Skip to content
LeanSuite

Yamazumi chart: how to build one from a time study and how to read it

Short answer

A yamazumi chart is a stacked bar chart of the work on a line. Each bar is one operator, each block is one work element, and a line marks takt time. It shows who is overloaded, who is waiting and where the waste is.

To build a yamazumi chart, time every work element at each operator, label each element as value-added, necessary or waste, and stack the elements into one bar per operator in the order they are done. Then draw the takt line across the bars. A bar above the line cannot keep up with demand. A bar well below it is waiting. In the example on this page, four operators carry 56, 94, 49 and 36 seconds of work against a 72 second takt, so the second operator sets the pace of the whole cell.

Last reviewed:

What is a yamazumi chart?

How to read the parts of a yamazumi chart

Example numbers
Yamazumi chart of a four-operator cell with numbered calloutsFour operators carrying 56, 94, 49, 36 seconds against a takt of 72 seconds. Callouts mark a bar, a block, a waste block, the takt line, a total and the gap under takt.020406080100s12345Op 16789101112Op 213141516Op 318192021Op 4Takt72 s56 s94 s49 s36 s123456
  1. 1A bar is one operator. Its height is that person's work for one unit.
  2. 2A block is one work element. Its height is the element's time. The number matches the element log.
  3. 3The colour is the type of work. Dark is value-added, light is necessary, hatched yellow is waste.
  4. 4The takt line is the limit. Available time divided by demand. Here 72 seconds.
  5. 5The total says who is over. Operator 2 carries 94 seconds, 22 more than takt.
  6. 6The gap is waiting. Operator 4 has 36 seconds of work and half of every cycle spare.
The chart is the hose reel cell from the worked example below. Match the six numbers on the chart to the list.

A yamazumi chart shows how the work on a line is shared between the people who do it. Every operator gets a bar. The bar is built from blocks, one for each work element that person does, and the height of a block is the time the element takes. Stack the blocks and the height of the bar is that operator's work for one unit.

Yamazumi is Japanese for piling up, from yama, mountain, and tsumi, a pile. The name describes the picture: work elements heaped on top of each other until you can see whose heap is too high.

The chart exists because a list of times does not show balance. Twenty-one element times in a table tell you very little. The same numbers as four bars beside a takt time line tell you in a few seconds which operator is holding the line back, who has spare time, and where the waste sits.

You will also hear it called an operator balance chart. The Lean Enterprise Institute's Lean Lexicon lists yamazumi board and operator loading diagram as other names for the same tool. In day-to-day use, people tend to say yamazumi when each bar is broken into coloured elements, and operator balance chart when each bar is one solid total. The difference matters less than it sounds, and there is a comparison further down.

What a yamazumi chart shows

Six things are on every good chart. Miss one and the chart gets harder to act on.

The parts of a yamazumi chart
PartWhat it isWhat it tells you
A barOne operator, or one station if a station has one personThat person's work for one unit
A blockOne work element, as tall as its timeWhich pieces of work make up the load, and which are big enough to matter
The colour of a blockValue-added, necessary but not value-added, or wasteHow much of the load you could remove without touching the product
The takt lineAvailable time divided by demand, drawn across all the barsThe most work any one person can carry and still keep up with demand
The total on each barThe element times added upWho is over takt, and by how many seconds
The gap under the lineTakt minus the bar's totalTime that operator spends waiting each cycle

The colours are a convention. Many plants use green, yellow and red. The charts on this page use dark, light and hatched yellow so they also read in black and white.

Some charts carry a second line a little below takt, for the time the line really has per unit once small stops are taken off. On this page it is drawn as a dashed line.

When to use one, and when not to

  • Use it when a line misses its output and you do not know which station is the cause.
  • Use it before and after a line balancing exercise, to show the split you have and the split you want.
  • Use it when takt changes and you need to decide how many operators the line should run with.
  • Use it in a kaizen event, on the wall, so the team can move elements between bars with their own hands.
  • Use it to show a manager why a line needs a fixture or a parts rack: the waste blocks make the case better than a paragraph does.

It is the wrong tool when the limit is a machine and not a person. A yamazumi stacks operator work. A slow oven or an automatic tester will not show up on it, and you need a process capacity sheet or a bottleneck check for that. It is also a poor fit for work that does not repeat, because there is no stable set of elements to stack.

How to build a yamazumi chart from a time study

The chart is the last ten minutes of the job. The work is in the timing. If you already have a time and motion study of the line with the elements broken out, you can start at step 5.

