Practical guide · Lean leadership and employee engagement
Time study in a union plant: the people side
Short answer
In a union plant, agree the rules before the study: its purpose, who is studied, who may observe, who sees the data and how a standard can be challenged. Tell the crew in person, involve the operator, never time or film in secret, and share results with them first.
A time study in a union plant succeeds or fails before the stopwatch starts. Read the collective agreement, then meet the union committee and agree the purpose, the jobs, the method, who may observe, who sees the data and the route for challenging a result. Tell supervisors and the crew in person a few days ahead. Study a qualified operator who knows it is happening, with a union observer present if the agreement or good sense calls for it. Show the operator the readings first, review the result jointly, and change a standard only when the method changes. This is general guidance, not legal advice.
Last reviewed:
What works, in one page
The technical part of a time study is the same everywhere. What differs in a represented plant is that the people being studied have a formal voice, a contract and usually a long memory. Treat that as an advantage. A standard the union has watched being set, checked and agreed is one you will not be arguing about in a year.
- Rules first. Agree how studies are done before you need one.
- No surprises. Everyone affected hears about the study from a person, ahead of time.
- Nothing hidden. No secret timing, no concealed cameras, no data the union cannot see.
- The operator is a participant, not a specimen.
- Results go to the people studied before they go up the line.
- A way to challenge the result that both sides trust.
Most of this is good practice in any plant. The time and motion study guide covers the method. This page covers the people. It is general guidance and not legal advice: labor law differs by country and state, and your agreement is its own law. Check both with HR and counsel.
Why operators and unions worry about time studies
The worry is earned. Time study arrived in American industry tied to piece rates, and to the rate cut that often followed when people beat the rate. In 1911 molders at the Watertown Arsenal walked out when a stopwatch study began in their foundry. Congress held hearings, and from 1915 its appropriation acts barred stopwatch studies in government arsenals for decades. Sociologists such as Donald Roy later documented how machine shop crews held output down so the rate would not be cut. None of that is ancient history to a union committee. It is why the clauses in your agreement exist.
- The rate will be tightened. Work faster during the study and that pace becomes the minimum for good.
- Jobs will go. A study that finds 20 percent waste reads, on the floor, as one job in five.
- It will be used against individuals. The slowest person on the sheet gets the conversation with the supervisor.
- The study will not be fair. The fastest operator on the best day with the best parts becomes the standard for everyone.
- Judgment calls go one way. Rating and allowances are opinions, and the opinions belong to management's engineer.
- The camera never forgets. Video can be copied, kept and watched by people who were not there.
- Nobody asked us. The people who know the job best are the last to hear.
Every worry has an answer you can keep
“The rate will be tightened.”
A standard stays until the method, tooling or materials change. Never re-study because people are beating the rate.
“Jobs will go.”
Decide before the study what happens to the people if the job needs fewer hours, and say it early.
“It will be used against individuals.”
Study the job, not a person. Nobody's individual times go to the supervisor or into a file.
“The study will not be fair.”
Time a qualified operator at a normal pace on a normal day, not the fastest person with perfect parts.
“Judgment calls go one way.”
Explain the rating and allowances, let a union observer take their own readings, and list what is still open.
“The camera never forgets.”
Open filming only, a named list of viewers, one purpose and a deletion date, then keep to it.
“Nobody asked us.”
The union hears first, then the supervisors, then the crew, then the operator, each in person.
Seven worries and the commitment that answers each: the standard stays until the job changes; decide early what happens to people; study the job and not a person; time a qualified operator on a normal day; explain rating and allowances and let the union observer take readings; film openly with named viewers and a deletion date; tell the union, then supervisors, the crew and the operator, in that order.
Every one of these has an answer, and the answer is a commitment you can keep, not a reassurance. If you cannot make the commitment, do not give the reassurance. Resistance to change on the shop floor explains why objections like these are information, not obstruction.
What the law and agreements say, in general
This section is a map, not advice. It names the kinds of rule that usually apply so that you know what to ask your labor relations lead and counsel.
Your collective agreement
Start here, because it is the rule that most directly binds you. Language on time study has been common in manufacturing agreements for generations. A 1948 survey of contract clauses by the US Bureau of Labor Statistics already listed the main types, and you will recognize them in agreements today.
