Labor losses in manufacturing: 13 losses a time study should expose

Short answer

A labor loss is paid time that does not turn into good product. A time study should expose 13 of them: walking, searching, reaching and bending, double handling, starving, blocking, machine watching, over-processing, rework, imbalance, changeover, micro-stops and learning.

Labor losses come in two layers. The first is time lost against the standard: idle time, working slower than standard and time spent on bad units. Labor reports and overall labor effectiveness (OLE = availability x performance x quality) measure this layer. The second is waste built into the standard itself: walking, reaching, double handling and machine watching that were there when the job was timed, so the report counts them as earned hours. Only a time study that classifies every element finds the second layer, and it is often the larger one.

Last reviewed:

What is a labor loss?

Where 45 paid hours went: two readings of one shift

Example numbers

What the labor report sees

What a time study sees in the same hours

  • Lost against the standard: 10.8 h
  • Waste built into the standard: 11.4 h
  • Necessary work: 8.55 h
  • Value added: 14.25 h (31.7% of paid hours)

One bar of 45 paid hours read twice. The labor report sees 10.8 hours lost against the standard and 34.2 hours earned, an overall labor effectiveness of 76.0%. The time study splits the earned hours into 11.4 hours of waste built into the standard, 8.55 hours of necessary work and 14.25 hours of value-added work, 31.7% of the paid hours.

The labor report stops at the first bar: 10.8 hours lost, 34.2 earned. The time study opens up the earned hours and finds another 11.4 hours of waste that the standard itself contains.

A labor loss is any paid labor time that does not end up as good product made by the best known method. An operator waiting for parts is a loss. So is an operator walking six steps to a rack every cycle, even when the cycle is on standard and the labor report shows 100 percent.

That second case is the reason to study the work and not just read the report. A labor report compares actual hours with standard hours. It can only see losses against the standard. If the walk was there on the day the job was timed, the walk is inside the standard, and every report since has counted it as hours earned.

Almost none of these losses are about effort. Starving, blocking, imbalance, long reaches and double handling are designed into the line, the layout and the schedule. The people doing the job did not choose them and cannot remove them alone. Keep that in view when the numbers come out.

The labor loss tree

A loss tree breaks one big number into parts until each part has a cause someone can fix. For labor, the first split is the one that matters most: is the loss measured against the standard, or hidden inside it?

The labor loss tree

Paid labor hours that did not become good product

Lost against the standard

The labor report sees it

  • Not workingOLE availability

    • Starving
    • Blocking
    • Changeover
  • Working below standardOLE performance

    • Searching
    • Micro-stops
    • Learning
  • Working on bad productOLE quality

    • Rework

Built into the standard

Only a time study sees it

  • Movement

    • Walking
    • Reaching and bending
    • Double handling
  • Built-in waiting

    • Machine watching
    • Imbalance
  • Extra work

    • Over-processing

Paid labor hours that did not become good product split into two layers. Lost against the standard, which the labor report sees: not working (starving, blocking, changeover), working below standard (searching, micro-stops, learning) and working on bad product (rework). Built into the standard, which only a time study sees: movement (walking, reaching and bending, double handling), built-in waiting (machine watching, imbalance) and extra work (over-processing).

Each loss sits where it is most often found. A loss can change sides: once searching or rework is timed into the standard, it moves to the right and leaves the report.
  • Against the standard, not working: the crew is paid and present, and no work is being done. Starved for parts, blocked by the next station, waiting out a changeover.
  • Against the standard, working below it: the job is running, slower than standard. Micro-stops, searching, people still learning the job.
  • Against the standard, working on bad product: hours that went into units that were scrapped or had to be made again. Rework.
  • Inside the standard, movement: walking, reaching and bending, double handling.
  • Inside the standard, built-in waiting: machine watching and the idle time that line imbalance gives every station but the slowest.
  • Inside the standard, extra work: over-processing.

The first three branches line up with the three factors of overall labor effectiveness: availability, performance and quality. The last three do not show in any ratio that uses the standard as its yardstick. A loss can also move between branches. Rework with its own routing and its own standard time becomes earned hours, and drops out of sight.

Plants that run World Class Manufacturing will know the same losses by their cost deployment names. NVAA, non value added activity, covers the movement and extra work inside the cycle. Unbalancing is imbalance. And an operator left waiting by a breakdown is booked as a resultant loss of that breakdown, so the cost lands on the cause and not on the station where the waiting shows.

