Short answer
A video time study times each element of a job from a recording instead of a stopwatch. Film a fixed, wide view of several whole cycles, then read the start and end of each element off the frames. At 30 frames a second each reading is good to 0.03 second.
To run a time study from video, tell the operators first, fix the camera on a tripod 4 to 6 metres away at about 45 degrees to the work, and record whole cycles in one continuous take at 1080p and 30 frames a second. Then list the elements with a visible break point for each, step through the video, note the timecode at every break point and subtract. Rate the pace, add allowances, and check that the element times add up to the length of the clip. The camera does not see weight, force, heat or anything outside the frame, so stand at the station as well.
Last reviewed:
What is a video time study?
One cycle on the clip, read off the timecodes
Example numbersGet housing and seat it in the fixture00:12:04 to 00:17:19, 165 frames
5.50 s
Fit two brackets00:17:19 to 00:29:10, 351 frames
11.70 s
Drive four screws00:29:10 to 00:44:25, 465 frames
15.50 s
Inspect and place in tote00:44:25 to 00:51:01, 186 frames
6.20 s
Cycle00:12:04 to 00:51:01, 1,167 frames
38.90 s
The first cycle of the bracket station runs from timecode 00:12:04 to 00:51:01, 1,167 frames or 38.90 seconds at 30 frames a second. It splits into four elements of 5.50, 11.70, 15.50 and 6.20 seconds.
A video time study is a time study where the watch is replaced by a recording. You film the job, then find the instant each element starts and ends by stepping through the frames. The rest is the same as any time study: elements, cycles, a pace rating, allowances and a standard time.
The idea is over a century old. Frank and Lillian Gilbreth filmed work with a clock in the shot and called it micromotion study. Barnes describes cameras running at 16 frames a second, 960 a minute, and motor-driven ones at 1,000 a minute so that one frame was a thousandth of a minute. What changed is the cost. A phone on a tripod now does what took a film crew.
- You can replay. A stopwatch gives one chance at each reading. Video lets you go back, slow down and check.
- Short elements become measurable. A two second element is at the edge of what a stopwatch can read. On video it is 60 frames.
- The record is the evidence. Anyone who doubts a number can look at the frames it came from, including the operator.
- The observer can watch the job, not the watch. You are free to notice the reach, the fumble and the wait for parts.
- One recording feeds more than one study. The same footage shows the method, the walking and the posture.
It is not always the better tool. If you need one rough cycle time for a quote today, a stopwatch is quicker. If the work moves across the plant, a fixed camera cannot follow it and work sampling fits better. And if filming is going to cost you the trust of the people at the station, sort that out before anything else.
Before you film: notice, consent and the rules for the footage
A camera pointed at a person at work is a bigger ask than a stopwatch. The footage shows a face, it can be copied, and it can be watched by people who were not there. Settle the rules before the tripod comes out. This is general practice, not legal advice: privacy and labor rules differ by country and by state, and your HR lead or counsel should check the plan.
- Say what is being filmed and why, in the team's own meeting, at least a few days ahead. Name the job, the day and the purpose: a standard, a line balance, a kaizen.
- Say what the footage will not be used for. If it will not be used for discipline or to compare individuals, say so, and only if that is true.
- Never film in secret. A hidden camera gets you one study and loses you the next ten.
- Ask who is willing. Study a qualified operator who agrees to be filmed. If someone would rather not be in the shot, plan around it.
- Involve the union or works council where there is one. Many agreements cover work measurement and cameras. See time study in a union plant.
- Write down who can view the video, where it is kept and when it is deleted. Then keep to it.
- Offer the operator the first look. People who have seen their own footage and their own numbers argue far less about the result.
Where the law treats video of an identifiable person as personal data, as it does across the EU and the UK, you will also need a stated purpose, a legal basis and a retention period. Some places add rules on notice of electronic monitoring or on software that identifies people by their face. Check which apply to your plant.
Where to put the camera
The recording decides how good the study can be. One rule covers most of it: every break point you plan to time has to be visible in a paused frame. If you cannot see the hand leave the part, you cannot time the element that ends there.
- Fix the camera. A tripod or a clamp, never a hand. A moving frame makes break points hard to judge.
- Stand 4 to 6 metres back with a phone's main lens. At 5 metres the scene is about 6.7 metres wide and a person is about 199 pixels across in a 1080p frame.
