and preferred Squires. For laying out a bench the simple arcs are close enough, as long as you size them from measured arm lengths and not from memory.
| Dimension | Sets | Women: 5th, 50th, 95th percentile | Men: 5th, 50th, 95th percentile |
|---|---|---|---|
| Elbow to fingertip | Radius of the normal working area | 400, 430, 460 | 440, 475, 510 |
| Shoulder to grip | Radius of the maximum working area | 555, 600, 650 | 610, 665, 715 |
Source: Pheasant and Haslegrave, Bodyspace, 3rd edition (2006). The 5th percentile means 95 percent of that group reach at least this far. Other populations differ, so use data for your own workforce where you have it, or measure.
Reach zones on the bench, seen from above
Both hands. Where the two forearm sweeps overlap. Put the work point here.
Normal working area. Forearm only, elbow at the side: 400 mm. Everything used every cycle.
Maximum working area. Straight arm from the shoulder: 555 mm. Items used every few cycles.
Beyond. The trunk has to move. Replenishment stock only.
Top view of a bench with two arcs for each hand. The inner arcs, the normal working area, have a radius of 400 millimetres from the point under each shoulder. The outer arcs, the maximum working area, have a radius of 555 millimetres. The two inner arcs overlap in front of the body, where both hands can work. Beyond the outer arcs the operator has to lean or step.
Design reach for the smallest person who will work the station. If she can reach it, everyone can. On these figures that means a normal area of about 40 cm from the elbow and a maximum area of about 55 cm from the shoulder. Fingertips reach the edge of the arc; a full grasp ends a few centimetres short of it, so keep bins and tools inside the line, not on it. Measure on the bench from the point under the shoulder, not from the centre of the body.
| Zone | How the body reaches it | Put here | Keep out |
|---|---|---|---|
| Normal working area, both hands | Forearms only, in front of the body | The work point: the fixture or nest where parts are joined | Bins and stock, which push the work away from the body |
| Normal working area, one hand | Forearm sweep, elbow at the side | Every part and tool used every cycle | Items used once an hour |
| Maximum working area | Straight arm from the shoulder | Items used every few cycles: a gauge, a marker, the next box of fasteners | Anything picked every cycle; heavy items |
| Beyond the maximum | Leaning, twisting or stepping | Replenishment stock, fed in from outside the operator's space | Anything the operator needs during the cycle |
Reach has a vertical side too. Plants running workplace organisation under World Class Manufacturing call the best band the golden zone: between about waist and shoulder height, close to the body. The strike zone is the smaller area inside it where a part is picked up or fitted. The rule is the same as on the bench top. The heavier the part and the more often it is handled, the closer it belongs to the middle of that band.
Working heights by task type
Height is set from the elbow, not from the floor. Stand relaxed with the upper arms hanging and the forearms level: the height of the elbow is the reference. Precision work goes slightly above it, so the eyes are close and the forearms can rest. Light assembly goes slightly below it, so the arms hang freely. Heavy work goes well below it, so the operator can push down with a straight arm and use body weight.
| Task type | Examples | Pheasant and Haslegrave (2006) | CCOHS guidance |
|---|---|---|---|
| Precision work | Electronics assembly, inspection, fine fitting | 5 to 10 cm above elbow height, with wrist or forearm support | About 5 cm above elbow height, with elbow support |
| Light work | Bench assembly, packing small parts, small hand tools | 5 to 10 cm below elbow height | About 5 to 10 cm below elbow height |
| Heavy work | Pressing parts home, hammering, work needing downward force | 10 to 25 cm below elbow height | 20 to 40 cm below elbow height |
The Pheasant and Haslegrave figures are as published by the Centre of Research Expertise for the Prevention of Musculoskeletal Disorders (University of Waterloo). CCOHS is the Canadian Centre for Occupational Health and Safety. The two differ on heavy work: the harder the downward push, the lower the work should sit.
