Short answer

Time enough cycles that the mean of the most variable element is within the accuracy you need, usually plus or minus 5 percent at 95 percent confidence. Time 10 cycles first, then apply n = (t × s ÷ (k × mean))². Before any readings, a 1 minute cycle is usually planned at 30 cycles.

There are two ways to get the number, and a careful study uses both. Before you have any readings, look the cycle length up in the General Electric guide: 30 cycles for a job of up to 1 minute, 15 for up to 5 minutes, 3 for over 40 minutes. Once you have 5 to 10 readings, use the statistical formula on each element: n = (t × s ÷ (k × mean))², where s is the standard deviation of the readings, k is the accuracy as a decimal (0.05 for plus or minus 5 percent) and t comes from the t table for the number of readings you have. The element that needs the most cycles sets the length of the study.

Last reviewed:

What you are deciding, and why it is not one number

From ten pilot cycles to the length of the study

Example numbers
  1. 1

    Time a pilot10 cycles, every element

  2. 2

    Measure the spreadMean and standard deviation of each element

  3. 3

    Apply the formulan = (t × s ÷ (k × mean))², with k = 0.05

  • 1. Seat housing

    15

  • 2. Gasket and cover

    8

  • 3. Start 4 bolts

    51

  • 4. Run down bolts

    10

  • 5. Start test, label

    19

  • 6. Wait for test

    6

  • 7. Unload

    18

  • 10 cycles timed so far
  • Enough already
  • Needs more
  • Sets the length of the study

Cycles needed for plus or minus 5 percent at 95 percent confidence, from ten pilot readings of each element: element 1, Seat housing, 15; element 2, Gasket and cover, 8; element 3, Start 4 bolts, 51; element 4, Run down bolts, 10; element 5, Start test, label, 19; element 6, Wait for test, 6; element 7, Unload, 18. Element 3 needs the most, so the study runs to 51 cycles.

Read each bar against the line at 10, the cycles already timed. Three elements are done. Element 3 is not close: its times swing the most, so it needs 51 cycles, and because every element is timed in every cycle, the whole study runs to 51.

Every reading in a time study is a little different from the last. The operator's hand lands slightly differently, a bolt catches the thread or does not. The mean of your readings is therefore an estimate of the true mean, and the more the readings scatter, the more of them you need before the estimate is worth using.

So the honest answer to "how many cycles?" is another question: how much do the times vary, and how close do you need to be? A power tool that takes the same time on every part is pinned down in a handful of cycles. Hand-fitting that depends on feel is not pinned down in ten. The number is a property of the element, which is why it cannot come from a single rule.

You state the target as an accuracy and a confidence level. Plus or minus 5 percent at 95 percent confidence means: if I repeated this study many times, 19 times out of 20 my mean would land within 5 percent of the true mean. That pairing is the convention in the textbooks (Barnes, Freivalds and the ILO all work their examples at 5 percent), and it is the default in our time study sample size calculator.

What each extra cycle buys, for element 3

Example numbers
  • 5 cycles

    ±19.5%

  • 10 cycles

    ±11.2%

  • 15 cycles

    ±8.7%

  • 20 cycles

    ±7.3%

  • 30 cycles

    ±5.9%

  • 40 cycles

    ±5.0%

  • Mean of the readings
  • Target: ±5% of the mean
  • 95% band, wider than the target
  • Inside the target

The plus or minus band around the mean of element 3 at 95 percent confidence, if its spread stays the same: 5 cycles give plus or minus 19.5 percent, 10 cycles give plus or minus 11.2 percent, 15 cycles give plus or minus 8.7 percent, 20 cycles give plus or minus 7.3 percent, 30 cycles give plus or minus 5.9 percent, 40 cycles give plus or minus 5.0 percent.

The band narrows fast at first and slowly after that. Going from 5 to 10 cycles takes it from ±19.5 to ±11.2 percent. Going from 30 to 40 moves it by less than one point. To halve the band you need four times the cycles, so decide the accuracy you need before you start, not after.

The number is worked out for each element, not for the cycle. Since every element is timed in every cycle, the element that needs the most readings decides how long you stand there.

Before any readings: the General Electric guide

When you are planning the study you have no readings, so you cannot use a formula. The usual planning number comes from a table that depends only on how long the cycle is. The ILO's Introduction to Work Study prints it as its Table 15 and says that some authors, and companies such as General Electric, adopted it as a conventional guide; the ILO credits it to A. E. Shaw in Maynard's Industrial Engineering Handbook. Freivalds prints the same guide as coming from the time study manual of General Electric's Erie Works.

