Short answer

Cycle time is how long one cycle of the work takes, from one finished unit to the next. Measure it with a stopwatch or video over many cycles, from the same event every time, and leave out only the readings you can explain.

Cycle time is the time to produce one unit at a step, found by timing it, not by calculating it. Pick one event that marks the end of a cycle, such as a finished unit landing on the chute, and time from that event to the same event on the next unit. Time at least ten cycles under normal running, leave out only readings with a logged outside cause, and take the mean. Machine cycle time covers only the machine, operator cycle time covers the operator's work, and a line's cycle time is its slowest station. In the example here the bench averages 42.0 seconds against a takt time of 45.

Last reviewed:

What is cycle time?

One cycle: start and stop on the same event

Example numbers
Clock starts: unit lands on chuteClock stops: next unit lands
  1. 1. Pick the parts6 s
  2. 2. Fit the seal9 s
  3. 3. Drive the screws11 s
  4. 4. Leak test runs (machine, operator waits)10 s
  5. 5. Inspect, place on the chute6 s
  6. Cycle time42 s

One cycle at a bench is 42 seconds, from one finished unit landing on the chute to the next. The elements are Pick the parts 6 seconds, Fit the seal 9 seconds, Drive the screws 11 seconds, Leak test runs 10 seconds, Inspect, place on the chute 6 seconds. The leak test is a machine step and the operator waits for it.

The clock starts when a finished unit lands on the chute and stops when the next one does. Everything between is the cycle, including the wait for the test. Time from the same event each time and cycles line up with no gaps.

Cycle time is the time it takes a step to produce one unit. The Lean Enterprise Institute's Lean Lexicon puts it as the time required to produce a part or complete a process, as timed by actual measurement. The last words matter. Nobody gets cycle time from a routing sheet or a drawing. You get it by watching the work and writing down the clock.

It is a rate seen from the other side. If a bench finishes a unit every 42 seconds, it makes 3,600 / 42 = 85.7 units an hour. Cycle time is the number you compare with takt time, the pace the customer sets, to see whether a step can keep up. It is also what you divide into a shift to find capacity, and the starting point for a standard time.

It is not lead time. Cycle time is about one step. Lead time is how long a unit spends in the whole process, waiting included, and is usually many times longer. That page works one part through both. This page is about getting the cycle time right in the first place.

How to measure cycle time, step by step

Most wrong cycle times are wrong at step one or two, before anyone presses the stopwatch. Fix the definition first, then time.

  1. 1

    Define the cycle and the product

    Write down which job, which product or variant, which station, and what one cycle produces: one unit, one tray of six, one pallet. Two variants with different cycle times need two sets of readings.

  2. 2

    Choose one start and stop event

    Pick an event you can see clearly and that happens once per cycle: the finished unit landing on the chute, the machine door closing, the operator's hand leaving the fixture. Time from that event to the same event on the next unit. Because the stop of one cycle is the start of the next, no time falls between cycles.

  3. 3

    Time under normal running

    Choose a time when materials are there, the machine is warm and the usual person is working at the usual pace. Do not pick the best hour. Do not wait for a bad one either. Note the date, shift, operator and any odd condition on the sheet.

  4. 4

    Time enough cycles and write each one down

    Record every cycle in order, not a running average. At least ten for a stable, short cycle is a common starting point. How many cycles to time gives the method for working out the number the job actually needs.

  5. 5

    Log what interrupts, then decide about the reading

    When something outside the job happens (a part runs out, a forklift blocks the aisle, someone asks a question), write what happened next to that cycle. Afterwards, set aside only readings that have a logged cause outside the job. Count the interruption separately as a stop.

  6. 6

    Take the mean and check the spread

    Add the kept readings and divide by how many there are. Look at the lowest and highest. A tight spread means the cycle is stable. A wide one means the method varies, and the mean hides that. Report the mean together with the range.

Machine, operator, effective and line cycle time

The same word is used for several different times, and mixing them is the quickest way to argue about numbers for an hour. Say which one you mean.

