Practical guide · Value stream mapping and flow
Yamazumi chart: how to build one from a time study and how to read it
Short answer
A yamazumi chart is a stacked bar chart of the work on a line. Each bar is one operator, each block is one work element, and a line marks takt time. It shows who is overloaded, who is waiting and where the waste is.
To build a yamazumi chart, time every work element at each operator, label each element as value-added, necessary or waste, and stack the elements into one bar per operator in the order they are done. Then draw the takt line across the bars. A bar above the line cannot keep up with demand. A bar well below it is waiting. In the example on this page, four operators carry 56, 94, 49 and 36 seconds of work against a 72 second takt, so the second operator sets the pace of the whole cell.
Last reviewed:
What is a yamazumi chart?
How to read the parts of a yamazumi chart
Example numbers- 1A bar is one operator. Its height is that person's work for one unit.
- 2A block is one work element. Its height is the element's time. The number matches the element log.
- 3The colour is the type of work. Dark is value-added, light is necessary, hatched yellow is waste.
- 4The takt line is the limit. Available time divided by demand. Here 72 seconds.
- 5The total says who is over. Operator 2 carries 94 seconds, 22 more than takt.
- 6The gap is waiting. Operator 4 has 36 seconds of work and half of every cycle spare.
A yamazumi chart shows how the work on a line is shared between the people who do it. Every operator gets a bar. The bar is built from blocks, one for each work element that person does, and the height of a block is the time the element takes. Stack the blocks and the height of the bar is that operator's work for one unit.
Yamazumi is Japanese for piling up, from yama, mountain, and tsumi, a pile. The name describes the picture: work elements heaped on top of each other until you can see whose heap is too high.
The chart exists because a list of times does not show balance. Twenty-one element times in a table tell you very little. The same numbers as four bars beside a takt time line tell you in a few seconds which operator is holding the line back, who has spare time, and where the waste sits.
You will also hear it called an operator balance chart. The Lean Enterprise Institute's Lean Lexicon lists yamazumi board and operator loading diagram as other names for the same tool. In day-to-day use, people tend to say yamazumi when each bar is broken into coloured elements, and operator balance chart when each bar is one solid total. The difference matters less than it sounds, and there is a comparison further down.
What a yamazumi chart shows
Six things are on every good chart. Miss one and the chart gets harder to act on.
| Part | What it is | What it tells you |
|---|---|---|
| A bar | One operator, or one station if a station has one person | That person's work for one unit |
| A block | One work element, as tall as its time | Which pieces of work make up the load, and which are big enough to matter |
| The colour of a block | Value-added, necessary but not value-added, or waste | How much of the load you could remove without touching the product |
| The takt line | Available time divided by demand, drawn across all the bars | The most work any one person can carry and still keep up with demand |
| The total on each bar | The element times added up | Who is over takt, and by how many seconds |
| The gap under the line | Takt minus the bar's total | Time that operator spends waiting each cycle |
The colours are a convention. Many plants use green, yellow and red. The charts on this page use dark, light and hatched yellow so they also read in black and white.
Some charts carry a second line a little below takt, for the time the line really has per unit once small stops are taken off. On this page it is drawn as a dashed line.
When to use one, and when not to
- Use it when a line misses its output and you do not know which station is the cause.
- Use it before and after a line balancing exercise, to show the split you have and the split you want.
- Use it when takt changes and you need to decide how many operators the line should run with.
- Use it in a kaizen event, on the wall, so the team can move elements between bars with their own hands.
- Use it to show a manager why a line needs a fixture or a parts rack: the waste blocks make the case better than a paragraph does.
It is the wrong tool when the limit is a machine and not a person. A yamazumi stacks operator work. A slow oven or an automatic tester will not show up on it, and you need a process capacity sheet or a bottleneck check for that. It is also a poor fit for work that does not repeat, because there is no stable set of elements to stack.
How to build a yamazumi chart from a time study
The chart is the last ten minutes of the job. The work is in the timing. If you already have a time and motion study of the line with the elements broken out, you can start at step 5.
From a time study to the chart in eight steps
- 1
Tell the operators what you are doing
- 2
Break each job into elements
- 3
Time each element over several cycles
- 4
Put occasional work in as an average
- 5
Label every element
- 6
Stack the bars
- 7
Draw the takt line
- 8
Check it at the line
- 1
Tell the operators what you are doing
Say what the study is for and that you are timing the work, not judging the person. Ask them to work at their normal pace and to show you the awkward parts. A chart built behind people's backs gets argued with, not used.