Working height is set from the elbow
Example numbersSide view of a standing operator with an elbow height of 105 centimetres and three benches. For precision work the work sits 5 to 10 centimetres above the elbow, for light work 5 to 10 centimetres below it, and for heavy work 10 to 25 centimetres below it.
Two details catch people out. First, the number is the height of the work, not of the bench. A fixture that stands 12 cm tall on a bench set at the right height puts the hands 12 cm too high. Second, people differ by far more than the 5 cm width of a band, so a fixed bench fits only some of them. The Waterloo guidance gives the adjustment range needed to fit 90 percent of workers: 102 to 132 cm for precision tasks, 87 to 117 cm for light tasks and 72 to 112 cm for heavy tasks.
For seated work the same elbow rule applies with the person in the chair: set the chair so the feet are flat and the thighs level, then bring the work to elbow height, or slightly above it for fine work with the forearms supported. Leave room for the knees and feet under the surface. A bench with a shelf or drawer under the front edge cannot be sat at.
Part presentation and point of use
Point of use means the part is stored where it is fitted, in the quantity the station needs, so nobody fetches it. Presentation is the next level of detail: which way up the part arrives, how it is separated from the others, and how the hand gets hold of it. A part that has to be untangled, turned over or peeled off a stack costs time on every cycle, and none of it adds value.
- Deliver to a fixed place. Every bin and tool has one marked position, so the hand goes there without the eyes. This is the set in order step of 5S applied to seconds.
- Feed by gravity. Sloped flow racks and gravity bins bring the next part to the same pick point every time and keep the oldest stock moving first.
- Present the part the way it is used. The grip surface faces the hand and the part needs no turning before it is fitted.
- Size the container to the reach, not to the delivery. A small bin refilled often fits inside the normal area. A pallet box never does.
- Lay parts out in the order of assembly, so the hands move in one direction across the bench.
- Refill from the back or the side. The person who replenishes should never need the space the operator is working in.
- Let finished parts leave by a chute, slide or conveyor at bench height. Barnes called this drop delivery: the hand lets go and is free for the next part.
Part presentation: the same part, two ways of getting it
Two side views. Before: the operator bends to a tote on the floor behind them, then turns and carries the part to the bench. After: the operator stands upright and takes the part from the lip of a sloped gravity rack at the bench, which is refilled from the back while empty bins roll back on an upper lane.
Presentation is also where mistakes are prevented. If two similar parts sit in neighbouring bins, the wrong one will be fitted sooner or later. Separate look-alike parts, or shape the bin opening or the fixture so only the right part goes in, which is poka-yoke built into the station.
Two-handed work
Watch what each hand does separately. On most benches that were never designed, one hand works and the other holds the part still. A holding hand is a clamp with a wage. Give the part to a fixture and that hand can fetch, fit or steady, and the cycle shortens without anyone moving faster.
- Let both hands start and finish their motions together, moving in opposite, mirrored directions. Mirrored reaches balance the body and need little thought, which is why they are quick.
- Never have both hands idle at once except in a rest pause, and question every hold.
- Place the two parts that are picked together at the same distance on each side, so the hands arrive together.
- Bring both hands back to the same work point in front of the body, where the eyes already are.
- If one hand must hold, make it the non-dominant hand and make the hold short.
A left-hand and right-hand chart, before and after a fixture
Example numbers6 steps. Hands doing work in 7 of 12 hand-steps, holding in 4, idle in 1.
5 steps. Hands doing work in 9 of 10 hand-steps, holding in 1, idle in 0.
Two charts of the same small assembly. Before, the left hand holds the base for four of six steps, and hands do work in 7 of 12 hand-steps. After a fixture is added, the job takes 5 steps and hands do work in 9 of 10 hand-steps.
The tool for seeing this is a left-hand and right-hand chart: one row for each step, one column for each hand, and a mark for work, move, hold or idle. Ten minutes with a video and a chart shows where a fixture would pay for itself.
The principles of motion economy
The rules above are not new. Frank and Lillian Gilbreth worked them out in their motion studies in the early 1900s, and Ralph Barnes set them down as 22 principles of motion economy in three groups in Motion and Time Study, first published in 1937. The ILO's Introduction to Work Study and most industrial engineering textbooks still teach Barnes's list. Here it is in plain words.
