How to explain a time study to a worried operator
Short answer
Tell the operator before the study, in person, in plain words: what job, why, what you will time, who sees the numbers and what the result will and will not be used for. Promise only what you can keep. Then show them the readings first.
Operators worry that a time study will cut jobs, speed up the work, change their pay or single them out. Often they have seen it happen. Meet them one to one a day or two ahead, away from the line. Say which job you will study, why, how long you will be there, and what you will do with the numbers. Say it is a study of the job and not of the person, but only if that is true. Ask what you should know about the job before you time it. On the day, tell them when timing starts and stops. Afterward show them the readings before anyone else sees them, and tell them what changed because of the study. This is general guidance, not legal advice.
Last reviewed:
What works, in one page
A worried operator is not being difficult. They are doing sums about their job, and you are the person standing there with a stopwatch or a camera. Answer the sums before they ask: what is the study for, what happens to me, who sees it.
- Tell them first, in person, a day or two ahead. Not on the morning, and never from a notice on the board.
- Say what the study is for in one sentence you could defend in front of the whole crew.
- Promise only what you can keep. If you do not know what happens to headcount, say that, and say when you will know.
- Ask for their knowledge. They know the bad days, the bad parts and the shortcuts. You do not.
- Show them the readings before anyone else. Fix what is wrong with them.
- Tell them afterward what came of it. Silence after a study is read as bad news.
When the operator hears what
1. Day minus 2
You and the operator, one to one
What, when, why, what it will not be used for, who sees the data. Ask what worries them and what you should know about the job.
2. Day 0
The study, in the open
Say when timing starts and stops. Note anything unusual aloud. Stop if the day is not normal.
3. Day plus 2
The operator, first
The readings and any video, before the supervisor or anyone else. Correct what is wrong.
4. Day plus 10
The crew, then the plan
The result, how the standard was set, and what was fixed because of the study.
5. Day plus 30
The operator, again
Is the standard fair now they have lived with it? Change it only if the job changed.
Five touch points around a study: a one to one talk two days before, the study itself on day 0, the readings shown to the operator first on day 2, the result to the crew with what was fixed on day 10, and a check on day 30.
The method itself is in the time and motion study guide. This page is the conversation around it. If the crew has a union, read time study in a union plant first, because the committee should hear before the operator does. Nothing here is legal advice. Agreements and labor law differ by country and state, so check yours with HR.
What operators fear, and what is true
The fears are specific and they have a history. Time study grew up next to piece rates, and workers who beat a rate often saw it cut. In 1911 the molders at the Watertown Arsenal stopped work when a stopwatch study began in their foundry. A sociologist, Donald Roy, worked in a machine shop in the 1940s and described in 1952 how the crew held output down under piece rates, partly so that the rate would not be tightened. People on your floor may not know that history, but they have their own version of it: a cousin at another plant, a rate that changed, a consultant who came and then a layoff.
Five common fears, what they are usually built on, and what you can honestly say
The fear
This is to cut jobs.
What it is built on: A study that finds waste looks, from the floor, like a study that finds people to remove. Past layoffs after an efficiency project make it worse.
What you can honestly say
Say what you know. If there is a commitment on headcount, state it plainly. If there is not one, do not invent one: say what the study is for, that you do not know of any plan to cut people on this job, and that you will tell them first if that changes. Say only what is true.
The fear
They will make me work faster.
What it is built on: A standard looks like a speed. If the study times a person at a hard pace, that pace becomes the minimum.
What you can honestly say
The standard should be set for a qualified person at a normal, sustainable pace, with allowances for fatigue and delays. Tell them that is the aim and invite them to say if the numbers look otherwise.
The fear
My pay will change.
What it is built on: Many people have seen pay tied to a rate. Others fear the study leads to a new grade or bonus.
What you can honestly say
Say plainly whether pay is connected to this study. If it is not, say so and mean it. If it is, tell them how, and see time standards and incentive pay.
The fear
I am being checked on.