- Film from the front quarter, about 45 degrees to the line of work, at head height or a little above and tilted slightly down. Straight on, the body hides the hands. From behind, you see a back.
- Keep the whole cycle in the frame. If the operator walks to a rack for parts, the rack is part of the job and belongs in the shot.
- Put the light behind the camera. A window or an open dock door behind the operator turns a person into a silhouette.
- Use a second camera for detail. One wide view for the cycle, one close view of the hands if the fine work matters.
Where the camera goes, seen from above
- Fixed on a tripod, never held.
- 4 to 6 m back. At 5 m a person is about 199 pixels across at 1080p.
- Front quarter, about 45 degrees to the line of work.
- Head height or a little above, tilted slightly down.
- Whole cycle in frame, including the walk to the rack.
- Light behind the camera, not behind the operator.
Top view. The operator faces a bench. The camera stands on a tripod 4 to 6 metres away, at the front quarter, about 45 degrees to the line of work. Its lens covers about 6.7 metres at 5 metres, so the bench and the parts rack are in the frame. The light is behind the camera and no bright window is behind the operator.
The filming guide has the sums for distance, pixels, file size and battery, and the video time study filming checklist is the page to print and take to the floor. This guide does not repeat them.
Frame rate, resolution and lighting
Frame rate sets the smallest time you can read. Resolution sets what you can see. Light decides whether either is worth anything.
| Setting | Use | Why |
|---|---|---|
| Frame rate | 30 frames a second | One frame is 0.033 second, about 0.0006 minute. That is 18 times finer than a stopwatch tick of 0.01 minute. |
| Higher frame rate | 60 frames a second, only for elements under about a second | Halves the reading error and doubles the file. Rarely needed for assembly work. |
| Lower frame rate | 1 frame a second or time lapse, for work that runs for hours | Mundel's memomotion study used 60 or 100 frames a minute for long cycles and crews. You lose the short elements and keep the shape of the job. |
| Resolution | 1080p | Enough to see hands and parts at 4 to 6 metres. 4K has four times the pixels and much larger files. |
| Frame rate lock | Turn off automatic frame rate if the camera has it | Some phones drop to 24 frames a second in low light. The timecode still works, but be sure which rate you are counting in. |
| Stabilization and zoom | Off | Both move the picture. A fixed, unzoomed frame keeps break points easy to judge. |
| Light | Bright, even, from behind the camera | Dim light blurs fast hands, because the camera holds each frame open longer. |
| Sound | On, unless your rules say otherwise | A click, a torque tool or a cycle start beep is often the clearest break point there is. |
Time each element from the video's own clock or frame count, not from the wall clock. If the software shows only seconds, step frame by frame and count.
A reading can be off by up to one frame at each end of an element. At 30 frames a second that is at most 0.067 second on any one element. On a 5.5 second element it is about 1 percent. On a half second element it is 13 percent, and that is when 60 frames a second pays for itself.
One frame at each end: how far a reading can be off
Example numbers5.5 second element at 30 frames a second
Worst case 0.067 s (up to a frame at each end) is 1.2 percent of the 5.5 s element.
0.5 second element at 30 frames a second
Worst case 0.067 s (up to a frame at each end) is 13.3 percent of the 0.5 s element.
0.5 second element at 60 frames a second
Worst case 0.033 s (up to a frame at each end) is 6.7 percent of the 0.5 s element.
- Red marks the share of the element a reading could be off by, split between its two ends. Each bar is the whole element.
A reading can be off by up to one frame at each end of an element. At 30 frames a second that is at most 0.067 second. On a 5.5 second element it is 1.2 percent. On a half second element it is 13.3 percent, and 6.7 percent at 60 frames a second.
How to run a time study from video
The filming takes an hour. Most of the quality comes from the steps before the camera is switched on and the checks after the log is done.
A video time study in eight steps
- 1
Agree the purpose and tell the team
- 2
Standardize the job, then list the elements
- 3
Place the camera and do a pause test
- 4
Film whole cycles in one take
- 5
Note what the camera cannot see
- 6
Log the break points
- 7
Rate, add allowances and work out the standard
- 8
Check, review with the operator and file
- 1
Agree the purpose and tell the team
Say what the study is for, who will be filmed, who will see the footage and when it is deleted. Get the operator's agreement and bring in the union or works council where there is one.
- 2
Standardize the job, then list the elements
Check that the method, the layout and the tools are the ones you want to time. Split the job into elements and write a break point for each: something you can see or hear in the video.