From a time study to the chart in eight steps

  1. 1

    Tell the operators what you are doing

  2. 2

    Break each job into elements

  3. 3

    Time each element over several cycles

  4. 4

    Put occasional work in as an average

  5. 5

    Label every element

  6. 6

    Stack the bars

  7. 7

    Draw the takt line

  8. 8

    Check it at the line

Steps 2 to 5 are the time study. The chart itself is steps 6 and 7.
  1. 1

    Tell the operators what you are doing

    Say what the study is for and that you are timing the work, not judging the person. Ask them to work at their normal pace and to show you the awkward parts. A chart built behind people's backs gets argued with, not used.

  2. 2

    Break each job into elements

    Watch a few cycles before you time anything. List the elements in the order they are done, with a clear start and end for each. Keep walking, waiting, searching and rework as their own elements. Aim for elements of a few seconds or more: anything shorter is hard to time by hand and too small to move.

  3. 3

    Time each element over several cycles

    Record at least ten cycles per operator and pick a time for each element that a trained person can repeat all shift. Note the odd cycles and why they happened. If your plant uses a standard time with rating and allowances, use it for every operator or for none.

  4. 4

    Put occasional work in as an average

    Some work does not happen every cycle: changing a reel of labels, clearing a jam, reworking a reject. Divide its time by how often it happens and add it as its own block. A rework that takes 80 seconds on one unit in ten is 8 seconds a unit.

  5. 5

    Label every element

    Value-added changes the product in a way the customer would pay for. Necessary does not, but today's process needs it, such as loading a fixture or a required test. Waste is everything else: walking, waiting, searching, double handling, rework.

  6. 6

    Stack the bars

    One bar per operator, elements from the bottom up in the order they are done. Draw each block to scale and write the element number in it. On paper, cut strips of card to scale so they can be moved. In a spreadsheet, use a stacked column chart with one series per element.

  7. 7

    Draw the takt line

    Takt is available time divided by demand. Draw it across all the bars and write the number on it. If the line loses time to small stops, add a second line at the time you really have per unit.

  8. 8

    Check it at the line

    Take the chart to the operators and ask what is missing. The first version always leaves something out. Fix it, date it and put it where the team meets.

The free yamazumi and operator balance chart template has the element table and the stacked chart set up. A time study sheet holds the raw timings.

Worked example: from 21 timed elements to the chart

Illustrative example. A four-person cell assembles a garden hose reel. It works one shift with 450 minutes available, which is 27,000 seconds, and customers take 375 reels a day. Takt time is 27,000 / 375 = 72 seconds. The cell has been finishing about 285 reels a shift and making up the rest on overtime.

The element log

A time study of the four operators gives 21 elements. This table is the whole input to the chart.

Illustrative: the element log for the hose reel cell
No.OperatorWork elementTime (s)Type
11Pick side frames from the tote, load the fixture9Necessary
21Press in axle bushings14Value-added
31Fit drum onto axle14Value-added
41Walk to the rack for handle kits7Waste
51Fit crank handle12Value-added
62Take hose coil out of its bag9Waste
72Fit inlet connector to drum15Value-added
82Crimp hose to connector18Value-added
92Search the mixed bin for the right hose guide10Waste
102Wind hose onto drum22Value-added
112Re-seat connector after a failed leak test (average per unit)8Waste
122Fit hose guide12Value-added
133Connect reel to the leak test rig10Necessary
143Leak test: hold and read the gauge16Necessary
153Disconnect and wipe dry8Necessary
163Fit spray nozzle10Value-added
173Clip on wall bracket kit5Value-added
184Label and final visual check8Necessary
194Erect carton10Necessary
204Box the reel with the leaflet9Necessary
214Carry carton to the pallet9Waste
Total21 elements235

Element 11 does not happen every cycle. About one reel in ten fails the leak test and takes 80 s to put right, so it goes in at 8 s a unit.

Stack one bar

Take operator 2. Seven elements, stacked in the order they are done: 9, then 15 on top makes 24, then 42, 52, 74, 82 and 94 seconds. The bar crosses the 72 second takt line partway through winding the hose, with two elements still to go.