To build the tree for your own area in hours or dollars, the loss tree worksheet lists each item under its parent and works out its share. For machine time, as opposed to people's time, the matching breakdown is the six big losses worksheet.

Movement losses: walking, searching, reaching and double handling

Movement losses are the easiest to see on video and the cheapest to remove. They sit inside the cycle, so they repeat with every unit.

Four movement losses at one bench, seen from above

  1. Walking. The rack is three steps from the bench, so every cycle starts with a walk there and back.

  2. Searching. Tools lie loose on the bench with no fixed place. The hand hovers before it picks.

  3. Reaching and bending. A high-use bin sits outside the shaded zone of easy reach, so each pick is a stretch.

  4. Double handling. The part goes from tote to bench, then from bench to fixture: two touches where one would do.

A top view of a workstation. The operator stands at a bench with a shaded zone of easy reach. A rack stands away from the bench with a dashed walking path to it. Loose tools lie on the bench. One bin sits outside the reach zone. A part moves from a tote to the bench and then to the fixture.

Film from above or from behind the shoulder and all four show in the first few cycles. Each one repeats with every unit, which is why a few seconds matter.

Movement losses: what to look for, how to measure and how to remove

  • 1. Walking

    What it looks like on video
    The operator's feet leave the work position: to a rack, a bin, a printer, another machine. Hands are empty or carrying, and nothing happens to the product.
    How to measure it
    Seconds per cycle with the feet moving, and steps or meters per cycle. Trace the route on a spaghetti diagram.
    How to remove it
    Bring parts and tools to the point of use. Shorten the route with a U-shaped layout. Have material delivered on a set route.
  • 2. Searching

    What it looks like on video
    The head turns and the hands pause over a bench or a bin. A tool is picked up and put back. Someone leaves the frame to ask.
    How to measure it
    Count how often it happens and time each one. It is irregular, so film long enough to catch several.
    How to remove it
    A fixed, marked place for every tool and part, which is what 5S is for. Kit parts in assembly order.
  • 3. Reaching and bending

    What it looks like on video
    Arms at full stretch, a hand above the shoulder or below the knee, the trunk bent or twisted to get a part.
    How to measure it
    Seconds per reach and reaches per cycle outside easy arm's length. Note the posture for an ergonomic check.
    How to remove it
    Put the high-use parts inside easy reach, between hip and shoulder height. Tilt the bins. Raise the pallet.
  • 4. Double handling

    What it looks like on video
    The same part is picked up twice: tote to bench, bench to fixture. Parts are unwrapped, restacked, turned over or moved from one container to another.
    How to measure it
    Count the touches per part and the seconds per touch. One pick and one place is the minimum.
    How to remove it
    Present the part in the position it is used in. Take out the containers in between. Combine the pick with the load.
All four sit inside the cycle, so every second saved is saved on every unit.

Reaching and bending are a labor loss and a strain on the body at once. When the study flags them, look at the posture as well as the seconds.

Waiting losses: starving, blocking and machine watching

Waiting is the loss people stop seeing first, because a person who is waiting looks calm and the line looks under control. There are three kinds, and they have different causes. A stopwatch study often misses the first two, because the observer pauses the watch when the work stops.

Three kinds of waiting, and where the cause sits

  • Starved

    B is ready. The slots before it are empty, because A is slow or stopped.

  • Blocked

    B has finished a part. The slots after it are full, because C is slow or stopped.

  • Machine watching

    The machine is running on its own. The operator stands and waits for the cycle to end.

Three drawings. Starved: station B is ready and the buffer slots before it are empty. Blocked: station B has finished and the buffer slots after it are full. Machine watching: the operator stands in front of a machine that is running on its own.

An empty infeed means starved and the cause is upstream. A full outfeed means blocked and the cause is downstream. Machine watching has no cause elsewhere: it is written into the job.

