A field level risk assessment (FLRA) is the short check each person makes at the job, right before starting and again whenever conditions change: stop, look, assess, control, then work and keep watching. FLHA, Take 5, last minute and point of work risk assessment are other names for it.
A field level risk assessment is done by the people doing the work, at the place of work, in the minutes before they start. Stop before touching the job. Look around, above, below and behind. Ask what could hurt you or someone else here, today, and what is different from the plan. Put the control in place or get someone who can. Then work, and repeat the check when anything changes. If a hazard cannot be controlled, the job does not start. Canada calls it a field level hazard assessment, Australia a Take 5, the Netherlands a last minute risk analysis and many UK sites a point of work risk assessment. It adds to the written risk assessment and never replaces it. This is general guidance, and the rules differ by jurisdiction.
Last reviewed:
What is a field level risk assessment?
A field level risk assessment is a safety check made by the person doing the work, standing where the work will happen, just before it starts. It takes a few minutes. It asks one question the paperwork cannot answer: is the job in front of me, right now, the job the plan described?
It exists because every other safety document is written early. The job safety analysis was written weeks ago for the job as designed. The permit was signed this morning in an office. The pre-task plan was agreed at the start of the shift. Since then the weather turned, another crew parked a scissor lift in your access route, and the valve you were told was drained is dripping. Only the person at the job can see that, so the last check belongs to them.
A note on the short forms, because they collide with other things. Outside safety, FLRA is a United States federal agency, LMRA is a United States labor law and Take 5 is a candy bar. On this page FLRA means field level risk assessment, FLHA field level hazard assessment and LMRA last minute risk assessment (or analysis). They are one method under different names, and a later section maps which name is used where.
Two things it is not. It is not the employer's risk assessment: that is a written, planned piece of work, and a card filled in at the job does not stand in for it. And it is not a form to complete so that work may begin. The check is the looking and the thinking. The card is only where you write down what you found.
The five steps
Programs word the steps differently, but nearly all of them reduce to the same five. This is the version we would teach, and it is the Stop, Look, Assess, Control, Monitor sequence many Take 5 cards use.
The five steps of the point-of-work check
- 1
Stop
- 2
Look
- 3
Assess
- 4
Control
- 5
Work, and keep watching
Anything changes: stop and check again
- 1
Stop
Before you touch a tool, stop at the edge of the work area, far enough back to see all of it. Put the phone and the radio down for a minute. The point of stopping is to break the momentum of walking up and starting, which is when people miss things.
- 2
Look
Walk around the job if you can. Look up, look down, look behind the equipment and along the path anything could move, fall, swing or spray. Look at who else is working nearby and what they are about to do. Compare what you see with what the plan and the brief said you would find.
- 3
Assess
Ask three questions. What here could hurt me or someone else? Is each of those things covered by the plan, with the control really in place? What is different today? If you cannot name the worst thing that could happen on this job, you are not ready to start it.
- 4
Control
Deal with what you found before starting: clear the floor, block the stored energy, put up the barrier, fetch the right tool, speak to the other crew. If the fix is beyond you, get the person who can make it. If it cannot be controlled, the job does not start, and you say so.
- 5
Work, and keep watching
Start the job and stay alert to change: a new person arrives, the method stops working, the weather shifts, something does not come apart the way it should. Any of those means stop and run the check again. The check is tied to conditions, so it has no fixed number of times a shift.
Short form and long form
The short form is the five steps done in the head or on a pocket card, in a minute or two, by one person or a pair. It suits routine work in a place you know: a planned adjustment, a familiar changeover, a delivery to a known dock. The long form is a one-page sheet filled in by the crew together at the job: the task broken into its main steps, the hazards of today for each, the controls, who is on the crew, and everyone's signature. It suits non-routine work, work under a permit, work with more than one crew, and any job nobody on the crew has done before. In Canada that sheet is usually called the FLHA form.
