Reach envelope and reach zones: how to study and lay out a work area
Short answer
A reach envelope is the space a person's hands can get to from a fixed working position without leaning or stepping. A work area study maps every pick, tool and control against it, then moves the frequent ones inside the forearm's sweep.
On a bench the envelope has two parts. The normal working area is what each forearm sweeps with the upper arm hanging: an arc of about 35 to 40 cm around each elbow. The maximum working area is the sweep of the whole arm from the shoulder: about 55 to 65 cm. Put anything used every cycle in the first, anything used now and then in the second, and nothing beyond it. Design reach for your smallest operators and clearance for your largest.
Last reviewed:
What is a reach envelope?
Reach zones on a bench, seen from above
A plan view of a bench with the operator at the near edge. Around each shoulder is a primary arc of 35 centimeters and a secondary arc of 55 centimeters. The two primary arcs overlap in front of the chest.
Sit or stand at a bench, let your upper arms hang and keep your elbows by your sides. Sweep each forearm across the surface. The area your hands cover is the normal working area. Now straighten each arm and sweep from the shoulder without leaning forward. That larger area is the maximum working area. Together, and extended upward and downward, they make the reach envelope.
The two areas cost the body very different amounts. Inside the normal area only the forearm and hand move, and the shoulder stays relaxed. Between the normal and the maximum, the upper arm lifts and the shoulder muscles hold it there. Beyond the maximum, the trunk has to bend or twist, and on a seated job the back leaves the backrest. Each step outward is slower, more tiring and less precise.
That is why the idea belongs to time study as much as to ergonomics. It comes from the principles of motion economy that Ralph Barnes set out in Motion and Time Study: tools and materials should sit close to and directly in front of the operator, in a fixed place, in the order of use. Predetermined time systems price every reach by its distance, so a part moved 30 cm closer is a faster element as well as an easier one. The guide to therbligs and motion economy covers the full list of principles.
The normal and maximum working areas
The picture most engineers know, two small arcs inside two large ones on a bench top, was given dimensions by Farley at General Motors in 1955. He drew the normal area with the elbow as a fixed pivot and a forearm of 15.5 in for men and 14 in for women, which is 394 and 356 mm.
A year later Squires pointed out that the elbow does not stay still. As the forearm swings outward the elbow moves away from the body, so the real comfortable area is wider and flatter than a plain arc. Das and Grady compared the two in 1983 and found that Squires' normal areas came out 24% to 43% larger in total than Farley's. They recommended Squires' version.
For laying out a bench the difference is small next to the difference between people. Farley's arcs are the cautious choice: anything inside them is comfortable for nearly everyone. Squires tells you that items a little outside the arcs toward the sides are still fine.
| Dimension | Women, 5th percentile | Women, 50th | Men, 50th | Men, 95th | What it sets |
|---|---|---|---|---|---|
| Elbow to fingertip length | 400 | 430 | 475 | 510 | The outer edge of the normal area for a fingertip pick |
| Shoulder to grip length | 555 | 600 | 665 | 715 | The outer edge of the maximum area for a full grip |
| Forward grip reach, seated | 650 | 705 | 780 | 835 | Reach from the seat back, sitting upright |
Source: Pheasant and Haslegrave, Bodyspace, 3rd edition. A full grip reaches several centimeters less than a fingertip, which is one reason Farley's forearm figures are shorter than the first row.
The working rule against four body sizes
Woman, 5th percentile
Woman, 50th percentile
Man, 50th percentile
Man, 95th percentile
Red lines: the 35 cm and 55 cm working rules. Source of lengths: Bodyspace, 3rd edition, British adults 19 to 65.
Bars of elbow to fingertip length and shoulder to grip length for four body sizes, with lines at the 35 and 55 centimeter working rules. Every bar is longer than its rule, because the rule is sized for the smallest operator and a grip reaches less than a fingertip.
