Short answer

A field level risk assessment (FLRA) is the short check each person makes at the job, right before starting and again whenever conditions change: stop, look, assess, control, then work and keep watching. FLHA, Take 5, last minute and point of work risk assessment are other names for it.

A field level risk assessment is done by the people doing the work, at the place of work, in the minutes before they start. Stop before touching the job. Look around, above, below and behind. Ask what could hurt you or someone else here, today, and what is different from the plan. Put the control in place or get someone who can. Then work, and repeat the check when anything changes. If a hazard cannot be controlled, the job does not start. Canada calls it a field level hazard assessment, Australia a Take 5, the Netherlands a last minute risk analysis and many UK sites a point of work risk assessment. It adds to the written risk assessment and never replaces it. This is general guidance, and the rules differ by jurisdiction.

Last reviewed:

What is a field level risk assessment?

A field level risk assessment is a safety check made by the person doing the work, standing where the work will happen, just before it starts. It takes a few minutes. It asks one question the paperwork cannot answer: is the job in front of me, right now, the job the plan described?

It exists because every other safety document is written early. The job safety analysis was written weeks ago for the job as designed. The permit was signed this morning in an office. The pre-task plan was agreed at the start of the shift. Since then the weather turned, another crew parked a scissor lift in your access route, and the valve you were told was drained is dripping. Only the person at the job can see that, so the last check belongs to them.

A note on the short forms, because they collide with other things. Outside safety, FLRA is a United States federal agency, LMRA is a United States labor law and Take 5 is a candy bar. On this page FLRA means field level risk assessment, FLHA field level hazard assessment and LMRA last minute risk assessment (or analysis). They are one method under different names, and a later section maps which name is used where.

Two things it is not. It is not the employer's risk assessment: that is a written, planned piece of work, and a card filled in at the job does not stand in for it. And it is not a form to complete so that work may begin. The check is the looking and the thinking. The card is only where you write down what you found.

The five steps

Programs word the steps differently, but nearly all of them reduce to the same five. This is the version we would teach, and it is the Stop, Look, Assess, Control, Monitor sequence many Take 5 cards use.

The five steps of the point-of-work check

  1. 1

    Stop

  2. 2

    Look

  3. 3

    Assess

  4. 4

    Control

  5. 5

    Work, and keep watching

Anything changes: stop and check again

The last step loops back to the first: any change at the job means stop and run the check again.
  1. 1

    Stop

    Before you touch a tool, stop at the edge of the work area, far enough back to see all of it. Put the phone and the radio down for a minute. The point of stopping is to break the momentum of walking up and starting, which is when people miss things.

  2. 2

    Look

    Walk around the job if you can. Look up, look down, look behind the equipment and along the path anything could move, fall, swing or spray. Look at who else is working nearby and what they are about to do. Compare what you see with what the plan and the brief said you would find.

  3. 3

    Assess

    Ask three questions. What here could hurt me or someone else? Is each of those things covered by the plan, with the control really in place? What is different today? If you cannot name the worst thing that could happen on this job, you are not ready to start it.

  4. 4

    Control

    Deal with what you found before starting: clear the floor, block the stored energy, put up the barrier, fetch the right tool, speak to the other crew. If the fix is beyond you, get the person who can make it. If it cannot be controlled, the job does not start, and you say so.

  5. 5

    Work, and keep watching

    Start the job and stay alert to change: a new person arrives, the method stops working, the weather shifts, something does not come apart the way it should. Any of those means stop and run the check again. The check is tied to conditions, so it has no fixed number of times a shift.

Short form and long form

The short form is the five steps done in the head or on a pocket card, in a minute or two, by one person or a pair. It suits routine work in a place you know: a planned adjustment, a familiar changeover, a delivery to a known dock. The long form is a one-page sheet filled in by the crew together at the job: the task broken into its main steps, the hazards of today for each, the controls, who is on the crew, and everyone's signature. It suits non-routine work, work under a permit, work with more than one crew, and any job nobody on the crew has done before. In Canada that sheet is usually called the FLHA form.

Pick the form by the risk of the job, not by habit. A written sheet for topping up a hand-wash dispenser teaches people that the sheet is a joke. A mental check for breaking into a line that held hot oil is not enough.

What to look at

People do not miss hazards because they do not care. They miss them because they look at the task in their hands and nothing else. A fixed order of looking fixes that. Run these six every time, in this order, and the check takes about as long as reading this list.

