Short answer
Cycle time is how long one cycle of the work takes, from one finished unit to the next. Measure it with a stopwatch or video over many cycles, from the same event every time, and leave out only the readings you can explain.
Cycle time is the time to produce one unit at a step, found by timing it, not by calculating it. Pick one event that marks the end of a cycle, such as a finished unit landing on the chute, and time from that event to the same event on the next unit. Time at least ten cycles under normal running, leave out only readings with a logged outside cause, and take the mean. Machine cycle time covers only the machine, operator cycle time covers the operator's work, and a line's cycle time is its slowest station. In the example here the bench averages 42.0 seconds against a takt time of 45.
Last reviewed:
What is cycle time?
One cycle: start and stop on the same event
Example numbers- 1. Pick the parts6 s
- 2. Fit the seal9 s
- 3. Drive the screws11 s
- 4. Leak test runs (machine, operator waits)10 s
- 5. Inspect, place on the chute6 s
- Cycle time42 s
One cycle at a bench is 42 seconds, from one finished unit landing on the chute to the next. The elements are Pick the parts 6 seconds, Fit the seal 9 seconds, Drive the screws 11 seconds, Leak test runs 10 seconds, Inspect, place on the chute 6 seconds. The leak test is a machine step and the operator waits for it.
Cycle time is the time it takes a step to produce one unit. The Lean Enterprise Institute's Lean Lexicon puts it as the time required to produce a part or complete a process, as timed by actual measurement. The last words matter. Nobody gets cycle time from a routing sheet or a drawing. You get it by watching the work and writing down the clock.
It is a rate seen from the other side. If a bench finishes a unit every 42 seconds, it makes 3,600 / 42 = 85.7 units an hour. Cycle time is the number you compare with takt time, the pace the customer sets, to see whether a step can keep up. It is also what you divide into a shift to find capacity, and the starting point for a standard time.
It is not lead time. Cycle time is about one step. Lead time is how long a unit spends in the whole process, waiting included, and is usually many times longer. That page works one part through both. This page is about getting the cycle time right in the first place.
How to measure cycle time, step by step
Most wrong cycle times are wrong at step one or two, before anyone presses the stopwatch. Fix the definition first, then time.
- 1
Define the cycle and the product
Write down which job, which product or variant, which station, and what one cycle produces: one unit, one tray of six, one pallet. Two variants with different cycle times need two sets of readings.
- 2
Choose one start and stop event
Pick an event you can see clearly and that happens once per cycle: the finished unit landing on the chute, the machine door closing, the operator's hand leaving the fixture. Time from that event to the same event on the next unit. Because the stop of one cycle is the start of the next, no time falls between cycles.
- 3
Time under normal running
Choose a time when materials are there, the machine is warm and the usual person is working at the usual pace. Do not pick the best hour. Do not wait for a bad one either. Note the date, shift, operator and any odd condition on the sheet.
- 4
Time enough cycles and write each one down
Record every cycle in order, not a running average. At least ten for a stable, short cycle is a common starting point. How many cycles to time gives the method for working out the number the job actually needs.
- 5
Log what interrupts, then decide about the reading
When something outside the job happens (a part runs out, a forklift blocks the aisle, someone asks a question), write what happened next to that cycle. Afterwards, set aside only readings that have a logged cause outside the job. Count the interruption separately as a stop.
- 6
Take the mean and check the spread
Add the kept readings and divide by how many there are. Look at the lowest and highest. A tight spread means the cycle is stable. A wide one means the method varies, and the mean hides that. Report the mean together with the range.