Three reach zones, with dimensions
Most plants turn the two areas into three zones and give each a job. The names vary: primary, secondary and tertiary; zones 1, 2 and 3; or A, B and C on a World Class Manufacturing material presentation sheet. The dimensions below are a working rule sized for a small operator, rounded from Farley's figure for women and the Bodyspace 5th percentile woman. They are a convention, so check them against your own people.
| Zone | How it is drawn | Working rule | What belongs there |
|---|---|---|---|
| Primary (normal working area) | Forearm sweep, upper arm hanging, pivot at each elbow | Within about 35 cm (14 in) of the elbow | The work itself and everything touched every cycle: parts, the main tool, the fixture |
| Secondary (maximum working area) | Whole-arm sweep without leaning, pivot at each shoulder | Within about 55 cm (22 in) of the shoulder | Things used every few cycles: a gauge, a second tool, the next container |
| Beyond the envelope | Needs a lean, a twist or a step | Past 55 cm | Nothing in the cycle. Spare stock, documents, items used once a shift |
For lifting, the NIOSH equation is stricter: its horizontal multiplier halves the recommended weight at 50 cm from the ankles and gives none past 63 cm.
Three details decide whether the zones work in practice. The pivots are the elbows and shoulders, not the front edge of the bench, so an operator who has to stand back from the bench because of a toe kick or a tote on the floor loses most of the primary zone. The zones are drawn for each hand, so a part picked with the left hand belongs on the left. And the area straight in front of the chest, where both primary zones overlap, is the most valuable space on the bench. That is where the assembly itself should happen.
The envelope is a volume
The arcs on the bench top are one slice. Raise the hand and the comfortable reach shrinks, because the arm is now holding itself up. The vertical limits are the ones in the golden zone guide: between knuckle and shoulder height, and best near elbow height. A shelf above the bench at eye level can be inside the 55 cm arc on a plan view and still be a reach above the shoulder for a short operator. Check both views.
Anthropometric data: who to design for
Anthropometry is the measurement of body size. For a workstation you need a handful of dimensions and one decision for each: whose body sets the limit.
| Design question | Design for | Why | Typical dimension |
|---|---|---|---|
| How far away can a part be? | The smallest users (5th percentile woman) | If the shortest arms reach it, everyone does | Shoulder to grip length, elbow to fingertip length |
| How much room under and around? | The largest users (95th percentile man) | If the biggest body fits, everyone does | Knee height, thigh thickness, shoulder breadth |
| How high is the work surface? | Each user, by adjustment | No single height suits a 30 cm spread in elbow height | Standing or sitting elbow height |
| How high can a shelf or a control be? | The smallest users for the top, the tallest for the bottom | Short people reach up, tall people stoop | Shoulder height, knuckle height |
Designing for the 5th to 95th percentile range of one dimension still leaves out one person in ten. Adjustment is the only way to fit nearly everyone.
Do not design for the average. A bench at the average elbow height is too high for half the people and too low for the other half, and a part at the average reach is out of reach for half. The average is useful for one thing only, which is knowing where the middle of the adjustment range should be.
Published tables are a starting point. Bodyspace covers British adults and several other populations. In the United States the public sources are the Army's ANSUR II survey from 2012 and the civilian CAESAR scans. Soldiers are younger and fitter than a plant workforce, national averages differ by several centimeters, and a table tells you nothing about the six people on your line. Measuring them takes a tape, a wall and ten minutes, and it is the data the layout should be built on.
How to run a work area study
- 1
Film the bench from above
Mount a phone over the operator's head looking straight down, or as near to it as you can get, and record ten cycles. Add a side view if items sit at different heights.
- 2
Draw the bench to scale and mark the body
Sketch the work surface from above with every container, tool, fixture and control. Mark where the operator's elbows and shoulders are in the normal working position, not where you would like them to be.
- 3
Draw the arcs
An arc of 35 cm and an arc of 55 cm around each shoulder point. Seen from above with the upper arm hanging, the elbow sits under the shoulder, so on a plan the two arcs share a center. Use your own operators' measurements if you have them. Masking tape on the bench itself works as well as a drawing and the operator can see it.
- 4
Count the picks
From the video, list every item the hands go to in a cycle, which hand, and how many times. Note the zone each sits in and measure the reach to it from the shoulder of the hand that picks it.