From the element log to one bar: operator 2

Example numbers
No.ElementsStack
6Take hose coil out of its bagWaste99
7Fit inlet connector to drumValue-added1524
8Crimp hose to connectorValue-added1842
9Search the mixed bin for the right hose guideWaste1052
10Wind hose onto drumValue-added2274
11Re-seat connector after a failed leak test (average per unit)Waste882
12Fit hose guideValue-added1294
Operator 2's bar, stacked from seven elementsSeven blocks stacked to 94 seconds: element 6, 9 seconds, reaching 9; element 7, 15 seconds, reaching 24; element 8, 18 seconds, reaching 42; element 9, 10 seconds, reaching 52; element 10, 22 seconds, reaching 74; element 11, 8 seconds, reaching 82; element 12, 12 seconds, reaching 94. Takt is 72 seconds.697248429521074118212Takt72 s94 s22 s over takt
Each line of the log becomes a block as tall as its time, stacked in the order the work is done. The running total is the height of the stack so far. The bar passes the takt line during element 10.

Add up each operator

Illustrative: each operator's load by type, against a 72 s takt
OperatorValue-added (s)Necessary (s)Waste (s)Total (s)Against takt
140975616 s under
2670279422 s over
3153404923 s under
402793636 s under
Cell1227043235

Value-added is 122 / 235 = 51.9% of the work, necessary 29.8% and waste 18.3%.

What the chart says

  • Operator 2 is 22 seconds over takt. The cell can only go as fast as its slowest person, so it makes one reel every 94 seconds: 27,000 / 94 = 287 a shift, 88 short of the 375 customers want. That matches what the cell has been finishing.
  • The other three wait. At a 94 second pace the four operators are paid for 4 x 94 = 376 seconds per reel and work for 235. The other 141 seconds are waiting.
  • The overloaded bar is also the one with the most waste. Operator 2 carries 27 of the cell's 43 waste seconds: unbagging, searching and rework. Take those out and the bar drops to 67, under takt, before a single element has moved.
  • The cell has enough people. Work content divided by takt is 235 / 72 = 3.26, so four is the right number for the work as it is done today. The problem is the split and the waste, not the headcount.
  • Operator 3's bar is mostly necessary work around the leak test. It is under takt today, but those 34 seconds are the next place to look once the waste is gone.

How to read a yamazumi chart

Read the chart in the same order every time. It stops you jumping to the most colourful block.

  1. 1

    Find the tallest bar

    The tallest bar sets the pace of the line. If it is above takt, the line cannot meet demand in normal hours, and nothing you do to the other bars will change that.

  2. 2

    Look at the gaps under the line

    Each gap is waiting. Large gaps next to a tall bar mean the work is badly shared. Gaps on every bar mean the line has more people than the work needs.

  3. 3

    Add the bars and divide by takt

    Total work content divided by takt, rounded up, is the fewest operators the line could run with. Compare it with the number of bars on the chart.

  4. 4

    Read the colours on the tall bars first

    Waste on an overloaded bar is the cheapest fix on the chart. Remove it before you move any work, or you will hand the waste to someone else.

  5. 5

    Then look for what to move

    Find elements at the top or bottom of a tall bar that the neighbouring operator could take without breaking the sequence or needing a tool they do not have. Small elements move easily. A big element may need splitting.

  6. 6

    Check the result against takt with a margin

    After the moves, every bar should sit just under the line. The Lean Lexicon describes the aim as work for each operator that is very nearly equal to takt but slightly less.

Read the colours on the tall bar first

Example numbers
Operator 2 with and without the waste elementsOperator 2 today at 94 seconds, and with 27 seconds of waste removed at 67 seconds, against a takt of 72 seconds.020406080100s6789101112Op 2 today781012Waste outTakt72 s94 s67 s
  1. 6Take hose coil out of its bag9 s
  2. 9Search the mixed bin for the right hose guide10 s
  3. 11Re-seat connector after a failed leak test (average per unit)8 s
  4. 94 minus 2767 s
Operator 2 is 22 seconds over takt. Before any work moves to a neighbour, take out the three hatched blocks. The bar lands at 67 seconds, under takt with nothing handed to anyone else.

The order of fixes follows from that reading: take out waste, then shrink the necessary work, then move work between people, and only then think about adding a person. Each step is cheaper than the next.

Six shapes a yamazumi chart makes, and what each one means

After a few charts you start to recognise the outline before you read a number. These are the six you will meet most. Each example has five operators and a 60 second takt.

Six shapes to recognise

Example numbers

One tall bar

One tall bar: a yamazumi shapeFive operators carrying 50, 52, 74, 48, 46 seconds against a takt of 60 seconds.5052744846

A bottleneck. Right crew, wrong split.

