Method guide · Standard work, SOPs and training
Time study app or software: which tool for which job
Short answer
For a few studies a year on cycles over 30 seconds, a tablet app or a stopwatch and a spreadsheet is enough. For short elements, disputed standards or many studies, use video. AI video analysis pays when logging the footage by hand is the bottleneck.
Time study tools come in five kinds. A stopwatch app replaces the watch and nothing else. A tablet time study app lets you tap each element as it ends and does the sums. A spreadsheet does the sums and the charts from times you type in. Video analysis software lets an analyst mark elements on a recording. AI video analysis drafts those marks for an engineer to review. Choose by the shortest element you need to time, how many studies you run, whether anyone will challenge the numbers, and what you need out: a cycle time, a standard, or a line balance.
Last reviewed:
Which kind of time study tool do you need?
Start from the job, not from the tool. Four questions settle most of the choice.
- How short is the shortest element? Below about 2.4 seconds a stopwatch stops being reliable, and video becomes the only way to see the break points.
- How many studies a year? Three studies do not justify software. Three a week do.
- Will the result be challenged? A standard that affects pay, headcount or a customer price needs evidence someone else can check. Video is that evidence.
- What has to come out? A cycle time, a full standard with rating and allowances, a line balance, or a list of waste to remove. Each tool stops at a different point on that list.
Which kind of tool does the job need?
Is the shortest element you need to time under about 2.4 seconds?
If yes
Rule out stopwatch tools for that job. Use video, or a predetermined time system such as MTM or MOST.
Could operators, a union, finance or a customer challenge the result?
If yes
Choose a tool that keeps the evidence: video analysis software or AI video analysis, so every time links to the frames.
Do you run many studies, or have more footage than analyst hours to log it?
If yes
AI video analysis drafts the timeline and an engineer reviews it. Hand marking is the bottleneck it removes.
Every answer right
A few studies a year on cycles over 30 seconds: a tablet time study app, or a stopwatch and a spreadsheet, is enough.
Three questions in order. If the shortest element you need is under about 2.4 seconds, a stopwatch tool is out and you need video or a predetermined time system. If the result may be challenged, choose a tool that keeps the evidence, which means video. If you run many studies or have more footage than hours to log it, AI video analysis drafts the timeline for an engineer to check. If all three answers are no, a tablet app or a stopwatch and a spreadsheet is enough.
Whatever you pick, the method does not change. A tool records times. It does not decide the elements, judge the pace or choose the allowances. How to conduct a time study is the method, and it is the same on paper, on a tablet and on video.
The five kinds of time study tool
| Kind | What it does | What you still do | Fits |
|---|---|---|---|
| Stopwatch app or lap timer | Starts, stops and records laps on a phone | Everything else: elements, the sheet, the sums, the charts | One quick cycle time. Checking a number on the floor |
| Tablet time study app | You tap as each element ends. It records the times by element and cycle, and usually applies rating and allowances | Define elements, watch, tap, rate. Any chart beyond the basics | Stopwatch studies done often, on cycles long enough to tap |
| Spreadsheet | Averages, normal and standard time, sample size, charts, from times typed or pasted in | Collect the times some other way, and keep the formulas honest | Any study. It is the default back end for the first two |
| Video analysis software | Plays a recording frame by frame while an analyst marks each element on a timeline. Many add value-added splits and line balance charts | Film, mark every break point, rate | Short elements, detailed method study, standards that must be defended |
| AI video analysis | A model watches the recording and drafts the element timeline. An engineer reviews, corrects and signs off | Film well, check the draft, rate, decide | Many studies, long recordings, or a team with more footage than analyst hours |
Two neighbors are not time study tools in this sense. Predetermined time software builds a standard from motion tables such as MTM or MOST without timing anyone. Always-on camera or sensor systems measure every cycle at a station all the time.
Who does each step, by kind of tool
- You do it
- The tool does it
- Tool drafts, you check
- You decide, tool applies
| Kind of tool | Find the break points | Record the times | Do the sums | Rate and set allowances | Charts and reports |
|---|---|---|---|---|---|
| Stopwatch app | You, by eye | Laps only | You | You | You |
| Tablet time study app | You tap each one | By element and cycle | Tool | You decide, it applies | Basic report |
| Spreadsheet | Collected elsewhere | You type them in | Formulas | You | You build them |
| Video analysis software | You mark each | Linked to the frame | Tool | You | Tool |
| AI video analysis | Drafted, you check | Linked to the frame | Tool | You | Tool |
A grid of the five kinds of tool against five steps of a study. Rating the pace and setting allowances is always the engineer's, whatever the tool. A stopwatch app records laps only. A tablet app records by element and does the sums. A spreadsheet does the sums from times you type. Video software records times linked to the frame and builds the charts, and AI video analysis also drafts the break points for you to check.