Use of the human body (principles 1 to 9)
- 1. The two hands begin and end their motions at the same time.
- 2. The two hands are not idle at the same time, except during rest.
- 3. The arms move in opposite and symmetrical directions, at the same time.
- 4. Use the lowest class of movement that does the job well: fingers before wrist, wrist before forearm, forearm before upper arm, upper arm before trunk.
- 5. Use momentum to help the work, and keep it small wherever muscle has to stop it.
- 6. Smooth, continuous, curved hand motions beat straight lines with sharp changes of direction.
- 7. Free-swinging (ballistic) movements are faster, easier and more accurate than restricted or controlled ones.
- 8. Arrange the work to allow an easy, natural rhythm.
- 9. Keep eye fixations few and close together.
Arrangement of the workplace (principles 10 to 17)
- 10. A definite, fixed place for every tool and material.
- 11. Tools, materials and controls close to the point of use.
- 12. Gravity-feed bins and containers that deliver material close to the point of use.
- 13. Drop delivery wherever possible.
- 14. Materials and tools placed to allow the best sequence of motions.
- 15. Good conditions for seeing. Good lighting is the first requirement.
- 16. Workplace and chair heights that make it easy to alternate between sitting and standing.
- 17. A chair of the type and height that allows good posture, for every worker.
Design of tools and equipment (principles 18 to 22)
- 18. Free the hands from any work a jig, a fixture or a foot-operated device can do better.
- 19. Combine two or more tools wherever possible.
- 20. Pre-position tools and materials wherever possible.
- 21. Where each finger does its own work, as on a keyboard, share the load according to the strength of each finger.
- 22. Place levers, crossbars and handwheels so the operator can work them with the least change of body position and the greatest mechanical advantage.
Principle 4 deserves a picture, because it explains the reach zones. The ILO text sorts movements into five classes by the joint they pivot on. Each class moves everything below it as well, so a higher class moves more mass, takes longer and tires the operator sooner. The normal working area is simply the area that class 3 movements can cover. The maximum working area needs class 4. Anything beyond it needs class 5, the trunk.
The five classes of movement
- Class 1, knuckle. Moves: fingers. Work at the fixture.
- Class 2, wrist. Moves: hand and fingers. Work at the fixture.
- Class 3, elbow. Moves: forearm, hand and fingers. The normal working area.
- Class 4, shoulder. Moves: upper arm, forearm, hand and fingers. The maximum working area.
- Class 5, trunk. Moves: torso and the whole arm. Anything beyond the maximum working area.
A trunk with one arm stretched out. The pivots are numbered: 1 at the knuckle, 2 at the wrist, 3 at the elbow, 4 at the shoulder and 5 at the trunk. The higher the class, the more of the body moves.
Read the list as a set of questions, not as law. The principles were written for short, repetitive bench work. They say nothing about force, about how many times a day a motion repeats or about how long a posture is held, which is what ergonomic scoring methods were later built to measure. A station can obey all 22 and still overload a wrist.
Seated, standing or both
The task decides, and a few questions settle it. Neither posture is healthy for eight hours without a break, so where the job allows it, the best answer is a station that lets the operator change.
Sit, stand or both: three questions in order
| Posture | The station must provide |
|---|---|
| Standing | Work at the right height for the task and the person, room for the feet under the front edge so the operator can stand close, a foot rail or footrest to shift weight from one leg to the other, a mat on concrete or metal floors, and somewhere to sit during pauses |
| Seated | An adjustable chair that supports the back, clear space for knees and feet, every item inside the seated arm sweep, and forearm support for fine work |
| Sit or stand | A surface at standing height with a high chair and a footrest, or a height-adjustable bench, with the reach layout unchanged in either posture |
The standing requirements follow CCOHS guidance, which also advises against thick foam mats: too much cushioning tires the legs and can cause trips.