270 ÷ 60 = 4.5, needs 5

Staircase

Staircase: a yamazumi shapeFive operators carrying 58, 50, 42, 34, 26 seconds against a takt of 60 seconds.5850423426

Work piled at one end. The last people wait.

210 ÷ 60 = 3.5, needs 4

Sawtooth

Sawtooth: a yamazumi shapeFive operators carrying 58, 30, 57, 31, 56 seconds against a takt of 60 seconds.5830573156

Heavy and light jobs alternate.

232 ÷ 60 = 3.87, needs 4

All low

All low: a yamazumi shapeFive operators carrying 38, 41, 36, 40, 37 seconds against a takt of 60 seconds.3841364037

Balanced, with more people than the work needs.

192 ÷ 60 = 3.2, needs 4

All over the line

All over the line: a yamazumi shapeFive operators carrying 66, 63, 68, 64, 67 seconds against a takt of 60 seconds.6663686467

A capacity problem. Moving work will not fix it.

328 ÷ 60 = 5.47, needs 6

Level, one short bar

Level, one short bar: a yamazumi shapeFive operators carrying 57, 56, 57, 56, 26 seconds against a takt of 60 seconds.5756575626

The target. The spare time is in one visible place.

252 ÷ 60 = 4.2, needs 5

Takt 60 sOver takt

Every chart has five operators and a 60 second takt. Add the bars and divide by takt before you decide what a shape means: the staircase and the sawtooth both hide a spare operator, and the tall bar does not.
Illustrative: six yamazumi shapes with a 60 s takt
ShapeOperator loads (s)Work content / taktWhat it meansFirst move
One tall bar50, 52, 74, 48, 46270 / 60 = 4.5, needs 5One station is the bottleneck. The crew size is right and the split is wrongTake waste out of the tall bar, then move its smallest elements to the neighbours
Staircase58, 50, 42, 34, 26210 / 60 = 3.5, needs 4The work is piled at one end. The last operators wait most of every cycleFill the bars from the front to just under takt and free the last operator
Sawtooth58, 30, 57, 31, 56232 / 60 = 3.87, needs 4Heavy and light stations alternate, often because stations were built around machinesCombine the two light jobs into one operator, or hand each of them work from the heavy bars either side
All low38, 41, 36, 40, 37192 / 60 = 3.2, needs 4The line is balanced but has more people than the work needs, often after demand fellRebalance to four operators at about 48 seconds each
All over the line66, 63, 68, 64, 67328 / 60 = 5.47, needs 6This is a capacity problem and no amount of moving work will fix itRemove work content, or add a sixth operator
Level with one short bar57, 56, 57, 56, 26252 / 60 = 4.2, needs 5The target. Four operators are just under takt and the spare time is in one visible placeAim the next kaizen at the 26 seconds on the short bar

The last shape surprises people who expect a good chart to be perfectly flat. Spreading the spare time evenly hides it: five people each wait a little and nobody notices. Putting it on one bar makes it obvious, and it gives the team a clear goal, which is to find enough improvement to free that person for other work.

Using the chart in a kaizen: the hose reel cell after

A yamazumi earns its keep when the team changes it. In a kaizen event, put the chart on the wall with each element on its own strip, and let the operators propose the moves. Then try them at the line the same day.

On the hose reel cell the team went after the yellow blocks first.

Illustrative: the five waste elements and what removed them
ElementWasteTime (s)What the team changed
4Walk to the rack for handle kits7Handle kits moved to a flow rack at the bench
6Take hose coil out of its bag9Hose now arrives unbagged on a peg cart
9Search the mixed bin for the right hose guide10One guide type per lane in a divided bin
11Re-seat connector after a failed leak test8Crimp die reset, with a go/no-go gauge check at the press
21Carry carton to the pallet9Pallet moved next to the packing bench
Total43

That leaves 235 minus 43 = 192 seconds of work. Divided by takt, 192 / 72 = 2.67, so three operators can carry it. The team then restacked the 16 remaining elements into three bars, keeping the build sequence.

Illustrative: the hose reel cell with three operators
OperatorElementsTotal (s)Against takt
11, 2, 3, 5, 7648 s under
28, 10, 12, 136210 s under
314 to 20666 s under
Cell16 elements192

Balance efficiency against takt is 192 / (3 x 72) = 88.9%. Value-added work is now 122 / 192 = 63.5% of the total.