- 3
Place the camera and do a pause test
Fix the camera at the front quarter, 4 to 6 metres back. Record 30 seconds, pause a frame at full screen and check that every break point on your list can be seen.
- 4
Film whole cycles in one take
Start recording before a cycle begins and stop after one ends. Do not pause between cycles. Film enough cycles for the accuracy you need, and stand at the station taking notes while the camera runs.
- 5
Note what the camera cannot see
Write down the product, the operator, the time of day, the part weights, anything unusual, and every interruption with the clock time it happened.
- 6
Log the break points
Step through the video and record the timecode at each break point. Subtract to get element times. Log interruptions as foreign elements, not as part of the element they landed in.
- 7
Rate, add allowances and work out the standard
Rate the pace against a normal one, cycle by cycle or element by element, then add personal, fatigue and delay allowances. This part is the same as in a stopwatch study.
- 8
Check, review with the operator and file
Run the checks in the section below, show the operator the video and the numbers, correct what is wrong, and store the footage under the rules you agreed.
How many cycles to film follows the same rule as any study. The time study sample size calculator works it out from the spread of your first few cycles, and how to plan a time study covers which job, which operator and which shift.
How to log elements from the video
Logging is the continuous timing method done on a screen. You never reset anything. You read the clock at each break point and subtract afterwards, so every frame of the clip is accounted for.
- Use a player that steps one frame at a time and shows a timecode or frame number. Most free players do, with the arrow keys or the comma and full stop keys.
- Watch at normal speed first, with no logging, to learn the cycle and confirm the break points.
- Then log at half or quarter speed. When you reach a break point, stop, step back and forward a frame at a time until you find the first frame where it is true, and write that timecode down.
- Use the same definition every cycle. If element 1 ends when the hand releases the housing, it ends on the first frame where the fingers are open, every time.
- Slow motion is for finding the frame, never for judging pace. Rate the operator at normal speed.
- Write timecodes as minutes, seconds and frames, such as 00:17:19, and let a spreadsheet do the subtraction. Seconds = (end frame count minus start frame count) / frames a second.
A worked log
Illustrative example. An operator assembles a bracket set onto a housing at a bench. The video is 30 frames a second. The cycle has four elements, and this is the log for the first cycle.
| Element | Break point (the element ends when) | Start | End | Frames | Seconds |
|---|---|---|---|---|---|
| 1. Get housing and seat it in the fixture | Hand releases the seated housing | 00:12:04 | 00:17:19 | 165 | 5.50 |
| 2. Fit two brackets | Second bracket is seated and the hand leaves it | 00:17:19 | 00:29:10 | 351 | 11.70 |
| 3. Drive four screws | Driver lifts off the fourth screw | 00:29:10 | 00:44:25 | 465 | 15.50 |
| 4. Inspect and place in tote | Hand releases the part in the tote | 00:44:25 | 00:51:01 | 186 | 6.20 |
| Cycle | 00:12:04 | 00:51:01 | 1,167 | 38.90 |
Timecodes are minutes : seconds : frames. 00:17:19 is 17 seconds and 19 frames, or frame 529. Element 1 runs from frame 364 to frame 529: 165 frames / 30 = 5.50 seconds.
From two timecodes to one element time
Example numbersStart timecode
00:12:04
12 x 30 + 4
= frame 364
End timecode
00:17:19
17 x 30 + 19
= frame 529
Subtract
529 minus 364
= 165 frames
Divide by the frame rate
165 / 30
= 5.50 seconds
Element 1 of the bracket station starts at timecode 00:12:04, which is frame 364, and ends at 00:17:19, which is frame 529. The difference is 165 frames, and 165 divided by 30 frames a second is 5.50 seconds.
Repeat for every cycle on the clip. Then the arithmetic is the usual one: an average or a selected time for each element, a rating, allowances. Standard time covers that part step by step.
What the camera misses
A video is a flat picture of one place for one hour. Plenty that matters to a standard is not in it. Stand at the station while you film and write these down.
- Weight and force. A 2 kilogram part and a 12 kilogram part look the same on screen. Fatigue allowances depend on the difference.
- Heat, noise, fumes and vibration. The conditions that tire people do not show up in pixels.
- Anything outside the frame. The walk to the far rack, the wait at the tool crib, the conversation that happened one step to the left.
