Practical guide · Standard work, SOPs and training
Twelve time study mistakes and how to spot them in a finished study
Short answer
Most time study errors are visible on the sheet if you know where to look. Six show in the header before any reading: who was timed, on what, when, and using which method. Four show in the readings. Two show where observed time becomes a standard: the rating and the allowances.
The twelve mistakes are: timing the wrong operator, timing before the method is settled, not recording the method, mixing products, timing only the best shift, not telling the operators, elements that are too long, too few cycles, leaving abnormal cycles in, ignoring the effect of being watched, rating without calibration and forgetting allowances. None needs special software to find. Read the header, look at the spread of the readings in each element, check that every odd reading has a note, then check who rated the pace and which allowances were added. A study that fails on the header should be redone; one that fails on rating or allowances can usually be repaired.
Last reviewed:
Why finished studies go wrong
Where each of the twelve mistakes shows on a finished study
Header
OperatorTrained, qualified, and typical of the people who do the job?
Workplace against the standardWas the method settled before the watch started?
Method, tools, layout sketchCould someone set the job up again from this?
Part and modelOne product, or several run together?
Date, shift, start and stopMore than one shift, and not only the first hour?
Operator briefedWho explained the study, and when?
Readings
Elements and break pointsShort enough to show where the time goes?
Number of cyclesEnough for the most variable element?
Circled readingsIs every odd reading explained in a note?
Pace through the studyDo the first cycles differ from the last?
From observed time to standard
RatingWho rated, and when were they last checked against a benchmark?
AllowancesPersonal, fatigue and delay: which were applied, and from what source?
A time study produces a number with two decimals, and numbers with two decimals get believed. The standard goes into the costing system, the line balance and sometimes the pay scheme, and nobody looks at the sheet again. That is the problem this page is for. The errors that matter are rarely arithmetic. They are decisions made before and during the study, and almost all of them leave a trace.
The twelve below are numbered in the order you meet them when you read a study from the top: the header, the readings, then the two steps that turn observed time into a standard time. For each one there is a symptom you can look for, what it costs, and the fix. If you are about to run a study, read it as a list of things to get right. How to conduct a time study has the procedure.
The twelve mistakes at a glance
Each card is one mistake and the thing you would see in a finished study if it had been made.
Twelve time study mistakes and their symptoms
1The wrong operator
One name on the sheet, and it is the fastest person, the newest, or whoever was free
2Method not settled first
Readings that drift down through the study; notes about parts or tools being moved
3Method not recorded
A standard with no sketch, no tool list and no part positions behind it
4Products mixed
Element times in two clumps; a header that names a family, not a part number
5Only the best shift
One date, one shift, readings from a single hour
6Operators not told
No briefing noted; a first hour of slow, careful, textbook cycles
7Elements too long
Three or four elements for a one minute job; wide ranges nobody can explain
8Too few cycles
Five or ten readings of an element that varies by 15 percent
9Abnormal cycles left in
One reading far from the rest, with no circle and no note
10Observer effect ignored
The first cycles differ from the last, or the times are unusually even
11Rating without calibration
Every element rated 100, or ratings by someone never checked against a benchmark
12Allowances forgotten
Standard time equal to normal time, or one flat percent with no source
What a wrong standard costs
Illustrative example. One station makes 120,000 pieces a year at a correct standard of 0.92 minutes a piece. That is 0.92 × 120,000 ÷ 60 = 1,840 hours of work. If the standard is 6 percent off, the plan is wrong by 110 hours a year on that one station, and the direction decides who pays.
A standard that is 6 percent off, over a year
Example numbers6% tight0.865 min a piece
1,730 h
The plan is 110 hours short. It shows up as overtime, missed schedules and an operator who can never hit the number.
Right0.920 min a piece
1,840 h
Planned hours match the work.
6% loose0.975 min a piece
1,950 h
110 hours are planned and costed that the job does not need. Quotes run high and the slack hides real losses.
One station making 120,000 pieces a year. 6% tight: standard 0.865 minutes, 1,730 hours. Right: standard 0.920 minutes, 1,840 hours. 6% loose: standard 0.975 minutes, 1,950 hours.
- A loose standard (too much time) costs quietly. The job is planned, costed and quoted at more hours than it needs. Real losses hide inside the slack, because the station always hits its number.
- A tight standard (too little time) costs loudly. The plan is short of hours, so there is overtime and missed schedule, and the operator is measured against a number that cannot be reached. That is where grievances start, and it is the kind of error that gives time study its reputation.
- Either way, the numbers built on top inherit the error: the line balance, the headcount, the quote.