Pick the form by the risk of the job, not by habit. A written sheet for topping up a hand-wash dispenser teaches people that the sheet is a joke. A mental check for breaking into a line that held hot oil is not enough.
What to look at
People do not miss hazards because they do not care. They miss them because they look at the task in their hands and nothing else. A fixed order of looking fixes that. Run these six every time, in this order, and the check takes about as long as reading this list.
- The line of fire. Where would you be standing if something moved, fell, swung, sprang back, rolled or sprayed? That path is the line of fire. Find it for the load, the tool, the part under tension and the vehicle, then stand somewhere else.
- Energy. Electricity, pressure, heat, gravity, springs, moving parts and chemicals. For each one ask where it is, whether it is isolated or only switched off, and what is still stored. A locked-out conveyor can still hold a loaded take-up weight. The lockout tagout guide covers isolation itself.
- Footing and access. What you will stand, kneel or climb on, how you get in and how you get out in a hurry. Wet floors, scrap, hoses, open gratings, a ladder on uneven ground.
- Overhead. Cranes, loads, pipework, work on the level above, low steel, anything that can drop. People rarely look up unless they are told to.
- Other crews and traffic. Who else is working within reach of your job, and whose work could change yours: the crane, the forklift route, the contractor on the roof, the operator who is about to restart the line next to you.
- What changed. Compare today with the plan and with the last time you did this. A different person, a different tool, a part that looks wrong, a missing guard, a job that was moved to another shift. Change is where the plan stops protecting you.
The six things to look at, on the roller job
Line of fire. Where something would go if it moved, fell or sprang back. Stand somewhere else.
Energy. Electricity, pressure, heat, gravity, springs. Isolated, or only switched off?
Footing and access. What you stand or kneel on, and how you get out in a hurry.
Overhead. Cranes, loads, pipework, work on the level above.
Other crews and traffic. Whose work could change yours.
What changed. Today against the plan and the last time you did this.
Then one look inward. Are you trained for this exact task, fit to do it today, and holding the right tools and protective equipment for it? One Canadian regulator's guidance on the field level hazard assessment puts people first on its list for that reason: are they the right people, with enough experience and supervision, and rested enough to do the job safely.
One check, many names
The check was invented many times. Researchers who traced its history (Havinga, Shire and Rae, 2022) found no single origin. They point to a five point safety system used by supervisors in Quebec's underground mines from the middle of the last century, to decades of take time to be safe slogans, and to the 1980s, when behavior-based safety programs turned an informal habit into a written card that could be counted. Each industry and country then gave its card a name.
| Name | Where you will meet it | What kind of term it is |
|---|---|---|
| Field level hazard assessment (FLHA) | Canada, above all Alberta and the western provinces: oil and gas, construction, forestry, maintenance | Workplace usage for the site-specific hazard assessment done on the day. Alberta's Occupational Health and Safety Code (section 7) requires employers to assess a work site and identify existing and potential hazards before work begins, in writing, and to repeat the assessment when a work process or operation changes. The Code does not use the words field level. |
| Field level risk assessment (FLRA) | Alberta heavy industrial construction, and sites that copied it | An industry program. The Construction Owners Association of Alberta published a manager's handbook for it in 1998. In daily use, FLRA and FLHA mean the same check. |
| Take 5 | Australia and New Zealand above all: mining, construction, utilities | A company practice with no standard behind it. The five steps and the wording differ from one company's card to the next. |
| SLAM (stop, look, analyze, manage) | Mining in the United States | A program promoted by the Mine Safety and Health Administration in its training material. |
| Last minute risk assessment or analysis (LMRA) | The Netherlands and Belgium: process industry, energy and their contractors | A site owner's and contractor's rule. The Dutch name is laatste minuut risicoanalyse. |
| Point of work risk assessment (POWRA) | United Kingdom: construction, utilities and street works | A company and client procedure. It sits under the written risk assessment that UK regulations require and is not a substitute for it. |
| Dynamic risk assessment | UK fire and rescue services first; borrowed widely for lone and mobile work | An emergency service term for judging risk while a situation is changing fast. See the limits below. |
| Stop, think, act | Posters and cards everywhere | A slogan. Three words that carry the first four steps. |
| Step back 5x5 | Oil, gas and chemical sites | A company program: step back from the job and take about five minutes to think before starting. |
Where a name is a company program, the steps and the form are whatever that company wrote. Ask to see your own site's version.
