Taylor, the Gilbreths and the history of time and motion study
Short answer
Frederick W. Taylor developed time study with a stopwatch at Midvale Steel in the early 1880s. Frank and Lillian Gilbreth developed motion study with a camera from about 1909. The two were combined as motion and time study in the 1930s.
Time study is credited to Frederick W. Taylor, who began timing machine shop work with a stopwatch at Midvale Steel in the early 1880s and published the method in Shop Management in 1903. Motion study is credited to Frank and Lillian Gilbreth, who filmed work to remove wasted motion and named the basic motions therbligs. The two approaches were rivals at first and were merged into motion and time study by teachers such as Ralph Barnes, whose textbook appeared in 1937. Predetermined time systems followed with MTM in 1948. Toyota kept the stopwatch and gave it to team leaders and operators.
Last reviewed:
Who invented time and motion study?
Two founders, one argument, one blended method
Time study
How long should the job take?
- Early 1880sTaylor times work with a stopwatch at Midvale
- 1903Shop Management
- 1927Westinghouse performance rating
Motion study
What is the best way to do it?
- 1909Gilbreth, Bricklaying System
- About 1912Filmed micromotion study
- 1915Sixteen therbligs listed
Pushback
Who sets the standard?
- 1911Watertown Arsenal walkout
- From 1915Congress bars stopwatch study in arsenals
The two merge
Method first, then measure.
- 1937Barnes, Motion and Time Study
Beyond the stopwatch
How else can work be measured?
- 1935Tippett's snap readings, later work sampling
- 1948Methods-Time Measurement
- 1972MOST released in Sweden
Toyota
Who owns the standard?
- 1955Shingo begins teaching industrial engineering at Toyota
- 1978Ohno, Toyota Production System
Six strands in date order. Time study: Taylor from the early 1880s, Shop Management in 1903, Westinghouse rating in 1927. Motion study: Bricklaying System in 1909, filmed micromotion about 1912, sixteen therbligs in 1915. Pushback: the Watertown walkout in 1911 and the arsenal ban from 1915. The two merge in Barnes's textbook of 1937. Beyond the stopwatch: work sampling in 1935, MTM in 1948, MOST in 1972. Toyota: Shingo from 1955 and Ohno's book in 1978.
Two different people invented two different things, and the phrase time and motion study joins them. Time study asks how long a job should take. Its founder is Frederick Winslow Taylor, an American engineer, and its tool is the stopwatch. Motion study asks what the best way to do the job is. Its founders are Frank Gilbreth, a building contractor, and Lillian Gilbreth, a psychologist, and its tool is the camera.
Taylor is usually called the father of scientific management, and textbooks credit him as the founder of time study. Frank Gilbreth is called the father of motion study. Neither worked alone, neither was first to put a clock on work, and the two camps argued in public about whose method was sound. What plants use today is a blend that later engineers assembled from both.
The history matters for a practical reason. Almost every objection you will hear to a time study on the floor was first raised over a century ago, and so was almost every answer. If you run studies, it helps to know which parts of the tradition earned their bad name. For the method as it is practised now, see time and motion study.
Before Taylor: pins and clocks
People studied work long before anyone called it scientific. In 1776 Adam Smith opened The Wealth of Nations with a pin workshop where ten men, splitting the job into about eighteen operations, made upwards of 48,000 pins in a day. His point was the division of labor, not timing, but the idea that a job can be taken apart and examined piece by piece starts there.
In 1832 Charles Babbage went further in On the Economy of Machinery and Manufactures. He set out the operations of pin making in a table with the time and the cost of each. He also warned his readers that workers who know they are being timed may change their pace, a problem that has never gone away.
What neither man did was use the timing to set a standard that workers were then held to and paid by. That step was Taylor's.
Frederick Taylor and the stopwatch
Taylor (1856 to 1915) joined the Midvale Steel Company in Philadelphia in 1878 and rose from laborer to chief engineer. As a gang boss he fought his machinists over output. He believed they were holding back, a habit he called soldiering, and that neither side knew what a fair day's work was. In the early 1880s he began to find out with a stopwatch.
His method had four parts that are still the skeleton of a time study. Break the job into elements. Time each element over several cycles. Pick a representative time and add allowances for rest and delays. Then set the standard and tie pay to it. He described the system in Shop Management in 1903 and for a general audience in The Principles of Scientific Management in 1911.
- Elements. Timing a whole job tells you little. Timing its parts shows which part is slow and lets you reuse the times on other jobs.
