Design for assembly: cutting work content before the product launches
Short answer
Design for assembly, or DFA, is the practice of designing a product so it takes fewer parts and fewer, simpler motions to put together. It cuts work content on paper, before tooling exists, which is far cheaper than cutting it on the line after launch.
Design for assembly asks of every part: does it have to exist? A part earns its place only if it moves relative to the others, must be a different material, or must be separate so the product can be assembled or serviced. Everything else is a candidate to merge or remove. A time study of the current product shows which elements hold the seconds, usually the fasteners, and the same study times the prototype of the new design. In the worked box on this page, 20 parts and 115 seconds became 6 parts and 38 seconds.
Last reviewed:
What is design for assembly?
The test every part faces
- 1
Does it move relative to every other part?
A hinge, a shaft, a slide. Not a part that only flexes.
- 2
Must it be a different material from the parts next to it?
Insulator against metal, a seal against a rigid shell.
- 3
Must it be separate so you can assemble or reach the others?
A cover that has to come off for service.
Yes to any one: the part counts toward the theoretical minimum.
No to all three: merge it, or remove it.
Three questions asked about each part, one at a time. A yes to any of them makes the part essential. If all three answers are no, the part is a candidate to merge with a neighbour or to remove.
Design for assembly is a way of judging a product design by how hard it is to put together. Most work on an assembly line is not building the product. It is picking up parts, turning them the right way, lining them up and holding them while a fastener goes in. Every one of those motions was set, quietly, by someone drawing the product. DFA moves the argument to where the choice is still free: the drawing.
The idea is older than most plants' current lines, and the lean version is simple. Work content, the time it takes to do the work once, is partly set by the method on the floor and mostly set by the design. A line balancer can move elements between stations. A better standard can shave seconds off a motion. Only the design can make the element disappear.
DFA is not the same as design for manufacture (DFM), which asks how easily each single part can be made. DFA asks how easily the parts go together. The two pull on each other, and the combined practice is usually called DFMA. This guide covers the assembly half, and how the industrial engineer's time study feeds it.
Why cut work content in the design and not on the line?
Because of what a change costs at each stage. On paper, removing a screw is a line in a drawing. After tooling is cut, it is an engineering change, a tool modification and a re-qualification. After launch, it is also a retrain, a work instruction rewrite and a line that is running while you change it. The saving is the same second in every case. What differs is what you pay to get it.
Cutting a part also cuts things a time study does not count. A part removed is a part not bought, not stored, not kitted, not counted, not mixed up and not missing on the day the line needs it. It is one fewer thing for the process FMEA to worry about. That is why a design review pays for the hour you spend on it.
The catch is that during design there is no line to time. That is where an industrial engineer earns a seat in the review: you bring the standard times of the current product, or of a similar one, so the design team can see which elements hold the seconds before they argue about which part to change.
The established methods: Boothroyd Dewhurst, Lucas and Hitachi
Three families of DFA method are in common use, and all three give a design a score so two designs can be compared. They differ in how they get it.
| Method | Origin | How it scores a design |
|---|---|---|
| Boothroyd Dewhurst DFA | Geoffrey Boothroyd began it in the late 1970s at the University of Massachusetts Amherst. He and Peter Dewhurst built software for it from the early 1980s. Their textbook is Product Design for Manufacture and Assembly, with Winston Knight. | Decide the theoretical minimum number of parts, estimate the assembly time of each part from its handling and insertion, and compare the two as a design efficiency. |
| Lucas DFA | Developed by Lucas Engineering Systems with the University of Hull in the UK, so it is often called the Lucas Hull method. | Three stages: a function analysis of which parts are essential, a handling analysis and a fitting analysis, each scored from penalty tables. |
| Hitachi Assembly Evaluation Method (AEM) | Developed at Hitachi. It is described as the first numerical DFA evaluation, built for judging assemblies for automatic assembly. | One motion for one part is the ideal. Each extra motion or difficulty subtracts points. |
Scoring tables and constants differ by method and edition. This guide teaches the Boothroyd Dewhurst ideas, which are the most widely used, and does not reproduce their tables. Buy the book or licensed software for the tables.
You do not need the full method to get most of the value. The three questions and the ratio below catch the big savings. Use the licensed tables when a design review needs a number it will defend.
The three questions that set the minimum part count
The Boothroyd Dewhurst method asks, for each part in turn, whether it must be a separate part at all. As the method is usually taught, a part passes if the answer to any of these is yes:
- Does it move relative to every other part already assembled? (Small flexing does not count. A hinge, a lever or a shaft does.)
- Must it be made of a different material from the parts next to it, for a reason such as insulation, strength or sealing?