- Notice: the union is told before a study is made.
- Knowledge: studies are made with the knowledge of the employee, and secret studies are barred.
- Observation: the union may have its own observer or time study representative present.
- Access to data: the study sheets and calculations are open to the union.
- The operator and the pace: standards are set on a qualified employee working at a normal pace under normal conditions.
- Stability: an established rate is not changed unless the method, tooling, materials or equipment change.
- Challenge: a standard can be grieved, often with a joint re-study and arbitration as later steps.
Your agreement may have all, some or none of these, and past practice in the plant can matter as much as the text. Read it with someone who has lived with it.
Labor law
- United States. The National Labor Relations Act requires an employer and a recognized union to bargain in good faith over wages, hours and other terms and conditions of employment. Production standards that drive pay or discipline often fall inside that, so a new or changed system may need to be bargained and not simply announced. Ask counsel before you change one.
- Information. Unions are generally entitled to information they need to police the agreement, and time study data behind a disputed rate is a classic example. Whether a union may bring its own engineer into the plant to run a study has gone both ways in the US courts, depending on the facts.
- Germany. The Works Constitution Act gives the works council a right of co-determination over technical devices designed to monitor employees' behavior or performance, and over piece and bonus rates and similar performance pay. A video study will usually need a works agreement.
- Elsewhere. Many countries have works council or consultation rules with similar effect. Assume there is one and find it.
Cameras and data
- In the United States, the labor board has treated the installation of hidden surveillance cameras as something an employer must bargain over. Open filming for a study is a different thing, but the lesson stands: talk first.
- In the EU and the UK, video of an identifiable worker is personal data. The UK regulator's guidance on monitoring workers says to tell them, to have a lawful basis, and to assess the impact first where the monitoring is intrusive.
- Some US states require notice of electronic monitoring, Connecticut among them, and Illinois regulates biometric identifiers such as scans of face geometry, which can matter if software identifies people by their faces.
- Whatever the law requires, the practical rule is stricter: nobody should learn they were filmed after the fact.
Agree the ground rules before you need them
The worst moment to negotiate how studies are done is the week you need one. If your agreement is thin on the subject, propose a short joint protocol while nothing is at stake. One or two pages, signed by both sides, that answers these questions.
- Purpose. What may a study be used for: standards, line balance, quoting, improvement, ergonomics? What may it not be used for?
- Trigger. When is a study done: new job, method change, a request from either side?
- Notice. Who is told, how far ahead?
- Who is studied. A qualified, trained operator, on a normal day, on the standard method.
- Who watches. May a steward or a union time study representative observe, and take their own readings?
- Method. Stopwatch, video or a predetermined time system. How pace is rated and which allowances apply.
- Data. Who gets the sheets, the video and the calculation, and when.
- Video. Where it is kept, who can view it, when it is deleted, and what it may never be used for.
- Challenge. How a result is questioned, who re-studies, how long each step takes.
- Changes. A standard stays until the job changes. Say so in writing.
Some unions train their own time study representatives, and a few larger ones have had industrial engineering staff for decades. A trained union observer is good news. They know what a fair study looks like, and their agreement carries weight on the floor that yours does not.
A communication plan for one study
People should hear about a study in the right order: the union before the supervisor's crew, the supervisor before the operator, the operator before the camera. Each should hear it from the person they would expect to hear it from. The plan below is an example for one study. Shorten it for a routine re-study and lengthen it for the first study a plant has seen in years.
| When | Who talks to whom | What is covered |
|---|---|---|
| Day minus 14 | Plant or HR lead and the engineer, with the union committee | Why this job, what the study is for, method, dates, observer, data and video rules. Ask for concerns and adjust. |
| Day minus 10 | Engineer with the area supervisor and team leader | The same message, plus what the supervisor should say and not say. The supervisor must not hear it from the steward. |
| Day minus 5 | Supervisor and engineer with the crew, steward present | The crew talk: what, why, when, what it will not be used for. Take questions. Ask who is willing to be studied. |
| Day minus 1 | Engineer with the operator, one to one | Walk the elements together. Confirm the method, the parts and that tomorrow is a normal day. Agree where the observer and camera will stand. |
| Day 0 | Engineer, operator, union observer | The study. Say when timing starts and stops. Note anything abnormal aloud. |
| Day plus 2 | Engineer with the operator | The readings and, if filmed, the video. Was it a normal run? Correct what is wrong. |
| Day plus 5 | Engineer with the steward or union time study representative | The full calculation: element times, rating, allowances. Agree or list the open points. |
| Day plus 10 | Supervisor and engineer with the crew | The result, what changes and what does not, and what was fixed because of what the study found. |
| Day plus 30 | Engineer with operator and steward | Is the standard holding? Anything changed in the job since? |
The days are an example, not a rule. Your agreement may set notice periods of its own.