  • The line of fire. Where would you be standing if something moved, fell, swung, sprang back, rolled or sprayed? That path is the line of fire. Find it for the load, the tool, the part under tension and the vehicle, then stand somewhere else.
  • Energy. Electricity, pressure, heat, gravity, springs, moving parts and chemicals. For each one ask where it is, whether it is isolated or only switched off, and what is still stored. A locked-out conveyor can still hold a loaded take-up weight. The lockout tagout guide covers isolation itself.
  • Footing and access. What you will stand, kneel or climb on, how you get in and how you get out in a hurry. Wet floors, scrap, hoses, open gratings, a ladder on uneven ground.
  • Overhead. Cranes, loads, pipework, work on the level above, low steel, anything that can drop. People rarely look up unless they are told to.
  • Other crews and traffic. Who else is working within reach of your job, and whose work could change yours: the crane, the forklift route, the contractor on the roof, the operator who is about to restart the line next to you.
  • What changed. Compare today with the plan and with the last time you did this. A different person, a different tool, a part that looks wrong, a missing guard, a job that was moved to another shift. Change is where the plan stops protecting you.

The six things to look at, on the roller job

Top view of a conveyor repair with six numbered things to look atA conveyor runs across the middle with one idler roller highlighted. A crane path crosses above it carrying a die. Below the conveyor is a forklift aisle where the person kneels, with flash on the floor beside them and a second crew to the left. A take-up weight hangs at the end of the belt. Number 1 marks the line of fire from the roller toward the aisle, 2 the stored energy at the weight, 3 the flash on the floor, 4 the crane path, 5 the other crew and 6 the warm housings left on the belt.forklift aisle123456
  1. Line of fire. Where something would go if it moved, fell or sprang back. Stand somewhere else.

  2. Energy. Electricity, pressure, heat, gravity, springs. Isolated, or only switched off?

  3. Footing and access. What you stand or kneel on, and how you get out in a hurry.

  4. Overhead. Cranes, loads, pipework, work on the level above.

  5. Other crews and traffic. Whose work could change yours.

  6. What changed. Today against the plan and the last time you did this.

Run the six in the same order every time. In the worked example four of the five things found were not in the plan, and every one was on this list.

Then one look inward. Are you trained for this exact task, fit to do it today, and holding the right tools and protective equipment for it? One Canadian regulator's guidance on the field level hazard assessment puts people first on its list for that reason: are they the right people, with enough experience and supervision, and rested enough to do the job safely.

One check, many names

The check was invented many times. Researchers who traced its history (Havinga, Shire and Rae, 2022) found no single origin. They point to a five point safety system used by supervisors in Quebec's underground mines from the middle of the last century, to decades of take time to be safe slogans, and to the 1980s, when behavior-based safety programs turned an informal habit into a written card that could be counted. Each industry and country then gave its card a name.

Names for the point-of-work check and where each is used
NameWhere you will meet itWhat kind of term it is
Field level hazard assessment (FLHA)Canada, above all Alberta and the western provinces: oil and gas, construction, forestry, maintenanceWorkplace usage for the site-specific hazard assessment done on the day. Alberta's Occupational Health and Safety Code (section 7) requires employers to assess a work site and identify existing and potential hazards before work begins, in writing, and to repeat the assessment when a work process or operation changes. The Code does not use the words field level.
Field level risk assessment (FLRA)Alberta heavy industrial construction, and sites that copied itAn industry program. The Construction Owners Association of Alberta published a manager's handbook for it in 1998. In daily use, FLRA and FLHA mean the same check.
Take 5Australia and New Zealand above all: mining, construction, utilitiesA company practice with no standard behind it. The five steps and the wording differ from one company's card to the next.
SLAM (stop, look, analyze, manage)Mining in the United StatesA program promoted by the Mine Safety and Health Administration in its training material.
Last minute risk assessment or analysis (LMRA)The Netherlands and Belgium: process industry, energy and their contractorsA site owner's and contractor's rule. The Dutch name is laatste minuut risicoanalyse.
Point of work risk assessment (POWRA)United Kingdom: construction, utilities and street worksA company and client procedure. It sits under the written risk assessment that UK regulations require and is not a substitute for it.
Dynamic risk assessmentUK fire and rescue services first; borrowed widely for lone and mobile workAn emergency service term for judging risk while a situation is changing fast. See the limits below.
Stop, think, actPosters and cards everywhereA slogan. Three words that carry the first four steps.
Step back 5x5Oil, gas and chemical sitesA company program: step back from the job and take about five minutes to think before starting.

Where a name is a company program, the steps and the form are whatever that company wrote. Ask to see your own site's version.

FLHA and FLRA: is there a difference?