Six percent is not an extreme case. The examples further down show a single unexplained reading moving one element by 12 percent, and a forgotten allowance leaving a standard 13 percent short.
Mistakes you can see in the header (1 to 6)
1. The wrong operator
A standard is meant to describe what a qualified worker can do all day. The ILO's definition is someone who has acquired the skill, knowledge and other attributes to do the work to satisfactory standards of quantity, quality and safety. Freivalds's advice is to study an operator who is average or somewhat above average, because a very slow or a very fast one is harder to rate fairly.
- Symptom: one operator on the sheet with no note on experience. Ask who it was. If the answer is the best on the line, the trainee, or whoever was on the job that morning, nobody chose.
- Cost: a standard built on the star is tight for everyone else, however it is rated. One built on a learner captures hesitation and re-work that will be gone in a month.
- Fix: choose a trained operator of typical skill, with the supervisor, and record how long they have done the job. Better, time two or three people and compare. How to plan a time study covers the choice.
2. Timing before the method is settled
Method first, then time. A time study measures a method. If the parts are in the wrong place, the tool is on the wrong side, or every operator does the job differently, the study measures that, to two decimals.
- Symptom: times that fall steadily through the study as the operator rearranges the bench; notes such as "moved bin closer"; two operators with different sequences.
- Cost: the standard is out of date the day the workplace is tidied, and usually loose, so the improvement never shows up in the numbers.
- Fix: walk the job before the study. Take out the obvious walking, reaching and searching, agree one sequence, then time it. If the method changes later, re-time the elements that changed.
3. Not recording the method
The standard time is the time for a described method. Without the description, the number has nothing to belong to.
- Symptom: a sheet of readings with no layout sketch, no tools, no part locations, no machine settings and no break points written against the elements.
- Cost: nobody can tell later whether the job has changed, so nobody can defend the standard or know when to revise it. The study cannot be repeated or checked.
- Fix: before timing, write the elements with their break points, sketch the workplace, and list tools, fixtures, containers and settings. A few photographs or a video of two cycles do most of this in a minute.
4. Mixing products
A four-bolt cover and a six-bolt cover are different jobs that happen to share a bench. Timed together, they give an average that is right for neither.
- Symptom: the readings for an element fall in two clumps with a gap between them; the header names a product family and not a part number; the cycle count does not match any one order.
- Cost: one product is under-timed and the other over-timed. As soon as the mix changes, the standard is wrong for the line as a whole as well.
- Fix: write the part number on every study and against every cycle if models change mid-study. Treat the element that differs as a variable element and time it for each variant. How to break a job into elements explains constant and variable elements.
5. Timing only the best shift
A study is a sample of the job. If every reading comes from one hour of one shift, it is a sample of that hour.
- Symptom: one date and one start time in the header, usually mid-morning on days. No readings from the end of a shift, from nights, or from a day when material was awkward.
- Cost: fatigue, a different crew, poorer lighting, a cold machine and a different material lot are all invisible. The standard fits the best conditions and is tight in the rest.
- Fix: split the cycles you need across at least two shifts and two times of day, and say on the sheet when each batch was taken. If the batches disagree, that is a finding worth more than the standard.
6. Not telling the operators
People who do not know why they are being timed assume the worst, and they are often right to. A study taken without an explanation damages the next ten studies as well as this one.
- Symptom: no note of who briefed the operator or when; cycles that are slow, deliberate and by the book; a supervisor who heard about the study afterwards.
- Cost: readings of a performance put on for the observer, and a workforce that treats every later study as a threat.
- Fix: explain beforehand, in person, what is being measured, why, what the result will be used for and what it will not be used for. Never time covertly. Show the sheet. Share the result. Where there is a union agreement or a works council, follow its rules on notice and attendance; this page is general practice, not legal advice.
Mistakes you can see in the readings (7 to 10)
7. Elements that are too long
An element is meant to be short enough to show where the time goes. The ILO asks for elements as short as a trained observer can time, about 0.04 minutes at the least, and says a long manual element should be rated about every 0.33 minutes, which is a hint that past 20 seconds or so an element is hiding something.
- Symptom: a one minute job in three or four elements; element names with "and" in them twice; a wide range in one element and no way to say which motion caused it.
- Cost: the total may be right, but the study cannot say what to improve, cannot separate machine time from manual time for rating, and cannot be reused for a similar job. In the example below, three lumps report that loading and assembly swings between 0.30 and 0.39 minutes. Seven elements show that almost all of the swing is one hand operation.
