Practical guide · Standard work, SOPs and training
Time study in metal fabrication and welding: arc time and everything else
Short answer
In welding, the arc is on for a minority of the shift. Measure that share, the operator factor, by work sampling or from the power source. Estimate a job as arc time, from weld length and travel speed, divided by the operator factor. Then go after the time outside the arc.
Fabrication work is long, varied and rarely repeats, so a classic stopwatch study of one cycle says little. The useful measure for welding is the operator factor: arc-on time divided by total time. Find it by work sampling the welders over one or two weeks, or from arc-time data on the power source. Estimate a weldment by working out the arc time from weld length and travel speed, then dividing by the operator factor to get labor time. Most of a welder's day is fit-up, handling, grinding, fetching and waiting, and that is where the improvement is. Do not confuse the operator factor with duty cycle, which is a rating of the welding machine.
Last reviewed:
What makes fabrication different
A time study was designed for a job that repeats every minute. A fabrication shop offers the opposite. A welder may spend forty minutes on one frame and not see the same frame again for a month. The job after it is a different size, with different joints, in a different position.
- Cycles are long and few. Thirty cycles of a 40 minute job is twenty hours of observation for one part number.
- The value-adding moment is narrow. Metal is joined only while the arc is on. Everything else, from fitting the parts to chipping spatter, surrounds it.
- The work content depends on the weld, not the part. Time follows weld length, joint type, position and plate thickness, which is good news: those can be read off a drawing.
- The welder moves. Fetching parts, waiting for a crane, walking to the wire store: a camera fixed on the booth sees only part of the day.
- Machines set part of the pace. A laser cuts at the speed of its program, and a press brake bends in seconds but takes many minutes to set up.
So fabrication uses a different mix of methods. A direct study still fits the repeating jobs, such as a robot cell or a bracket welded all week. For everything else, the tools are work sampling, machine data and estimating from standard data.
What gets timed, process by process
| Process | Paced by | What to measure | Method |
|---|---|---|---|
| Laser, plasma or punch | The program | Cut time per nest, sheet load and unload, part sorting | Machine data for the cut. Video for loading and sorting, which is where the labor is. |
| Press brake | Setup, then hands | Tool change and first-part time per job, seconds per bend, handling per part | A changeover study for the setup. A short video study for the bend cycle. |
| Fit-up and tack | Hands, fixtures, the crane | Time per part located and tacked, waiting for lifting gear | Work sampling across the shop, video for a repeating fixture job |
| Manual and semi-automatic welding | The welder | Arc-on time, operator factor, time per metre of weld by joint type | Work sampling or power source data, plus standard data per metre |
| Robot welding | The program | Robot cycle, load and unload, operator work during the cycle | Machine data and a man-machine chart |
| Grinding and cleaning | Hands | Time per metre of weld dressed, time on spatter and rework | Video, or sampling for the share of the day |
| Inspection and handling | People and cranes | Waiting time, crane moves per job | Work sampling |
Two of these rows repay study faster than the rest. The press brake, because in a job shop its setup can take longer than the run, and that is a SMED problem. And manual welding, because it is the most labor in the building and the least measured. The rest of this guide is mostly about the second.
A robot cell is machine-paced, so treat it like a CNC machine: the robot cycle comes from the controller and the operator's loading and tacking are timed against it. The method is in time study in CNC machining.
The operator factor: the one number to know
The operator factor, also called the operating factor, is the share of a welder's time in which the arc is on.
Operator factor = arc time / total time.
It exists because weld metal goes down only while the arc is on, and the arc time for a given weld is close to fixed by the procedure. So the operator factor is what turns a calculated arc time into the labor time you pay for: labor time = arc time / operator factor.
What is a normal figure? It depends heavily on the process and the kind of work. The Welding Institute (TWI) job knowledge note on welding costs lists the share of working time the arc is burning at 15 to 30 percent for manual metal arc welding, 30 to 45 for manual MIG/MAG and 25 to 40 for TIG, excluding set-up and assembly time. TWI calls that share the duty cycle, which is not the machine rating covered below. Those ranges are wide for a reason. Treat any published figure as a starting guess and measure your own shop, because the number you assume goes straight into every quote.
It is not the duty cycle
The two terms are mixed up constantly, and they measure different things.
| Operator factor | Duty cycle | |
|---|---|---|
| What it describes | How the welder's time was spent | What the welding power source can stand |
| Definition | Arc time / total time, over a shift or a job | Minutes in a ten minute period the machine can run at a rated current |
| Example | 28 percent: the arc was on for 28 percent of the time studied | 60 percent at 300 amps: six minutes welding, four minutes cooling |
| Where it comes from | Work sampling or arc-time data from your shop | The machine's rating plate and manual |
| Used for | Estimating labor and finding lost time | Choosing a machine that will not overheat |
The ten minute period is the convention in the equipment standard EN 60974-1. Some makers rate on a different period, so check the manual.