Waiting losses: what to look for, how to measure and how to remove

  • 5. Starving

    What it looks like on video
    The operator is ready, hands empty, looking upstream. The infeed is empty: no part has arrived from the station before, or the material has run out.
    How to measure it
    Seconds per cycle and minutes per shift with no part to work on. Note what was missing each time.
    How to remove it
    Fix the cause upstream, which is usually the slow station or a late delivery. Rebalance the work. Hold a small, sized buffer where it is needed.
  • 6. Blocking

    What it looks like on video
    The operator has finished a part and is holding it or standing next to it. The outfeed is full: the next station has not taken the last one.
    How to measure it
    Seconds per cycle and minutes per shift with a finished part and nowhere to put it.
    How to remove it
    Fix the slow station downstream. Rebalance. Do not add buffer to hide it unless the stop is short and rare.
  • 7. Machine watching

    What it looks like on video
    The machine is running and the operator stands in front of it, arms folded or a hand on the guard, until the cycle ends.
    How to measure it
    Seconds per cycle of machine time with no manual work. A standard work combination table shows it as a gap in the operator's line.
    How to remove it
    Let the machine stop itself on a fault. Give the operator work during the cycle: load the next machine, or prepare the next part.
Keep the camera running between cycles, or the first two will not be on the recording.

Starving and blocking are symptoms. The cause sits at another station, so the fix is rarely at the station where the waiting shows. Machine watching is different: it is designed into the job and repeats every cycle, which is why it usually sits inside the standard.

Extra work: over-processing and rework

These two are real work, done with care. That is what makes them hard to challenge.

Extra work losses: what to look for, how to measure and how to remove

  • 8. Over-processing

    What it looks like on video
    More than the drawing asks for: an extra wipe, a third check, a bolt tightened past the click, tape where a clip would hold, a form filled in twice.
    How to measure it
    List each element against the specification. Time the ones the specification does not call for.
    How to remove it
    Agree the standard with quality and engineering, write it down and train to it. Remove checks that repeat an earlier check.
  • 9. Rework

    What it looks like on video
    A part comes back to the bench. A fastener is backed out and redone. A unit is pulled aside, fixed and put back in the flow.
    How to measure it
    Time each rework as its own element and count how often it happens. Seconds per rework x reworks per 100 units.
    How to remove it
    Find the cause of the defect and fix it at the source. Error-proof the step. Do not give rework its own standard time, or it disappears from the report.
Both need quality and engineering in the room, because the fix is a decision about the specification or the defect.

System losses: imbalance, changeover, micro-stops and learning

The last four come from how the line is set up and scheduled. No single station owns them.

Imbalance: each operator's work against the 36 second line cycle

Example numbers
  • Work per filter, seconds
  • Idle, waiting for the line: 14 s in all

Six columns, one per operator, against a line cycle of 36 seconds. Work per filter: 36, 34, 31, 36, 33, 32 seconds. Idle per filter: 0, 2, 5, 0, 3, 4 seconds, 14 seconds in all.

Operators 1 and 4 set the pace at 36 seconds. The other four finish early and wait: 2 + 5 + 3 + 4 = 14 idle seconds on every filter, which is the imbalance figure in the worked example below.

System losses: what to look for, how to measure and how to remove

  • 10. Imbalance

    What it looks like on video
    One operator never stops and the next one waits a few seconds every cycle. Film two stations side by side and the pattern is plain.
    How to measure it
    Each operator's work time against the line's cycle. Idle seconds per cycle = line cycle time minus the operator's work time. Stack it on a Yamazumi chart.
    How to remove it
    Move elements from the full station to the idle one. See line balancing.
  • 11. Changeover

    What it looks like on video
    The line stops making parts. People fetch tools, wait for a die cart, adjust, run trial pieces and wait for a first-off approval.
    How to measure it
    Labor minutes from the last good part of one run to the first good part of the next, for everyone involved, split into work that needed the line stopped and work that did not.
    How to remove it
    Prepare before the line stops and standardize what is left, which is the SMED method.
  • 12. Micro-stops

    What it looks like on video
    A jam cleared by hand, a part reseated, a sensor wiped, a label that did not feed. Each one is a few seconds and nobody writes it down.
    How to measure it
    Count them and time them from video or from a machine signal. Group them by cause. A log kept by hand will undercount.
    How to remove it
    Fix the top cause first: the feed, the sensor or the part variation behind it.
  • 13. Learning

    What it looks like on video
    A new operator stops to look at the instruction, moves in a different order each cycle and is helped by a neighbor.
    How to measure it
    A new operator's cycle time against the standard, tracked by day until it levels out.
    How to remove it
    Train with a clear method, element by element, before the person joins the line. Plan the ramp into the schedule so it is not found as a surprise.
None of the four belongs to one station, so each needs an owner above station level.