- Selecting the worker. Taylor studied what he called a first-class man: someone suited to the job and willing to work at a good pace.
- Allowances. He added a percentage for unavoidable delays and rest, having noticed that heavy work needs rest built into it.
- A planning department. Deciding the method and the time was taken from the foreman and the worker and given to specialists. This separation of thinking from doing is the most criticised part of his legacy.
- Differential pay. A higher piece rate for meeting the standard and a lower one for missing it.
The pig iron story, with its caveats
The most famous example in Principles comes from Bethlehem Steel in 1899. A gang of about 75 men loaded pig iron onto rail cars, each bar weighing about 92 pounds. By Taylor's account they averaged 12.5 long tons a man a day, his study showed that a first-class man could load 47 to 48, and a worker he called Schmidt was picked, told exactly when to lift and when to rest, and loaded 47.5 tons a day for $1.85 in place of $1.15.
| Measure | Before | After | Change |
|---|---|---|---|
| Pig iron loaded per man per day, long tons | 12.5 | 47.5 | 3.8 times |
| Daily wage | $1.15 | $1.85 | 1.6 times |
Taylor's own numbers, from The Principles of Scientific Management. Historians dispute how they were arrived at. See the text.
Pig iron, Bethlehem Steel, as Taylor reported it in 1911
- Before
- After
Pig iron loaded per man per day
12.5 long tons47.5 long tons, 3.8 timesDaily wage
$1.15$1.85, 1.6 timesWage per long ton loaded (1.15 / 12.5 and 1.85 / 47.5)
9.2 cents3.9 cents
Taylor reported output per man per day rising from 12.5 to 47.5 long tons, 3.8 times, while the daily wage rose from $1.15 to $1.85, 1.6 times. Divided out, the wage per ton fell from 9.2 cents to 3.9 cents. Historians dispute how the figures were arrived at.
Treat that story with care. In 1974 Charles Wrege and Amedeo Perroni went back to the Bethlehem records and Taylor's earlier drafts. They identified Schmidt as a laborer named Henry Noll, found that the account had changed from one telling to the next, and concluded that it was closer to a parable than to a report of an experiment. Later work by Wrege and Hodgetts reached the same verdict from the primary sources. Other historians reply that Taylor meant it as an illustration and never claimed more.
Two things can be said safely. The 47.5 ton figure should not be quoted as a measured result. And even on Taylor's own numbers, output rose 3.8 times while pay rose 1.6 times, which is the arithmetic his critics have pointed at ever since.
Frank and Lillian Gilbreth and motion study
Frank Gilbreth (1868 to 1924) started as a bricklayer's apprentice in Boston and noticed that no two bricklayers worked the same way, and that each used different motions when working fast, working slow and teaching. He set out to find the best set. His answer was not to hurry the man. It was to change the job: a scaffold that kept bricks and mortar at waist height, bricks delivered already sorted, mortar of the right consistency so that a brick needed no tapping.
| Measure | Before | After |
|---|---|---|
| Motions to lay one brick | 18 | 5 |
| Bricks laid per man per hour | 120 | 350 |
The figures are from Taylor's Principles of Scientific Management, describing Gilbreth's work. Other accounts give four and a half motions. Gilbreth published the method in Bricklaying System (1909) and Motion Study (1911).
Bricklaying: the method changed, not the man
- Before
- After
Motions to lay one brick
18 motions5 motionsBricks laid per man per hour
120 bricks350 bricks, 2.9 times
As reported by Taylor in 1911, Gilbreth cut the motions to lay one brick from 18 to 5, and bricks laid per man per hour rose from 120 to 350, about 2.9 times. Other accounts give four and a half motions.
Whatever the exact numbers, the idea was new and it has lasted: most of the gain came from redesigning the workplace and the method, and none of it from asking for more effort.
- Micromotion study. From about 1912 the Gilbreths filmed work with a fast-running clock in the frame, so that each motion could be timed from the film. This is the ancestor of every video time study.
- Cyclegraphs. A small light on the hand and a long exposure drew the path of a motion as a line of light. A flashing light turned the line into dashes whose spacing showed speed.
- Therbligs. They broke hand work into basic motions such as reach, grasp, transport and hold, and named them with their own surname reversed. A 1915 article lists 16. Later lists have 17 or 18.
- Fatigue and the worker. Lillian Gilbreth (1878 to 1972) took a doctorate in psychology at Brown University in 1915 and wrote The Psychology of Management. She brought rest, skill, training and the worker's own satisfaction into a field that had mostly counted seconds.