- Must it be separate, because otherwise the product could not be assembled or serviced? (A cover that has to come off.)
A part that fails all three is a candidate to merge into a neighbour or to drop. The parts that pass add up to the theoretical minimum number of parts. It is a target set by the product's function, not a design. You will not always reach it, and sometimes the better design stays above it. The value is the argument it starts: every part above the minimum now has to justify itself.
Screws, washers, clips, clamps and labels nearly always fail all three. They exist to hold other parts together or to mark them, and a fastener is a part whose only job is to hold other parts. That is why fasteners are the first place to look.
Design efficiency: one number for how close the design is to ideal
The method turns the minimum into a ratio. As the DFMA literature describes it, the ideal is a part that takes about 3 seconds to handle and insert, so the ideal assembly time is 3 seconds times the theoretical minimum number of parts. Design efficiency divides that by the assembly time estimated for the real design.
Design efficiency = (theoretical minimum parts × 3 s) ÷ estimated assembly time. A design with only essential parts that are all easy to handle would score near 100%. The score drops with every extra part and every awkward motion. On the 115 second box in the example below the minimum is 4 parts, so the ideal is 12 seconds and the efficiency is 12 ÷ 115, or 10.4%.
Design efficiency: the ideal time against the real one
Example numbersDesign efficiency = (theoretical minimum parts × 3 s) ÷ estimated assembly time
- Old box =(4 × 3) ÷ 115= 10.4%
- New box =(4 × 3) ÷ 38= 31.6%
Design efficiency equals the theoretical minimum number of parts times 3 seconds, divided by the estimated assembly time. For the old box, 4 times 3 is 12 seconds against 115 seconds, which is 10.4 percent. For the new box, 12 seconds against 38 seconds is 31.6 percent.
Two cautions. The 3 seconds is the method's allowance, not a measured time, so use the ratio to compare designs of the same product and do not quote it as a prediction of the line. And there is no pass mark that is true everywhere. Web articles quote benchmark percentages, but they are rarely sourced. Treat any pass mark as the target your own team agrees on.
The design guidelines, and the motion each one removes
The standard DFA guidelines are easiest to remember as the motions they remove. Every one of them shows up in a time study as a pick, a turn, a hold or a fumble. The therbligs on the motion economy page are the same list from the other side.
| Guideline | What it takes out of the element |
|---|---|
| Fewer parts | Each part is at least a pick, a place and a check. A part that is gone has none of them. |
| Fewer fasteners, one kind where you need them, snap fits where the load allows | Start and drive time, a tool change, and the screw pick that is often the slowest motion on the line. |
| Parts that locate themselves: lead-ins, chamfers, pins, posts | The hold and adjust after placing the part. The part goes in and stays put. |
| One direction of assembly, usually straight down | Turning the product over or reorienting it between steps. |
| Symmetric parts, or clearly asymmetric ones | The try it one way, turn it, try again. A part that fits only one way cannot be fitted wrong. |
| No parts that tangle, nest, stick or flop: loose gaskets, springs, long wires | Handling time, and a second hand used only to keep a part under control. |
| Room for the hand and the tool to reach | Search and reach, and awkward postures that also show up in an ergonomic study. |
| Parts that stay put without being held while the next goes on | The hold element, which is a hand doing no useful work. |
These are the widely taught DFA guidelines, stated in plain terms. A good guideline is one that matches a motion you can see on the video of the old product.
Error-proofing sits in the same list. A part that cannot be put in backwards removes a defect as well as a second. That is poka-yoke done in the design.
How a time study feeds a design review, step by step
- 1
Time the current product, or the nearest one
Break the job into elements and take a standard time for each, as in how to break a job into elements and how to conduct a time study. If the product is all new, take the nearest existing one, and say so in the review.
- 2
Rank the elements by seconds
Sort them from longest to shortest and add the cumulative share. Two or three elements usually hold most of the time, and they are often fastening. Bring that list to the review.
- 3
Ask the three questions about every part
Go part by part with the designer. Mark each part essential or not, and count the essential ones. That count is the theoretical minimum.
- 4
Redesign with the guidelines and estimate new times
Keep the same element list where you can, so before and after compare row by row. Estimate the new times from the old ones for the same motion, or from a predetermined motion time system such as MOST or MTM.
- 5
Build a prototype and time it
A 3D print, a hand-built unit or a cardboard mock-up is enough. Time the assembly with the people who will do it, and replace the estimates with seen times. See the new product time study playbook for how to time a thing that does not exist yet.
- 6
Hand the result to process planning
The new element list and times go into process planning for the new product and the line balance. Keep the before and after, because the next product's review starts from it.