- 2
Break each job into elements
Watch a few cycles before you time anything. List the elements in the order they are done, with a clear start and end for each. Keep walking, waiting, searching and rework as their own elements. Aim for elements of a few seconds or more: anything shorter is hard to time by hand and too small to move.
- 3
Time each element over several cycles
Record at least ten cycles per operator and pick a time for each element that a trained person can repeat all shift. Note the odd cycles and why they happened. If your plant uses a standard time with rating and allowances, use it for every operator or for none.
- 4
Put occasional work in as an average
Some work does not happen every cycle: changing a reel of labels, clearing a jam, reworking a reject. Divide its time by how often it happens and add it as its own block. A rework that takes 80 seconds on one unit in ten is 8 seconds a unit.
- 5
Label every element
Value-added changes the product in a way the customer would pay for. Necessary does not, but today's process needs it, such as loading a fixture or a required test. Waste is everything else: walking, waiting, searching, double handling, rework.
- 6
Stack the bars
One bar per operator, elements from the bottom up in the order they are done. Draw each block to scale and write the element number in it. On paper, cut strips of card to scale so they can be moved. In a spreadsheet, use a stacked column chart with one series per element.
- 7
Draw the takt line
Takt is available time divided by demand. Draw it across all the bars and write the number on it. If the line loses time to small stops, add a second line at the time you really have per unit.
- 8
Check it at the line
Take the chart to the operators and ask what is missing. The first version always leaves something out. Fix it, date it and put it where the team meets.
The free yamazumi and operator balance chart template has the element table and the stacked chart set up. A time study sheet holds the raw timings.
Worked example: from 21 timed elements to the chart
Illustrative example. A four-person cell assembles a garden hose reel. It works one shift with 450 minutes available, which is 27,000 seconds, and customers take 375 reels a day. Takt time is 27,000 / 375 = 72 seconds. The cell has been finishing about 285 reels a shift and making up the rest on overtime.
The element log
A time study of the four operators gives 21 elements. This table is the whole input to the chart.
| No. | Operator | Work element | Time (s) | Type |
|---|---|---|---|---|
| 1 | 1 | Pick side frames from the tote, load the fixture | 9 | Necessary |
| 2 | 1 | Press in axle bushings | 14 | Value-added |
| 3 | 1 | Fit drum onto axle | 14 | Value-added |
| 4 | 1 | Walk to the rack for handle kits | 7 | Waste |
| 5 | 1 | Fit crank handle | 12 | Value-added |
| 6 | 2 | Take hose coil out of its bag | 9 | Waste |
| 7 | 2 | Fit inlet connector to drum | 15 | Value-added |
| 8 | 2 | Crimp hose to connector | 18 | Value-added |
| 9 | 2 | Search the mixed bin for the right hose guide | 10 | Waste |
| 10 | 2 | Wind hose onto drum | 22 | Value-added |
| 11 | 2 | Re-seat connector after a failed leak test (average per unit) | 8 | Waste |
| 12 | 2 | Fit hose guide | 12 | Value-added |
| 13 | 3 | Connect reel to the leak test rig | 10 | Necessary |
| 14 | 3 | Leak test: hold and read the gauge | 16 | Necessary |
| 15 | 3 | Disconnect and wipe dry | 8 | Necessary |
| 16 | 3 | Fit spray nozzle | 10 | Value-added |
| 17 | 3 | Clip on wall bracket kit | 5 | Value-added |
| 18 | 4 | Label and final visual check | 8 | Necessary |
| 19 | 4 | Erect carton | 10 | Necessary |
| 20 | 4 | Box the reel with the leaflet | 9 | Necessary |
| 21 | 4 | Carry carton to the pallet | 9 | Waste |
| Total | 21 elements | 235 |
Element 11 does not happen every cycle. About one reel in ten fails the leak test and takes 80 s to put right, so it goes in at 8 s a unit.
Stack one bar
Take operator 2. Seven elements, stacked in the order they are done: 9, then 15 on top makes 24, then 42, 52, 74, 82 and 94 seconds. The bar crosses the 72 second takt line partway through winding the hose, with two elements still to go.