FLHA and FLRA: is there a difference?
Strictly, a hazard assessment lists what could cause harm and a risk assessment also judges how likely and how bad. In practice the two forms look alike, and some FLHA forms include a small risk rating. If your site has both words, use them the way your site does. The steps on this page work for either.
What dynamic risk assessment really means
In the UK the phrase comes from the fire service. The National Fire Chiefs Council describes dynamic risk assessment as the assessment of risk in a rapidly changing environment at an incident, where decisions are sometimes made with incomplete or inaccurate information. Two things in that guidance are easy to lose when the phrase is borrowed for ordinary work. First, it is done by trained crews working to procedures written long before the call. Second, it is followed by an analytical risk assessment that is formally recorded as soon as time and resources allow.
So a dynamic risk assessment is a way to keep thinking while things change. It is not a way to skip the written assessment for work you could have planned. A fitter who says I did a dynamic risk assessment about a job that was on the schedule for a week is using a firefighter's word for a planning gap.
How it differs from a JSA, a pre-task plan and a permit
These four are layers, each closer to the moment of work than the last. None replaces another. The point-of-work check is the only one made with the job in sight.
Four layers, each closer to the job than the last
Weeks before
Job safety analysis
The job as designed: every step, its hazards and controls.
Before the job
Permit to work
Whether the equipment is safe to hand over, and on what conditions.
Start of shift
Pre-task plan
Today's plan: who does what, with which controls.
Minutes before
Point-of-work check
This place, right now: what is here that the plan did not see.
| Job safety analysis | Permit to work | Pre-task plan | Point-of-work check | |
|---|---|---|---|---|
| When | Days or weeks before; reviewed when the job changes | Before the job, each time it is done | Start of the shift or the job | At the job, minutes before starting, and at every change |
| Who | A small team with the people who do the job | An authorized issuer, with the person in charge of the work | The supervisor with the whole crew | Each person doing the work, alone or as a pair or crew |
| Covers | The job as designed: every step, its hazards and its controls | High-risk work: isolations, tests, conditions and handback | Today's job: who does what, with which controls and equipment | This place, right now: what is here today that the plan did not see |
| Form | A written analysis kept on file | A signed, time-limited permit | A one-page sheet or a briefing record | A mental check, a pocket card or a one-page sheet |
| Answers | How should this job be done safely? | Is it safe to hand this equipment over for work? | Do we all know today's plan? | Is it safe to start, here and now? |
Guides to the other three: [job safety analysis](/learn/job-safety-analysis), [permit to work](/learn/permit-to-work) and [pre-task plan](/learn/pre-task-plan).
The layers feed each other. A hazard that turns up on point-of-work cards for the same job three times is not a surprise any more. It belongs in the JSA, with a control designed in, so that the next crew does not have to find it again.
The card
A pocket card has one job: to prompt the looking and hold a few words about what was found. Everything on it should serve that. A card that works has five things.
- The task, the place, the date and time, and who is doing the work.
- An open question with lines to write on: what could hurt me or someone else here today?
- A second open question: what is different from the plan or from last time?
- What I did about each thing I found, and who I told about anything I could not fix.
- Space to check again after a change, with the time and what changed.
Leave off the long list of yes or no boxes (am I fit for work, do I have my PPE, do I understand the task). They are answered yes without a thought, and they push the two real questions to the bottom of the card. If your site wants a reminder list, print the six things to look at on the back as prompts with no boxes beside them.
