Practical guide · Lean leadership and employee engagement
Time standards and incentive pay: what to watch when a standard drives pay
Short answer
When a standard sets pay, every error in it becomes money and every argument about it becomes a grievance. Set it on a defined method at a normal pace, keep it until the method changes, never cut it because people beat it, and check quality, safety and gaming.
A time standard used for pay turns a technical number into a wage, so the standard has to be right, stable and trusted. Before pay depends on it, the method must be defined and written down, the study done on a qualified person at a normal pace with fair allowances, and the rule for changing it agreed: a standard changes when the method, tooling, material or equipment changes, and not because people are beating it. Cutting a rate after people beat it teaches a crew to hold back, which one 1952 shop floor study described in detail. Pay should rest on good pieces only, and never reward skipping safety or quality checks. Plans also get gamed, so audit counts, rates and methods. Some work is better paid another way. This is general guidance, not legal advice.
Last reviewed:
What to watch, in one page
A time standard used for planning can be a bit wrong and nobody is hurt. A standard that sets pay cannot. Every second of error becomes cents in a pay packet, every loose job becomes a place people go to earn, and every tight job becomes a grievance. The standard, the method and the rules around them have to be good enough to be argued over.
- Method first. A standard belongs to one written method. Change the method and the standard is no longer valid.
- A normal pace. The standard is for a qualified person working at a pace they can keep all shift, with fair allowances for fatigue and delays.
- Same standard for the same work. Two similar jobs with very different earning opportunities will empty one and overload the other.
- Stable. A standard changes when the job changes. It does not change because people did well.
- Good pieces only. Pay for output that passes inspection. Never pay for output that skipped the checks.
- Open. The operator and the union, where there is one, can see how the number was made and have a way to challenge it.
- Audited. Counts, rates and methods are checked, because every incentive plan gets gamed a little.
This page is about the standard side of pay. The method of setting one is in standard time, and the whole cost side is in labor cost and quoting with time standards. It is general guidance and not legal advice. Pay rules differ by country and state and your collective agreement, if you have one, is its own law.
The main kinds of plan
Names vary between books and plants. These are the plain descriptions, from the standard work measurement texts.
- Straight piece rate. Pay per piece made, often with a guaranteed minimum. The standard is a price per piece.
- Standard hour plan. Each job has a standard time. A person earns standard hours for the work done, paid at a base rate per standard hour, whatever the clock hours were. Working at 100 percent performance earns base pay. Faster earns more.
- Group or team incentive. The group is paid on its total output against its standard. It suits work where people depend on each other and individual output cannot be separated, but it needs a shared sense of fairness.
- Plant or department bonus. A share of savings or a bonus on measures such as output, quality or cost, often as a gainsharing plan. The standard is part of a bigger formula.
- Measured daywork. Pay is fixed. The standard is used to plan, schedule and manage performance, but not for pay. Many plants chose this to get the benefits of standards without the arguments over piece rates.
Frederick Taylor proposed a differential piece rate in the early 1900s, a higher rate per piece for output at or above the task and a lower one below. Nearly every plan since has been a variation on the idea of paying more for more. The question is not whether it works. It is what else it does.
A worked example: three operators on a standard hour plan
The job is a bracket weld. The standard time is 2.4 minutes per piece, which is 0.04 standard hours. The base rate is 20 dollars per standard hour, with a guarantee that nobody is paid less than the base rate for the clock hours. The shift is 8 hours, or 480 minutes. At standard, a person makes 480 / 2.4 = 200 pieces. All numbers here are invented.
| Operator A | Operator B | Operator C | |
|---|---|---|---|
| Good pieces | 170 | 200 | 240 |
| Standard hours earned (pieces x 0.04) | 6.8 | 8.0 | 9.6 |
| Performance (standard hours / 8 clock hours) | 85% | 100% | 120% |
| Earnings at the base rate (standard hours x $20) | $136 | $160 | $192 |
| Guarantee (8 clock hours x $20) | $160 | $160 | $160 |
| Paid (the higher of the two) | $160 | $160 | $192 |
Operator A earns the guarantee, so the plan costs nothing extra but gives A no reason to speed up until they reach 100 percent.