What it is built on: A person with a clipboard watching one individual looks like a performance review.
What you can honestly say
It is a study of the job. Individual readings are not passed to the supervisor or kept in a file. Say it only if you will keep to it.
The fear
Nobody asked me, and they will get it wrong.
What it is built on: The operator knows details of the job that an hour of observation will miss, and has seen studies that missed them.
What you can honestly say
Ask. Build the list of steps with them. Show them the readings. Change what is wrong.
Notice that the fix for each fear is a commitment, not a reassurance. A reassurance ("don't worry, it's nothing") is the thing people have heard before. A commitment with a date or a name on it is new. Resistance to change on the shop floor explains why objections like these are information about what people stand to lose, and difficult conversations at work covers preparing for the harder ones.
Before you talk: what to settle first
The conversation goes badly when you find out mid-sentence that you cannot answer the obvious question. Settle these first, with your manager or HR where needed.
- Purpose. One sentence on what the study will be used for: a new standard, a line balance, a changeover review, an ergonomic check, a quote. If it has more than one use, say so.
- What it will not be used for. Discipline of an individual, ranking people, a headcount cut on this job. Only list what you can guarantee.
- Headcount. Is any change planned on this job or line? If you cannot say, find out, or decide what you will say instead.
- Pay. Does anything in pay depend on a standard? If yes, what happens to the standard when the method changes?
- Data. Who sees the readings, the calculation and any video, where they are kept and when they are deleted.
- Representation. If there is a union or works council, have they been told? Do they expect to observe? Has anyone agreed rules?
- The method and the day. What you will time, with what (stopwatch, tablet, camera), for how long, and on which shift. Is that a normal day?
- Who else. Does the supervisor know and agree? A supervisor who hears about it from the operator will undo your good work.
Choose the operator carefully, and say why. The usual choice is a trained person who works at a steady pace and does the job by the standard method. Tell them that is why they were chosen. "I picked you because you work at a steady pace and you know the job" lands very differently from silence. How to plan a time study covers picking the operator in detail, and volunteering is better than choosing wherever you can get it.
The conversation, word for word
Have it at the station or somewhere quiet, a day or two ahead, standing or sitting at the same level, about ten minutes. The words below are an example for a made-up bracket station. Use your own, drop any line that is not true in your plant, and do not read from the page.
Opening: what, when, why
- You: "Do you have ten minutes? I want to tell you what I am planning on your station on Thursday before it happens, not after."
- You: "On Thursday's first shift I will be here for about an hour. I will time each step of the bracket job with this tablet, and I would like to film it from over there so we can check the times afterward."
- You: "The standard on this job is from before the new fixture went in. Everyone knows it is off. We need a number that matches the job as it is now, and a list of the things that make it harder than it should be."
The worry, said out loud
- You: "I know studies like this have gone badly in other places, and some of that is on people like me. So here is what I can tell you, and what I cannot."
- You: "This is a study of the job, not of you. I am not passing your times to your supervisor and I am not keeping a file on you. I picked you because you do the job at a steady pace and you know it better than I do."
- You: "I do not know of any plan to cut people on this job. If that changes, you will hear it from me or your supervisor before you read it anywhere. I will not tell you it never will, because I do not decide that."
- You: "The video stays on the engineering drive. Only I and, if you want, you will watch it, and it is deleted once the standard is signed off."
Their turn
- You: "What worries you about this?" Then stop talking and listen. Write down what they say.
- You: "What should I know about this job before I time it? What goes wrong that I will not see in an hour?"
- You: "If you would rather not be the one, tell me today and I will ask someone else. No problem either way."
Agreeing the day
- You: "Work the way you normally do. I know that is hard with someone standing there, and nobody manages it perfectly. If something is off, say so and I will note it."
- You: "I will tell you when I start and when I stop. If you need a break, take it. If a part is bad or the machine stops, I will write it down, because that is part of the job too."
- You: "After that you see the numbers first. We go through them together and you tell me what is wrong with them."