A stop-work authority card is a good companion in the same pocket, and the job safety analysis template is the document the card is checked against.
A worked example: a seized roller on a cooling conveyor
Illustrative example. The people and the plant are made up. Two maintenance technicians, Priya and Tom, are sent to replace a seized idler roller under the cooling conveyor that feeds a trim press cell. The job has a JSA and a lockout procedure. The supervisor ran the pre-task brief at the start of the shift: lock out the conveyor drive, unbolt the roller brackets, swap the roller, test.
At the conveyor they stop at the end of the line and walk its length before opening the toolbox. This is what the check finds.
| Looked at | What they found | In the plan? | What they did |
|---|---|---|---|
| Overhead and other crews | The overhead crane is carrying a trim die to the press in the next bay, and its path crosses the conveyor. The die change was moved to today. | No | Agreed with the crane operator: no lifts over the conveyor until they radio that they are clear. |
| Energy | The drive is locked out as the procedure says. The gravity take-up weight still hangs loaded, and warm 9 kg housings are sitting on the belt above the roller. | Partly: the lockout, yes; the take-up, no | Cleared the housings to the cooling rack. Pinned the take-up weight. |
| Footing | Flash and coolant on the floor where they will kneel. | No | Swept the flash, put down absorbent and a kneeling mat. |
| Line of fire | The roller has to be drawn out toward the forklift aisle, so the person pulling stands in the aisle. | No | Coned off the aisle at both ends and told the forklift driver. |
| The crew | Both are trained on this lockout. Tom has not changed this type of roller before. | Not asked | Priya leads. Tom works the second spanner and watches the first bracket come off. |
Five things found, four of them not in the plan. None is exotic. Every one came from the day, not from the job.
The card from the roller job, as filled in
Example numbersTask
Replace seized idler roller
Place
Cooling conveyor, trim press cell
Who
Priya, Tom
What could hurt me or someone else here today? What did I do?
- Crane path crosses the conveyor, die change moved to today. No lifts over us until the operator radios clear.
- Drive locked out. Take-up weight still loaded, warm housings on the belt. Weight pinned, belt cleared to the rack.
- Flash and coolant where we kneel. Pulling the roller out into the forklift aisle. Swept, kneeling mat, aisle coned and driver told.
What is different from the plan?
Die change moved to today. Tom has not changed this roller type: Priya leads.
Checked again after a change
20 min in: shaft seized in the bracket, grinder suggested. Stopped, called supervisor. Hydraulic puller instead, nobody in line with the shaft.
They write three lines on the card and start. Twenty minutes in, the job changes. The roller shaft is rusted solid into its bracket and will not drive out. Tom suggests cutting it with an angle grinder.
That is a different job. Grinding is hot work, it was not in the JSA or the brief, and the sparks would land in an oily pit under a conveyor. They stop, step back and call the supervisor. The choice is a hot work permit with a fire watch, or a different method. The supervisor sends a hydraulic puller from the tool crib. Before using it they run the check again for the new method: the pinch point at the puller jaws, and where the shaft will go if it lets go suddenly. Nobody stands in line with it. The roller is out ten minutes later.
Afterwards the supervisor reads the card and does two things with it. The take-up weight goes into the lockout procedure as a stored energy step, so it is in the plan next time. And the planner is asked why a die change and a conveyor repair were booked in neighboring bays on the same morning.
How the check leads to stop-work authority
Step four says that if a hazard cannot be controlled, the job does not start. That sentence only works if the person holding the card is allowed to act on it. Stop-work authority is the company rule that makes it real: anyone may stop a task they believe could hurt someone, and nobody is punished for a stop made in good faith.
The two belong together. A point-of-work check without stop-work authority produces cards that say all clear, because writing anything else has no safe outcome for the writer. Stop-work authority without the check waits for someone to notice danger by luck. In the roller job, the moment that mattered was not the first walk along the conveyor. It was the stop when the grinder came out, and it cost about fifteen minutes.