From the element log to one bar: operator 2
Example numbers| No. | Element | s | Stack |
|---|---|---|---|
| 6 | Take hose coil out of its bagWaste | 9 | 9 |
| 7 | Fit inlet connector to drumValue-added | 15 | 24 |
| 8 | Crimp hose to connectorValue-added | 18 | 42 |
| 9 | Search the mixed bin for the right hose guideWaste | 10 | 52 |
| 10 | Wind hose onto drumValue-added | 22 | 74 |
| 11 | Re-seat connector after a failed leak test (average per unit)Waste | 8 | 82 |
| 12 | Fit hose guideValue-added | 12 | 94 |
Add up each operator
| Operator | Value-added (s) | Necessary (s) | Waste (s) | Total (s) | Against takt |
|---|---|---|---|---|---|
| 1 | 40 | 9 | 7 | 56 | 16 s under |
| 2 | 67 | 0 | 27 | 94 | 22 s over |
| 3 | 15 | 34 | 0 | 49 | 23 s under |
| 4 | 0 | 27 | 9 | 36 | 36 s under |
| Cell | 122 | 70 | 43 | 235 |
Value-added is 122 / 235 = 51.9% of the work, necessary 29.8% and waste 18.3%.
What the chart says
- Operator 2 is 22 seconds over takt. The cell can only go as fast as its slowest person, so it makes one reel every 94 seconds: 27,000 / 94 = 287 a shift, 88 short of the 375 customers want. That matches what the cell has been finishing.
- The other three wait. At a 94 second pace the four operators are paid for 4 x 94 = 376 seconds per reel and work for 235. The other 141 seconds are waiting.
- The overloaded bar is also the one with the most waste. Operator 2 carries 27 of the cell's 43 waste seconds: unbagging, searching and rework. Take those out and the bar drops to 67, under takt, before a single element has moved.
- The cell has enough people. Work content divided by takt is 235 / 72 = 3.26, so four is the right number for the work as it is done today. The problem is the split and the waste, not the headcount.
- Operator 3's bar is mostly necessary work around the leak test. It is under takt today, but those 34 seconds are the next place to look once the waste is gone.
How to read a yamazumi chart
Read the chart in the same order every time. It stops you jumping to the most colourful block.
- 1
Find the tallest bar
The tallest bar sets the pace of the line. If it is above takt, the line cannot meet demand in normal hours, and nothing you do to the other bars will change that.
- 2
Look at the gaps under the line
Each gap is waiting. Large gaps next to a tall bar mean the work is badly shared. Gaps on every bar mean the line has more people than the work needs.
- 3
Add the bars and divide by takt
Total work content divided by takt, rounded up, is the fewest operators the line could run with. Compare it with the number of bars on the chart.
- 4
Read the colours on the tall bars first
Waste on an overloaded bar is the cheapest fix on the chart. Remove it before you move any work, or you will hand the waste to someone else.
- 5
Then look for what to move
Find elements at the top or bottom of a tall bar that the neighbouring operator could take without breaking the sequence or needing a tool they do not have. Small elements move easily. A big element may need splitting.
- 6
Check the result against takt with a margin
After the moves, every bar should sit just under the line. The Lean Lexicon describes the aim as work for each operator that is very nearly equal to takt but slightly less.
Read the colours on the tall bar first
Example numbers- 6Take hose coil out of its bag9 s
- 9Search the mixed bin for the right hose guide10 s
- 11Re-seat connector after a failed leak test (average per unit)8 s
- 94 minus 2767 s
The order of fixes follows from that reading: take out waste, then shrink the necessary work, then move work between people, and only then think about adding a person. Each step is cheaper than the next.
Six shapes a yamazumi chart makes, and what each one means
After a few charts you start to recognise the outline before you read a number. These are the six you will meet most. Each example has five operators and a 60 second takt.
Six shapes to recognise
Example numbersOne tall bar
A bottleneck. Right crew, wrong split.
270 ÷ 60 = 4.5, needs 5
Staircase
Work piled at one end. The last people wait.
210 ÷ 60 = 3.5, needs 4
Sawtooth
Heavy and light jobs alternate.
232 ÷ 60 = 3.87, needs 4
All low
Balanced, with more people than the work needs.
192 ÷ 60 = 3.2, needs 4
All over the line
A capacity problem. Moving work will not fix it.
328 ÷ 60 = 5.47, needs 6
Level, one short bar
The target. The spare time is in one visible place.