For named products and what each vendor says about itself, with the date we checked, see best time and motion study software. This page stays with the kinds, because the kind decides most of what you get.
The criteria that matter
Feature lists run to pages. Eight things decide whether a tool does your job.
- Timing resolution: the smallest time the tool can separate, set against your shortest element.
- Evidence: whether someone else can check a number after the study, without taking your word for it.
- Element detail: whether you get each element for each cycle, or only a cycle total.
- Analyst effort: hours of your time for each hour of work studied.
- Several operators at once: whether one study can follow a crew or a cell.
- Output: how far it goes toward the thing you need, from raw times to a standard, a balance chart and a list of findings.
- Set-up: what has to be bought, installed, learned or approved before the first study.
- The people side: what the tool asks of the operators. A camera is a bigger ask than a watch.
| Criterion | Stopwatch app | Tablet app | Spreadsheet | Video software | AI video analysis |
|---|---|---|---|---|---|
| Timing resolution | Limited by your thumb | Limited by your thumb | Whatever you type in | One frame | One frame |
| Evidence to check later | None | None | None | The video | The video |
| Element detail | Laps only | Every element, every cycle | Whatever you type in | Every element, every cycle | Every element, every cycle |
| Analyst effort | Low to collect, high to write up | Low | Medium | High: marking is slow | Low to medium: review and correct |
| Several operators at once | No | Hard | No | Yes, one pass per person | Yes, if they can be told apart |
| Output | Raw times | Standard time, basic report | Anything you build | Standard, value-added split, balance charts | The same, drafted for you |
| Set-up | None | Minutes | A template | Software, a camera, training | A camera and an upload |
| Ask of the operators | Being watched | Being watched | None | Being filmed | Being filmed |
Our reading of each kind, not a rating of any product. Products within a kind differ, so check the one you are looking at.
Timing resolution: the number that rules tools out
Every tool has a smallest step. A decimal-minute stopwatch reads to 0.01 minute, which is 0.6 second. Video at 30 frames a second steps in 0.033 second. Divide the step by your shortest element and you see at once which tools can time it.
| Tool | Smallest step | Share of a 1.2 second element | Share of a 6 second element |
|---|---|---|---|
| Decimal-minute stopwatch | 0.01 min = 0.6 s | 50% | 10% |
| Video at 30 frames a second | 0.033 s | 2.8% | 0.6% |
| Video at 60 frames a second | 0.017 s | 1.4% | 0.3% |
Arithmetic only: step / element length. A phone stopwatch shows hundredths of a second, but the reading is only as good as the tap, and a person reacts in tenths of a second, not hundredths.
A 1.2 second element, ruled in each tool's smallest step
Decimal-minute stopwatch, one tick is 0.6 s
One tick is 50% of a 1.2 s element and 10% of a 6 s element.
Video at 30 frames a second, one tick is 0.033 s
One tick is 2.8% of a 1.2 s element and 0.6% of a 6 s element.
Video at 60 frames a second, one tick is 0.017 s
One tick is 1.4% of a 1.2 s element and 0.3% of a 6 s element.
- 0 s1.2 s, the whole element
A 1.2 second element has 2 ticks on a decimal-minute stopwatch, one every 0.6 second, which is 50 percent of the element. At 30 frames a second it has 36 ticks, 2.8 percent each. At 60 frames a second it has 72, 1.4 percent each. For a 6 second element the shares are 10 percent, 0.6 percent and 0.3 percent.
This is why textbooks put a floor under stopwatch elements. Niebel and Freivalds advise keeping elements above about 0.04 minute, 2.4 seconds, because shorter ones cannot be read consistently. If your job has elements shorter than that and you need them separately, you need video, or a predetermined time system such as MTM or MOST.
Averaging helps a stopwatch more than the table suggests. Over 20 cycles the reading errors partly cancel. They do not cancel a habit, such as always tapping late on one element.
Stopwatch apps and lap timers
A stopwatch app is a stopwatch. The clock app already on your phone has a lap button, and that is all most of them add. It is the right tool for a fast answer: is this station nearer 40 seconds or 55?
- Good for: a first look, checking a claimed cycle time, timing a changeover or a long cycle where a second either way does not matter.
- Weak at: elements. With one lap button you get a row of times and no record of what each one was.