After Frank died in 1924, Lillian ran the consultancy, taught at Purdue, and worked for another four decades on everything from factory work to kitchen layout and jobs for disabled workers. She became a member of the American Society of Mechanical Engineers in 1926 and in 1965 was the first woman elected to the National Academy of Engineering. Therbligs and motion economy covers the motion side of their work in detail.
The quarrel with Taylor's followers
The Gilbreths began as admirers of Taylor and ended as rivals. They argued that a stopwatch timed a method nobody had improved, and that the human reading it was too crude an instrument. In December 1920 they read a paper to the Taylor Society with a blunt subtitle that called it an indictment of stopwatch time study. Taylor's followers answered that film was expensive and slow. Both sides had a point, and practice settled it: improve the method first, then time it.
The backlash: a strike, hearings and a ban
Resistance came early. In August 1911 molders at the US Army's Watertown Arsenal in Massachusetts walked out when a stopwatch study began in their foundry. The strike lasted days, but it put scientific management in front of Congress. A House committee held hearings, and Taylor testified at length in early 1912.
The committee did not ban anything. Congress did, piece by piece. From 1915 the army and navy appropriation acts carried a rider forbidding the use of a stopwatch or other time-measuring device to study government employees in arsenals and navy yards, and forbidding bonus payments tied to such studies. The rider was renewed year after year into the late 1940s.
Organized labor's objections were set down in 1915 in Robert Hoxie's Scientific Management and Labor, based on an investigation of plants that used the system. The objections are worth reading because they are the ones you still hear: that the standard is set by one side, that the fastest man becomes the yardstick, that the rate is cut once it is beaten, and that skill is taken from the worker and handed to an office.
Later critics widened the charge. Harry Braverman's Labor and Monopoly Capital in 1974 argued that Taylorism's lasting effect was deskilling: splitting planning from doing so that work could be done by cheaper, more replaceable people. Historians have since argued over how far that describes what happened. That it describes what many workers feared is not in doubt. Time study in a union plant is about answering those fears today.
Gantt, the rating problem and the 1920s
Henry Gantt (1861 to 1919) joined Taylor at Midvale in 1887 and followed him to Bethlehem. He softened the system in two ways that outlived it. His bonus plan, published in 1902, paid a guaranteed day wage and a bonus for meeting the task, in place of Taylor's punishing lower rate. And in the 1910s he drew production schedules as bars against time, the chart that carries his name.
The stopwatch men, meanwhile, had a problem that Taylor had sidestepped. If you time whoever happens to be on the job, you need a way to adjust for how fast that person was working. In 1927 three engineers at Westinghouse, Lowry, Maynard and Stegemerten, published a system that rated the operator on skill, effort, conditions and consistency. Performance rating has been part of time study ever since, and it has remained the part most open to argument. Standard time explains how it is done now.
The same years produced the Hawthorne studies at Western Electric, from 1924 to 1932, which turned attention to the social side of work. The popular version, that output rose simply because workers were being watched, is tidier than the evidence. A 2011 re-analysis of the original lighting data by Levitt and List found the famous pattern hard to see in the numbers. The safer lesson is the old one from Babbage: people who know they are observed do not behave quite as usual.
Barnes, Tippett and Maynard: the method takes its modern shape
By the 1930s the quarrel between time study and motion study had cooled, and teachers put the two together. Ralph Barnes published Motion and Time Study in 1937. It taught method improvement first and measurement second, added principles of motion economy, and went through many editions as the standard textbook. The order in its title was deliberate.
- Work sampling. In 1935 the statistician L.H.C. Tippett described a snap-reading method for British textile mills: glance at many looms at random moments and count how many are stopped. It measured what a stopwatch could not. See work sampling.
- Predetermined times. If every job is built from the same basic motions, the motions can be timed once and for all. Harold Maynard, Gustave Stegemerten and John Schwab published Methods-Time Measurement in 1948, with times in units of a hundred-thousandth of an hour. It is the Gilbreths' therbligs with Taylor's numbers attached.
- Simpler systems. MODAPTS came from Australia in 1966. MOST was developed at Maynard's firm in Sweden and released there in 1972 and in the United States in 1974. See predetermined motion time systems.
- Memomotion. Marvin Mundel slowed the camera to one frame a second to study long jobs and crews, the forerunner of time lapse studies.
By mid century the toolkit was complete: stopwatch study with rating and allowances, work sampling, predetermined times, and film. Everything since has been a change in who uses the tools and how fast.