Learning is the one loss on this list that should not be driven to zero by pressure. Nobody starts a job at standard, and a planned ramp is a cost of bringing someone in. The loss to remove is the unplanned part: no training method, no instruction and no time set aside.

How to measure labor losses with a time study

The method is an ordinary time study with two changes: nothing is left out, and every element gets a class and a loss type.

From video to a ranked list of losses

  1. 1

    Film the whole job, including the gaps

  2. 2

    Break the job into elements

  3. 3

    Classify every element

  4. 4

    Tag each waste element with one of the 13 losses

  5. 5

    Record how often the irregular ones happen

  6. 6

    Convert seconds per unit into hours per week

  7. 7

    Rank the losses and pick the first one

Step 6 is the one that changes minds: seconds per unit become hours per week.
  1. 1

    Film the whole job, including the gaps

    Keep the camera running between cycles. Waiting, searching and micro-stops happen in the gaps, and a study that only times clean cycles will not find them. Film more than one operator and more than one time of day.

  2. 2

    Break the job into elements

    Split wherever the kind of activity changes, so a walk is not buried inside an assembly element. The guide to breaking a job into elements covers the break points.

  3. 3

    Classify every element

    Value added, necessary or waste, using written rules. The guide to value added vs non value added has the tests and the hard cases.

  4. 4

    Tag each waste element with one of the 13 losses

    A class says the time is waste. The loss type says what kind, and so who can fix it: layout for walking, the upstream station for starving, quality for rework.

  5. 5

    Record how often the irregular ones happen

    Rework, searching, micro-stops and changeovers do not come every cycle. Time each one, count how often it occurs and spread it over the units made.

  6. 6

    Convert seconds per unit into hours per week

    Hours per week = seconds per unit x units per week / 3,600. Ten seconds of walking per unit looks small. At 3,000 units a week it is 8.3 labor hours.

  7. 7

    Rank the losses and pick the first one

    Sort by hours per week. Start with the largest loss that the team in the room can fix. Study the job again after the change, because removing one loss often exposes the next.

The formulas: utilization, efficiency, line efficiency and OLE

Four ratios describe the losses against the standard. They are built from the same four numbers: hours paid, hours worked, standard hours produced and good units. Names vary between plants and textbooks, so write your own definitions down before comparing anything.

Labor ratios: the formula, what it shows and what it misses
RatioFormulaWhat it showsWhat it misses
Labor utilizationHours worked / hours availableHow much of the paid time the crew had work to doHow well the working time was used
Labor efficiencyStandard hours produced / hours workedOutput against the standard while workingIdle time, and anything wrong with the standard
Line efficiencyStandard minutes produced / minutes attendedUtilization and efficiency in one numberWhich of the two is the problem, and quality
Overall labor effectiveness (OLE)Availability x performance x qualityPaid hours that became good units at standardWaste built into the standard
Labor efficiency variance(Actual hours minus standard hours allowed) x standard rateThe same gap as efficiency, in moneyEverything efficiency misses

Utilization and efficiency follow the common capacity-planning definitions. Line efficiency in this form is the sewing industry's, where standard minutes are SAM. OLE has no single standard: this is the version on the [OLE calculator](/tools/ole-calculator). In line balancing, line efficiency means something else: work content / (stations x cycle time).

How the labor ratios nest

Example numbers
  1. Hours paid45.0 h

    6 operators x 7.5 h

  2. Hours worked40.5 h

    40.5 / 45.0 = 90.0% availability, or labor utilization

  3. Standard hours produced36.0 h

    36.0 / 40.5 = 88.9% performance, or labor efficiency. 36.0 / 45.0 = 80.0% line efficiency

  4. Standard hours of good units34.2 h

    34.2 / 36.0 = 95.0% quality. 34.2 / 45.0 = 76.0% OLE

Four bars on one scale. Hours paid 45.0. Hours worked 40.5, which is 90.0% utilization. Standard hours produced 36.0, which is 88.9% efficiency and 80.0% line efficiency. Standard hours of good units 34.2, which is 95.0% quality and 76.0% overall labor effectiveness.