Three operators, one standard, one shift
Example numbersOperator A: 170 good pieces, 85% performance
Paid $160
Operator B: 200 good pieces, 100% performance
Paid $160
Operator C: 240 good pieces, 120% performance
Paid $192
- Earned on standard hours
- Earned, below the guarantee
- Top up to the guarantee
- Dashed line: guarantee, $160
Operator A made 170 good pieces, 85 percent performance, paid 160 dollars. Operator B made 200 good pieces, 100 percent performance, paid 160 dollars. Operator C made 240 good pieces, 120 percent performance, paid 192 dollars
What a loose standard does
Suppose the job really takes 2.16 minutes at a normal pace, so the 2.4 minute standard is 10 percent too loose: 2.16 x 1.111 = 2.4. A person working at a plain, normal pace makes 480 / 2.16 = 222.2 pieces, which is 8.89 standard hours and 111.1 percent performance, or 177.78 dollars. Normal effort pays 11 percent extra. Nobody did anything wrong. The standard is wrong, and everyone on that job is now earning over 100 percent. Notice the arithmetic: the true time is 10 percent below the standard, which makes the standard 11.1 percent above the true time, and the pay is 11.1 percent over.
Now suppose someone improves the method and the true time drops to 1.8 minutes. A person at the same normal pace makes 480 / 1.8 = 266.7 pieces, 10.67 standard hours and 133.3 percent. Whether that gain stays with the operator, goes to the plant or is shared is the question the plan has to answer in advance, because the standard will soon look loose, and the tempting answer is to cut it. The next sections are about why that is the wrong first move.
What a loose standard does to pay
Example numbers- Correct standard
- Standard 10% too loose
A line chart. Horizontal: effort at a true normal pace as a percent of the true standard, 70 to 140. Vertical: pay as a percent of base pay. With a correct standard, pay stays at 100 until effort reaches 100 and then rises one for one. With a standard 10 percent loose, the same effort pays 111 percent at a normal pace and the line is shifted up everywhere above the guarantee.
Rate cutting, and why trust is the whole game
When a standard turns out loose and operators earn well over 100 percent, the pull to cut the rate is strong. It is also the move that has done the most damage to the idea. In 1952 the sociologist Donald Roy published an account of piecework in a machine shop, based on working there himself. He described several forms of output restriction by the crew, one of which was holding to a group agreed ceiling on output. He found the pattern in a shop where workers had seen rates cut. The details belong to one shop and one era, but the lesson has held up in plant after plant.
- If a rate is cut every time people beat it, the lesson is to not beat it.
- Crews then keep their best method to themselves, because a better method means a lower rate.
- Output hides. People bank pieces, hold jobs back and report what they need, not what they made.
- Management loses the information that improvements depend on.
The usual answer, which appears in collective agreements back to at least the 1940s (the US Bureau of Labor Statistics catalogued such clauses in 1948), is that an established rate is not changed unless the method, tooling, materials or equipment change. A standard that stays put is a promise, and a promise kept is what makes people show you how the job can be done better. Rate cuts after improvement are the opposite promise.
How a rate cut teaches a crew to hold back
- 1
The standard turns out loose
- 2
The plant cuts the rate
- 3
The crew learns the rule
- 4
Output and ideas are held back
- 5
The standard looks right and the plant looks slow
Back to step 1: the next improvement is hidden
- 1
The standard turns out loose
A method change, better tooling or a standard that was always generous leaves people earning well above 100 percent.
- 2
The plant cuts the rate
To bring earnings back, the plant tightens the standard without a change in the job.
- 3
The crew learns the rule
Beat the rate and it goes. Better to stay a little below the line that triggers a re-study.