252 ÷ 60 = 4.2, needs 5
Takt 60 sOver takt
| Shape | Operator loads (s) | Work content / takt | What it means | First move |
|---|---|---|---|---|
| One tall bar | 50, 52, 74, 48, 46 | 270 / 60 = 4.5, needs 5 | One station is the bottleneck. The crew size is right and the split is wrong | Take waste out of the tall bar, then move its smallest elements to the neighbours |
| Staircase | 58, 50, 42, 34, 26 | 210 / 60 = 3.5, needs 4 | The work is piled at one end. The last operators wait most of every cycle | Fill the bars from the front to just under takt and free the last operator |
| Sawtooth | 58, 30, 57, 31, 56 | 232 / 60 = 3.87, needs 4 | Heavy and light stations alternate, often because stations were built around machines | Combine the two light jobs into one operator, or hand each of them work from the heavy bars either side |
| All low | 38, 41, 36, 40, 37 | 192 / 60 = 3.2, needs 4 | The line is balanced but has more people than the work needs, often after demand fell | Rebalance to four operators at about 48 seconds each |
| All over the line | 66, 63, 68, 64, 67 | 328 / 60 = 5.47, needs 6 | This is a capacity problem and no amount of moving work will fix it | Remove work content, or add a sixth operator |
| Level with one short bar | 57, 56, 57, 56, 26 | 252 / 60 = 4.2, needs 5 | The target. Four operators are just under takt and the spare time is in one visible place | Aim the next kaizen at the 26 seconds on the short bar |
The last shape surprises people who expect a good chart to be perfectly flat. Spreading the spare time evenly hides it: five people each wait a little and nobody notices. Putting it on one bar makes it obvious, and it gives the team a clear goal, which is to find enough improvement to free that person for other work.
Using the chart in a kaizen: the hose reel cell after
A yamazumi earns its keep when the team changes it. In a kaizen event, put the chart on the wall with each element on its own strip, and let the operators propose the moves. Then try them at the line the same day.
On the hose reel cell the team went after the yellow blocks first.
| Element | Waste | Time (s) | What the team changed |
|---|---|---|---|
| 4 | Walk to the rack for handle kits | 7 | Handle kits moved to a flow rack at the bench |
| 6 | Take hose coil out of its bag | 9 | Hose now arrives unbagged on a peg cart |
| 9 | Search the mixed bin for the right hose guide | 10 | One guide type per lane in a divided bin |
| 11 | Re-seat connector after a failed leak test | 8 | Crimp die reset, with a go/no-go gauge check at the press |
| 21 | Carry carton to the pallet | 9 | Pallet moved next to the packing bench |
| Total | 43 |
That leaves 235 minus 43 = 192 seconds of work. Divided by takt, 192 / 72 = 2.67, so three operators can carry it. The team then restacked the 16 remaining elements into three bars, keeping the build sequence.
| Operator | Elements | Total (s) | Against takt |
|---|---|---|---|
| 1 | 1, 2, 3, 5, 7 | 64 | 8 s under |
| 2 | 8, 10, 12, 13 | 62 | 10 s under |
| 3 | 14 to 20 | 66 | 6 s under |
| Cell | 16 elements | 192 |
Balance efficiency against takt is 192 / (3 x 72) = 88.9%. Value-added work is now 122 / 192 = 63.5% of the total.
The hose reel cell before and after the kaizen
Example numbersBefore: 4 operators, 235 s of work
After: 3 operators, 192 s of work
- Value-added
- Necessary, not value-added
- Waste
- Takt 72 s
- 68.4 s per unit after stoppages
- Numbers in the blocks are element numbers; totals in red are over 68.4 s.
- Operators
- 4 to 3
- Tallest bar
- 94 s to 66 s
- Waste per reel
- 43 s to 0 s
- Reels a shift at that pace
- 287 to 409
Check the margin before you celebrate. The cell loses about 5% of the shift to small stops, so the time it really has per reel is 72 x 0.95 = 68.4 seconds. The longest bar is 66, which fits. With no stops at all the cell could make 27,000 / 66 = 409 reels a shift. On a normal day it makes 25,650 / 66 = 388 against a demand of 375, with no overtime.
One operator is now free. Decide where that person goes before the event starts, and say it out loud: another line, the next kaizen team, training as a relief operator. If people believe a yamazumi ends with someone losing their job, the next time study will find every job mysteriously takes longer.