- Watch for: reading in the wrong units. Standards are usually kept in decimal minutes or decimal hours, and phones show minutes, seconds and hundredths. Convert before you average.
- Tip: use the continuous method. Let the clock run, press lap at each break point and sort out the subtraction afterwards. Nothing is lost between elements.
Tablet time study apps
A time study app puts the observation sheet on a screen. You enter the elements before the study. During it you tap once as each element ends, and the app files the time under the right element and cycle. Most let you mark a foreign element, enter a rating and an allowance, and export the result.
- Good for: an engineer who runs stopwatch studies every week. It removes the transcription and the arithmetic, which is where paper studies pick up errors.
- Weak at: short elements, for the same reason as a stopwatch, and at anything you did not see. There is no replay.
- Watch for: looking at the tablet. Every glance at the screen is a moment you are not watching the job. Buttons you can find without looking matter more than features.
- Ask: can you export every reading, not only the averages? You will want the raw times the day someone questions the standard.
Spreadsheets
Most time studies in most plants end up in a spreadsheet, whatever collected the times. It is flexible, everyone has it, and a good template does the sums in front of you so you can see how the standard was built.
- Good for: the calculation, the charts and the record. Average and selected times, normal time, standard time, sample size, units an hour.
- Weak at: collecting times. Typing readings into cells while watching a job does not work. Collect on paper or with an app and enter them afterwards.
- Watch for: broken formulas. A study copied from last year's file with one row inserted can be wrong for years. Protect the formula cells and keep the raw readings on their own tab.
- Tip: you can do a video study this way. Play the clip in a player that steps frame by frame, type the timecodes into the sheet and let it subtract. It is slow, and it costs nothing.
The free time study sheet is built for this, and the time study sample size calculator tells you whether you have timed enough cycles.
Video analysis software
Video analysis software gives you a player, a timeline and a way to mark elements on it. You step to each break point and mark it, and the software records the time, keeps the link to the frame and builds the tables and charts. This kind of tool has been the industrial engineering department's standard for years.
- Good for: detailed method study. You can see each motion, label it as value-added or waste, compare two operators side by side and replay a doubtful element.
- Good for: standards that must stand up. Every time links to the frames it came from.
- Weak at: speed. Marking is manual and you watch the footage several times at reduced speed. A long recording is days of desk time.
- Watch for: studies that never get done. If marking a study is that slow, the plant studies three jobs a year and the other three hundred run on old numbers.
- Many of these suites also hold predetermined time systems, line balancing and ergonomics. If your standards are MTM-based, that matters more than anything else on the list.
Time study from video covers filming and logging in detail.
AI video analysis
AI video analysis starts from the same recording and removes most of the marking. A model watches the video, splits it into elements and proposes the start and end of each. You get a draft timeline to review instead of a blank one to fill.
- Good for: volume. When the footage outruns the analyst hours, the draft is what makes the study happen at all.
- Good for: long recordings and several operators, where manual marking is at its slowest.
- Weak at: footage it cannot read. Hidden hands, people in identical clothing, a moving camera and poor light all produce drafts that need heavy correction.
- Not a replacement for: the engineer. Somebody has to check the labels, rate the pace, set allowances and sign the study. A draft nobody reviewed is not a standard.
- Watch for: claims without a way to check them. Ask to see how a number links back to the video, and how you correct one that is wrong.
LeanSuite's time and motion study is in this group. You upload a recording, the AI times every element on a timeline that links to the video, and an engineer splits or merges elements, asks for a re-check of a time window and certifies the study. The same footage gives each operator's time against takt in a Yamazumi chart. It analyses files you upload. It does not watch a live camera.
Two neighbors: predetermined times and always-on measurement
Predetermined time software does not time anyone. You describe the motions of the job, the software looks up each one in a table such as MTM or MOST, and the total is the time. It works before the line exists, and it needs no rating, because the tables are already at a defined pace. It needs a trained analyst, and it is only as good as the description of the method. Predetermined motion time systems explains how they work.
Always-on systems put fixed cameras or sensors at a station and record every cycle, every shift. They answer a different question: not what the standard should be, but what is happening now and how it varies. They also raise the people question in its strongest form, because the camera never leaves. Plan the conversation with the team and any union before the hardware.
How to choose
Choosing a tool, in six steps
- 1
Write down what has to come out
- 2
Find your shortest element
- 3
Count the studies
- 4
Decide how much proof you need
- 5
Check the people side
- 6
Try it on one real job
- 1
Write down what has to come out
A cycle time, a standard time, a line balance or a waste list. Name who will use it and what they will decide with it.