Watch what happens after a stop, because the whole site is watching too. If the first question from the supervisor is how long will this take, the next card will say all clear. If it is what did you see, show me, the next card will say something true.
Why cards turn into tick-box rituals, and how to stop it
This is the honest part. The written card has a poor record. In 2022 researchers ran a trial on a large infrastructure construction project, alternating periods when Take 5 cards were enforced, optional and banned, and watched the work in each. They found no evidence that the written card improved planning, made workers more heedful, taught them about hazards or helped the organization manage them. They concluded that the card mostly served to show that safety work had been done. Workers who defended it tended to say it helped someone else.
That is one study on one project, and it tested the paper, not the thinking. But anyone who has collected a box of cards knows what it describes: forty identical cards, every box ticked, hazards listed as slips, trips and falls, all filled in at the truck before anyone saw the job. The causes are ordinary.
How a point-of-work card turns into a ritual, and the fix
What goes wrong
Every box is ticked yes on every card
Why it happens: Yes or no questions have one acceptable answer, so people give it
Do this instead
Ask open questions with lines to write on: what could hurt someone here today, and what is different from the plan?
What goes wrong
Cards are filled in at the truck or in the break room
Why it happens: The card is treated as a pass to start work, so it is done before the job is seen
Do this instead
Fill it in at the job. Supervisors ask to be shown the hazard on the card, at the spot.
What goes wrong
Nobody reads the cards
Why it happens: They go into a box, then a drawer
Do this instead
The supervisor reads that day's cards and answers every problem written on one, in person, before the next shift.
What goes wrong
Cards are counted and the count is a target
Why it happens: A number is easy to report upward
Do this instead
Never set a target for cards. Count what changed because of a card: hazards fixed, plans updated, jobs stopped and restarted safely.
What goes wrong
Writing a real hazard causes trouble for the writer
Why it happens: A stopped job is met with pressure about time
Do this instead
Thank the stop first. Tie the card to stop-work authority and tell the story of a good stop at the next toolbox talk.
What goes wrong
The same long card is used for every job
Why it happens: One form is simpler to administer
Do this instead
A mental check or pocket card for routine work, the crew sheet for non-routine and permit work.
What goes wrong
The card grows every year
Why it happens: Each incident adds a question and nothing is ever removed
Do this instead
Cap it at one side of a pocket card. To add a line, take one out.
A test for your own site: pull ten cards from last week and try to tell from the writing which job each one was for. If you cannot, the cards are not about the jobs.
And a rule for leaders: the most useful thing you can do with a card is stand at the job with the person who wrote it and ask them to walk you through it. A safety walk is a good time to do it.
What the check cannot do
- It cannot replace the written risk assessment. In the UK, for example, the Management of Health and Safety at Work Regulations 1999 (regulation 3) require a suitable and sufficient assessment, reviewed when it may no longer be valid. A check made at the job is an addition to that, and the same logic holds in most places.
- It cannot engineer anything. A person at the job can move, block, barricade and refuse. They cannot fit a guard or redesign a lift. Hazards that keep appearing on cards need the hierarchy of controls applied upstream.
- It sees only what the person knows how to see. Someone who has never met a confined space hazard or an arc flash boundary will not spot one in two minutes. The check rests on training and on a plan made by people with more time.
- It is weakest when it is most needed: late, in a hurry, with the job nearly done. That is a reason to build the stop into the work at fixed points, such as before breaking containment or before the first lift, and not to leave it to memory.
The law on who must assess what, in writing or not, differs by country, province and state. This page is general guidance. Check the rules that apply to your site.
Tools and related guides
- Stop-work authority policy and cards: the rule and the pocket card that give the check its teeth.
- Job safety analysis template: the planned document the check is compared with.
- Toolbox talk template: for the short talk where a good stop gets told.
- Near miss report form: for the hazard found at the job that needs more than the crew can do.
- Risk assessment: the planned assessment that sits above every check on this page.