- Hidden hands. The body, a guard or a fixture can cover the fine work. If the break point is hidden, the element cannot be timed from that angle.
- Thinking and checking. Reading a traveler or judging a surface finish looks like standing still.
- The rest of the day. One clip is one window. It will not show the Monday start up, the last hour of a shift or the bad batch of parts.
- Pace. People filmed for the first time often work faster or more carefully than usual. Film long enough for that to wear off, and rate what you see.
- Why. The video shows that the operator waited 20 seconds. Only asking tells you what for.
Pair the clip with a short written record: date, shift, product, operator's experience, part weights, tools, and every interruption with its clock time. A study with footage and no notes is half a study.
Manual logging or AI analysis
Logging by hand is slow, because you watch the footage several times at reduced speed. That is the part software now does. An AI model watches the video, proposes where each element starts and ends, and hands you a timeline to check.
| Manual logging | AI analysis | |
|---|---|---|
| Who finds the break points | The analyst, frame by frame | The software drafts them, the analyst reviews |
| Analyst time | Several passes through the footage at reduced speed | A review pass, plus corrections |
| Consistency | Depends on the analyst holding the same break points for every cycle | The same rule applied to every cycle, right or wrong |
| Typical errors | Tired eyes, skipped cycles, rounding | Mislabeled steps, people confused with each other, work hidden from the camera |
| What it needs from the footage | Break points visible to a person | The same, plus people who can be told apart and a steady, well lit frame |
| Who owns the result | The analyst | Still the analyst. A draft nobody checked is not a study |
| Rating and allowances | Analyst's judgment | Analyst's judgment |
Neither route removes the engineer. Rating pace, deciding what counts as a foreign element and choosing allowances are judgments. What AI changes is where your hours go: from finding frames to checking the draft and working on the fix.
LeanSuite's time and motion study works this way. You upload the recording, the AI times every element on a timeline that links to the video, and you split or merge elements, ask for a re-check of one time window and certify the study. Time study app or software compares the kinds of tool.
Quality checks before you trust the study
A video study can be checked in ways a stopwatch study cannot, because the evidence is still there. Run these before the numbers leave your desk.
- The clip adds up. The logged cycles plus the logged foreign elements should equal the time between the first and last break point. If they do not, something was skipped or counted twice.
- Every element has a break point you can point to in a paused frame.
- Outliers have a reason. Open the video at any cycle that is far from the others and see what happened. Keep it, or log the interruption as a foreign element. Do not delete it because it is inconvenient.
- A second person agrees. Have a colleague log three cycles on their own. If your element times differ by more than a couple of frames, the break point definitions are loose.
- The method on screen is the standard method. If the operator skipped a check or used a shortcut, you have timed a different job.
- There are enough cycles. Put the spread of your cycle times into the sample size formula and film more if it says so.
- The operator has seen it. Ask whether this was a normal run, and note the answer on the study.
| Item | Seconds |
|---|---|
| Ten logged cycles (mean 39.24) | 392.4 |
| Foreign element: tote change | 14.2 |
| Foreign element: supervisor question | 9.4 |
| Total logged | 416.0 |
| Clip from first to last break point (6 min 56.0 s) | 416.0 |
| Unaccounted | 0.0 |
The two foreign elements are 23.6 seconds, 5.7 percent of the clip. They stay out of the cycle times and go into the delay allowance question instead.
The clip adds up, to the tenth of a second
Example numbersWhat you logged
What the clip holds
- Ten logged cycles392.4 s
- Tote change14.2 s
- Supervisor question9.4 s
- Total logged416.0 s
- Unaccounted0.0 s
Ten logged cycles take 392.4 seconds. A tote change took 14.2 seconds and a supervisor question 9.4 seconds. Together they are 416.0 seconds, which is the length of the clip from the first to the last break point, so nothing is unaccounted for.
Storing the footage
Work video is large and it is personal. Plan both before you fill a card.
- Know the size. A camera recording at 32 megabits a second writes about 14.4 gigabytes an hour. Record one minute, read the file size and multiply.
- Name files so they can be found: date, line, station, product, operator code. Not the operator's name, unless your rules allow it.
- Keep the original untouched. Log from a copy and never trim the source, because trimmed clips break the timecodes.
- Store it where access is controlled. A shared drive anyone can browse is the wrong place, and a personal phone is worse.
- Keep the study record with the clip: the element list, the log, the notes, the rating and who certified it.