Who hears about the study, and when
Example numbers14 days beforeThe union committee
Plant or HR lead and the engineer: why, method, dates, observer, data and video rules.
10 days beforeThe supervisor and team leader
The same message, plus what to say and not say.
5 days beforeThe crew, steward present
What, why, when, what it will not be used for.
The day beforeThe operator, one to one
Walk the elements. Confirm tomorrow is a normal day.
Study dayEngineer, operator and union observer
Say when timing starts and stops.
2 days afterThe operator
Readings and video. Was it a normal run?
5 days afterThe steward or union time study representative
The full calculation: times, rating, allowances.
10 days afterThe crew
The result, what changes, what was fixed.
30 days afterOperator and steward
Is the standard holding?
Nine conversations around one study. The union committee 14 days before, supervisors 10 days before, the crew 5 days before, the operator the day before. The study itself on day 0. Then the operator 2 days after, the steward 5 days after, the crew 10 days after and a check with the operator and steward 30 days after.
A script for the crew talk
Say it standing at the line, in plain words, in about three minutes. Adapt the words below to what is true in your plant. Do not say any line you cannot stand behind.
- What: "Next Tuesday we are going to study the bracket station on first shift. I will be timing each step of the job for about an hour, and filming it from over there so we can check the times afterwards."
- Why: "The standard for this job is from before the new fixture went in. It is wrong, and you have been telling us so. We need a number that matches the job as it is today."
- What it is not: "This is a study of the job, not of a person. Nobody's individual times go to the supervisor or into a file. The result is not being used to cut heads on this line."
- Who: "We need someone who knows the job well and works at a steady, normal pace. Not a race. If you would rather not be the one, that is fine."
- The union's part: "The committee has seen the plan. Your steward will be there on the day and gets the full calculation afterwards."
- The video: "Only I and the steward will watch it. It stays on the engineering drive and it is deleted when the new standard is signed off."
- What happens next: "Whoever is studied sees the numbers first. Then we bring the result back to all of you, with anything we found that makes the job harder than it should be."
- Ask: "What should I know about this job before I time it? What goes wrong that I will not see in an hour?"
What never to say
- "Just work normally, ignore me." Nobody can, and it tells them you do not understand what you are asking.
- "This will not affect anyone's job" when you do not know that.
- "It is only for information" when it will set a standard.
- "Management needs the numbers." It makes the study something done to them.
- "We will see who is pulling their weight."
- Anything about the union you would not say with the steward standing there.
If a question comes that you cannot answer, say so and come back with the answer the next day. A crew will forgive not knowing. It will not forgive a guess that turns out wrong. Difficult conversations at work has more on preparing for a talk like this.
Involving the operator in the study
An operator who helped build the study will defend it. One who was watched in silence will pick it apart, and will often be right, because they know things about the job that an hour of observation cannot show.
- Build the element list together. Ask the operator to talk you through the job step by step and use their words for each element.
- Ask what a normal day looks like, and what makes a bad one. Those are your delay allowances and your improvement list.
- Agree the method before you time it. If the operator's way differs from the written way, find out why. Often the written way is out of date.
- Say when you are timing and when you are not.
- Let the operator see the sheet or the screen. Readings made in the open are rarely disputed.
- Go through the result together before anyone else sees it. Ask one question: is this what the job really takes?
- Fix something they raised. A study that leaves the job easier is remembered differently from one that only left a number.
The same goes for the union observer. Offer them your element list and break points before the study. If they take their own readings, compare afterwards. Two sets of readings that agree end the argument about the times and leave only the judgment calls, which is where the discussion should be.