The hose reel cell before and after the kaizen

Example numbers

Before: 4 operators, 235 s of work

Yamazumi chart before the kaizenFour operators carrying 56, 94, 49, 36 seconds against a takt of 72 seconds. Operator 2 is over takt.020406080100s12345Op 16789101112Op 213141516Op 318192021Op 4Takt72 s56 s94 s49 s36 s

After: 3 operators, 192 s of work

Yamazumi chart after the kaizenThree operators carrying 64, 62, 66 seconds against a takt of 72 seconds. All are under takt and under 68.4 seconds.020406080100s12357Op 18101213Op 2141516181920Op 3Takt72 s64 s62 s66 s
  • Value-added
  • Necessary, not value-added
  • Waste
  • Takt 72 s
  • 68.4 s per unit after stoppages
  • Numbers in the blocks are element numbers; totals in red are over 68.4 s.
Operators
4 to 3
Tallest bar
94 s to 66 s
Waste per reel
43 s to 0 s
Reels a shift at that pace
287 to 409
The yellow blocks are gone, the 16 elements that remain are restacked into three bars, and every bar is under the dashed line. Nobody works faster: the tallest bar fell from 94 seconds to 66.

Check the margin before you celebrate. The cell loses about 5% of the shift to small stops, so the time it really has per reel is 72 x 0.95 = 68.4 seconds. The longest bar is 66, which fits. With no stops at all the cell could make 27,000 / 66 = 409 reels a shift. On a normal day it makes 25,650 / 66 = 388 against a demand of 375, with no overtime.

One operator is now free. Decide where that person goes before the event starts, and say it out loud: another line, the next kaizen team, training as a relief operator. If people believe a yamazumi ends with someone losing their job, the next time study will find every job mysteriously takes longer.

Yamazumi chart vs operator balance chart vs line balancing chart

These three get used as if they were one chart. They share a takt line and a set of bars, and they answer slightly different questions.

Yamazumi chart, operator balance chart and line balancing chart compared
Yamazumi chartOperator balance chartLine balancing chart
Each bar isOne operator, stacked from individual elementsOne operator, usually a single totalOne station, as assigned by a balancing method
Colour showsValue-added, necessary and wasteOften nothing, or before against afterOften nothing, or idle time
Compared withTakt timeTakt timeThe cycle time the line is balanced to
Question it answersWho is overloaded, and what is the load made of?How should the work be shared so each person is just under takt?Does this assignment respect the sequence and fit the cycle time?
Built fromA time study with every element typedOperator cycle times, with or without elementsElement times and a precedence diagram
Used most inKaizen events and waste huntsDesigning a cell and its standard workEngineering a new line or a rebalance

The Lean Lexicon treats yamazumi board and operator balance chart as names for one tool. The split in this table is how the words are commonly used on the floor.

The same cell drawn two ways

Example numbers

Operator balance chart: how big each load is

Operator balance chart with one solid bar per operatorFour solid bars of 56, 94, 49, 36 seconds against a takt of 72 seconds.020406080100sOp 1Op 2Op 3Op 4Takt72 s56 s94 s49 s36 s

Yamazumi chart: what each load is made of

Yamazumi chart with each bar stacked from typed elementsThe same four operators, each bar stacked from its work elements. Value-added 122 seconds, necessary 70 seconds, waste 43 seconds.020406080100s12345Op 16789101112Op 213141516Op 318192021Op 4Takt72 s56 s94 s49 s36 s
  • Value-added
  • Necessary, not value-added
  • Waste
The solid bars say operator 2 is over takt. The stacked bars say why: three hatched blocks of waste sit in that bar, and removing them alone brings it under the line.

In practice you often draw the same data twice. The solid bars tell you who is over. The stacked bars tell you why. And when the fix is more than a couple of obvious moves, the line balancing method with its precedence diagram tells you which moves are allowed.

A fourth chart is worth knowing. The standard work combination table takes one operator and lays their elements along a time axis, with manual work, walking and machine time drawn differently. A yamazumi compares people. A combination table shows how one person's cycle fits together with a machine.

A good yamazumi chart and a bad one

Most weak charts fail in the same few ways. Check yours against this before it goes on the wall.