Strictly, a hazard assessment lists what could cause harm and a risk assessment also judges how likely and how bad. In practice the two forms look alike, and some FLHA forms include a small risk rating. If your site has both words, use them the way your site does. The steps on this page work for either.

What dynamic risk assessment really means

In the UK the phrase comes from the fire service. The National Fire Chiefs Council describes dynamic risk assessment as the assessment of risk in a rapidly changing environment at an incident, where decisions are sometimes made with incomplete or inaccurate information. Two things in that guidance are easy to lose when the phrase is borrowed for ordinary work. First, it is done by trained crews working to procedures written long before the call. Second, it is followed by an analytical risk assessment that is formally recorded as soon as time and resources allow.

So a dynamic risk assessment is a way to keep thinking while things change. It is not a way to skip the written assessment for work you could have planned. A fitter who says I did a dynamic risk assessment about a job that was on the schedule for a week is using a firefighter's word for a planning gap.

How it differs from a JSA, a pre-task plan and a permit

These four are layers, each closer to the moment of work than the last. None replaces another. The point-of-work check is the only one made with the job in sight.

Four layers, each closer to the job than the last

  1. Weeks before

    Job safety analysis

    The job as designed: every step, its hazards and controls.

  2. Before the job

    Permit to work

    Whether the equipment is safe to hand over, and on what conditions.

  3. Start of shift

    Pre-task plan

    Today's plan: who does what, with which controls.

  4. Minutes before

    Point-of-work check

    This place, right now: what is here that the plan did not see.

Each layer is written by someone further from the job and earlier in time. Only the last one is made with the work in sight, so it is the only one that can see today.
JSA, permit to work, pre-task plan and point-of-work check compared
Job safety analysisPermit to workPre-task planPoint-of-work check
WhenDays or weeks before; reviewed when the job changesBefore the job, each time it is doneStart of the shift or the jobAt the job, minutes before starting, and at every change
WhoA small team with the people who do the jobAn authorized issuer, with the person in charge of the workThe supervisor with the whole crewEach person doing the work, alone or as a pair or crew
CoversThe job as designed: every step, its hazards and its controlsHigh-risk work: isolations, tests, conditions and handbackToday's job: who does what, with which controls and equipmentThis place, right now: what is here today that the plan did not see
FormA written analysis kept on fileA signed, time-limited permitA one-page sheet or a briefing recordA mental check, a pocket card or a one-page sheet
AnswersHow should this job be done safely?Is it safe to hand this equipment over for work?Do we all know today's plan?Is it safe to start, here and now?

Guides to the other three: [job safety analysis](/learn/job-safety-analysis), [permit to work](/learn/permit-to-work) and [pre-task plan](/learn/pre-task-plan).

The layers feed each other. A hazard that turns up on point-of-work cards for the same job three times is not a surprise any more. It belongs in the JSA, with a control designed in, so that the next crew does not have to find it again.

The card

A pocket card has one job: to prompt the looking and hold a few words about what was found. Everything on it should serve that. A card that works has five things.

  • The task, the place, the date and time, and who is doing the work.
  • An open question with lines to write on: what could hurt me or someone else here today?
  • A second open question: what is different from the plan or from last time?
  • What I did about each thing I found, and who I told about anything I could not fix.
  • Space to check again after a change, with the time and what changed.

Leave off the long list of yes or no boxes (am I fit for work, do I have my PPE, do I understand the task). They are answered yes without a thought, and they push the two real questions to the bottom of the card. If your site wants a reminder list, print the six things to look at on the back as prompts with no boxes beside them.

A stop-work authority card is a good companion in the same pocket, and the job safety analysis template is the document the card is checked against.

A worked example: a seized roller on a cooling conveyor

Illustrative example. The people and the plant are made up. Two maintenance technicians, Priya and Tom, are sent to replace a seized idler roller under the cooling conveyor that feeds a trim press cell. The job has a JSA and a lockout procedure. The supervisor ran the pre-task brief at the start of the shift: lock out the conveyor drive, unbolt the roller brackets, swap the roller, test.

At the conveyor they stop at the end of the line and walk its length before opening the toolbox. This is what the check finds.