- 5
Lay it out again by frequency
Highest count first, into the primary zone on the side of the hand that uses it. Then the next. Keep the order of use running in one direction, and move the work point itself to the center overlap if it is not there.
- 6
Try it, film it, fix the standard
Mock the new layout up with cardboard and tape, let the operator run it for an hour and change what they say is wrong. Film ten cycles again and compare. Then update the standard work sheet, because the method has changed.
Two numbers summarize a study: the share of picks in the primary zone, and the reach distance in a cycle, which is twice the reach to each item, out and back, times the number of times the hand goes there. Neither is a time, but both move the same way the cycle time does.
Worked example: a valve assembly bench
An operator assembles a small valve from five parts and four screws at a standing bench. The hands go to eight places 12 times in a cycle. As found, the screws were at the back of the bench because the box was large, and the valve bodies were in a tote at the far left.
| Item | Picks a cycle | Reach from the shoulder (cm) | Zone | Reach out and back (cm) |
|---|---|---|---|---|
| Screws | 4 | 66 | Beyond | 528 |
| Seal | 2 | 58 | Beyond | 232 |
| Valve body | 1 | 62 | Beyond | 124 |
| Driver | 1 | 52 | Secondary | 104 |
| Stem | 1 | 48 | Secondary | 96 |
| Cap | 1 | 45 | Secondary | 90 |
| Spring | 1 | 30 | Primary | 60 |
| Label | 1 | 28 | Primary | 56 |
Totals: 12 picks, 2 in the primary zone (17%), 7 beyond the envelope (58%). Reach distance 1,290 cm, or 12.9 m a cycle.
The two items in the best positions were each used once. The item used four times was the furthest away. The new layout puts a small screw dish and the seals directly beside the fixture, feeds valve bodies down a short slide from the left, hangs the driver on a balancer over the work point, and moves the label roll out to the edge of the secondary zone because one reach a cycle can afford it.
| Item | Picks a cycle | Reach from the shoulder (cm) | Zone | Reach out and back (cm) |
|---|---|---|---|---|
| Screws | 4 | 25 | Primary | 200 |
| Seal | 2 | 30 | Primary | 120 |
| Valve body | 1 | 40 | Secondary | 80 |
| Driver | 1 | 38 | Secondary | 76 |
| Stem | 1 | 32 | Primary | 64 |
| Cap | 1 | 34 | Primary | 68 |
| Spring | 1 | 30 | Primary | 60 |
| Label | 1 | 50 | Secondary | 100 |
Totals: 12 picks, 9 in the primary zone (75%), none beyond the envelope. Reach distance 768 cm, or 7.7 m a cycle, 40% less.
The valve assembly bench, before and after
Example numbersAs found
Primary picks: 2 of 12 (17%). Beyond the envelope: 7. Reach out and back: 12.9 m a cycle.
Laid out again
Primary picks: 9 of 12 (75%). Beyond the envelope: 0. Reach out and back: 7.7 m a cycle.
- 1 Screws, 4 picks: 66 cm, then 25 cm
- 2 Seal, 2 picks: 58 cm, then 30 cm
- 3 Valve body, 1 pick: 62 cm, then 40 cm
- 4 Driver, 1 pick: 52 cm, then 38 cm
- 5 Stem, 1 pick: 48 cm, then 32 cm
- 6 Cap, 1 pick: 45 cm, then 34 cm
- 7 Spring, 1 pick: 30 cm, then 30 cm
- 8 Label, 1 pick: 28 cm, then 50 cm
Two plan views of the bench. As found, 2 of 12 picks a cycle were in the primary zone and 7 were beyond the envelope, with 12.9 meters of reach out and back. Laid out again, 9 of 12 were primary, none were beyond, and reach fell to 7.7 meters, 40 percent less.
Nothing was bought except a dish, a slide and a balancer. The gain came from asking one question of every item: how many times a cycle do the hands go there?