What separates a useful yamazumi chart from a poor one
A poor chartA good chart
ElementsOne block per operator, or three vague ones such as "assemble"One block for each element you could move or remove, numbered to match the log
WasteWalking and waiting buried inside other elementsWalking, waiting, searching and rework as their own blocks, so they can be seen
TimesOne stopwatch cycle, or the standard from five years agoSeveral timed cycles, dated, with the basis written on the chart
Takt lineMissing, or last quarter's demandDrawn and labelled, with the demand and available time it came from
ScaleEach bar drawn to its own scaleOne shared axis that starts at zero
OrderBlocks sorted by size or by colourBlocks in the order the work is done, so a move can be judged
Where it livesIn a slide deckAt the line, where the team can argue with it
What happens nextNothingA named move, an owner and a date, then a new chart

What a yamazumi chart does not show

  • Variation. A bar is an average. A 66 second bar might be 60 on one cycle and 75 on the next, and the chart looks the same. Keep the range from the time study beside it.
  • Machine time. An operator's bar can be short because a machine is doing the work. The machine's cycle still has to fit takt, and the yamazumi will not tell you if it does.
  • The sequence rules. The chart will let you move any block anywhere. Whether the product can be built in that order is a question for the precedence diagram.
  • Strain. Two bars of equal height can be very different jobs. One might be light fitting and the other eight screws driven overhead. Check posture, force and repetition separately.
  • Skill. A block can only move to someone trained for it. Read the chart next to the skills matrix.
  • Quality. Nothing on the chart says whether the work is done right. A fast bar that makes rejects is not a good bar.

None of this is a reason not to draw one. It is a reason to treat the chart as the start of a conversation at the line and not as the answer.

Common mistakes

  • Moving work before removing waste. If you rebalance a line that is one fifth waste, you have carefully shared out the waste.
  • Loading every bar to exactly takt. With no margin, the first dropped part puts the line behind. Aim just under the line.
  • Timing the best operator. The chart then describes a line that only exists when that person is on every station.
  • Leaving out occasional work. Material changes, adjustments and rework are real time. Average them per unit and stack them.
  • Drawing it once. The chart is true for one product, one takt and one method. When any of them changes, the chart is out of date.
  • Using it to rank people. The bars show how work was assigned, not how hard anyone works. The moment it is used as a scorecard, the times stop being honest.

Templates and tools for yamazumi charts

If the timing is the part you never get to, LeanSuite's Line Balancing builds the chart from a video of the line. It times each operator's elements, charts every station against takt and lets you drag elements between operators to test a rebalance. You check the draft against the video before anyone acts on it.

Line balancing software

Balance a line in LeanSuite

One video of the line goes in. A Yamazumi chart against takt, and rebalancing scenarios you can test, come out.

FAQ

Questions about yamazumi chart

  1. Its purpose is to show how the work on a line is shared between operators, compared with takt time. Each operator's work elements are stacked into one bar, so you can see at a glance who is overloaded, who is waiting and how much of the work is waste. Teams use it to decide what to remove and which work to move.

  2. Take a four-person cell with a 72 second takt. The operators' bars are 56, 94, 49 and 36 seconds. The second bar is 22 seconds over takt, so it sets the pace of the cell, and 27 of its 94 seconds are waste. Removing the waste across the cell leaves 192 seconds, which three operators can carry at 64, 62 and 66 seconds.

  3. Yamazumi is a Japanese word for piling up or stacking, from yama, mountain, and tsumi, a pile. A yamazumi chart piles each operator's work elements into a bar, which is where the name comes from. You will also see it called a yamazumi board or an operator balance chart.

  4. The Lean Enterprise Institute's Lean Lexicon treats them as the same tool. In common use, a yamazumi chart breaks each bar into individual work elements coloured as value-added, necessary or waste, while an operator balance chart often shows one solid bar per operator against takt. The first shows what the load is made of. The second shows only how big it is.

  5. List the work elements in rows with their times and the operator who does each one. Put operators in columns and each element's time under its operator. Insert a stacked column chart with one series per element, colour the series by type, and add takt time as a horizontal line series. Keep the elements in the order the work is done.

  6. They show the type of each work element. The common convention is green for value-added work, yellow or orange for work that is necessary but adds no value, and red for waste such as walking, waiting and rework. The colours are a convention, not a standard, so always put a key on the chart.

  7. That operator has more work per unit than the time demand allows. The line can only run as fast as its slowest person, so it will fall short of demand, build a queue in front of that station or need overtime. Remove waste from that bar first, then move elements to operators who are under the line.

  8. No. Every bar should be just under takt, with a small margin for variation and stoppages. The Lean Lexicon describes the aim as work for each operator that is very nearly equal to takt but slightly less. Many teams also prefer to leave the spare time on one bar where it can be seen, not spread evenly across all of them.

  9. Update it whenever takt time, the product or the method changes, and after every improvement that removes or moves an element. A chart describes one product at one demand level with one way of working. Date every version so nobody balances a line from an old one.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.