- Fix: cut at every break point you can see or hear, then merge only what is too short to time. Keep machine-controlled time and waiting as their own elements.
The same job in three lumps and in seven elements
Example numbers- Shortest of ten cycles
- Spread up to the longest
- The widest spread
- Waiting on the machine
Before: 3 elements
Load and assemble0.30 to 0.39 min
Fasten and test0.35 to 0.39 min
Unload0.05 to 0.07 min
After: 7 elements
1. Seat housing0.07 to 0.09 min
2. Gasket and cover0.10 to 0.12 min
3. Start 4 bolts0.12 to 0.19 min
4. Run down bolts0.15 to 0.19 min
5. Start test, label0.06 to 0.08 min
6. Wait for test0.12 to 0.14 min
7. Unload0.05 to 0.07 min
Before: three elements. Load and assemble ranges from 0.30 to 0.39 minutes, Fasten and test ranges from 0.35 to 0.39 minutes, Unload ranges from 0.05 to 0.07 minutes. After: seven elements. The spread sits almost entirely in element 3, start four bolts by hand, which ranges from 0.12 to 0.19 minutes, and element 6 shows 0.13 minutes of waiting on the leak tester in every cycle.
8. Too few cycles
The mean of five readings is an estimate, and for a variable element it is a poor one. The number of cycles has to come from how much the element varies, which is what the formula in how many cycles to time works out.
- Symptom: five or ten cycles for every study regardless of the job; no sample size calculation on file; an element whose readings range over a third of its mean.
- Cost: illustrative example. Five readings of a hand-starting element average 0.142 minutes, but at 95 percent confidence the true mean could be anywhere within plus or minus 16.8 percent of that. Ten readings narrow it to plus or minus 11.2 percent. The usual target of plus or minus 5 percent takes 51.
- Fix: time a pilot of ten cycles, run each element through the sample size calculator, and keep timing until the most variable element has enough. If that number is very large, find out why the element varies before you time more.
How far off a mean from five cycles can be
Example numbers5 cycles
±16.8%
10 cycles
±11.2%
From 5 cycles the mean of element 3 is 0.142 minutes and the 95 percent band runs from 0.118 to 0.166, plus or minus 16.8 percent. From 10 cycles the mean of element 3 is 0.145 minutes and the 95 percent band runs from 0.129 to 0.161, plus or minus 11.2 percent
9. Leaving abnormal cycles in (or taking normal ones out)
Every study has a few readings that sit apart from the rest. The ILO calls them rogues and says they should be examined carefully, the short ones as much as the long ones, since either may be a timing error. The rule is simple and often broken in both directions: a reading leaves the average only if you know what caused it.
- Symptom: a reading well outside the others with no circle and no note. Or the opposite: several readings crossed out with no reasons given, and a suspiciously tidy set left behind.
- Cost: illustrative example. Nine readings of an element average 0.140 minutes. A tenth, 0.31, from a cycle where a bolt was dropped, takes the mean to 0.157, which is 12 percent more time on every piece from then on. Deleting inconvenient long readings does the reverse and builds a standard nobody can meet.
- Fix: circle the reading during the study and write the cause, as Freivalds advises. Afterwards, exclude only readings with a recorded cause that is not part of the job. Where there is no note, a statistical screen can flag candidates (Freivalds gives the 1.5 interquartile range criterion and the three-sigma rule), but a flag is a question to ask, not permission to delete. If drops and jams are a normal part of the job, they belong in an allowance set from how often they happen.
One abnormal cycle, left in
Example numbers- Dropped bolt, no note on the sheet
- Mean of all ten
0.157
Mean with it, min
0.140
Mean of the other nine, min
+12%
Built into the standard
Ten readings of element 3, start four bolts by hand. Nine lie between 0.12 and 0.17 minutes. One is 0.31, from a cycle in which the operator dropped a bolt. With it the mean is 0.157 minutes, without it 0.140.
10. Ignoring the effect of being watched
People do not work the same way with someone standing beside them holding a board. Some speed up. Some slow down and follow the written method to the letter for the first time in months. Both are honest reactions, and both distort the readings.
- Symptom: the first cycles of the study are clearly slower or faster than the last; the readings are far more even than daily output suggests; the rate implied by the study does not match what the station makes in a normal week.
- Cost: a standard for a performance, not for the job. Rating corrects for pace. It cannot correct for a method that is used only when someone is looking.
- Fix: stay long enough for the novelty to wear off and treat the opening cycles as a warm-up. Stand in view but out of the way. Compare the standard with real output over a few weeks as a sanity check. Video helps, because the camera can run for a whole shift without a person next to it, though people know a camera is there too and need the same explanation.