Seated work, standing work and both hands
A seated operator cannot step or lean far, so the envelope is fixed and smaller: the arcs are the same but the trunk adds almost nothing. Seated work suits jobs where everything fits inside the secondary zone and nothing heavy is handled. A standing operator can shift a step either way, which is useful for larger products and a trap for layout, because a step every cycle is walking that no one planned. The guide to standing, seated and sit-stand workstations covers the choice.
Use both hands. A layout that feeds everything from the right loads one shoulder and leaves the other hand holding the part, which is a fixture's job. Splitting the picks between the hands, each on its own side, roughly halves the reach count per arm and is one of the oldest motion economy rules.
Limits of a reach study
- It is a two-dimensional view of a three-dimensional job. Check heights separately.
- It says nothing about force. A part inside the primary zone that needs a hard push is still a problem.
- Arcs drawn from a table fit a statistical person. Draw them from the people on the station where you can.
- Reach distance is not time. To claim seconds, time the elements or use a predetermined time system.
- The closest layout is not always the safest one. Keep sharp tools, hot parts and controls that must not be bumped out of the path of the hands.
A reach study is one part of a full station review. The workstation assessment puts it beside safety, 5S and material presentation, and workstation design uses the same zones to lay out a station from scratch. This page is general guidance, not a medical or legal opinion.
Tools and templates
The measurements sheet of the workstation assessment form has columns for reach and hand height at every pick, and the standard work sheet is where the new layout gets drawn once it is agreed. For walking between stations, as opposed to reaching within one, use the spaghetti diagram.
A top-down video is also the input for a time study. LeanSuite's Time and Motion Study takes a phone video and returns element times and cycle time, so the before and after of a layout change can be compared in seconds as well as in centimeters. It does not draw reach arcs. Those you still tape onto the bench.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work in Manufacturing: A Complete GuideHow a layout and a work sequence become the documented best method.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe standardized work chart, where the bench layout and the operator's path are drawn.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPWhy the order of use on the bench follows the work sequence.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
Doing this in LeanSuite
Time and Motion Study
Film a station on a phone and get element times, cycle time, standard time and a Yamazumi chart.
See Time and Motion StudyErgonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic StudyAI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about reach envelope and work area study
A reach envelope is the three-dimensional space a person can reach with their hands from a fixed working position, without leaning, twisting or stepping. On a work surface it is drawn as two areas: the normal working area swept by the forearms with the elbows at the sides, and the larger maximum working area swept by the whole arm from the shoulder. Workstations are laid out so frequent tasks fall inside the first.
The primary zone is what the forearms reach with the elbows at the sides, within roughly 35 to 40 cm, and holds everything used every cycle. The secondary zone is what a straight arm reaches from the shoulder without leaning, to roughly 55 to 65 cm, for items used occasionally. The third zone lies beyond that and needs a lean or a step, so nothing in the work cycle should be there.
The normal working area is the part of a bench each hand can cover by pivoting the forearm at the elbow while the upper arm hangs relaxed. Farley drew it in 1955 with a forearm of 15.5 inches for men and 14 inches for women. Squires showed a year later that the elbow moves outward during the sweep, which makes the true area somewhat wider. It is where the work itself should be done.
It depends on the dimension. Design reach distances for the smallest users, usually the 5th percentile woman, so everyone can reach. Design clearances for the largest users, usually the 95th percentile man, so everyone fits. Make work surface height adjustable, because no single height suits the range. Never design for the average person: half the users will be on the wrong side of it.
Anthropometric data gives the body dimensions of a population, such as elbow height, arm length and knee height, by percentile. Designers use it to set bench heights, reach distances, shelf heights and leg room so the station fits the people who will use it. Published tables such as Bodyspace or the US Army ANSUR II survey are a starting point. Measuring the actual operators is better.
Related guides and tools
- Golden zone: the vertical side of the reach envelope
- Workstation design: laying out a station from scratch
- Therbligs and motion economy: the principles behind the reach zones
- Workstation assessment: four lenses on one station in a day
- Standing, seated and sit-stand workstations: bench height and posture
- Spaghetti diagram: walking between stations
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.