What Toyota kept and what it changed
Toyota did not reject time study. It rebuilt it. American job training methods reached Japan after the war, and from 1955 the consultant Shigeo Shingo taught an industrial engineering course to Toyota engineers and supervisors, by his own count to about 3,000 people over 25 years. Taiichi Ohno, the architect of the production system, described that system as Toyota-style industrial engineering and insisted that it had to pay for itself in lower cost.
| Taylor's system | Toyota's standardized work | |
|---|---|---|
| Who times the job | A specialist from the planning department | The team leader and supervisor, with the operators |
| Who owns the method | The planning department | The team that does the work |
| What the time is compared with | A day's work for pay | Takt time, the pace of customer demand |
| What the standard is for | A fixed target to be met | A baseline to be improved, then rewritten |
| What a faster time leads to | At worst, a rate cut | A new standard and work moved between people to match takt |
| The stopwatch | Kept | Kept |
A simplified contrast. Many plants calling themselves lean run closer to the left column than they would admit.
The technique is nearly the same. Toyota's standard work rests on timing each element over several cycles, as Taylor's did. The change is in ownership and purpose. Ohno held that standards should be set by the people on the line, and he is often quoted as saying that a standard left unchanged for long is a sign that nobody is improving. That answers the oldest criticism of Taylor, the split between thinking and doing, without giving up measurement. The Toyota Production System guide has the wider picture.
What still holds
- Measure, do not guess. Before Taylor, a fair day's work was whatever the foreman and the men could force on each other. A measured time, openly arrived at, is still better than an opinion.
- Break work into elements. It is how you find the slow part, compare methods and reuse times.
- Fix the method before you time it. This is the Gilbreths' lasting point, and Barnes built a textbook on it.
- Most waste is in the workplace, not the worker. Gilbreth's scaffold did more than any exhortation.
- Rest is part of the job. Taylor's pig iron handlers were told when to sit down. Allowances for fatigue are not a concession.
- Standards make improvement visible. You cannot show a change is better without a baseline.
- Use the camera. The Gilbreths were right that a record you can replay beats a reading you cannot.
What has been criticised, fairly
- Separating thinking from doing. Giving the method to an office and the doing to the worker wastes what operators know and breeds the resentment that sinks standards.
- The first-class man. A standard set on the best worker on the best day is unfair to everyone else. Modern practice studies a qualified operator at a normal pace.
- Rate cutting. Where beating the standard led to a tighter standard, workers learned to hold back. Taylor himself warned against it. Many of his imitators did it anyway.
- One best way. Taylor and the Gilbreths both spoke as if a single best method existed and would stay best. Toyota's answer is that the best method is only the best one found so far.
- False precision. Rating and allowances are judgments. A standard quoted to three decimal places rests on an estimate of pace that two trained people may score a few points apart.
- Stories told as data. The pig iron tale shows how an illustration hardens into a fact. Treat any century-old productivity figure, and any modern one, by asking how it was measured.
- Ignoring the person. Early studies counted motions and seconds and little else. Fatigue, posture and injury came into the field later, largely through Lillian Gilbreth and then through ergonomics.
The same arguments are live again wherever software sets a pace for people, in warehouses and elsewhere. The technology is new. The questions are Hoxie's from 1915: who sets the standard, on what evidence, and can the people held to it see and challenge it?
From film to phone: where the method is now
The Gilbreths needed a hand-cranked camera, a special clock and hours with a projector to study one job. That cost is why the stopwatch won for most of a century. A phone now records better footage than their camera, and software can find the elements in it. In a sense the Gilbreths' method has finally become as cheap as Taylor's.
LeanSuite's time and motion study is one example: you film the station, the AI times every element on a timeline linked to the video, and an engineer reviews and certifies the result. The history above is the reason for that last step, and for doing the study in the open. The tools have changed more than the lessons. Time study from video covers the practical side.