A machine with a 60 percent duty cycle does not mean the welder welds 60 percent of the time. In most manual work the welder's own stops keep the machine well inside its rating.
Two clocks that people mix up
Duty cycle: what the machine can stand
Operator factor: how the welder's time was spent
Duty cycle is a machine rating: at 60 percent and 300 amps the power source can weld 6 minutes of every 10 and must cool for 4. Operator factor is a measure of the shop: in the example the arc was on 28 percent of the time studied, and 72 percent was fit-up, handling, grinding and waiting.
Measuring the operator factor by work sampling
Work sampling suits welding well. The work is long and irregular, several welders can be covered on one round, and a glance is enough to tell whether the arc is on. The full method, with the sample size formula and a random schedule, is in the work sampling guide. The steps for a weld shop:
- 1
Set the categories
Seven is enough: arc on, fit-up and tack, grinding and cleaning, handling and positioning, getting parts and consumables, waiting, and personal or other. Write a one-line definition for each.
- 2
Tell the welders
Explain that the tally is by activity and not by name, and that the aim is to find what keeps them from welding. Most welders have a list ready.
- 3
Decide the number of observations
About 500 gives a margin of around 4 points on a category near 30 percent. The work sampling observations calculator gives the number for your target.
- 4
Make rounds at random times
Spread them over at least ten shifts, including the start and end of shifts. On each round, record what each welder is doing at the instant you first see them.
- 5
Tally and calculate
The operator factor is the arc-on count divided by all observations. Report it with its margin of error.
- 6
Rank what is not arc time
Sort the other categories from largest to smallest. The top two are your improvement project.
| Activity | Observations | Share of time |
|---|---|---|
| Arc on | 140 | 28.0% |
| Fit-up and tack | 110 | 22.0% |
| Grinding and cleaning | 75 | 15.0% |
| Handling and positioning | 70 | 14.0% |
| Getting parts and consumables | 45 | 9.0% |
| Waiting: crane, inspection, instructions | 40 | 8.0% |
| Personal and other | 20 | 4.0% |
| Total | 500 | 100.0% |
Operator factor = 140 / 500 = 28 percent. Margin at 95 percent confidence = 1.96 x the square root of 0.28 x 0.72 / 500 = 3.9 points, so between 24.1 and 31.9 percent.
Where a welder's day goes: 500 observations
Example numbersArc on140 of 500
28.0%Fit-up and tack110 of 500
22.0%Grinding and cleaning75 of 500
15.0%Handling and positioning70 of 500
14.0%Getting parts and consumables45 of 500
9.0%Waiting: crane, inspection, instructions40 of 500
8.0%Personal and other20 of 500
4.0%
95% margin on the arc share: 1.96 x the square root of 0.28 x 0.72 / 500 = 3.9 points, so 24.1 to 31.9 percent.
Work sampling of a welding bay, 500 observations over ten shifts. Arc on: 140, 28.0%. Fit-up and tack: 110, 22.0%. Grinding and cleaning: 75, 15.0%. Handling and positioning: 70, 14.0%. Getting parts and consumables: 45, 9.0%. Waiting: crane, inspection, instructions: 40, 8.0%. Personal and other: 20, 4.0%. The arc was on 28.0% of the time, with a 95 percent margin of 3.9 points, between 24.1 and 31.9 percent.
The shortcut: arc-time data
Many modern power sources log arc-on time, and some shops fit a simple arc timer. Arc hours divided by paid hours gives the operator factor with no observer and no sampling error. Use it when you have it. Its limit is the same as any machine data: it tells you the arc was off for 72 percent of the time and nothing about why. The sampling study, or a day of video, is what splits the 72 percent into causes.
A worked example: estimating a frame, then improving it
Illustrative example. A shop welds a steel base frame with 3,200 millimetres of fillet weld. The weld procedure gives a travel speed of 400 millimetres a minute. The bay's operator factor is the 28 percent measured above.
| Step | Working | Result |
|---|---|---|
| Arc time | 3,200 mm / 400 mm per minute | 8.0 min |
| Labor time | 8.0 min / 0.28 | 28.6 min |
| Time outside the arc | 28.6 minus 8.0 | 20.6 min |
| Frames per welder in a 450 minute shift | 450 / 28.6 | 15.8 |
Travel speed comes from the weld procedure for the joint, position and process. Where welds differ, calculate the arc time for each and add them.