- 4
Output and ideas are held back
People stop showing better methods and keep their pace under the trigger.
- 5
The standard looks right and the plant looks slow
Counts say the standard is met. The real capability is hidden. The next improvement has nothing to build on.
What a standard must be before it drives pay
The standard-setting texts agree on the basics, and they are stricter when pay depends on the number. If any of these is missing, fix it before pay depends on the standard, not after.
What a standard needs before pay depends on it
Requirement
A defined, written method
Why it matters for pay: A standard belongs to a method. If the method drifts, so does the standard, and the pay with it.
How to check
Standard work sheet signed by the operator and supervisor, dated, held where both can see it. See standard work.
Requirement
A qualified, trained operator
Why it matters for pay: A standard set on a trainee or a star is wrong for everyone else.
How to check
Record who was studied and why they were chosen.
Requirement
A normal pace, rated with care
Why it matters for pay: Pace is the soft spot. A generous rating pays everyone extra, a harsh one underpays. See standard time and the observer effect.
How to check
Rate on a recognized scale, keep the observed times, let a second rater or the union's observer check a sample.
Requirement
Enough cycles, on enough days
Why it matters for pay: A small sample on one day is easy to dispute.
How to check
Use a sample size rule such as how many cycles to time and study on more than one day for important jobs.
Requirement
Fair allowances
Why it matters for pay: Allowances turn a normal time into an achievable one. See standard time.
How to check
Write down which were applied and why. Agree them with the operators or their representative.
Requirement
A way to challenge it
Why it matters for pay: A standard nobody can question is a standard nobody believes.
How to check
A written route: joint re-check, then the grievance steps in your agreement.
Requirement
A rule for changing it
Why it matters for pay: Without one, every improvement starts an argument.
How to check
Written trigger: method, tooling, material, equipment, product design. Nothing else.
Rate setting fairness: tight, loose and consistent
A plan is fair when similar effort earns similar pay across jobs. In every plan that has run a few years some jobs end up looser than others, because of mistakes, because methods changed on some and not on others, or because a few people made an easy standard on purpose. People know which jobs they are. Operators bid for the loose jobs and avoid the tight ones, and supervisors learn to put the right people on the right jobs to keep the output coming.
- Look at earnings by job. A job where everyone earns far above the rest, or far below, has a standard problem and not a people problem.
- Look at who gets the loose jobs. If it is always the same people, say why.
- Review the odd standards, not the whole book. Open them for re-study only if the method changed or you have evidence of an error, and say which.
- Fix a bad standard in the open, with the people on the job. A loose one that is corrected for a real reason, such as an error in the original study, is fair. Be ready to say what the error was.
- Compare similar jobs across lines and shifts, and do it on the same basis.
One well studied case shows how strong the incentive effect can be, and why it is worth getting right. Edward Lazear's 2000 paper on a US auto glass company that moved its windshield installers from hourly pay to a piece rate reports that output per worker rose 44 percent, and that profits rose. The paper also looks at how the change altered who worked there. It is one firm and one job with easily counted output and it does not tell you what will happen in your plant. It does show that how people are paid can change output a great deal, which is why the standard under the pay has to be sound.
How plans get gamed, and what to do about it
Gaming is not a sign of bad people. It is what intelligent people do when a number sets their pay. Expect it, look for it, and design so that the easy way to earn is the intended way.
Common ways incentive plans are gamed, how they show and what to do
What happens
Output is held back so the rate is not cut
How it shows: A flat ceiling on earnings, output hidden or banked, a cluster of people just under the same line.
What to do
Never cut a rate for beating it. Say so in writing. Treat a stable ceiling as a sign you have a trust problem.
What happens
Loose jobs are hoarded and tight jobs avoided
How it shows: Operators cherry-pick work, tight jobs wait.
What to do
Review earnings by job. Fix the standards that are wrong. Assign work by a fair rule.