Yamazumi chart vs operator balance chart vs line balancing chart
These three get used as if they were one chart. They share a takt line and a set of bars, and they answer slightly different questions.
| Yamazumi chart | Operator balance chart | Line balancing chart | |
|---|---|---|---|
| Each bar is | One operator, stacked from individual elements | One operator, usually a single total | One station, as assigned by a balancing method |
| Colour shows | Value-added, necessary and waste | Often nothing, or before against after | Often nothing, or idle time |
| Compared with | Takt time | Takt time | The cycle time the line is balanced to |
| Question it answers | Who is overloaded, and what is the load made of? | How should the work be shared so each person is just under takt? | Does this assignment respect the sequence and fit the cycle time? |
| Built from | A time study with every element typed | Operator cycle times, with or without elements | Element times and a precedence diagram |
| Used most in | Kaizen events and waste hunts | Designing a cell and its standard work | Engineering a new line or a rebalance |
The Lean Lexicon treats yamazumi board and operator balance chart as names for one tool. The split in this table is how the words are commonly used on the floor.
The same cell drawn two ways
Example numbersOperator balance chart: how big each load is
Yamazumi chart: what each load is made of
- Value-added
- Necessary, not value-added
- Waste
In practice you often draw the same data twice. The solid bars tell you who is over. The stacked bars tell you why. And when the fix is more than a couple of obvious moves, the line balancing method with its precedence diagram tells you which moves are allowed.
A fourth chart is worth knowing. The standard work combination table takes one operator and lays their elements along a time axis, with manual work, walking and machine time drawn differently. A yamazumi compares people. A combination table shows how one person's cycle fits together with a machine.
A good yamazumi chart and a bad one
Most weak charts fail in the same few ways. Check yours against this before it goes on the wall.
| A poor chart | A good chart | |
|---|---|---|
| Elements | One block per operator, or three vague ones such as "assemble" | One block for each element you could move or remove, numbered to match the log |
| Waste | Walking and waiting buried inside other elements | Walking, waiting, searching and rework as their own blocks, so they can be seen |
| Times | One stopwatch cycle, or the standard from five years ago | Several timed cycles, dated, with the basis written on the chart |
| Takt line | Missing, or last quarter's demand | Drawn and labelled, with the demand and available time it came from |
| Scale | Each bar drawn to its own scale | One shared axis that starts at zero |
| Order | Blocks sorted by size or by colour | Blocks in the order the work is done, so a move can be judged |
| Where it lives | In a slide deck | At the line, where the team can argue with it |
| What happens next | Nothing | A named move, an owner and a date, then a new chart |
What a yamazumi chart does not show
- Variation. A bar is an average. A 66 second bar might be 60 on one cycle and 75 on the next, and the chart looks the same. Keep the range from the time study beside it.
- Machine time. An operator's bar can be short because a machine is doing the work. The machine's cycle still has to fit takt, and the yamazumi will not tell you if it does.
- The sequence rules. The chart will let you move any block anywhere. Whether the product can be built in that order is a question for the precedence diagram.
- Strain. Two bars of equal height can be very different jobs. One might be light fitting and the other eight screws driven overhead. Check posture, force and repetition separately.
- Skill. A block can only move to someone trained for it. Read the chart next to the skills matrix.
- Quality. Nothing on the chart says whether the work is done right. A fast bar that makes rejects is not a good bar.
None of this is a reason not to draw one. It is a reason to treat the chart as the start of a conversation at the line and not as the answer.
Common mistakes
- Moving work before removing waste. If you rebalance a line that is one fifth waste, you have carefully shared out the waste.
- Loading every bar to exactly takt. With no margin, the first dropped part puts the line behind. Aim just under the line.
- Timing the best operator. The chart then describes a line that only exists when that person is on every station.
- Leaving out occasional work. Material changes, adjustments and rework are real time. Average them per unit and stack them.
- Drawing it once. The chart is true for one product, one takt and one method. When any of them changes, the chart is out of date.
- Using it to rank people. The bars show how work was assigned, not how hard anyone works. The moment it is used as a scorecard, the times stop being honest.
Templates and tools for yamazumi charts
- Yamazumi and operator balance chart template: the element table and the stacked chart, ready to fill in.
- Time study sheet: record the timed cycles the chart is built from.
- Line balancing calculator: station times and takt in, efficiency and minimum stations out.