In a line or a cell with several stations and one operator covering more than one of them, standing and walking is the normal choice, because a seated station fixes the person in place and breaks the flow of work between stations. Barnes's principle 16, alternate sitting and standing made easy, is the one to aim for at stand-alone benches.
Lighting and visual access
Hands follow eyes. If the operator cannot see the work point, the pick points and the quality feature without moving the head, the body will bend and twist until it can, and no bench height will stop it. Barnes's principles 9 and 15 put it in two lines: few eye fixations, close together, and good conditions for seeing.
| Assembly work | Maintained illuminance on the task |
|---|---|
| Rough | 200 lux |
| Medium | 300 lux |
| Fine | 500 lux |
| Precision | 750 lux |
EN 12464-1 is the European standard for lighting indoor workplaces. These are the values in the table for assembly work in the 2011 edition; the 2021 edition supersedes it, so check the current text and your own national rules before specifying an installation.
- Measure the light on the task, with the operator in position. Overhead racks, balancers and the operator's own head and hands cast shadows the building survey never saw.
- Bring task lighting from the front and above, slightly to the side, so the hands do not shade the work.
- Keep bright lamps and reflections out of the line of sight. Glare on a polished part hides the defect you are looking for.
- Put the work point, the bins and any display inside a small cone in front of the operator, so the eyes move and the neck does not.
- Keep the top of racks and screens low enough to see over. An operator who cannot see the next station cannot see a problem coming.
A worked example: one bench for six operators
Illustrative example. A light assembly bench is shared by six operators across two shifts. The team measures each person's standing elbow height in work shoes, then applies the light-work rule: the work 5 to 10 cm below the elbow.
| Operator | Standing elbow height | Work 10 cm below | Work 5 cm below |
|---|---|---|---|
| 1 | 98 cm | 88 cm | 93 cm |
| 2 | 101 cm | 91 cm | 96 cm |
| 3 | 104 cm | 94 cm | 99 cm |
| 4 | 106 cm | 96 cm | 101 cm |
| 5 | 109 cm | 99 cm | 104 cm |
| 6 | 113 cm | 103 cm | 108 cm |
No single height sits inside all six bands. Operator 1 needs the work no higher than 93 cm and operator 6 no lower than 103 cm.
One bench, six operators: no fixed height fits them all
Example numbersA chart of six operators. For each, a dot marks standing elbow height (98, 101, 104, 106, 109, 113 centimetres) and a bar marks the light-work band 5 to 10 centimetres below it. The bands run from 88 to 108 centimetres in total and no single height lies inside all six.
So a fixed bench cannot fit this team. There are two honest answers. The better one is a height-adjustable bench covering 88 to 108 cm at the work, which gives every operator their own band. The cheaper one follows the CCOHS advice for stations that cannot be adjusted: fix the work at 103 cm, the bottom of the tallest operator's band, and give shorter operators a platform. Operator 1 then needs a platform of 10 to 15 cm, and a platform is a trip hazard that has to be managed.
Reach is checked the same way. With no arm measurements for the team, they use the smallest figures in the table above: every-cycle bins within 40 cm of the shoulder point and occasional items within 55 cm. Then they tape the arcs on the bench and ask operator 1 to try them, because a table describes a population and she is one person. Remember that the fixture stands 8 cm tall here, so the bench top itself is set 8 cm below the heights in the table.
Workstation design checklist
Walk the station with the operator and answer each line with yes or no. Every no is a design task. Do it once on the drawing or the mock-up and again in the first week of running.