- Job safety analysis from video: building the step list of the JSA from footage of the job.
A hazard found at the point of work that the crew cannot fix should not live only on a card. In LeanSuite anyone can log a near miss, unsafe act or unsafe condition on a phone by scanning a QR code, and each corrective action is tracked until it is closed. See near miss reporting.
Go deeper
This page is the short version. These guides cover each part in full.
- Why Most Manufacturing Hazards Go UnreportedWhy people write all clear when it is not, and what removes the barriers to saying so.
- Top Five Common Manufacturing HazardsThe hazards a point-of-work check most often turns up on a plant floor.
- Building Proactive Safety Culture Instead of Reactive ResponseThe conditions under which a stop at the job is thanked and not resented.
- 7 Preventable Shop Floor Incidents Most Plants MissIncidents that start with a change nobody checked for.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Stop-work authority policy templateA one-page stop-work policy to edit and sign, a record form for each stop, and fold-over wallet cards to hand out at orientation.
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Toolbox talk templateA record of a short safety talk: topic, key points, questions raised, actions and an attendee sign-in sheet.
- Near miss report formA two-page near miss report from the first report to closure, and an Excel log with status and days open.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
Doing this in LeanSuite
Near Miss Reporting
Anyone logs a near miss, unsafe act or unsafe condition on their phone in seconds, and each corrective action is tracked until it is closed.
See Near Miss ReportingSafety Improvement
Safety inspections, gemba walks and LOTO checks from ready-made templates, with a safety tag raised for every failed item.
See Safety Improvement
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about field level risk assessment (FLRA)
The most common version is stop, look, assess, control and monitor. Stop before starting. Look around the work area for hazards. Assess what could hurt you or someone else and whether it is controlled. Put the controls in place. Then do the work and keep watching for change. Take 5 is a company practice with no standard behind it, so the five words vary from one site's card to another.
In daily use, none. A field level hazard assessment lists what could cause harm at the job today, and a field level risk assessment also judges how likely and how serious each one is. Both are done by the crew at the place of work before starting, and both forms look alike. FLHA is the more common name in Canada. Use the term your site uses.
A last minute risk assessment, or last minute risk analysis, is the short check a worker makes at the workplace just before starting a task, to catch hazards that the planning missed or that have appeared since. The term is used mainly in the Netherlands and Belgium, in process plants and by their contractors. It is the same check as a Take 5 or a field level hazard assessment.
It is the continuing judgment of risk while a situation is changing. The term comes from UK fire and rescue services, where commanders assess risk at an incident with incomplete information and follow up with a recorded analytical risk assessment as soon as they can. In ordinary work the phrase is used loosely for a check at the job. It does not replace a written risk assessment for work that could have been planned.
It depends on where you work. As one example, Alberta's Occupational Health and Safety Code requires employers to assess a work site and identify existing and potential hazards before work begins, to put the result in writing and to repeat it when the work changes. Other places require a risk assessment without naming a check at the job. Many sites require it as a company or client rule. Check the rules for your location.
The line of fire is the path something would take if it moved, fell, swung, sprang back, rolled or sprayed, and anyone standing in that path. Examples are under a suspended load, in line with a tensioned strap, between a forklift and a fixed object, or in front of a flange being opened. The control is simple to say: find the path before you start and stand somewhere else.
For routine work in a familiar place, a minute or two. For non-routine work, permit work or a job with several crews, the written crew version takes longer because people talk it through together. Time is the wrong measure, though. The check is done when you can say what the worst thing that could happen on this job is, and what is stopping it.
Related guides and tools
- Pre-task plan: the crew's plan for today's job, made before the check at the job
- Job safety analysis: the steps, hazards and controls of the job as designed
- Permit to work: the authorization for high-risk jobs
- Stop-work authority: who may stop a job and how it restarts
- Safety observation: watching a task and talking about it
- Safety walk: leaders going to see the work
- Risk assessment: the planned assessment above every check
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.