Key dates in the history of time and motion study
| Year | Who | What |
|---|---|---|
| 1776 | Adam Smith | Describes the division of labor in a pin workshop in The Wealth of Nations |
| 1832 | Charles Babbage | Tabulates the time and cost of each pin making operation |
| Early 1880s | Frederick Taylor | Begins stopwatch time study at Midvale Steel |
| 1899 | Frederick Taylor | Pig iron handling study at Bethlehem Steel |
| 1903 | Frederick Taylor | Publishes Shop Management |
| 1909 | Frank Gilbreth | Publishes Bricklaying System |
| 1911 | Taylor and Gilbreth | The Principles of Scientific Management and Motion Study appear. Watertown Arsenal walkout |
| 1915 | Congress, the Gilbreths | First appropriation rider against stopwatch study in government arsenals. Sixteen therbligs listed in print. Lillian Gilbreth takes her doctorate. Taylor dies |
| 1921 | The Gilbreths | Their indictment of stopwatch time study is printed by the Taylor Society |
| 1927 | Lowry, Maynard, Stegemerten | The Westinghouse system of performance rating |
| 1935 | L.H.C. Tippett | The snap-reading method, later called work sampling |
| 1937 | Ralph Barnes | Motion and Time Study, the standard textbook |
| 1948 | Maynard, Stegemerten, Schwab | Methods-Time Measurement, the first widely used predetermined time system |
| 1955 | Shigeo Shingo | Begins teaching industrial engineering at Toyota |
| 1972 | H.B. Maynard and Company | MOST released in Sweden, and in the United States in 1974 |
| 1974 | Braverman; Wrege and Perroni | Labor and Monopoly Capital, and the paper that re-examined the pig iron story |
| 1978 | Taiichi Ohno | Toyota Production System published in Japan |
Go deeper
This page is the short version. These guides cover each part in full.
- The History of Lean Manufacturing: From Ford to Toyota to TodayWhat happened next: how Ford and then Toyota built production systems on these foundations.
- What Is the Toyota Production System?The system Ohno called Toyota-style industrial engineering.
- Standard Work in Manufacturing: A Complete GuideStandardized work, the form in which time study survives on a lean shop floor.
- Lean Leadership: Developing People in ManufacturingThe answer lean gives to the split between thinking and doing.
All our articles on this subject are in the lean manufacturing fundamentals topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Turns video of real work into time studies, line balance charts, changeover splits and other studies you review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about history of time and motion study
Two sets of people. Frederick W. Taylor developed time study, timing the elements of a job with a stopwatch, at Midvale Steel in the early 1880s. Frank and Lillian Gilbreth developed motion study, analysing and improving the motions of a job with film, from about 1909. Later engineers and teachers, Ralph Barnes among them, combined the two into motion and time study in the 1930s.
Frederick Winslow Taylor (1856 to 1915) is credited as the founder of time study and is widely called the father of scientific management. He began stopwatch studies of machine shop work at Midvale Steel in the early 1880s and set out the method in Shop Management in 1903. Frank Gilbreth is called the father of motion study.
Originally to set a fair day's work and the piece rate paid for it, and to find a better method for the job. Taylor used time study to set output standards and incentive pay. The Gilbreths used motion study to remove wasted motion and fatigue. Today the same studies feed standard times, staffing, line balancing, costing and improvement work.
Taylor started from time: how long should this job take, measured with a stopwatch, so that a standard and a pay rate could be set. The Gilbreths started from method: what is the best way to do the job, studied on film, so that wasted motions could be removed. The Gilbreths criticised timing a method nobody had improved. Modern practice does both, method first.
Only loosely. Taylor wrote that a laborer he called Schmidt raised his loading from 12.5 to 47.5 long tons a day at Bethlehem Steel. In 1974 Wrege and Perroni compared the account with company records and Taylor's earlier drafts and found that it changed between tellings and was closer to a parable than a report. The figures should not be quoted as measured results.
Therbligs are the basic motions into which the Gilbreths divided manual work, such as search, grasp, transport loaded, position and hold. The word is Gilbreth spelled backwards with two letters swapped. A 1915 article lists 16, and later lists have 17 or 18. They are the ancestors of the motion tables in predetermined time systems such as MTM.
Its techniques are. Breaking work into elements, timing them, adding allowances and setting a standard are still how time standards are built. What most plants have dropped, at least in principle, is the idea that specialists alone decide the method. In Toyota-style standardized work, team leaders and operators time the job themselves and the standard is a baseline to improve.
After molders at the Watertown Arsenal walked out over a stopwatch study in 1911, a House committee held hearings on the Taylor system. From 1915, army and navy appropriation acts carried a rider that barred using a stopwatch or other time-measuring device to study government workers in arsenals and navy yards, and barred bonus pay based on such studies. The rider was renewed into the late 1940s.
Related guides and tools
- Time and motion study: the method as it is practised now
- Therbligs and motion economy: the Gilbreths' side of the story in detail
- Predetermined motion time systems: MTM, MOST and MODAPTS
- Time study in a union plant: answering the old objections today
- Toyota Production System: what Toyota built on these foundations
- Standard work: time study in the hands of the team
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.