What happens
Quality is traded for speed
How it shows: Scrap, rework and customer returns rise on incentive jobs.
What to do
Pay on good pieces. Charge defects back to the job. Keep inspection independent of the people paid on output.
What happens
Safety steps are skipped
How it shows: Guards left off, lockout skipped, a rise in near misses on incentive jobs.
What to do
No plan should pay for work done unsafely. Include safety in the review and listen to near misses.
What happens
Counts are inflated or moved
How it shows: Piece counts that do not match inspection, stock or machine data.
What to do
Reconcile counts with an independent source. Spot check.
What happens
Delays are claimed to protect earnings
How it shows: Rising claims of waiting time, machine problems and bad parts.
What to do
Give delays a clear code and a rule for pay. Fix the causes. Review the claims.
What happens
Better methods are kept secret
How it shows: A person on a job is much faster than the standard method allows. Nobody else knows how.
What to do
Reward people who share better methods and let the standard change on a method change, with a share of the gain. See updating standard work after an improvement.
Keeping standards current
Standards drift. Methods change in small ways nobody records, tooling is replaced, parts change, and after a few years the standard describes a job that no longer exists. In a plan that pays on it, that is a liability, because the old number now pays for a different job.
- Tie the standard to a written method with a date, and keep both in the same place.
- Make method changes go through a gate. A change that affects time is flagged, studied and given a new standard before it is released. Updating standard work after an improvement covers the loop.
- Decide in advance how the gain from an improvement is shared. A common arrangement is to apply the new standard only after a set period, or to share the gain in some way. Whichever you choose, agree it before the first improvement.
- Audit methods against standards on a schedule. A job done differently from its sheet is either a better method to capture or a problem to fix.
- Give new jobs and new products a learning allowance. People are slower on the first few weeks of a new job. See ramp up and the learning curve.
- Do not re-study a job because people are beating the standard. Re-study it because the job changed.
When not to pay on output
Many plants that used piece rates dropped them, and not because standards are a bad idea. The pay link is a different thing from the standard. Think twice about linking pay to individual output when:
- The pace is set by a machine or a line. The operator cannot go faster, so the plan only pays for the machine.
- Quality or safety is the main risk. A plan that pays for speed raises the pressure on the thing you care about most.
- The work is a team's and not a person's, such as an assembly line, a cell or a maintenance crew.
- The mix is wide and changes often. Standards cannot be kept current for hundreds of jobs.
- The cost of counting and auditing is more than the gain.
- The plant is changing methods fast. Lean improvement and an individual piece rate pull in opposite directions, because every improvement threatens someone's pay.
In these cases, keep the standard and drop the link. Use it for line balancing, capacity, costing and labor efficiency, where an error is a planning error and not a wage. If you want people to get better, pay for skills or share plant results rather than individual output.
The legal and union context, in general terms
This is a map and not advice. It names the kinds of rule that usually apply so you know what to ask HR, your labor relations lead and counsel.
- Union plants. In the United States, wages and other terms and conditions of employment are subjects of mandatory bargaining under the National Labor Relations Act, so introducing or changing an incentive system or its standards may need to be bargained, not simply announced. Many agreements also set out how standards are set and challenged. See time study in a union plant.
- Overtime for piece rate workers. In the United States, the Fair Labor Standards Act requires overtime based on the regular rate, which for piece rate workers is worked out from total weekly earnings including piece earnings, divided by hours worked (29 CFR 778.111). The Department of Labor publishes fact sheets on the regular rate. Check the current rules with counsel before designing any plan.
- Minimum pay. Workers covered by minimum wage law have to receive at least the minimum for every hour worked, however slow the output. A guarantee, as in the example above, usually covers this, but check how your jurisdiction treats waiting time and non-productive time.
- Other countries. Many have works council, consultation or collective bargaining rules that cover performance pay and monitoring. Assume there is one and find it.
- Records. A pay plan driven by a time standard creates a record of how the standard was made. Keep it, because it will be asked for.