Using video, with consent
Video makes a study more transparent, because the union can check every reading against the footage. It also raises the stakes, because footage outlives the study. Write the rules down and agree them before the first recording.
- Ask, do not assume. The operator agrees to be filmed, knowing what for. If they decline, find another operator or use a stopwatch.
- Film the job, not the room. Frame the station so that people who are not part of the study are not in the shot.
- Open filming only. The camera is visible and everyone nearby knows when it is recording.
- A short list of viewers. Name them: the engineer, the operator, the union representative.
- One purpose. The footage sets this standard. It is not evidence for discipline and not material for training or marketing without going back to the people in it.
- A deletion date. Tie it to an event, such as sign-off of the standard or the end of the grievance window, and show that it happened.
- Give the union the same access you have. A recording only management can watch is worse than no recording.
If you use software to analyse the footage, tell the union what it does and does not do. LeanSuite's time and motion study works from a recording you upload, links every time to the frame it came from so anyone can check it, and leaves the review and sign-off to a person. It does not watch a live camera. Time study from video covers the filming itself.
What builds trust and what destroys it
| Builds trust | Destroys trust |
|---|---|
| Telling the union and the crew before the study, in person | A stranger with a clipboard appearing at the station |
| Studying an average, qualified operator on a normal day | Studying the fastest person, or a day with perfect parts |
| Timing in the open, with the sheet visible | Timing from across the aisle, or a camera nobody mentioned |
| Sharing every reading and the full calculation | Announcing a number with no working |
| Explaining the rating and the allowances, and listening to the challenge | "That is what the study says" |
| Fixing a problem the study exposed | Raising the rate and leaving the problems |
| Leaving a standard alone until the job changes | Re-studying because people are beating the rate |
| Saying plainly what happens to people if the job needs fewer hours | Silence about headcount |
| Deleting the video when you said you would | Footage turning up in a disciplinary meeting |
The right-hand column works fast. One item from it can undo years of the left.
The hardest line in the table is the one about people. If a study may lead to fewer hours on a job, decide before you start what happens to the people: redeployment, attrition, growth. Say it early. A workforce that believes improvement costs jobs will make sure there is no improvement, and no study method gets around that.
How to run the study, start to finish
The study, start to finish, in nine steps
- 1
Read the agreement and ask about past practice
- 2
Meet the union committee
- 3
Brief the supervisors
- 4
Talk to the crew
- 5
Prepare with the operator
- 6
Study in the open
- 7
Review with the operator, then the union
- 8
Settle open points by the agreed route
- 9
Report back, fix something, and follow up
- 1
Read the agreement and ask about past practice
Find every clause on standards, time study, incentive pay, cameras and information. Ask the labor relations lead how studies have been handled before.
- 2
Meet the union committee
Explain the purpose, the job, the method and the dates. Agree who observes, who gets the data and how the video is handled. Write it down.
- 3
Brief the supervisors
They get the questions on the floor. Give them the same facts the union has, and the words to use.
- 4
Talk to the crew
In person, with the steward there, a few days ahead. Say what the study is for and what it is not for. Ask for a volunteer who is qualified and works at a normal pace.
- 5
Prepare with the operator
Walk the job together, agree the elements and the method, and check that study day will be a normal day.
- 6
Study in the open
Observer present, sheet or camera visible, start and stop announced. Note every interruption and its cause.
- 7
Review with the operator, then the union
Readings and video to the operator first. Then the full calculation to the steward or the union's time study representative. List what is agreed and what is open.
- 8
Settle open points by the agreed route
A joint re-check of the element in question usually does it. Use the grievance steps if not.
- 9
Report back, fix something, and follow up
Tell the crew the result and what changed because of the study. Check after a month that the standard holds, and leave it alone until the job changes.
When a standard is challenged
A challenge is the system working. Treat it as a technical question with a technical answer.
- Find out which part is in dispute. It is nearly always one of four: an element missed, the method changed, the rating, or the allowances.
- For a missed element or a changed method, go and look together. If the job is not the job you timed, re-study it.
- For a rating dispute, watch the same cycles together, on the floor or on the video, and rate them separately before comparing. If your plant has rating films or benchmark jobs, use them.