Point-of-work check for the roller change (illustrative)
Looked atWhat they foundIn the plan?What they did
Overhead and other crewsThe overhead crane is carrying a trim die to the press in the next bay, and its path crosses the conveyor. The die change was moved to today.NoAgreed with the crane operator: no lifts over the conveyor until they radio that they are clear.
EnergyThe drive is locked out as the procedure says. The gravity take-up weight still hangs loaded, and warm 9 kg housings are sitting on the belt above the roller.Partly: the lockout, yes; the take-up, noCleared the housings to the cooling rack. Pinned the take-up weight.
FootingFlash and coolant on the floor where they will kneel.NoSwept the flash, put down absorbent and a kneeling mat.
Line of fireThe roller has to be drawn out toward the forklift aisle, so the person pulling stands in the aisle.NoConed off the aisle at both ends and told the forklift driver.
The crewBoth are trained on this lockout. Tom has not changed this type of roller before.Not askedPriya leads. Tom works the second spanner and watches the first bracket come off.

Five things found, four of them not in the plan. None is exotic. Every one came from the day, not from the job.

The card from the roller job, as filled in

Example numbers

Task
Replace seized idler roller

Place
Cooling conveyor, trim press cell

Who
Priya, Tom

What could hurt me or someone else here today? What did I do?

  • Crane path crosses the conveyor, die change moved to today. No lifts over us until the operator radios clear.
  • Drive locked out. Take-up weight still loaded, warm housings on the belt. Weight pinned, belt cleared to the rack.
  • Flash and coolant where we kneel. Pulling the roller out into the forklift aisle. Swept, kneeling mat, aisle coned and driver told.

What is different from the plan?

Die change moved to today. Tom has not changed this roller type: Priya leads.

Checked again after a change

20 min in: shaft seized in the bracket, grinder suggested. Stopped, called supervisor. Hydraulic puller instead, nobody in line with the shaft.

Three lines found, three lines done, and one more line when the job changed. Open questions, no tick boxes, and the writing is about this conveyor and not any conveyor.

They write three lines on the card and start. Twenty minutes in, the job changes. The roller shaft is rusted solid into its bracket and will not drive out. Tom suggests cutting it with an angle grinder.

That is a different job. Grinding is hot work, it was not in the JSA or the brief, and the sparks would land in an oily pit under a conveyor. They stop, step back and call the supervisor. The choice is a hot work permit with a fire watch, or a different method. The supervisor sends a hydraulic puller from the tool crib. Before using it they run the check again for the new method: the pinch point at the puller jaws, and where the shaft will go if it lets go suddenly. Nobody stands in line with it. The roller is out ten minutes later.

Afterwards the supervisor reads the card and does two things with it. The take-up weight goes into the lockout procedure as a stored energy step, so it is in the plan next time. And the planner is asked why a die change and a conveyor repair were booked in neighboring bays on the same morning.

How the check leads to stop-work authority

Step four says that if a hazard cannot be controlled, the job does not start. That sentence only works if the person holding the card is allowed to act on it. Stop-work authority is the company rule that makes it real: anyone may stop a task they believe could hurt someone, and nobody is punished for a stop made in good faith.

The two belong together. A point-of-work check without stop-work authority produces cards that say all clear, because writing anything else has no safe outcome for the writer. Stop-work authority without the check waits for someone to notice danger by luck. In the roller job, the moment that mattered was not the first walk along the conveyor. It was the stop when the grinder came out, and it cost about fifteen minutes.

Watch what happens after a stop, because the whole site is watching too. If the first question from the supervisor is how long will this take, the next card will say all clear. If it is what did you see, show me, the next card will say something true.

Why cards turn into tick-box rituals, and how to stop it

This is the honest part. The written card has a poor record. In 2022 researchers ran a trial on a large infrastructure construction project, alternating periods when Take 5 cards were enforced, optional and banned, and watched the work in each. They found no evidence that the written card improved planning, made workers more heedful, taught them about hazards or helped the organization manage them. They concluded that the card mostly served to show that safety work had been done. Workers who defended it tended to say it helped someone else.

That is one study on one project, and it tested the paper, not the thinking. But anyone who has collected a box of cards knows what it describes: forty identical cards, every box ticked, hazards listed as slips, trips and falls, all filled in at the truck before anyone saw the job. The causes are ordinary.

How a point-of-work card turns into a ritual, and the fix

  • What goes wrong

    Every box is ticked yes on every card

    Why it happens: Yes or no questions have one acceptable answer, so people give it

    Do this instead

    Ask open questions with lines to write on: what could hurt someone here today, and what is different from the plan?

  • What goes wrong

    Cards are filled in at the truck or in the break room

    Why it happens: The card is treated as a pass to start work, so it is done before the job is seen

    Do this instead

    Fill it in at the job. Supervisors ask to be shown the hazard on the card, at the spot.

  • What goes wrong

    Nobody reads the cards

    Why it happens: They go into a box, then a drawer

    Do this instead

    The supervisor reads that day's cards and answers every problem written on one, in person, before the next shift.