Machine, operator, effective and line cycle time
The same word is used for several different times, and mixing them is the quickest way to argue about numbers for an hour. Say which one you mean.
| Name | What it covers | How you get it | In the example |
|---|---|---|---|
| Machine cycle time | The machine finishing all its operations on one piece (Lean Lexicon) | Time the machine from start to finish with nobody touching it | 18 s |
| Operator cycle time | The operator doing every element at the station before starting again (Lean Lexicon) | Watch the operator and time the repeating sequence | Set by the job, measured per station |
| Effective machine cycle time | Machine cycle plus load and unload plus the changeover share per piece (Lean Lexicon) | Machine + load and unload + changeover time / pieces between changeovers | 18 + 8 + 600 / 300 = 28 s |
| Station cycle time | How often the station finishes a unit, whoever or whatever does the work | Time from one finished unit to the next | 42 s at the bench below |
| Line cycle time | How often the whole line finishes a unit | The slowest station's cycle time, once the line is full | 42 s for the four stations below |
The 18 + 8 + 600 / 300 line follows the Lean Lexicon's formula for effective machine cycle time, with made-up numbers.
Machine cycle time and effective machine cycle time
Example numbers- Machine cycle18 s
- Load and unload8 s
- Changeover share2 s
Effective machine cycle time
18 + 8 + 600 / 300 = 28 sA machine runs 18 seconds on its own, needs 8 seconds of loading and unloading, and loses a 600 second changeover spread over 300 pieces, which is 2 seconds a piece. The effective machine cycle time is 28 seconds.
The gap between the first and third rows is where capacity plans go wrong. A machine rated at 18 seconds does not make a part every 18 seconds in real running. It has to be loaded, unloaded and changed over. If you plan from 18 you promise capacity the machine does not have. A job where the operator works while the machine runs is covered by the man machine chart.
Worked example: twelve cycles at a bench
Illustrative numbers. A bench fits a seal, drives the screws, runs a leak test and places the unit on a chute. The operator picks parts (6 s), fits the seal (9 s), drives the screws (11 s), waits for a 10 second automatic leak test, and inspects and places the unit (6 s). The clock starts when a unit lands on the chute and stops when the next one does: 6 + 9 + 11 + 10 + 6 = 42 seconds on a clean cycle. An observer timed twelve cycles in a row.
| Reading | Result |
|---|---|
| Cycles timed, in order (s) | 41, 43, 42, 40, 44, 42, 41, 43, 64, 42, 41, 43 |
| Sum and mean of all twelve | 526 s, 526 / 12 = 43.8 s |
| Note on cycle 9 | 64 s: the operator walked off to fetch a carton |
| Sum and mean of the other eleven | 462 s, 462 / 11 = 42.0 s |
| Range of the eleven | 40 s to 44 s |
| Effect of keeping cycle 9 | Mean 43.8 s instead of 42.0 s, 4.4% higher |
Cycle 9 is the interesting one. It is 22 seconds over the mean, and it has a cause that is not part of the job: the operator went for packaging. The rule here is simple. A reading is set aside only when there is a note saying what happened outside the work. It is not set aside because it looks high. If there had been no note, the 64 would stay in, and the next question would be what happened. The carton fetch does not vanish either. It goes on the interruption log as a stop of about 22 seconds, because it still costs the shift time.
Twelve timed cycles, one with a reason
Example numbers- Cycle reading
- Logged interruption, set aside
- Mean of the 11 clean cycles, 42.0 s
Cycle number, seconds on each bar.
Twelve cycle readings in seconds: 41, 43, 42, 40, 44, 42, 41, 43, 64, 42, 41, 43. Eleven fall between 40 and 44 seconds. The ninth, 64 seconds, has a logged cause: the operator fetched a carton. The mean of all twelve is 43.8 seconds. The mean of the eleven is 42 seconds.
Ideal, observed, net and effective cycle time
A stopwatch gives you the observed cycle time. For capacity and for OEE you need to say how it relates to three other numbers. OEE.com defines ideal cycle time as the fastest time per part a process can sustain over the long run with no losses, and cycle time as the measured time per part while running. It also defines an effective cycle time, which adds downtime. Sources differ on how to set the ideal: some take it from the design or nameplate rate and some from the best run you can show over a long stretch. Whichever you use, write it down and keep it fixed, or the OEE trend means nothing.
| Measure | How it is found | Result |
|---|---|---|
| Ideal cycle time | Fastest sustained time per unit, from the design rate or a proven best run | 36 s |
| Observed cycle time | Mean of the clean stopwatch readings | 42.0 s |
| Net cycle time | Run time / pieces made: 22,800 s / 515 | 44.3 s |
| Effective cycle time | Planned production time / pieces made: 25,200 s / 515 | 48.9 s |
Shift of 450 minutes with a 30 minute break and 40 minutes of downtime. Planned time 420 minutes, run time 380 minutes, takt time 25,200 / 560 = 45 s.