Illustrative: the kinds of cycle time at one machine
NameWhat it coversHow you get itIn the example
Machine cycle timeThe machine finishing all its operations on one piece (Lean Lexicon)Time the machine from start to finish with nobody touching it18 s
Operator cycle timeThe operator doing every element at the station before starting again (Lean Lexicon)Watch the operator and time the repeating sequenceSet by the job, measured per station
Effective machine cycle timeMachine cycle plus load and unload plus the changeover share per piece (Lean Lexicon)Machine + load and unload + changeover time / pieces between changeovers18 + 8 + 600 / 300 = 28 s
Station cycle timeHow often the station finishes a unit, whoever or whatever does the workTime from one finished unit to the next42 s at the bench below
Line cycle timeHow often the whole line finishes a unitThe slowest station's cycle time, once the line is full42 s for the four stations below

The 18 + 8 + 600 / 300 line follows the Lean Lexicon's formula for effective machine cycle time, with made-up numbers.

Machine cycle time and effective machine cycle time

Example numbers
  • Machine cycle18 s
  • Load and unload8 s
  • Changeover share2 s

Effective machine cycle time

18 + 8 + 600 / 300 = 28 s

A machine runs 18 seconds on its own, needs 8 seconds of loading and unloading, and loses a 600 second changeover spread over 300 pieces, which is 2 seconds a piece. The effective machine cycle time is 28 seconds.

The machine's 18 s is the number on the spec sheet. What the part actually costs the line is 28 s, once loading and the changeover are shared across the pieces. Use the second when you plan capacity.

The gap between the first and third rows is where capacity plans go wrong. A machine rated at 18 seconds does not make a part every 18 seconds in real running. It has to be loaded, unloaded and changed over. If you plan from 18 you promise capacity the machine does not have. A job where the operator works while the machine runs is covered by the man machine chart.

Worked example: twelve cycles at a bench

Illustrative numbers. A bench fits a seal, drives the screws, runs a leak test and places the unit on a chute. The operator picks parts (6 s), fits the seal (9 s), drives the screws (11 s), waits for a 10 second automatic leak test, and inspects and places the unit (6 s). The clock starts when a unit lands on the chute and stops when the next one does: 6 + 9 + 11 + 10 + 6 = 42 seconds on a clean cycle. An observer timed twelve cycles in a row.

Illustrative: twelve timed cycles at the seal and screw bench
ReadingResult
Cycles timed, in order (s)41, 43, 42, 40, 44, 42, 41, 43, 64, 42, 41, 43
Sum and mean of all twelve526 s, 526 / 12 = 43.8 s
Note on cycle 964 s: the operator walked off to fetch a carton
Sum and mean of the other eleven462 s, 462 / 11 = 42.0 s
Range of the eleven40 s to 44 s
Effect of keeping cycle 9Mean 43.8 s instead of 42.0 s, 4.4% higher

Cycle 9 is the interesting one. It is 22 seconds over the mean, and it has a cause that is not part of the job: the operator went for packaging. The rule here is simple. A reading is set aside only when there is a note saying what happened outside the work. It is not set aside because it looks high. If there had been no note, the 64 would stay in, and the next question would be what happened. The carton fetch does not vanish either. It goes on the interruption log as a stop of about 22 seconds, because it still costs the shift time.

Twelve timed cycles, one with a reason

Example numbers
  • Cycle reading
  • Logged interruption, set aside
  • Mean of the 11 clean cycles, 42.0 s

Cycle number, seconds on each bar.

Twelve cycle readings in seconds: 41, 43, 42, 40, 44, 42, 41, 43, 64, 42, 41, 43. Eleven fall between 40 and 44 seconds. The ninth, 64 seconds, has a logged cause: the operator fetched a carton. The mean of all twelve is 43.8 seconds. The mean of the eleven is 42 seconds.

Leaving the 64 in moves the mean from 42 to 43.8 s, 4.4% higher, from one reading with a known outside cause. Mark it and log it, so the carton fetch is counted as a stop and not forgotten.

Ideal, observed, net and effective cycle time

A stopwatch gives you the observed cycle time. For capacity and for OEE you need to say how it relates to three other numbers. OEE.com defines ideal cycle time as the fastest time per part a process can sustain over the long run with no losses, and cycle time as the measured time per part while running. It also defines an effective cycle time, which adds downtime. Sources differ on how to set the ideal: some take it from the design or nameplate rate and some from the best run you can show over a long stretch. Whichever you use, write it down and keep it fixed, or the OEE trend means nothing.