- For allowances, go back to what was agreed. If nothing was agreed, that is the gap to close.
- Offer a joint re-study early. It costs an hour and often ends a dispute that would have run for months.
- Keep running the old standard, or an agreed temporary one, while the question is open. Do not impose the disputed one.
- Whatever the outcome, write down what was learned and put it in the protocol.
A challenged standard is nearly always one of four things
Is it about
An element was missed
Go and look at the job together.
Is it about
The method changed
If the job is not the job you timed, re-study it.
Is it about
The rating
Watch the same cycles together, rate them separately, then compare. Use rating films or benchmark jobs if you have them.
Is it about
The allowances
Go back to what was agreed. If nothing was agreed, that is the gap to close.
While it is open: keep running the old standard, or an agreed temporary one. Do not impose the disputed one.
Find which part is in dispute. An element was missed: look at the job together. The method changed: re-study the job as it is now. The rating: watch the same cycles together and rate them separately before comparing. The allowances: go back to what was agreed. While the question is open, keep the old standard or an agreed temporary one, and offer a joint re-study early.
If a standard is being missed and nobody has challenged it, do not start with the people. Start with the job: parts, tools, training, the method. How to get employees to follow procedures sets out that order of questions.
Go deeper
This page is the short version. These guides cover each part in full.
- Lean Leadership: Developing People in ManufacturingThe respect for people half of lean, which a study either shows or contradicts.
- How to Increase Employee Engagement in ManufacturingWhy involvement in decisions about the work matters more than any message about it.
- Strategies to Engage Factory Floor TeamsPractical ways to bring crews into improvement work.
- Standard Work in Manufacturing: A Complete GuideWhat happens to a time standard once it is agreed: it becomes the baseline for the next improvement.
All our articles on this subject are in the lean leadership and employee engagement topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyErgonomic Study
Posture risk scored from the same video, so a study can also make the job easier on the body.
See Ergonomic Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time study in a union plant
Yes. Time studies are done in unionized plants every day. What changes is the process. The collective agreement usually sets rules on notice, on who may observe, on access to the data and on how a standard is challenged, and labor law may require bargaining over a new standards system. Read the agreement, involve the union early and study in the open. This is general guidance, not legal advice.
Because of how they have been used. Time study grew up alongside piece rates, and workers who beat a rate often saw it cut. Unions also object to studies of the fastest operator, to rating and allowances decided by management alone, to data they cannot see, and to video that can be kept and reused. Each objection points to a rule worth agreeing in advance.
Often, yes. Many agreements say so directly, and in the United States unions are generally entitled to information they need to administer the contract, which has included time study data behind a disputed rate. Whether a union can run its own study inside the plant has depended on the facts of each case. Check your agreement and ask counsel.
Do not. Many agreements bar secret studies outright, some laws require notice of monitoring, and a concealed study gives poor data and worse relations once it comes out. Good practice in any plant is that the operator, the supervisor and any union representative know when a study is being made and what it is for.
In person, a few days ahead, in plain words. Say which job, when and why. Say it is a study of the job and not of a person, and what the result will and will not be used for, but only what is true. Say who will see the data and any video. Then ask what you should know about the job before timing it.
Usually, if it is agreed and open. Get the operator's consent and the union's agreement first, and write down who may view the footage, where it is kept, what it may be used for and when it is deleted. In some countries a works council must agree to it, and data protection law applies to video of identifiable people. Never film covertly.
A union time study steward or representative is a member trained in work measurement who watches studies on the union's behalf. They may observe, take their own readings, check the rating and allowances, and review the calculation before a standard is agreed. Many agreements provide for the role. A trained observer usually makes agreement quicker, because both sides are looking at the same evidence.
The usual rule, written into many agreements, is that an established standard stays until the job changes: a new method, tooling, material, equipment or layout. Then only the affected elements are re-studied. Re-studying a job because people are beating the standard is the fastest way to teach a workforce to hold output down.
Related guides and tools
- Difficult conversations at work: how to prepare and what to say
- Resistance to change on the shop floor: what objections are telling you
- How to get employees to follow procedures: fix the job before the person
- Time study from video: filming with consent
- Standard time: rating and allowances
- The history of time study, including why unions distrust the stopwatch
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.