From weld length to frames per shift
Example numbersArc time
3,200 mm / 400 mm a min
8.0 min
Labor time
8.0 / 0.28
28.6 min
Outside the arc
28.6 minus 8.0
20.6 min
Frames per shift
450 / 28.6
15.8
Arc time is 3200 millimetres divided by 400 millimetres a minute, 8.0 minutes. Labor time is 8.0 divided by an operator factor of 0.28, 28.6 minutes, of which 20.6 are outside the arc. A welder makes 15.8 frames in a 450 minute shift.
Now the question every shop asks: how do we make it faster? There are two levers, and they are not equal.
| Option | Arc time | Time outside the arc | Labor time | Saving |
|---|---|---|---|---|
| Today | 8.0 min | 20.6 min | 28.6 min | |
| Weld 10 percent faster | 7.3 min | 20.6 min | 27.8 min | 2.5% |
| Raise the operator factor to 40 percent | 8.0 min | 12.0 min | 20.0 min | 30.0% |
Welding faster changes only the arc time: 3,200 / 440 = 7.3 minutes. Raising the operator factor changes only the time outside the arc: 8.0 / 0.40 = 20.0 minutes.
Two ways to cut the labor time of the frame
Example numbersToday
28.6 min
Weld 10 percent faster (saves 2.5%)
27.8 min
Operator factor 40 percent (saves 30.0%)
20.0 min
- Arc time (the weld)
- Time outside the arc: fit-up, handling, fetching, waiting
Today: arc 8.0 minutes, outside the arc 20.6, labor 28.6 minutes. Weld 10 percent faster: arc 7.3 minutes, outside the arc 20.6, labor 27.8 minutes, a saving of 2.5%. Operator factor 40 percent: arc 8.0 minutes, outside the arc 12.0, labor 20.0 minutes, a saving of 30.0%.
Pushing travel speed up by a tenth, if the procedure and the quality allow it at all, saves 2.5 percent. Taking 8.6 minutes out of the handling, fetching and waiting saves 30 percent, and the weld itself is untouched. In the sampling tally those three categories were 31 percent of the day. A positioner that turns the frame, a kit of cut parts delivered to the booth and wire stocked at the point of use go after exactly those.
This is the main lesson of a welding study. The welder is rarely slow at welding. The shop is slow at letting the welder weld.
Building standard data for quoting
A fabricator quotes jobs it has never built, so it needs times it can read off a drawing. Build them the same way, piece by piece: minutes per metre of weld by joint type, size and position from the procedures; minutes per part for fit-up and tack from a few video studies; minutes per bend and per setup at the brake; minutes per metre of weld dressed. Check the total against the hours booked on finished jobs and correct the pieces that are off. Keep the operator factor as its own line, so that when you improve it every quote improves with it.
Ergonomics of welding and fabrication
Welding loads the body in a way assembly does not: the posture is held still. A welder may hold a torch steady with the neck bent and the arms unsupported for minutes at a time, and the worst positions, overhead and inside a structure, are the ones the work forces.
- Static postures: a bent neck under a helmet, a bent back over a low weldment, arms held out with no support.
- Awkward positions: kneeling, squatting and overhead welding on large fabrications.
- Force and weight: lifting plate and parts, pulling cables, and the weight of the torch and its lead over a shift.
- Vibration and grip: long periods on a grinder.
- Heat, fume and light: these are occupational hygiene matters with their own rules and limits. They are outside a time study, and they are not optional.
The best fix is also the best productivity fix: a positioner or a turning fixture that brings the joint to the welder at bench height, flat and in front. It removes handling time from the tally and the bent back from the posture score in one move. Score the job with the method in ergonomic assessment in manufacturing, and plan the booth with workstation design. This is general practice, not medical or safety advice for your site.
The people side
Welders are skilled, certified and proud of the work, and a number like 28 percent is easy to hear as an accusation. Present it the right way round from the first day.
- Say what the number is: a measure of the shop, not of the welder. Nobody chooses to wait for a crane.
- Show the whole tally, not only the arc share. The other six rows are where the welders will recognise their day.
- Never rank individuals by arc time. It punishes whoever got the awkward job and rewards rushing a weld.
- Keep quality in the room. A higher arc share from skipping interpass cleaning is not an improvement.
- Follow any agreement that covers work measurement, and tell people before the first round.