  • What goes wrong

    Cards are counted and the count is a target

    Why it happens: A number is easy to report upward

    Do this instead

    Never set a target for cards. Count what changed because of a card: hazards fixed, plans updated, jobs stopped and restarted safely.

  • What goes wrong

    Writing a real hazard causes trouble for the writer

    Why it happens: A stopped job is met with pressure about time

    Do this instead

    Thank the stop first. Tie the card to stop-work authority and tell the story of a good stop at the next toolbox talk.

  • What goes wrong

    The same long card is used for every job

    Why it happens: One form is simpler to administer

    Do this instead

    A mental check or pocket card for routine work, the crew sheet for non-routine and permit work.

  • What goes wrong

    The card grows every year

    Why it happens: Each incident adds a question and nothing is ever removed

    Do this instead

    Cap it at one side of a pocket card. To add a line, take one out.

Seven ways the card goes wrong. Most come down to one thing: the card became the goal, and the looking stopped.

A test for your own site: pull ten cards from last week and try to tell from the writing which job each one was for. If you cannot, the cards are not about the jobs.

And a rule for leaders: the most useful thing you can do with a card is stand at the job with the person who wrote it and ask them to walk you through it. A safety walk is a good time to do it.

What the check cannot do

  • It cannot replace the written risk assessment. In the UK, for example, the Management of Health and Safety at Work Regulations 1999 (regulation 3) require a suitable and sufficient assessment, reviewed when it may no longer be valid. A check made at the job is an addition to that, and the same logic holds in most places.
  • It cannot engineer anything. A person at the job can move, block, barricade and refuse. They cannot fit a guard or redesign a lift. Hazards that keep appearing on cards need the hierarchy of controls applied upstream.
  • It sees only what the person knows how to see. Someone who has never met a confined space hazard or an arc flash boundary will not spot one in two minutes. The check rests on training and on a plan made by people with more time.
  • It is weakest when it is most needed: late, in a hurry, with the job nearly done. That is a reason to build the stop into the work at fixed points, such as before breaking containment or before the first lift, and not to leave it to memory.

The law on who must assess what, in writing or not, differs by country, province and state. This page is general guidance. Check the rules that apply to your site.

Tools and related guides

A hazard found at the point of work that the crew cannot fix should not live only on a card. In LeanSuite anyone can log a near miss, unsafe act or unsafe condition on a phone by scanning a QR code, and each corrective action is tracked until it is closed. See near miss reporting.

FAQ

Questions about field level risk assessment (FLRA)

  1. The most common version is stop, look, assess, control and monitor. Stop before starting. Look around the work area for hazards. Assess what could hurt you or someone else and whether it is controlled. Put the controls in place. Then do the work and keep watching for change. Take 5 is a company practice with no standard behind it, so the five words vary from one site's card to another.

  2. In daily use, none. A field level hazard assessment lists what could cause harm at the job today, and a field level risk assessment also judges how likely and how serious each one is. Both are done by the crew at the place of work before starting, and both forms look alike. FLHA is the more common name in Canada. Use the term your site uses.

  3. A last minute risk assessment, or last minute risk analysis, is the short check a worker makes at the workplace just before starting a task, to catch hazards that the planning missed or that have appeared since. The term is used mainly in the Netherlands and Belgium, in process plants and by their contractors. It is the same check as a Take 5 or a field level hazard assessment.

  4. It is the continuing judgment of risk while a situation is changing. The term comes from UK fire and rescue services, where commanders assess risk at an incident with incomplete information and follow up with a recorded analytical risk assessment as soon as they can. In ordinary work the phrase is used loosely for a check at the job. It does not replace a written risk assessment for work that could have been planned.

  5. It depends on where you work. As one example, Alberta's Occupational Health and Safety Code requires employers to assess a work site and identify existing and potential hazards before work begins, to put the result in writing and to repeat it when the work changes. Other places require a risk assessment without naming a check at the job. Many sites require it as a company or client rule. Check the rules for your location.

  6. The line of fire is the path something would take if it moved, fell, swung, sprang back, rolled or sprayed, and anyone standing in that path. Examples are under a suspended load, in line with a tensioned strap, between a forklift and a fixed object, or in front of a flange being opened. The control is simple to say: find the path before you start and stand somewhere else.

  7. For routine work in a familiar place, a minute or two. For non-routine work, permit work or a job with several crews, the written crew version takes longer because people talk it through together. Time is the wrong measure, though. The check is done when you can say what the worst thing that could happen on this job is, and what is stopping it.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.