| # | Area | Check | Why it matters |
|---|---|---|---|
| 1 | Reach | Is every part and tool used each cycle inside the normal working area of the smallest operator? | Reaches beyond the forearm sweep add time and load the shoulder |
| 2 | Reach | Is the work point in front of the body, where both normal areas overlap? | It is the only place both hands and the eyes can work together |
| 3 | Reach | Does anything used during the cycle need a lean, a twist or a step? | Trunk movement is the slowest and most tiring class of motion |
| 4 | Height | Is the work, measured at the hands, at the right height against the elbow for the task type? | Too high raises the shoulders, too low bends the back |
| 5 | Height | Can the height be adjusted, or is there a platform plan, for the shortest and tallest operators? | People differ by more than the width of the recommended band |
| 6 | Height | Are heavy or frequent picks between waist and shoulder height? | Lifts from the floor or above the shoulder are the costly ones |
| 7 | Presentation | Does every part and tool have one fixed, marked place? | A fixed place lets the hand go without the eyes |
| 8 | Presentation | Do parts arrive the right way up, separated, in the order of assembly? | Turning and untangling repeat on every cycle |
| 9 | Presentation | Is the station refilled from outside the operator's working space? | Replenishment should never stop the cycle |
| 10 | Presentation | Do finished parts leave by a chute, slide or conveyor? | A carried part costs a walk and a set-down |
| 11 | Hands | Is the part held by a fixture and not by a hand? | A holding hand does no work |
| 12 | Hands | Do the two hands move together, in mirrored directions? | Symmetrical motions are faster and steadier |
| 13 | Hands | Are tools pre-positioned, hung or combined? | Picking up and putting down a tool adds two motions each time |
| 14 | Posture | Does the posture (sit, stand or both) match the forces and reaches of the job? | Seated work cannot supply force or long reaches |
| 15 | Posture | Is there foot room, a footrest and a suitable floor surface or chair? | Small supports decide whether the posture lasts a shift |
| 16 | Seeing | Is the light on the task right for the fineness of the work, without glare or shadow from the hands? | Poor light pulls the head and trunk toward the work |
| 17 | Seeing | Can the operator see the work point and every pick point without moving the head? | Each extra eye fixation is time and a chance of error |
| 18 | Proof | Has the layout been tried as a mock-up by the people who will work it, and timed? | Paper designs miss collisions, glove sizes and habits |
Common mistakes
- Designing for the average person. Half the team then reaches too far or works too high. Set reach for the smallest operator and clearance for the largest.
- Measuring reach from the centre of the body. The arcs start under each shoulder, so a bin 40 cm from the belt buckle and off to one side can be well outside the forearm sweep.
- Setting bench height and then adding a fixture, a nest and a part on top of it.
- Letting the size of the delivery container decide the layout. One pallet box at the bench can push every other item out of reach.
- Buying the bench before anyone has tried the layout. A cardboard mock-up costs an afternoon. A welded frame at the wrong height stays for ten years.
- Copying a seated office setup onto a production bench. Rules for screens and keyboards do not cover force, parts or tools.
- Fixing the station without checking the line. A perfect bench that is still over takt time needs work moved off it, which is line balancing.
- Never looking again. Part numbers, volumes and people change, and the layout quietly stops fitting.
What these rules cannot tell you
Reach arcs and height bands come from measurements of large groups. They place a first layout well, and they cannot tell you whether one particular person with one particular shoulder is comfortable. Treat every dimension as a starting point for a trial with the real operators, and treat a report of discomfort as outranking any table. Operators often fear that a study of their station is a study of them. Say plainly that the layout is being judged, ask what they would move first, and build their answer into the mock-up.
Layout rules also stop where forces begin. Lifting, pushing, pulling and high-repetition hand work need their own methods: the NIOSH lifting equation, the Liberty Mutual tables, REBA, RULA or the Strain Index. The ergonomic assessment guide explains which fits which job. This page is general practice, not a substitute for a qualified ergonomist or for the regulations where you operate.
Tools and related guides
- Designing a future workstation from a time study: the same principles applied step by step to one station, with before and after numbers.
- Ergonomic assessment in manufacturing: scoring postures and lifts once the layout is drawn.
- Spaghetti diagram: measuring the walking that a layout causes.
- Ergonomic risk assessment checklist: screen a station for 21 risk factors.
- Standard work sheet: draw the finished layout with the operator's path and standard stock.
- NIOSH lifting equation calculator: check any two-handed lift the station still contains.