Mistakes specific to welding and fabrication
| Mistake | What goes wrong | Do this |
|---|---|---|
| Assuming an operator factor | A quote built on 50 percent is far too low if the shop runs at 28. | Measure it, by sampling or arc-time data, and update it each year. |
| Confusing duty cycle with operator factor | A machine rating is read as a measure of the welder. | Keep them apart: one is on the rating plate, the other is in your tally. |
| Stopwatch study of a one-off job | Hours of observation produce a time for a job that will not run again. | Sample the bay, and build standard data per metre of weld. |
| Chasing travel speed | A few percent of labor is saved and weld quality is put at risk. | Work on the time outside the arc first. |
| Timing only the weld booth | Fetching, crane waits and inspection queues happen out of frame. | Use sampling for the whole route, video for the booth. |
| Ranking welders by arc time | People rush, hide problems and avoid the hard jobs. | Report by bay and by activity, never by name. |
| Leaving brake setup out of part cost | Small batches of bent parts look cheap and the brake is always changing over. | Divide the setup by the batch and study the changeover. |
Templates, tools and related guides
- Time and motion study: the family of methods and when to use each.
- How to conduct a time study and standard time: for the repeating jobs.
- Work sampling observations calculator.
- Man-machine and multiple activity charts: for robot cells and laser loading.
- Time study from video: filming a booth or a fixture job.
- Line balancing and the yamazumi chart: for a welding line that builds one product at a steady rate.
- Predetermined motion time systems: rarely worth it for manual welding, useful for repetitive loading and assembly around it.
LeanSuite's time and motion study times the elements of a repeating fabrication job from a phone video and splits them into value-added, necessary and waste, and the ergonomic study scores the postures from video. SMED covers the press brake and fixture changeovers. For how plants in the sector use the platform, see LeanSuite for metal fabrication.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work in Manufacturing: A Complete GuideWriting down the method for the jobs that do repeat.
- How to Reduce Changeover Time in ManufacturingThe press brake and fixture setups that small batches multiply.
- Value-Added vs Non-Value-Added Time in ManufacturingThe classes behind the tally: arc time is value added, most of the rest is not.
- Standard Work Tools: Combination Sheet, Chart and Job BreakdownCharting a robot cell, where operator and machine share the cycle.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- SMED changeover worksheetChangeover steps with times, internal or external, what can move, ideas and before/after totals.
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- REBA worksheet (Rapid Entire Body Assessment)Score up to six postures with REBA: body-part drop-downs, Tables A, B and C as lookups, final score and action level, and a before and after comparison.
- Work sampling observations calculatorThe number of random observations a work sampling study needs for the accuracy you want, with the working, the rounds and the days it takes.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
- SMED changeover calculatorTime saved by moving changeover steps from internal to external, capacity freed per week and the smaller batch it allows.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyErgonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic StudySMED
Runs each changeover as a timed checklist, and AI splits a filmed changeover into internal and external tasks.
See SMED
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time study in metal fabrication and welding
Arc-on time is the time during which the welding arc is burning and weld metal is being deposited. It is the value-adding part of a welder's day. Divided by the total time, it gives the operator factor. It can be measured by work sampling, by a timer on the welding machine or from the data log of a modern power source.
The operator factor, or operating factor, is arc time divided by total time, usually shown as a percentage. It turns a calculated arc time into labor time: labor time = arc time / operator factor. The Welding Institute lists the arc-on share at 15 to 30 percent for manual metal arc and 30 to 45 percent for manual MIG/MAG, so measure your own.
Duty cycle is a rating of the welding machine: the minutes in a ten minute period it can run at a stated current without overheating. A 60 percent duty cycle at 300 amps means six minutes of welding and four of cooling. Operator factor describes the welder's time: the share of a shift or a job in which the arc was on.
Work out the arc time for each weld as its length divided by the travel speed in the weld procedure, and add them. Divide the total by your shop's operator factor to get labor time. For 3,200 mm of weld at 400 mm a minute the arc time is 8.0 minutes, and at an operator factor of 28 percent the labor time is 28.6 minutes.
For a repeating job in a fixture, film it and time the elements as for any manual job. For varied work, use work sampling: make random rounds over about ten shifts, tally each welder as arc on, fit-up, grinding, handling, fetching, waiting or other, and report the arc share with its margin of error. Then work on the largest non-arc categories.
Raise the share of time the arc is on before trying to weld faster. In the worked example, a 10 percent rise in travel speed saves 2.5 percent of labor, while lifting the operator factor from 28 to 40 percent saves 30 percent. Positioners, kitted parts, consumables at the booth and less waiting for cranes and inspection are the usual means.
Related guides and tools
- Work sampling: the method, the formula and a worked study
- Time and motion study: the family of methods and when to use each
- Time study vs work sampling: which to use, and when to use both
- SMED: cutting press brake and fixture changeovers
- Ergonomic assessment in manufacturing: which method for which risk
- Time study in CNC machining: for robot cells and other machine-paced work
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.