How a time study feeds the design review
- 1
Time the current product
Elements and standard times from a study of the old box.
- 2
Rank the elements
Fastening is 82 of 115 s. Start there.
- 3
Ask the three questions
Part by part. Mark each essential or not.
- 4
Redesign and estimate
Same element list, new parts, new times.
- 5
Build a quick prototype and time it
Replace the estimates with seen times.
Five steps in order: time the current product, rank the elements by seconds, ask the three questions about each part, redesign and estimate the new times, then build a prototype and time it to replace the estimates with measured times.
Step 5 is the one most reviews skip. An estimate that nobody has checked against hands is a guess with a formula on it.
Worked example: a sensor junction box from 20 parts to 6
A moulded junction box holds a small circuit board and a cable. The current design was timed by video and the standard times are in the table. All numbers here are illustrative, made up for the example and recomputed by script. The old box has 20 parts: a housing, a circuit board, four board screws, a cable clamp with two screws, a flat gasket, a cover, four cover screws each with a lock washer, and a label.
| Element | Old box | New box | What changed |
|---|---|---|---|
| Place the housing in the fixture | 4 | 4 | Nothing |
| Fit the circuit board | 5 | 6 | Board now snaps onto moulded posts: 1 s slower to push |
| Fasten the board | 28 | 0 | 4 screws at 7 s gone; the posts hold the board |
| Fit the cable clamp | 18 | 5 | Clamp 4 s plus 2 screws at 7 s gone; cable is pressed into a moulded relief |
| Fit the seal | 9 | 4 | Loose flat gasket replaced by a seal that seats in a groove |
| Place the cover | 5 | 5 | Nothing |
| Fasten the cover | 40 | 14 | 4 screws with lock washers at 10 s become 2 screws at 7 s |
| Apply the label | 6 | 0 | Printed on the cover |
| Total | 115 | 38 | 77 s less, a cut of 67.0% |
Fastening is 28 + 14 + 40 = 82 of the 115 seconds on the old box, or 71.3%.
115 s of assembly became 38 s
Example numbers- Old box
- New box
Place the housing in the fixture
4 s1 part4 s1 partFit the circuit board
5 sPlace the board6 sSnap onto moulded postsFasten the board
28 s4 screws at 7 s0 sNoneFit the cable clamp
18 sClamp 4 s, 2 screws at 7 s5 sPress cable into moulded reliefFit the seal
9 sFlat gasket, loose and floppy4 sSeal seats in a groovePlace the cover
5 s1 part5 s1 partFasten the cover
40 s4 screws with lock washers at 10 s14 s2 screws at 7 sApply the label
6 sPeel and stick0 sPrinted on the cover
Eight assembly elements with standard time in seconds, old box then new box. Place housing 4 and 4. Fit board 5 and 6. Fasten board 28 and 0. Fit cable clamp 18 and 5. Fit seal 9 and 4. Place cover 5 and 5. Fasten cover 40 and 14. Apply label 6 and 0. Totals 115 seconds and 38 seconds.
The time study on the old box tells you where to start without any debate: fastening is 82 of the 115 seconds. The screws are the first target and the board, clamp and cover fasteners are the second. Nobody has to argue that the gasket is awkward when the video shows 9 seconds of fumbling with it.
| Part | Old box | New box | Essential? |
|---|---|---|---|
| Housing | 1 | 1 | Yes: the shell the others sit in |
| Circuit board | 1 | 1 | Yes: a different material and a function |
| Cover | 1 | 1 | Yes: it must come off for service |
| Seal or gasket | 1 | 1 | Yes: sealing needs a different material |
| Board screws | 4 | 0 | No: replaced by snap posts |
| Cable clamp and its screws | 3 | 0 | No: moulded into the housing |
| Cover screws | 4 | 2 | No by the test, but kept: they let the cover come off |
| Lock washers | 4 | 0 | No: not needed with the new screw |
| Label | 1 | 0 | No: printed on the cover |
| Total | 20 | 6 | Minimum 4 |
20 parts became 6. The theoretical minimum is 4.
Example numbersBefore: 20 parts
- 1 Housing
- 1 Circuit board
- 1 Cover
- 1 Gasket
- 4 Board screws
- 1 Cable clamp
- 2 Clamp screws
- 4 Cover screws
- 4 Lock washers
- 1 Label
After: 6 parts
- 1 Housing with snap posts and cable relief
- 1 Circuit board
- 1 Cover
- 1 Seal in a groove
- 2 Cover screws
- Essential
- Not essential
Before: 20 parts, of which 4 are essential (housing, circuit board, cover, gasket) and 16 are not (4 board screws, 1 cable clamp, 2 clamp screws, 4 cover screws, 4 lock washers, 1 label). After: 6 parts. The housing, circuit board, cover and seal are essential and the 2 cover screws are not.