Mistakes in turning observed time into a standard (11 and 12)
11. Rating without calibration
Rating is the observer's judgement of the operator's pace against a normal pace, and it multiplies straight into the result: rate an operator at 105 who was working at 100 and every element is 5 percent too long. It is the one step of a time study that rests on judgement, so it needs the most checking and usually gets the least.
- Symptom: every element on the sheet rated 100; one rating for a whole cycle that mixes fast hand work with walking; ratings by someone who has never rated against a benchmark or alongside a second rater.
- Cost: an error of a few percent in every standard that analyst sets, all in the same direction, which no number of cycles reduces. Two analysts who rate differently will set different standards for the same job.
- Fix: train and re-check raters against known benchmarks (the textbooks use paces such as walking at 3 miles an hour and dealing a deck of 52 cards in half a minute), and have two people rate the same cycles from time to time. Rate each manual element, not the cycle. Do not rate machine-controlled time at all. Video makes this practical, since several people can rate the same clip.
12. Forgetting allowances
Normal time is the time for the work itself at a normal pace. Nobody works a whole shift at that rate without a drink of water, a moment to recover or a wait for material. Allowances for personal needs, fatigue and unavoidable delays are what turn normal time into a standard a person can meet all day.
- Symptom: a standard time equal to the normal time; or a single flat percentage on every job in the plant with no record of where it came from; or allowances applied to machine time that needs none.
- Cost: illustrative example. A job with a normal time of 0.80 minutes and a 15 percent allowance has a standard of 0.92 minutes. Leave the allowance off and the standard is 13 percent short: at 120,000 pieces a year that is 240 hours of work the plan does not contain.
- Fix: state on every study which allowances were applied, to which elements and from what source (a company agreement, the ILO tables, a delay study). Check fatigue allowances against the actual job, since heavy lifting and light assembly do not earn the same. Standard time works through the calculation.
How to audit a finished study in fifteen minutes
Take the study sheet, a pencil and, if you can, ten minutes at the workplace. Go in this order and stop at the first serious failure.
- 1
Read the header
Operator, part number, date, shift, start and stop times, analyst. A missing field is a finding. One operator, one hour, one shift is a finding.
- 2
Look for the method record
Is there a sketch, a tool list and a break point for every element? Could you set the job up again from the sheet alone?
- 3
Walk to the job and compare
Watch three cycles. Is the sequence on the sheet the one in use? Are the parts and tools where the sketch says? If not, the standard describes a job that no longer exists.
- 4
Count elements against cycle time
Divide the cycle by the number of elements. If the average element is over 0.33 minutes on a short manual job, the breakdown is too coarse to learn from.
- 5
Check the number of cycles
Find the element with the widest range. Put its readings into the sample size calculator. Compare what it asks for with what was timed.
- 6
Scan each row for readings that stand apart
Each one should be circled with a note. Check that excluded readings have a cause written beside them and that long readings were not simply deleted.
- 7
Compare the first cycles with the last
A steady drift in either direction points to a learning operator, a changing method or a reaction to the observer.
- 8
Run the time check
The element times, foreign elements and the time before and after should add up to the elapsed clock time within 2 percent, the limit given by both the ILO and Freivalds. Stopwatch time study shows the sum.
- 9
Check the rating
Who rated, was each manual element rated, and was machine time left unrated? Ask when the rater was last checked against a benchmark or a second rater.
- 10
Check the allowances and the arithmetic
Which allowances, from what source, applied to which elements? Recompute one element from readings to standard by hand.
Repair the study or redo it?
Not every failure means starting again. The test is whether the readings themselves can still be trusted.
| What you found | Readings still usable? | What to do |
|---|---|---|
| Allowances missing or unsourced (12) | Yes | Apply documented allowances and reissue the standard |
| Rating in doubt (11) | Yes, if there is video; otherwise only partly | Re-rate from video with two raters, or re-observe a sample of cycles for pace |
| An unexplained outlier (9) | Yes | Ask the observer and the operator; if no cause is known, keep it and time more cycles |
| Too few cycles (8) | Yes | Time the extra cycles under the same conditions and add them |
| Elements too long (7) | For the total only | Keep the cycle time; re-time with a finer breakdown before using it for improvement or balancing |
| One shift only (5) | For that shift | Add cycles from the other shifts and compare before issuing |
| Method not recorded (3) | Only if the job has not changed | Record the method now and confirm with the operator that it is what was timed |
| Wrong operator, method not settled, products mixed, operators not told (1, 2, 4, 6) | No | Redo the study. The readings describe the wrong thing |
When a study is redone, say so openly and say why. Withdrawing a bad standard costs some pride. Defending one costs the credibility of every other number the department has issued.