Four numbers called cycle time, and where each sits
Example numbers- Takt time, 45 s
Ideal: 36 sFastest sustained, no losses
Observed mean: 42 sStopwatch, 11 clean cycles
Net (run time): 44.3 s22,800 s / 515 pieces
Effective: 48.9 s25,200 s / 515 pieces
Four bars against a takt time of 45 seconds. Ideal: 36 seconds. Observed mean: 42 seconds. Net (run time): 44.3 seconds. Effective: 48.9 seconds. The first three are left of takt. The effective cycle time, which includes the 40 minutes of downtime, is right of it, so the shift made 515 pieces and not the 560 needed.
Read the ladder from the top. The bench has a stopwatch cycle of 42.0 seconds, which beats the 45 second takt time, so on a good minute it keeps up. But over the shift it made 515 pieces and needed 560. The effective cycle time of 48.9 seconds is the honest one for planning, because it includes the 40 minutes of downtime. And the net figure is longer than the stopwatch figure for a reason you can find. At 42 seconds a piece, 515 pieces use 21,630 seconds. The shift ran 22,800. The other 1,170 seconds, 19.5 minutes, went on short stops and slow cycles that nobody timed. In OEE terms, performance is 36 x 515 / 22,800 = 81.3%.
That is the main reason to time the shift as well as the cycle: the stopwatch number never includes the things that go wrong. Cycle time should not come out shorter than the ideal. If it does, the ideal was set too slow, and the OEE score looks better than the process is.
Cycle time of a line: the slowest station, not the sum
Take the bench into a line of four stations with cycle times of 38, 42, 35 and 40 seconds. Once the line is full and nothing is blocked or starved, a unit comes off at the pace of the slowest station. That is 42 seconds, station B. Station A can finish in 38, but it then waits, or its output piles up. The line's cycle time is 42 seconds and the bottleneck is B.
The sum of the four, 38 + 42 + 35 + 40 = 155 seconds, is a different number. It is the work content in one unit, and it is not the line's cycle time. Divide it by takt time to estimate the people the line needs: 155 / 45 = 3.4, so four people. That is the idea behind line balancing. Do not add the station cycle times and call the total the cycle time. If you do, a four station line looks like it is four times slower than it is.
Line cycle time is the slowest station, not the total
Example numbers- Station cycle time
- Slowest station, sets the line
- Takt time, 45 s
A Cut and prep: 38 s
B Seal and screw: 42 sSets the line pace
C Label: 35 s
D Test and pack: 40 s
Four stations with cycle times A Cut and prep 38 seconds, B Seal and screw 42 seconds, C Label 35 seconds, D Test and pack 40 seconds. Station B is the slowest at 42 seconds, so the line finishes one unit every 42 seconds, which is inside the 45 second takt. Adding the four gives 155 seconds, which is the work content, not the line cycle time.
The time a single unit takes to cross the four stations, with the waiting between them, is throughput time. That is the territory of cycle time vs lead time. A fuller account of finding the slow station is in the bottleneck calculator.
How many cycles, and for how long
There is no single number. The bench above has a very stable cycle: eleven readings between 40 and 44 seconds. A small number of readings tells you its mean well. A job where the cycle ranges from 30 to 60 seconds needs many more, and the textbook way to work out how many is in how many cycles to time. Use it, or the time study sample size calculator, rather than guessing.
Two cautions. First, ten cycles in a row all come from the same few minutes. If the job changes between the start and the end of a shift (a new box of parts, a tired operator, a cold machine), time on different days and shifts too. Second, a long cycle, one that takes ten minutes or involves a team, gives you far fewer readings in an hour, so timing long cycles and team work needs its own plan.
Common errors that make the number wrong
- Timing from different events each cycle. If the clock starts at the operator's first touch one time and at the part landing the next, the numbers do not line up.