Each ratio is one bar divided by the bar above it. Line efficiency and OLE skip up to the top bar, which is why they are the smaller numbers.

The three factors of OLE

  • Availability = hours worked / hours paid, where hours worked is paid hours minus idle hours. Planned breaks are taken off the paid hours first. This is labor utilization under another name.
  • Performance = standard hours produced / hours worked, where standard hours produced = standard time per unit x all units made. This is labor efficiency under another name.
  • Quality = good units / all units made.
  • OLE = availability x performance x quality. The short way to the same answer: standard hours of good units / hours paid.

Because OLE multiplies, three factors that each look acceptable give a result that does not: 90 percent x 89 percent x 95 percent is 76 percent. The OLE calculator runs the sum on your own hours and counts. For the machine version of the same idea, see how to calculate OEE.

A worked example: where 45 paid hours went

Illustrative example. Six operators run a filter assembly line for one shift. Each is paid for 7.5 hours of work after breaks. The standard time is 3.6 labor minutes per filter. The line makes 600 filters, of which 570 are good first time. The supervisor's log shows 4.5 labor hours of idle time, mostly waiting for housings.

Illustrative: overall labor effectiveness for the filter line

Example numbers

OLE = availability × performance × quality

Check the short way: 34.2 / 45.0 = 76.0%. Line efficiency is availability x performance: 0.900 x 0.889 = 80.0%.

  1. Hours paid =6 operators x 7.5 h= 45.0 h
  2. Hours worked =45.0 minus 4.5 idle= 40.5 h
  3. Availability (labor utilization) =40.5 / 45.0= 90.0%
  4. Standard hours produced =600 units x 3.6 min / 60= 36.0 h
  5. Performance (labor efficiency) =36.0 / 40.5= 88.9%
  6. Quality =570 / 600= 95.0%
  7. Line efficiency =36.0 / 45.0= 80.0%
  8. Standard hours of good units =570 x 3.6 min / 60= 34.2 h
  9. OLE =0.900 x 0.889 x 0.950= 76.0%
OLE76.0%
Three factors that each look acceptable multiply to 76 percent. The same answer comes from 34.2 standard hours of good units over 45 paid hours.

So 10.8 of the 45 paid hours were lost against the standard: 4.5 hours idle, 4.5 hours working slower than standard, and 1.8 hours on the 30 filters that were not good. Most plants stop here. The labor report has nothing more to say.

What the time study adds

A video time study of the same line classifies the 3.6 standard minutes, 216 labor seconds, element by element.

Illustrative: what is inside the 216 standard seconds per filter
ClassSeconds per filterShare of the standardHours in the shift's 570 good filters
Value added9041.7%14.25 h
Necessary non value added5425.0%8.55 h
Waste built into the standard7233.3%11.40 h
Total216100%34.20 h

Waste inside the standard, seconds per filter: walking 22, machine watching 18, waiting from imbalance 14, double handling 12, over-processing 6. Hours = seconds x 570 / 3,600.

All eight losses on the filter line, in hours per shift

Example numbers
  • Idle, waiting for housings4.50 h
  • Working slower than standard4.50 h
  • Walking3.48 h
  • Machine watching2.85 h
  • Waiting from imbalance2.22 h
  • Double handling1.90 h
  • Hours on the 30 bad filters1.80 h
  • Over-processing0.95 h
  • Lost against the standard: 10.8 h
  • Built into the standard: 11.4 h

Losses ranked by hours per shift: Idle, waiting for housings 4.50 hours; Working slower than standard 4.50 hours; Walking 3.48 hours; Machine watching 2.85 hours; Waiting from imbalance 2.22 hours; Double handling 1.90 hours; Hours on the 30 bad filters 1.80 hours; Over-processing 0.95 hours. Three are lost against the standard and total 10.8 hours. Five are built into the standard and total 11.4 hours.

Sand bars are the 10.8 hours the labor report shows. Yellow bars are the 11.4 hours only the time study found. Ranked together, walking and machine watching come third and fourth, ahead of the bad units.

The hidden layer, 11.4 hours, is larger than everything the report could see, 10.8 hours. Of 45 paid hours, 14.25 were spent changing the product, which is 31.7 percent. A line at 76 percent OLE sounds like it has 24 points to gain. Count the waste inside the standard and it has about twice that, and the bigger half is in the method.