The General Electric guide: recommended cycles by the length of the whole cycle
Minutes per cycle, up toSeconds per cycle, up toCycles to time
0.106200
0.2515100
0.503060
0.754540
1.06030
2.012020
5.030015
10.060010
20.01,2008
40.02,4005
Over 40Over 2,4003

Source: ILO, Introduction to Work Study, 4th edition, Table 15 (after A. E. Shaw in Maynard's Industrial Engineering Handbook). The seconds column is the minutes column multiplied by 60.

Read down the table and the logic is clear: it trades cycles against observing time. Each of the first six rows comes to between 20 and 40 minutes at the bench (200 cycles of 0.10 minutes is 20 minutes; 20 cycles of 2 minutes is 40). Short cycles are cheap to watch, so you watch many. Long cycles are expensive, so you settle for few and accept a rougher answer.

What the table cannot know is how steady your job is. It gives the same 30 cycles to a 50 second machine-paced operation and to 50 seconds of hand assembly. Freivalds calls it an approximate guide and says a more accurate number comes from statistics. Use it to book the time and brief the operator, then check it with the formula once you have readings.

Other rules of thumb, and whose they are

  • Barnes: take 5 or 10 readings, then read the number needed from his table of range over mean. This is a pilot followed by a calculation, not a fixed count.
  • The ILO: its worked example starts from 5 preliminary readings and then applies its formula. Again a pilot, not a count.
  • Ten cycles: our own time study sheet has ten columns, as many observation forms do. Ten is a sensible pilot for a short job. It is a form layout, not a statistical rule, and the worked example below shows a job where ten is enough for three elements and far short for one.

After a pilot: the statistical formula

Time a pilot of 5 to 10 cycles. For each element work out the mean and the standard deviation of its readings, then apply the formula Freivalds gives in Niebel's Methods, Standards, and Work Design.

The statistical formula: n = (t × s ÷ (k × mean))²
SymbolWhat it isWhere it comes from
nCycles needed in total, pilot includedThe answer. Round it up.
sStandard deviation of the pilot readings of this elementThe sample standard deviation, with n minus 1 in the denominator (STDEV.S in a spreadsheet)
meanMean of the pilot readings of this elementSum of the readings divided by how many there are
kThe accuracy you want, as a fraction of the mean0.05 for plus or minus 5 percent, 0.10 for plus or minus 10 percent
tA multiplier for the confidence level and the size of the pilotThe t table, two-sided, at the number of pilot readings minus 1 degrees of freedom

The formula is the confidence interval for a mean turned around. The interval is mean plus or minus t × s ÷ √n. Set the plus-or-minus part equal to k × mean, solve for n, and you have it.

t or z?

With a large sample the multiplier is z from the normal distribution: 1.645 for 90 percent confidence, 1.96 for 95 percent, 2.576 for 99 percent. A pilot of ten readings is not a large sample. Its standard deviation is itself a rough estimate, and t is larger than z to allow for that. Freivalds says to use t whenever there are fewer than 30 readings, which in a time study pilot is always.

t at 95 percent confidence (two-sided) for common pilot sizes
Pilot readingsDegrees of freedomtEffect on n against z = 1.96
542.776About double
1092.262About a third more
15142.145About a fifth more
20192.093About 14 percent more
30292.045About 9 percent more
Large1.960The same

Standard t table values. The last column is (t ÷ 1.96)², since n depends on the square of the multiplier.

Because n depends on the square of everything, two shortcuts are worth knowing. Halving the variation cuts the cycles to a quarter. And loosening the accuracy from plus or minus 5 percent to plus or minus 10 percent also cuts them to a quarter, which Barnes states as a rule: for 10 percent precision, divide the number by 4.

Cycles needed rise with the square of the variation

Cycles needed against the variation in the elementTwo curves at 95 percent confidence. For plus or minus 5 percent: a coefficient of variation of 10 percent needs 16 cycles, a coefficient of variation of 15 percent needs 35 cycles, a coefficient of variation of 20 percent needs 62 cycles, a coefficient of variation of 25 percent needs 97 cycles. For plus or minus 10 percent: 10 percent needs 4, 15 percent needs 9, 20 percent needs 16, 25 percent needs 25.0204060801001201400%5%10%15%20%25%30%Variation (standard deviation ÷ mean)Cycles to time1635962169725±5%±10%
Computed from n = (1.96 × variation ÷ accuracy)² at 95 percent confidence. Doubling the variation from 10 to 20 percent takes the answer from 16 cycles to 62. Relaxing the accuracy from ±5 to ±10 percent divides every answer by four. A pilot of fewer than 30 readings uses t in place of 1.96, which pushes the curve up.