Illustrative: four cycle times for the same bench over one shift
MeasureHow it is foundResult
Ideal cycle timeFastest sustained time per unit, from the design rate or a proven best run36 s
Observed cycle timeMean of the clean stopwatch readings42.0 s
Net cycle timeRun time / pieces made: 22,800 s / 51544.3 s
Effective cycle timePlanned production time / pieces made: 25,200 s / 51548.9 s

Shift of 450 minutes with a 30 minute break and 40 minutes of downtime. Planned time 420 minutes, run time 380 minutes, takt time 25,200 / 560 = 45 s.

Four numbers called cycle time, and where each sits

Example numbers
  • Takt time, 45 s
  1. Ideal: 36 sFastest sustained, no losses

  2. Observed mean: 42 sStopwatch, 11 clean cycles

  3. Net (run time): 44.3 s22,800 s / 515 pieces

  4. Effective: 48.9 s25,200 s / 515 pieces

Four bars against a takt time of 45 seconds. Ideal: 36 seconds. Observed mean: 42 seconds. Net (run time): 44.3 seconds. Effective: 48.9 seconds. The first three are left of takt. The effective cycle time, which includes the 40 minutes of downtime, is right of it, so the shift made 515 pieces and not the 560 needed.

Ideal is what the process could do, observed is what the stopwatch saw, net is what the shift delivered while running, and effective counts the stops too. The line is only short of demand on the last one.

Read the ladder from the top. The bench has a stopwatch cycle of 42.0 seconds, which beats the 45 second takt time, so on a good minute it keeps up. But over the shift it made 515 pieces and needed 560. The effective cycle time of 48.9 seconds is the honest one for planning, because it includes the 40 minutes of downtime. And the net figure is longer than the stopwatch figure for a reason you can find. At 42 seconds a piece, 515 pieces use 21,630 seconds. The shift ran 22,800. The other 1,170 seconds, 19.5 minutes, went on short stops and slow cycles that nobody timed. In OEE terms, performance is 36 x 515 / 22,800 = 81.3%.

That is the main reason to time the shift as well as the cycle: the stopwatch number never includes the things that go wrong. Cycle time should not come out shorter than the ideal. If it does, the ideal was set too slow, and the OEE score looks better than the process is.

Cycle time of a line: the slowest station, not the sum

Take the bench into a line of four stations with cycle times of 38, 42, 35 and 40 seconds. Once the line is full and nothing is blocked or starved, a unit comes off at the pace of the slowest station. That is 42 seconds, station B. Station A can finish in 38, but it then waits, or its output piles up. The line's cycle time is 42 seconds and the bottleneck is B.

The sum of the four, 38 + 42 + 35 + 40 = 155 seconds, is a different number. It is the work content in one unit, and it is not the line's cycle time. Divide it by takt time to estimate the people the line needs: 155 / 45 = 3.4, so four people. That is the idea behind line balancing. Do not add the station cycle times and call the total the cycle time. If you do, a four station line looks like it is four times slower than it is.

Line cycle time is the slowest station, not the total

Example numbers
  • Station cycle time
  • Slowest station, sets the line
  • Takt time, 45 s
  1. A Cut and prep: 38 s

  2. B Seal and screw: 42 sSets the line pace

  3. C Label: 35 s

  4. D Test and pack: 40 s

Line cycle time: 42 sWork content: 38 + 42 + 35 + 40 = 155 s

Four stations with cycle times A Cut and prep 38 seconds, B Seal and screw 42 seconds, C Label 35 seconds, D Test and pack 40 seconds. Station B is the slowest at 42 seconds, so the line finishes one unit every 42 seconds, which is inside the 45 second takt. Adding the four gives 155 seconds, which is the work content, not the line cycle time.

Once the line is full, a unit comes off every 42 s, because station B sets the pace. The 155 s total is the work in one unit, a different number with a different use: it is what you divide by takt to estimate how many people the line needs.