That also sets the order of work. Chasing the 4.5 idle hours means fixing the housing supply. Chasing the 11.4 hours means moving racks, giving the operator work during the machine cycle and rebalancing, then timing the job again and setting a new standard time. The second is usually cheaper and lasts, because it changes the job and not the day.

What the ratios miss, and the people side

  • A ratio is only as good as its standard. A loose standard gives a high efficiency and an OLE over 100 percent. A standard with waste built in gives a good score to a wasteful job.
  • Efficiency rewards output, wanted or not. A line can lift its number by making parts nobody ordered. Read the labor ratios next to schedule attainment.
  • Idle time is under-reported when it is logged by hand. Short waits are never written down.
  • One shift is one shift. Losses differ by product mix, crew and time of day, so measure more than once before deciding.
  • No published benchmark says what a good OLE is, and plants count idle time differently. Compare a line with its own past.

People fear a labor loss study for a fair reason: they expect the result to be a headcount cut or a faster line. Say before filming what the study is for and what will happen to time that is freed, and keep to it. Show results as losses by type with the cause beside each, not as a ranking of operators. Almost every loss on this page is fixed by changing layout, supply, balance or method, and the operators are the people who know which fix will work.

This is general practice, not legal or labor relations advice. Where a union agreement or works council covers work measurement, follow it.

Templates and tools

LeanSuite's time and motion study works from video of the station: every element is timed on a timeline that links to the footage and split into value-added, necessary and waste, with a breakdown of the waste. Its balance view shows each operator's cycle time, idle time and utilization. An engineer reviews and certifies the study.

FAQ

Questions about labor losses in manufacturing

  1. Labor losses are paid labor hours that do not become good product made by the best known method. Some are lost against the standard: idle time, working slower than standard and time on bad units. Others are built into the standard: walking, reaching, double handling and machine watching that were present when the job was timed. Labor reports see only the first kind. A time study that classifies each element finds both.

  2. OLE = availability x performance x quality. Availability is hours worked divided by hours paid. Performance is standard hours produced divided by hours worked. Quality is good units divided by all units made. A crew paid for 45 hours that works 40.5, produces 36 standard hours and gets 570 good units from 600 has an OLE of 0.90 x 0.889 x 0.95, which is 76 percent. OLE has no single standard, so write down how you count idle time.

  3. Labor efficiency = standard hours produced / hours actually worked, as a percentage. Standard hours produced is the standard time per unit multiplied by the units made. A crew that works 40.5 hours and makes 600 units with a standard of 3.6 minutes each has produced 36 standard hours, so efficiency is 36 / 40.5, or 88.9 percent. Idle time is left out of this ratio; utilization covers it.

  4. Utilization asks whether people had work to do: hours worked divided by hours available. Efficiency asks how the working time compared with the standard: standard hours produced divided by hours worked. A crew can be fully utilized and inefficient, or efficient for the few hours it had parts. Multiply the two and you get line efficiency, the standard hours produced per hour paid.

  5. Line efficiency = standard minutes produced / minutes attended x 100. Standard minutes produced is units made x the standard minutes per unit. Minutes attended is operators x minutes each was at work. A six-person line at work for 450 minutes each that makes 600 units at 3.6 standard minutes has a line efficiency of 2,160 / 2,700, or 80 percent. In line balancing the same name is used for work content divided by stations x cycle time.

  6. OEE measures a machine: the share of planned production time that became good parts at the ideal cycle time. OLE applies the same three factors, availability, performance and quality, to a crew's paid hours. A line can have a high OEE and a low OLE if the machine runs well with more people around it than the work needs. OEE has a widely used definition; OLE does not, so definitions must be written down.

  7. A starved station is ready to work and has nothing to work on, because no part has arrived from upstream. A blocked station has finished a part and cannot pass it on, because the next station or the buffer after it is full. Both are waiting, and both are symptoms: the cause is at another station, usually the slowest one or the one that just stopped.

  8. A labor report compares actual hours with standard hours, so it only sees time lost against the standard. Any walking, reaching, double handling or machine watching that was present when the standard was set is inside the standard and is counted as earned. A time study looks at the work itself, element by element, and classifies each one, so it finds the waste the standard includes.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.