Two older versions of the same idea

Before calculators, the same sum was packaged so it could be done on the study board. You will meet both versions in older studies and in exam questions, and the calculator shows both next to the main answer.

The ILO formula

The ILO prints n = (40 × √(n′ × Σx² minus (Σx)²) ÷ Σx)², where n′ is the number of pilot readings, Σx is their sum and Σx² is the sum of their squares. It is fixed at plus or minus 5 percent and a confidence level of 95.45 percent, which is exactly two standard errors. The 40 is 2 divided by 0.05. The ILO's own example takes five readings of 7, 6, 7, 7 and 6 hundredths of a minute and gets 8.81, so 9 readings.

It uses 2 where the t table would say 2.776 for five readings, so it gives a smaller number than the t version from the same pilot. Treat it as the least you should time, not the most.

Barnes's range method

Barnes avoids the standard deviation altogether. Take the range R of the pilot (largest reading minus smallest), divide by the mean, and estimate the spread as R ÷ d2, where d2 is a constant from quality control tables: 2.326 for a pilot of 5 and 3.078 for a pilot of 10. That gives n = (40 × R ÷ (d2 × mean))², again at plus or minus 5 percent and two standard errors. His book prints the results as a table that analysts kept on the board.

The range uses only two of the readings, so one odd cycle moves the answer a lot. It is quick, and it is rough.

A worked example: seven elements, ten pilot cycles

Illustrative example. An operator assembles and leak-tests a gear pump cover in a cycle of about 0.77 minutes (46 seconds). The job is split into seven elements in how to break a job into elements. At the planning stage the General Electric guide gives 30 cycles, because the cycle falls in the row for up to 1.0 minute. The analyst times a pilot of 10 cycles and applies the formula to each element at plus or minus 5 percent and 95 percent confidence, with t = 2.262 for ten readings.

Illustrative: cycles needed for each element, from a pilot of 10 (plus or minus 5 percent, 95 percent confidence)
ElementMean (min)Std deviation (min)Variation (s ÷ mean)Formula resultCycles needed
1. Seat housing0.0800.00678.3%14.215
2. Gasket and cover0.1100.00676.1%7.58
3. Start four bolts by hand0.1450.022715.7%50.351
4. Run down bolts0.1700.01156.8%9.410
5. Start test, label0.0700.00679.5%18.619
6. Wait for test0.1300.00675.1%5.46
7. Unload0.0610.00579.3%17.718

Each result is (2.262 × s ÷ (0.05 × mean))², rounded up. Computed from the unrounded standard deviations.

Ten cycles were already enough for elements 2, 4 and 6. Four elements need more, and one of them needs far more. The study runs to 51 cycles because of element 3, starting four bolts by hand.

Same ten cycles, two very different answers

Example numbers

4Run down four bolts with the nutrunner

0.170

Mean, min

6.8%

Variation, s ÷ mean

10

Cycles needed

3Start four bolts by hand

0.145

Mean, min

15.7%

Variation, s ÷ mean

51

Cycles needed

Element 4, Run down four bolts with the nutrunner: readings from 0.15 to 0.19 minutes, mean 0.170, standard deviation 0.0115, needs 10 cycles. Element 3, Start four bolts by hand: readings from 0.12 to 0.19 minutes, mean 0.145, standard deviation 0.0227, needs 51 cycles

Each dot is one timed cycle and the dashed line is the mean. The nutrunner does the same thing every time, so ten readings already pin its mean down. Starting bolts by hand depends on how each bolt catches the thread, and no formula can make ten readings of that enough.

Element 3 by every method

The ten readings of element 3 are 0.14, 0.12, 0.17, 0.13, 0.15, 0.19, 0.12, 0.14, 0.16 and 0.13 minutes. Their sum is 1.45, the mean is 0.145, the sum of squares is 0.2149, the standard deviation is 0.02273 and the range is 0.19 minus 0.12 = 0.07.