- Using the machine's rated time as the cycle time. The effective machine cycle time is longer, as the example shows.
- Timing the best operator at their best hour. A standard for the job is not a record.
- Dropping any reading that looks high. Drop only the ones with a logged cause outside the job.
- Mixing products. A cycle time that averages two variants fits neither.
- Counting a batch as one unit. If a cycle makes six, divide by six when you quote a per-unit time, and say so.
- Adding station cycle times to get the line's cycle time. The line pace is the slowest station.
- Comparing cycle time with takt time without checking they use the same time base. Takt time uses planned production time; cycle time on the stopwatch uses none.
- Quoting the mean with no range. A mean of 42 s with a range of 40 to 44 and a mean of 42 s with a range of 30 to 60 are different jobs.
The people side
Someone standing with a stopwatch changes how people work, and operators know the numbers can end up in a standard. Tell the operator what you are measuring and why, show the sheet, and say that the aim is the method and not the person. Time several people, not only the fastest. Where you can, film the job and time from the video, which is less intrusive and can be checked by the operator afterwards. See time study from video, and how to conduct a time study for the whole procedure. This is general practice, not legal advice; some sites have agreements that set rules for timing work, so check yours.
Tools that help
A paper time study sheet and a stopwatch are enough for one bench. The cycle time calculator does the sum from your totals, and the takt time calculator gives the number to compare with. For longer studies, LeanSuite's Time and Motion Study drafts the element times from a video of the station on a timeline that links back to the footage, for you to check and certify, and line balancing sets the station cycle times against takt time.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- Takt Time and JIT: Matching Production to DemandThe pace that cycle time is compared with.
- The Four Types of Lead TimeHow the time of one step relates to the time a unit spends in the process.
- How to Improve Throughput TimeWhat to do once the cycle times and the slowest station are known.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- OEE calculatorOverall equipment effectiveness from shift time, downtime, ideal cycle time and part counts.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video. You check it and certify it.
See Time and Motion StudyLine balancing
Station cycle times set against takt time, to see which station holds the line back and how to even out the work.
See Line balancing
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about how to measure cycle time
Cycle time is the time a step takes to produce one unit, found by timing the work. The Lean Enterprise Institute defines it as the time required to produce a part or complete a process, as timed by actual measurement. It covers one step or one station. The time a unit spends in the whole process, waiting included, is lead time.
Time it. Choose one event that ends each cycle, such as a finished unit landing on the chute, and time from that event to the same event on the next unit, over at least ten cycles. Set aside only readings with a logged outside cause and take the mean. As a rate check, cycle time is production time divided by units made.
Cycle time is how often one step finishes a unit, for example 42 seconds. Lead time is how long a unit spends in the process from start to finish, including every wait, often days. A step can have a short cycle time while the unit sits in a pile for a week. Cutting piles shortens lead time, and speeding the step shortens cycle time.
Ideal cycle time is the fastest time per part the process can sustain over the long run with no losses. OEE uses it as the benchmark for performance: ideal cycle time times total count, divided by run time. It comes from the design rate or a proven best run. Setting it too slow makes OEE look better than the process really is.
Once the line is full and nothing is blocked or starved, the line's cycle time is the cycle time of its slowest station, which is the bottleneck. Four stations at 38, 42, 35 and 40 seconds give a line cycle time of 42 seconds. Adding them gives 155 seconds, which is the work content of one unit, not the line cycle time.
There is no fixed number. A stable short cycle can be well described by about ten readings, while a variable job needs many more. The textbook method works out the number from the spread in your first readings and the accuracy you need. Time on different shifts and days too, because ten cycles in a row all come from the same few minutes.
Related guides and tools
- Cycle time vs lead time: one part followed through six steps
- Takt time: the pace to compare cycle time with
- How many cycles to time: the number of readings
- Stopwatch time study: the full method
- How to conduct a time study: the procedure around the timing
- Standard time: from observed cycle time to a standard
- OEE calculation: where ideal cycle time is used
- Line balancing: station cycle times set against takt time
- Time study from video: timing without standing over the operator
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.