To see where the seconds go before you redesign, LeanSuite's time and motion study times every element from a phone video and splits it into value-added, necessary and waste, and the ergonomic study scores REBA or RULA on the same footage. Both are drafts for you to review.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Ergonomic Practices for Manufacturing TeamsDay-to-day ergonomic habits on the floor once the station itself is right.
- Cell Design in JIT: Flow Layout PlanningArranging several workstations into a cell so parts and people flow between them.
- 8 Wastes Examples: Real Manufacturing CasesWhat motion and transport waste look like in real processes, next to the other six.
- Standard Work Tools: Combination Sheet, Chart and Job BreakdownDocumenting the layout and the sequence once the station is settled.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Spaghetti diagram templateSquared paper to trace every trip, a trip log that turns grid squares into feet, meters and walking time, and a before and after comparison.
- REBA worksheet (Rapid Entire Body Assessment)Score up to six postures with REBA: body-part drop-downs, Tables A, B and C as lookups, final score and action level, and a before and after comparison.
- NIOSH lifting equation calculatorRecommended weight limit and lifting index for a two-handed lift, with every multiplier shown so you can see what to redesign.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
Doing this in LeanSuite
Time and Motion Study
Film a station on a phone and get every element timed and split into value-added, necessary and waste.
See Time and Motion StudyErgonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about workstation design
Workplace design, or workstation design, is arranging the work, parts, tools and the person so the job can be done at the planned pace all shift without strain. In a plant it comes down to five decisions: what sits within reach, how high the work is, how parts are presented and removed, what each hand does, and whether the operator sits or stands.
Seated and standing. A seated workstation suits fine, steady work where everything is inside the seated arm sweep and no real force is needed. A standing workstation suits work with larger reaches, downward force, heavier parts or movement between points. A third type, the sit-stand station, lets the operator change posture and is the better choice where the job allows it.
Workstation ergonomics is fitting the station to the people who use it: reach distances set by arm length, working height set from the elbow, parts presented between waist and shoulder, and room to change posture. The aim is to remove bending, twisting, long reaches and raised arms from the cycle, which cuts strain and usually cuts cycle time as well.
There is no single official list, but five principles cover most of it. Keep everything used each cycle inside the forearm sweep. Set the work near elbow height for the task. Present parts so they need no bending, turning or carrying. Keep the joints near neutral and both hands working. Let the operator change posture and see the work without stooping.
A work point in front of the body at the right height for the task, every-cycle parts and tools inside the normal working area, gravity-fed bins with one fixed place each, a fixture that holds the part, a chute or slide for finished parts, refilling from behind, foot room and a footrest or chair, and enough light on the task without glare.
The normal working area is the part of the bench each hand can cover with the upper arm hanging at the side and the forearm swinging about the elbow. Its radius is the elbow to fingertip length, about 40 cm for a small woman and 47.5 cm for an average man in the Bodyspace data for British adults. Everything used every cycle belongs inside it.
For light standing assembly, set the work 5 to 10 cm below the operator's standing elbow height. Precision work goes 5 to 10 cm above the elbow with the forearms supported, and heavy work 10 to 25 cm below, or lower for hard downward force. Measure at the hands, with the fixture and part in place, and make the bench adjustable if operators share it.
They are 22 rules for designing manual work so it takes the least motion, set out by Ralph Barnes in Motion and Time Study and built on the motion studies of Frank and Lillian Gilbreth. They fall into three groups: use of the human body, arrangement of the workplace, and design of tools and equipment. Examples are symmetrical two-handed motions, a fixed place for every tool, and gravity feed.
Related guides and tools
- Designing a future workstation from a time study: the method on one station
- Ergonomic assessment in manufacturing: RULA, REBA and the NIOSH lifting equation
- Time study and ergonomic study in one pass: one video, two results
- Spaghetti diagram: draw and measure the walking in a layout
- Time and motion study: where the seconds in a cycle go
- Line balancing: moving work between stations to meet takt
- 5S: a fixed place for everything at the station
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.