- Set a deletion date and keep to it. A common pattern is to keep footage while the standard it supports is live, then delete it. Whatever you agreed with the team is the rule.
- Do not reuse footage for a new purpose without going back to the people in it. Training videos and customer presentations are new purposes.
Mistakes that spoil a video time study
- Filming first and planning later. Without elements and break points agreed, you find out at your desk that the key moment is hidden.
- A handheld or moving camera.
- Stopping the recording between cycles, or cutting clips together. The gaps are not real time.
- Filming from too far away to fit the whole area in. Move closer and add a second camera.
- Rating pace from slowed footage.
- Treating the clip as the whole truth and leaving the station while the camera runs.
- Filming one fast, willing volunteer and calling it the standard.
- Keeping every clip forever on someone's laptop.
- Skipping the talk with the team because it is only a quick video.
Templates and tools for a video time study
- Video time study filming checklist: 25 checks and a shot log to take to the floor.
- Filming guide: distance, pixels, file size, upload time and battery, with the sums.
- Time study sheet: the observation sheet for the element times once they are logged.
- Time study sample size calculator: how many cycles to film.
- How to conduct a time study: the full procedure, of which this page is the video version.
- Therbligs and motion economy: what to look for in the motions once you can replay them.
Time and motion study software
Run a time study in LeanSuite
Time and motion study software that works from phone video: LeanSuite times every element, gives cycle and standard time, and draws a Yamazumi chart.
Go deeper
This page is the short version. These guides cover each part in full.
- How to Improve Shop Floor ProductivityWhat to do with the waiting, walking and searching once the video has put a number on them.
- Standard Work in Manufacturing: A Complete GuideTurning the timed method into standard work the next shift can follow.
- Visual Work InstructionsUsing stills and clips from the same footage to show the method.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsStacking the element times you logged against takt, operator by operator.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Turns video of real work into time studies, line balance charts, changeover splits and other studies you review and certify.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about time study from video
A video time study times the elements of a job from a recording instead of a stopwatch. You film whole cycles from a fixed camera, then read the timecode at the start and end of each element and subtract. Rating and allowances are added as in any time study. The recording stays as evidence, so any number can be checked against the frames it came from.
Thirty frames a second is enough for most work. One frame is 0.033 second, about 18 times finer than a stopwatch tick of 0.01 minute. Use 60 frames a second only when elements are shorter than about a second. For jobs that run for hours, one frame a second or time lapse keeps the file small and still shows the shape of the work.
Fix it on a tripod at the front quarter of the operator, about 45 degrees to the line of work, 4 to 6 metres back, at head height or a little above. Keep the whole cycle in the frame, including any walk for parts, and keep bright windows behind the camera. Then pause a test frame and check that every break point is visible.
Treat it as needed. Tell the team what is being filmed, why, who will see it and when it is deleted, and get the operator's agreement. Never film in secret. Where there is a union or works council, involve it first. The legal rules on workplace video differ by country and state, so have HR or counsel check your plan. This is general guidance, not legal advice.
Write a visible break point for each element. Step through the video frame by frame, note the timecode at each break point, and subtract the start from the end. With timecodes in minutes, seconds and frames at 30 frames a second, an element from 00:12:04 to 00:17:19 is 165 frames, or 5.50 seconds.
For reading times, yes. A frame at 30 frames a second is 0.033 second and you can replay it, while a stopwatch gives one chance at each reading. It is not more accurate about everything. Video does not show weight, force, heat or what happens outside the frame, and one clip is one window of the day. The rating and allowances still rest on judgment.
AI can draft one. Current tools watch a recording, propose where each element starts and ends, and return a timeline for an engineer to review. The engineer still corrects labels, decides what is a foreign element, rates the pace and sets allowances. The footage has to be good: a fixed camera, enough light, and people the software can tell apart.
As long as you told the people in them, and no longer. A common pattern is to keep the footage while the standard it supports is in use, then delete it. Store it where access is controlled, keep the study record with it, and go back to the operators before using it for anything new, such as training material.
Related guides and tools
- Filming guide: distance, pixels, file size and battery, with the sums
- How to conduct a time study: the full procedure step by step
- Time study app or software: stopwatch apps, video tools and AI compared
- Time study in a union plant: the people side of filming and timing
- Standard time: rating and allowances once the elements are logged
- Time and motion study: the family of methods
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.