- 2
Find your shortest element
List the elements of a typical job. If any you need separately is under about 2.4 seconds, rule out stopwatch tools for that job.
- 3
Count the studies
How many jobs need a current standard, and how often do they change? Multiply by the hours a study takes today. That is the size of the problem a tool has to solve.
- 4
Decide how much proof you need
If a result will be argued over, by operators, a union, finance or a customer, choose a tool that keeps the evidence.
- 5
Check the people side
If the tool needs a camera, agree the filming rules with the team first. A tool the floor rejects times nothing.
- 6
Try it on one real job
Take one station you know well. Run the same study by your current method and with the tool. Compare the hours it took you and the element times it gave.
The trial in step 6 is worth more than any feature list. Use a job where you already trust the numbers, so that a difference tells you about the tool and not about the job.
Questions to ask before you buy
- Can I see every raw reading, and export it?
- For a video tool: does every time link to the frame it came from, and can I correct it?
- For an AI tool: what does a draft look like on footage like mine, and how long does review take? Ask to run your own clip.
- How are rating and allowances entered, and are they stored with the study?
- Can it follow more than one operator in one recording?
- What comes out: a standard time only, or balance charts and a findings list as well? In what file formats?
- Where is the video stored, who can see it, and how is it deleted?
- What does it need from our IT team before the first study?
- Who else in the plant can open a study without a license or training?
What no tool does for you
- Fix the method. A tool times the job as it is done. If the method is poor, you get an accurate time for a poor method. Improve first, then time.
- Pick the operator. A standard built on the fastest person in the plant will fail on everyone else.
- Rate the pace. Software can count frames. Whether the operator was working at a normal pace is a trained judgment.
- Set allowances. Personal, fatigue and delay allowances come from your conditions and your agreements.
- Earn trust. Operators who were not told why they are being timed will not work normally, and the tool will record that faithfully.
Standard time covers rating and allowances, and time study in a union plant covers the conversation with the people being studied.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- How to Improve Shop Floor ProductivityWhat to do with the results once a study has shown where the time goes.
- How to Improve Production Efficiency: 7 Practical WaysThe wider set of levers on output, of which labor time is one.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsThe chart most time study tools produce, and how to read it.
- Standard Work in Manufacturing: A Complete GuideWhere the element times go next: the three standard work documents.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyLine Balancing
Each operator's cycle time against takt in a Yamazumi chart, built from the same video.
See Line Balancing
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time study app or software
Time study software records how long each element of a job takes and turns the readings into cycle times, standard times and charts. It ranges from tablet apps where you tap as each element ends, to video analysis software where an analyst marks elements on a recording, to AI tools that draft the element timeline from the video for an engineer to review.
Yes, at the simple end. The clock app on any phone has a stopwatch with laps, and a free spreadsheet template does the averages, normal time and standard time. That covers an occasional study on cycles longer than about 30 seconds. What free tools do not give you is replay, element times for short motions, or evidence someone else can check.
Yes. Excel is where most studies are calculated. Collect the times on paper, with an app or from video timecodes, enter one row per element and one column per cycle, and let the sheet work out the average, the normal time after rating and the standard time after allowances. Keep raw readings on their own tab and protect the formulas.
For elements longer than a few seconds, yes, if you take enough cycles. A decimal-minute stopwatch reads to 0.01 minute, or 0.6 second, and textbooks advise keeping elements above about 0.04 minute. For shorter elements a single reading can be off by half the element, and video is the better tool: one frame at 30 frames a second is 0.033 second.
In video time study software an analyst steps through the recording and marks where each element starts and ends. In AI video analysis a model proposes those marks and the analyst reviews and corrects them. Both keep every time linked to the video. The difference is who does the first pass, and so how many hours a study takes.
No. AI can find and time the elements in a recording. It does not decide whether the method is the right one, whether the operator was working at a normal pace, what allowances apply or what to change. An engineer still reviews the draft, corrects it and signs the study. The engineer's hours move from marking frames to checking and improving.
Check eight things: the smallest time it can separate against your shortest element, whether it keeps evidence you can check later, element detail for every cycle, analyst hours per study, whether it follows several operators, how far the output goes toward a standard or a balance chart, what set-up it needs, and what it asks of the operators.
Related guides and tools
- Best time and motion study software: named tools, from each vendor's own pages
- Time study from video: how to film, log and check it
- How to conduct a time study: the method every tool supports
- Predetermined motion time systems: MTM, MOST and MODAPTS
- Time study sheet: the free Excel and PDF template
- Time and motion study: the family of methods
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.