The time a single unit takes to cross the four stations, with the waiting between them, is throughput time. That is the territory of cycle time vs lead time. A fuller account of finding the slow station is in the bottleneck calculator.

How many cycles, and for how long

There is no single number. The bench above has a very stable cycle: eleven readings between 40 and 44 seconds. A small number of readings tells you its mean well. A job where the cycle ranges from 30 to 60 seconds needs many more, and the textbook way to work out how many is in how many cycles to time. Use it, or the time study sample size calculator, rather than guessing.

Two cautions. First, ten cycles in a row all come from the same few minutes. If the job changes between the start and the end of a shift (a new box of parts, a tired operator, a cold machine), time on different days and shifts too. Second, a long cycle, one that takes ten minutes or involves a team, gives you far fewer readings in an hour, so timing long cycles and team work needs its own plan.

Common errors that make the number wrong

  • Timing from different events each cycle. If the clock starts at the operator's first touch one time and at the part landing the next, the numbers do not line up.
  • Using the machine's rated time as the cycle time. The effective machine cycle time is longer, as the example shows.
  • Timing the best operator at their best hour. A standard for the job is not a record.
  • Dropping any reading that looks high. Drop only the ones with a logged cause outside the job.
  • Mixing products. A cycle time that averages two variants fits neither.
  • Counting a batch as one unit. If a cycle makes six, divide by six when you quote a per-unit time, and say so.
  • Adding station cycle times to get the line's cycle time. The line pace is the slowest station.
  • Comparing cycle time with takt time without checking they use the same time base. Takt time uses planned production time; cycle time on the stopwatch uses none.
  • Quoting the mean with no range. A mean of 42 s with a range of 40 to 44 and a mean of 42 s with a range of 30 to 60 are different jobs.

The people side

Someone standing with a stopwatch changes how people work, and operators know the numbers can end up in a standard. Tell the operator what you are measuring and why, show the sheet, and say that the aim is the method and not the person. Time several people, not only the fastest. Where you can, film the job and time from the video, which is less intrusive and can be checked by the operator afterwards. See time study from video, and how to conduct a time study for the whole procedure. This is general practice, not legal advice; some sites have agreements that set rules for timing work, so check yours.

Tools that help

A paper time study sheet and a stopwatch are enough for one bench. The cycle time calculator does the sum from your totals, and the takt time calculator gives the number to compare with. For longer studies, LeanSuite's Time and Motion Study drafts the element times from a video of the station on a timeline that links back to the footage, for you to check and certify, and line balancing sets the station cycle times against takt time.

Time and motion study software

Run a time study in LeanSuite

Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.

FAQ

Questions about how to measure cycle time

  1. Cycle time is the time a step takes to produce one unit, found by timing the work. The Lean Enterprise Institute defines it as the time required to produce a part or complete a process, as timed by actual measurement. It covers one step or one station. The time a unit spends in the whole process, waiting included, is lead time.

  2. Time it. Choose one event that ends each cycle, such as a finished unit landing on the chute, and time from that event to the same event on the next unit, over at least ten cycles. Set aside only readings with a logged outside cause and take the mean. As a rate check, cycle time is production time divided by units made.

  3. Cycle time is how often one step finishes a unit, for example 42 seconds. Lead time is how long a unit spends in the process from start to finish, including every wait, often days. A step can have a short cycle time while the unit sits in a pile for a week. Cutting piles shortens lead time, and speeding the step shortens cycle time.

  4. Ideal cycle time is the fastest time per part the process can sustain over the long run with no losses. OEE uses it as the benchmark for performance: ideal cycle time times total count, divided by run time. It comes from the design rate or a proven best run. Setting it too slow makes OEE look better than the process really is.

  5. Once the line is full and nothing is blocked or starved, the line's cycle time is the cycle time of its slowest station, which is the bottleneck. Four stations at 38, 42, 35 and 40 seconds give a line cycle time of 42 seconds. Adding them gives 155 seconds, which is the work content of one unit, not the line cycle time.

  6. There is no fixed number. A stable short cycle can be well described by about ten readings, while a variable job needs many more. The textbook method works out the number from the spread in your first readings and the accuracy you need. Time on different shifts and days too, because ten cycles in a row all come from the same few minutes.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.