Illustrative: five answers for element 3 from the same ten readings
MethodWorkingResultCycles
Statistical formula with t(2.262 × 0.02273 ÷ (0.05 × 0.145))²50.351
Statistical formula with z(1.96 × 0.02273 ÷ (0.05 × 0.145))²37.838
ILO formula(40 × √(10 × 0.2149 minus 1.45²) ÷ 1.45)²35.436
Range method (Barnes)(40 × 0.07 ÷ (3.078 × 0.145))²39.440
General Electric guideCycle of 0.77 min: row for up to 1.030

The first four are fixed at plus or minus 5 percent. The t and z rows are at 95 percent confidence, the ILO and range rows at 95.45 percent. Paste the ten readings into the calculator and it returns the same five numbers.

Five answers for element 3, start 4 bolts

Example numbers
  • Statistical formula with tt = 2.262 for 10 readings, 95%, ±5%

    51

  • Range method (Barnes)Range 0.07 ÷ mean 0.145, 95.45%, ±5%

    40

  • Statistical formula with zz = 1.96, as if the pilot were large

    38

  • ILO formula2 standard errors (95.45%), ±5%

    36

  • General Electric guideWhole cycle of 0.77 min; ignores the spread

    30

Statistical formula with t: 51 cycles. Range method (Barnes): 40 cycles. Statistical formula with z: 38 cycles. ILO formula: 36 cycles. General Electric guide: 30 cycles.

The four formulas use the same ten readings and differ only in how cautious they are about a small pilot. The t version is the most careful and is the one to quote. The General Electric guide knows nothing about this element, which is why it lands lowest here: it is a planning number for before you have any readings.

Quote the t answer, 51. The others are there to show that the spread between methods (36 to 51) is small next to the spread between elements (6 to 51). Which formula you pick matters much less than whether you looked at each element.

Then do what the ILO says to do next: time the extra 41 cycles, put all 51 readings back through the formula, and check again. The mean and the standard deviation will have moved, and t is smaller for a bigger sample, so the second answer is usually a little lower than the first. Stop when the readings you have are at least the readings you need.

The procedure, step by step

  1. 1

    Decide the accuracy and confidence the decision needs

    Plus or minus 5 percent at 95 percent confidence is the textbook default and suits a standard that will be used for pay, costing or a line balance. A first look at a job that is about to be redesigned can live with plus or minus 10 percent.

  2. 2

    Get a planning number from the General Electric guide

    Estimate the cycle time, find its row and book that much observing time. Tell the operator and the supervisor how long you expect to be there.

  3. 3

    Time a pilot of 5 to 10 cycles

    Time every element in every cycle. Circle any reading with a known cause, such as a dropped part or an interruption, and write the cause down.

  4. 4

    Work out the mean and standard deviation of each element

    Leave out only the circled readings with a recorded cause. Use the sample standard deviation.

  5. 5

    Apply the formula to each element

    Use t for the number of readings you have. Round up. The calculator does this from pasted readings and shows the working.

  6. 6

    Take the largest answer and look hard at it

    If one element is far above the rest, find out why before you time more. The next section covers what to check.

  7. 7

    Time the remaining cycles and recalculate

    Put all the readings through the formula again. If you now have at least as many as it asks for, stop. If not, time the difference and check once more.

What to do when one element varies too much

A large answer is a finding about the job before it is an instruction to keep timing. Work through these in order.

  • Check the break points. If the end of the element is hard to see, part of the scatter is the observer's, not the operator's. Tighten the break point and time a few more.
  • Check the watch against the element. Readings of 0.05, 0.06 and 0.07 on a 0.06 minute element vary by a sixth just from rounding to the nearest 0.01. Elements 5 and 7 in the example are this case. Combine the element with a neighbour, or time it from video.
  • Look for two methods. Readings that fall in two clumps usually mean the operator does the element two ways, or two part variants are mixed. Split the data, or fix the method first.
  • Look for a cause in the long readings. If the three longest all have a note beside them (bolt cross-threaded, gasket stuck to the liner), the variation has a name, and removing the cause is worth more than measuring it precisely.
  • Ask whether the element is variable by nature. If the time moves with bolt count or part size, it needs a study across that range, not more cycles on one part.
  • Only then decide between more cycles and less accuracy. At plus or minus 10 percent, element 3 needs 13 cycles in place of 51. That may be good enough for a line balance. It is not good enough for a piece rate.

It also matters how much of the cycle the element is. Element 3 is 0.145 of 0.766 minutes, about a fifth. A 10 percent error on a fifth of the cycle moves the total by about 2 percent. That is a judgement to make openly and write on the study, not a reason to ignore the formula.

Do not solve it by deleting the readings you do not like. The ILO is explicit that the statistics hold only if the variation is due to chance and is not introduced on purpose, and a study with its high readings trimmed away will pass the formula and still be wrong. Time study mistakes covers how that shows up later.