Design efficiency goes from 12 ÷ 115 = 10.4% to 12 ÷ 38 = 31.6%. The new box has 6 parts against a minimum of 4. The 2 extra are the cover screws, kept deliberately, because a snap cover that cannot be opened cleanly would fail the third question in service. That is a design call, and it is fine to make it and write it down.
What does it mean in hours? At an illustrative 50,000 boxes a year, 77 seconds each is 1,069 hours of assembly a year, before counting kitting, the parts not bought, or the defects not made. Treat that as the size of the prize, not a promise: it assumes the new design is built to the estimate.
Limits, trade-offs and the people side
- Fewer parts often means a more complex part. A snap post and an integral relief cost more to design and mould, and the tooling is more expensive. DFA gives you the assembly side of the ledger and not the cost of the part. Put both in front of the design team.
- A snap fit can fail in service, in the cold, or after the fifth time the cover comes off. Strength and service life are engineering work and do not come from a DFA score.
- The score is only as good as the estimates behind it. An estimate for a motion nobody has done is a guess until a prototype has been timed.
- DFA says little for low volumes, where the tooling for a merged part cannot be paid back, or for products assembled by a machine, where the rules differ.
- Ask the people who assemble the old product. They know which part fights them. A screw that takes 7 seconds on the standard may take 20 on the night shift, and they will say which one and why. Their name goes on the idea, not on the study.
Redesign also changes the job, so tell the operators early. The new box has fewer elements. If the line was balanced around the old one, the line has to be balanced again: line balancing with the new times.
Tools and templates
- Time study sheet: record the old product's elements and their times.
- Cycle time calculator: add the elements into a cycle and compare the two designs.
- Standard time: how an observed time becomes the standard time you put in the table.
- How to estimate cycle time for a new product: estimates for a design that is still on paper.
Go deeper
This page is the short version. These guides cover each part in full.
- Cell Design in JIT: Flow Layout PlanningWhat to do with the shorter job once it is a cell: layout and one-piece flow.
- Poka-Yoke Error Proofing MethodsDesigning the part so it cannot go in wrong, which is the same idea as DFA symmetry and asymmetry.
- Standard Work Tools: Combination Sheet, Chart, Job BreakdownThe documents the new element list and times go into once the design is frozen.
- Takt Time in JIT: Matching Production to DemandThe cycle the new design has to fit inside.
All our articles on this subject are in the value stream mapping and flow topic.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Upload one process video and get time and motion, SMED, ergonomic and line balancing studies to review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about design for assembly
Design for assembly, or DFA, is designing a product so it has fewer parts and simpler motions to put together. It judges each part by whether it has to exist and how easy it is to handle and insert. It cuts work content on paper, before tooling exists, which costs far less than removing the same seconds from a running line.
It is a method started by Geoffrey Boothroyd in the late 1970s and developed with Peter Dewhurst into software from the early 1980s. It finds the theoretical minimum number of parts, estimates the assembly time of the real design from handling and insertion, and compares the two as a design efficiency. The scoring tables are in their textbook and licensed software.
Multiply the theoretical minimum number of parts by 3 seconds, the method's ideal time per part, then divide by the estimated assembly time of the design. A box with a minimum of 4 parts and an assembly time of 115 seconds scores 12 divided by 115, or 10.4%. Cut that time to 38 seconds and it scores 31.6%. Use it to compare designs, not to predict the line.
A part counts toward the minimum if the answer to any of three questions is yes. Does it move relative to all the other parts? Must it be made of a different material? Must it be separate so the product can be assembled or serviced? Parts that fail all three, such as screws, washers and labels, are candidates to merge or remove.
Design for manufacture asks how easily each single part can be made. Design for assembly asks how easily the parts go together. They can pull against each other: a merged part may be harder to mould and cheaper to assemble. The combined practice is called DFMA, and a design review should look at both sides.
A time study of the current product shows which elements hold the seconds, usually fastening, so the design review starts where the saving is. Later, timing a prototype with the people who will build it replaces the estimates for the new design with seen times, so the claimed saving can be checked before the line is built.
Related guides and tools
- New product time study playbook: timing a product that does not exist yet
- Process planning for a new product: where the new element list goes
- Breaking a job into elements: the list the design review ranks
- Therbligs and motion economy: the motions each DFA guideline removes
- Standard time: turning observed times into the figures in the table
- Line balancing: rebalance the line once the design changes
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.