- Takt time calculator: work out the line you draw across the bars.
- Standard work combination table: one operator's manual, walking and machine time on a time axis.
- How many operators does this line need?: the full sum from work content to the roster.
If the timing is the part you never get to, LeanSuite's Line Balancing builds the chart from a video of the line. It times each operator's elements, charts every station against takt and lets you drag elements between operators to test a rebalance. You check the draft against the video before anyone acts on it.
Line balancing software
Balance a line in LeanSuite
One video of the line goes in. A Yamazumi chart against takt, and rebalancing scenarios you can test, come out.
Go deeper
This page is the short version. These guides cover each part in full.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsA shorter introduction to the chart with a seven-step build.
- Yamazumi Chart: Workload Balancing for JIT Production LinesWhere the chart fits in a just-in-time system and how it supports flow.
- The Three Elements of Standard Work: Takt Time, Work Sequence, Standard WIPHow the balanced split on the chart becomes each operator's standard work.
- Standard Work Tools: Combination Sheet, Chart and Job BreakdownThe documents you update once the chart has changed who does what.
- Manufacturing Bottleneck Elimination: 5 Proven StrategiesWhat to do when the tall bar is a machine or a process step, not a person.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Yamazumi chart template (operator balance)A printable grid for up to eight operators with the takt line, a task table per operator, and an Excel version that works out each total against takt.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Process capacity sheet templateEach machine in a part's routing with manual, auto and tool change time, its capacity per shift, and the step that limits the cell against demand.
- Operator staffing calculatorTakt, work content, the operators a line needs, a check of your station plan and the roster with absence cover, from your own demand and element times.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Bottleneck calculatorThe step that limits your line, from each step's cycle time, machines and uptime, with daily capacity and the gap to demand.
Doing this in LeanSuite
Line Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line BalancingTime and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about yamazumi chart
Its purpose is to show how the work on a line is shared between operators, compared with takt time. Each operator's work elements are stacked into one bar, so you can see at a glance who is overloaded, who is waiting and how much of the work is waste. Teams use it to decide what to remove and which work to move.
Take a four-person cell with a 72 second takt. The operators' bars are 56, 94, 49 and 36 seconds. The second bar is 22 seconds over takt, so it sets the pace of the cell, and 27 of its 94 seconds are waste. Removing the waste across the cell leaves 192 seconds, which three operators can carry at 64, 62 and 66 seconds.
Yamazumi is a Japanese word for piling up or stacking, from yama, mountain, and tsumi, a pile. A yamazumi chart piles each operator's work elements into a bar, which is where the name comes from. You will also see it called a yamazumi board or an operator balance chart.
The Lean Enterprise Institute's Lean Lexicon treats them as the same tool. In common use, a yamazumi chart breaks each bar into individual work elements coloured as value-added, necessary or waste, while an operator balance chart often shows one solid bar per operator against takt. The first shows what the load is made of. The second shows only how big it is.
List the work elements in rows with their times and the operator who does each one. Put operators in columns and each element's time under its operator. Insert a stacked column chart with one series per element, colour the series by type, and add takt time as a horizontal line series. Keep the elements in the order the work is done.
They show the type of each work element. The common convention is green for value-added work, yellow or orange for work that is necessary but adds no value, and red for waste such as walking, waiting and rework. The colours are a convention, not a standard, so always put a key on the chart.
That operator has more work per unit than the time demand allows. The line can only run as fast as its slowest person, so it will fall short of demand, build a queue in front of that station or need overtime. Remove waste from that bar first, then move elements to operators who are under the line.
No. Every bar should be just under takt, with a small margin for variation and stoppages. The Lean Lexicon describes the aim as work for each operator that is very nearly equal to takt but slightly less. Many teams also prefer to leave the spare time on one bar where it can be seen, not spread evenly across all of them.
Update it whenever takt time, the product or the method changes, and after every improvement that removes or moves an element. A chart describes one product at one demand level with one way of working. Date every version so nobody balances a line from an old one.
Related guides and tools
- Line balancing: the method, the formulas and a worked 12-element line
- How many operators a line needs, with yamazumi charts before and after a rebalance
- Time and motion study: how to get the element times the chart is built from
- Standard time: observed time, rating and allowances
- Takt time: the line you draw across the bars
- Free yamazumi and operator balance chart template
- Line Balancing in LeanSuite: a yamazumi chart from a video of the line
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.