What the number of cycles cannot fix

The formula answers one narrow question: is the mean of these readings close to the true mean for this operator, on this day, using this method? More cycles make that answer better. They do nothing for the questions around it.

  • The wrong operator. Fifty cycles of the fastest person on the line is a precise measure of the fastest person on the line.
  • One sitting. Fifty cycles in the first hour of Monday's day shift say nothing about the last hour of a night shift. Spread the readings over the conditions the standard has to cover. How to plan a time study covers that.
  • Rating. The formula treats the readings as facts. The pace rating applied afterwards has its own error, and no number of cycles reduces it.
  • Occasional elements. A tote change that happens once in 24 cycles is seen twice in a 51 cycle study. Its time and its frequency need their own evidence.
  • A method that is still changing. If the operator is still learning, or the layout is about to move, the readings describe a job that will not exist next month.

If the question is where a whole team's day goes, across many tasks, counting cycles is the wrong tool. That is a work sampling study, and it has its own sample size formula.

Do the sums with the calculator

The time study sample size calculator uses the methods on this page and nothing else. Paste the readings of one element (or type its mean and standard deviation), choose 90, 95 or 99 percent confidence and the accuracy, and it returns the t answer with the working shown, the z answer, the ILO formula, the range method for 2 to 10 pasted readings, the accuracy your readings already give, and the General Electric guide if you enter the whole cycle time. It also shows the reading furthest from the mean and the answer without it, and leaves the decision about that reading to you.

Counting cycles is cheaper from video, because the readings come from footage and not from an hour at the bench. In LeanSuite Time and Motion Study the AI times every element and every cycle in the video you film, so a longer study costs more filming and not more hours with a watch. You still decide how many cycles the job needs, and which shifts and operators they should come from.

Time and motion study software

Run a time study in LeanSuite

Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.

FAQ

Questions about how many cycles to time

  1. Enough that the mean of the most variable element is within your target accuracy, usually plus or minus 5 percent at 95 percent confidence. As a planning number, the General Electric guide suggests 30 cycles for a job of up to 1 minute and 15 for up to 5 minutes. After a pilot of 5 to 10 cycles, the statistical formula gives the number for your job.

  2. n = (t × s ÷ (k × mean))², from Freivalds. s is the standard deviation of the pilot readings, mean is their average, k is the accuracy as a decimal (0.05 for plus or minus 5 percent) and t is the two-sided t value for the confidence level at the number of pilot readings minus 1. With 30 or more readings, z replaces t: 1.96 at 95 percent.

  3. Sometimes. Ten cycles are enough for an element whose times vary by about 7 percent of the mean or less, at plus or minus 5 percent and 95 percent confidence. They are not enough for hand work that varies more. In the worked example on this page, ten cycles are enough for three of seven elements, and one element needs 51.

  4. A guide to the number of cycles by the length of the whole cycle: 200 cycles for up to 0.10 minutes, 100 for 0.25, 60 for 0.50, 40 for 0.75, 30 for 1, 20 for 2, 15 for 5, 10 for 10, 8 for 20, 5 for 40 and 3 for longer. The ILO prints it as Table 15 of Introduction to Work Study. It ignores how variable the job is.

  5. Because the pilot is small. With 5 or 10 readings the standard deviation is only an estimate, and the t distribution allows for that by using a larger multiplier: 2.776 for 5 readings and 2.262 for 10, against 1.96 for z at 95 percent confidence. Freivalds uses t for fewer than 30 readings. Using z on a small pilot understates the cycles needed.

  6. n = (40 × √(n′ × Σx² minus (Σx)²) ÷ Σx)², where n′ is the number of preliminary readings, Σx their sum and Σx² the sum of their squares. It is fixed at plus or minus 5 percent and a 95.45 percent confidence level, and the 40 is 2 divided by 0.05. The ILO's example of readings 7, 6, 7, 7, 6 gives 8.81, so 9.

  7. Treat it as a sign that something is wrong with the element before you time more. Check that the break points are clear, that the watch can resolve an element that short, that two methods or two part variants are not mixed, and whether the long readings share a cause. If the element is sound and simply variable, decide between more cycles and a wider accuracy.

  8. The one that needs the most. Every element is timed in every cycle, so the study has to run until the most variable element has enough readings. The ILO says to base the sample size on the element that calls for the largest sample. It is often a short hand-fitting element, not the longest one.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.