How to set a standard that will drive pay
Setting a standard that will drive pay
- 1
Define and write down the method
- 2
Agree the rules before the first study
- 3
Study a qualified operator on a normal day, in the open
- 4
Rate and calculate in the open
- 5
Test the standard before it pays
- 6
Set the payment rules and the quality gates
- 7
Fix the rule for change and for sharing gains
- 8
Audit, and review on a date
- 1
Define and write down the method
Sequence, tools, fixtures, parts and workplace layout, signed by the operator and supervisor and dated.
- 2
Agree the rules before the first study
Who is studied, who may observe, who sees the data, how pace is rated, which allowances apply, how the standard can be challenged and when it can change. With the union where there is one.
- 3
Study a qualified operator on a normal day, in the open
Record cycles in order, the conditions and any unusual events. Use enough cycles and more than one day for important jobs.
- 4
Rate and calculate in the open
Observed time, rating, normal time, allowances, standard time. Show the operator or their representative the whole calculation.
- 5
Test the standard before it pays
Run it as information for a few weeks. Compare with output of other operators and other jobs. Fix what looks off.
- 6
Set the payment rules and the quality gates
Base rate, guarantee, treatment of delays, pay on good pieces only, safety and quality conditions.
- 7
Fix the rule for change and for sharing gains
The standard changes when the method, tooling, material or equipment changes. Say how gains from improvements are treated.
- 8
Audit, and review on a date
Counts against inspection, earnings by job, method against sheet. Put the review date on the standard itself.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work in Manufacturing: A Complete GuideThe method side of the standard: what has to be written down before a number can be trusted.
- Intrinsic vs Extrinsic MotivationWhat paying for output does to the reasons people give for doing the work well.
- Six Types of Employee RewardsRewards other than pay on individual output, and when each fits.
- How to Improve Shop Floor ProductivityWhere productivity comes from besides pushing people harder.
All our articles on this subject are in the lean leadership and employee engagement topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, so the basis of a standard can be checked by anyone.
See Time and Motion StudyStandardized Work
Keep the current method for each job in one place, so a standard is always tied to the method it was set on.
See Standardized Work
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time standards and incentive pay
In a standard hour plan each job has a standard time. An operator earns standard hours for the good work done and is paid a base rate for each standard hour, whatever the clock hours were. At 100 percent performance they earn base pay and faster work earns more. Piece rates, group plans and bonuses use the same standard in other ways.
One where a qualified person working at a normal pace earns the base rate, similar jobs offer similar earning opportunity, and the standard is built on a written method with fair allowances. Check earnings by job. A job where everyone earns far above or below the rest points to a standard error and not to a people problem.
Because when rates are cut after people beat them, the lesson is to hold back. A 1952 study of one machine shop described crews restricting output for this reason. The usual remedy, found in many agreements, is that an established standard changes only when the method, tooling, material or equipment changes, and not because people did well.
People earn more than intended for normal effort. In the worked example here, a standard 10 percent too loose paid about 11 percent extra for a normal pace. Nobody did anything wrong. Fix a loose standard only for a real reason, such as an error in the original study or a change in the job, and say what the reason was.
Pay on good pieces, reconcile counts with inspection and stock data, review earnings by job, and give delays a clear code and rule. Never cut a rate for beating it, and keep safety and quality checks out of the trade. Treat a flat ceiling on earnings as a trust problem. Audit methods against standards on a schedule.
Not always. Avoid it where a machine or line sets the pace, where safety or quality is the main risk, where teams do the work, or where methods change fast. In those cases keep the standard and drop the link: use it for line balance, capacity, costing and labor efficiency, and reward skills or plant results instead of individual output.
Generally yes, but rules vary. In the United States, overtime for piece rate workers is based on the regular rate, minimum wage applies to all hours worked, and a union may have to be bargained with over wages and standards. Other countries have their own rules. This is general guidance, not legal advice. Check with HR and counsel.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.