When the mistake is using a time study at all
A clean study of the wrong kind of work is still a mistake. A stopwatch study suits a short, repeating cycle done by one person. It struggles elsewhere.
- Long, irregular or shared work, such as maintenance, material handling or supervision, is better measured by work sampling. Time study versus work sampling compares the two.
- A job that will be redesigned next month does not need a precise standard today. A rough timing to size the problem is enough.
- A machine-paced station is described by the machine's cycle and its stoppages, not by a rated study of the person tending it.
- A changeover is one long cycle that happens a few times a week. It needs a SMED study that splits internal from external work, not a standard time to two decimals.
Templates and tools
- Time study sheet: a header that asks for the fields this audit checks, with ten cycles and the averages.
- Time study sample size calculator: the check for mistake 8, and it shows the reading furthest from the mean for mistake 9.
- Standard time calculator: observed time, rating and allowances, so the conversion can be recomputed.
- Video time study filming checklist: filming a study so that it can be audited afterwards.
Several of these mistakes are hard to audit on paper because the evidence is gone the moment the cycle ends. A study done from video keeps it. In LeanSuite Time and Motion Study every element on the timeline links back to the footage, so a reviewer can open the cycle behind an odd reading and see what happened, and the study is certified by a person before it is used. It does not choose the operator, settle the method or brief the team for you. Those six header mistakes stay yours to avoid.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- Auditing Standard Work: Verification and Compliance ChecksAuditing whether the job is still done to the method the study timed.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe documents that carry the method a time standard belongs to.
- Standard Work in Manufacturing: A Complete GuideSettling and writing down the method before anyone times it.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsWhere a wrong element time ends up: an operator loaded over or under takt.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Standard work audit checklist24 checks of a job against its written standard, ten timed cycles, and each gap sorted by cause before anyone acts.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Turns video of real work into time studies, line balance charts, changeover splits and other studies you review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time study mistakes
Timing the wrong operator, timing before the method is settled, not recording the method, mixing products, timing one shift only, not telling the operators, elements that are too long, too few cycles, leaving abnormal cycles in, ignoring the effect of being watched, rating without calibration and forgetting allowances. Six of them are visible in the header of the study before you look at a single reading.
Read it in order. Check the header for operator, part, shift and method. Compare the recorded method with the job as it runs now. Check the number of cycles against the most variable element. Look for unexplained readings. Run the time check, which should agree with the clock within 2 percent. Then check who rated the pace and which allowances were added.
No. A standard should describe a qualified worker of typical skill, so that most trained people can meet it. Freivalds advises an operator who is average or somewhat above average. A very fast or very slow operator has to be rated a long way from normal, and large rating corrections are the least reliable part of a study.
Only when you know the cause and the cause is not part of the job. Circle the reading during the study and write what happened. Without a note, keep it and time more cycles. A statistical test can flag a reading for a second look but does not justify deleting it. Removing long readings because they are inconvenient builds a standard nobody can meet.
As a matter of good practice, always. Explain what is being measured, why and how the result will be used, and never time anyone covertly. People who are not told work differently, and trust lost on one study affects every later one. Legal and contractual rules vary by country and by union agreement, so check the ones that apply to your site.
When the readings describe the wrong thing: the wrong operator, a method that was not settled, products mixed together, or a study taken without the operators' knowledge. Also when the method, tooling, layout, material or product has changed since. Problems with rating, allowances or the number of cycles can usually be repaired without discarding the readings.
People change how they work when they are being watched and timed. Some speed up; others slow down and follow the written method more strictly than usual. Rating adjusts for pace but not for a method used only under observation. Stay long enough for the reaction to fade, treat the first cycles as a warm-up, and compare the standard with normal output.
The standard equals the normal time, which is the time for the work alone with no provision for personal needs, fatigue or unavoidable delays. Nobody can hold that for a whole shift, so the standard is tight. In the illustrative example on this page, a job with a 15 percent allowance comes out 13 percent short without it.
Related guides and tools
- How to conduct a time study: the procedure that avoids these mistakes
- How to plan a time study: operator, shift and product mix
- How to break a job into elements: the fix for mistake 7
- How many cycles to time: the fix for mistake 8
- Stopwatch time study: readings, foreign elements and the time check
- Standard time: rating and allowances done properly
- Labor losses in manufacturing: what a sound study should expose
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.