Do not hurry the end of it. A quiet pause is the operator thinking. The question "anything else?" asked once, slowly, produces the real concern more often than the first ten minutes do.
What never to say
Six things that go wrong in this conversation and what to say instead
Never say
"Just act normal, pretend I am not here."
Why it backfires: Nobody can. It also tells them you do not understand what you are asking.
Say instead
"I know it is odd with someone watching. Work as you usually do and tell me if anything is different."
Never say
"This will not affect anyone's job."
Why it backfires: You may not know that. If you are wrong, nothing you say afterward is believed.
Say instead
"I do not know of any plan to cut people on this job. You will hear it from me first if that changes."
Never say
"It is only for information."
Why it backfires: If a standard comes out of it, they will remember you said that.
Say instead
"The result will be used to set the standard for this job and to find what makes it harder than it should be."
Never say
"Management needs the numbers."
Why it backfires: It makes the study something done to them, for someone else.
Say instead
"The standard is out of date and you have been saying so. This is how we fix it."
Never say
"We will see who is pulling their weight."
Why it backfires: It is the fear, confirmed.
Say instead
"It is a study of the job. Individual readings stay with me."
Never say
"You have nothing to worry about."
Why it backfires: It tells them you did not listen to what they are worried about.
Say instead
"What worries you about it?"
The questions they ask, and honest answers
These come up nearly every time. The answers below are what a fair-minded plant can usually say. Where the true answer depends on your plant, the answer says so.
| The question | An honest answer |
|---|---|
| Is this going to cost jobs? | I do not know of any plan to cut people on this job. Studies often find work that should not be there, like walking for parts or waiting for a crane, and the usual use of that is to make the job easier. I do not decide headcount, and I will tell you what I know when I know it. |
| Why me? | Because you work at a steady pace and you do the job by the standard method. If you would rather not, say so and I will ask someone else. |
| What if I am slower than the standard? | The standard is for a qualified person at a normal pace, so a person will sometimes be above it and sometimes below. A single day does not say how good you are. I am not passing individual times to your supervisor. |
| Do you want me to work faster? | No. I want you to work at the pace you can hold all shift. A pace you could not keep up gives a bad standard, and a bad standard is a problem for you and for us. |
| What if the numbers are wrong? | Then we fix them. You see the readings before anyone else, and if the study missed a step or a bad day, we correct it or time it again. |
| Who sees the video? | Say exactly who, where it is kept and when it is deleted. If you have not decided, decide before you film. |
| Will my pay change? | Say what is true for your plant. If pay does not depend on the standard, say so. If it does, say how and what the route is if the operator disagrees. |
| Can my steward or a coworker be there? | If your agreement provides for it, yes. If it does not say, agree to it anyway unless there is a real reason not to. A second pair of eyes helps the study. |
| Can I say no? | Ask your own plant's rules, and your HR lead. In practice, a study of someone who has been forced into it is a poor study, so ask for a volunteer and accept a no. |
| What happens to the result? | You see it first. Then the crew hears it, along with what we fixed because of what the study found. |
A last point on honesty. If a plant asks operators to be studied while it is planning layoffs on that line and does not say so, the study will be found out for what it is. The cost is not one bad study. It is every study afterward. If you have been told to run a study and you believe the crew is not being told the truth, say so to the person who gave you the job before you stand next to the operator. How to tell employees about layoffs covers the other side of that conversation.
On the day: if the pace changes
People change how they work when someone watches. Some slow down to make sure of every step, some speed up to look good, some start doing the job exactly as the written method says although they have never done it that way. This is called the observer effect, and the observer effect in time studies goes through what is known about it. You cannot remove it. You can keep it small and notice it.
What you might see on the day, what it may mean and what to do
You see
The operator is slower than normal and careful with every step.
It may mean: Nervous about getting it wrong, or showing every step to prove they do it right.
What to do
Stay a few cycles longer and see if the pace settles. Chat about something else. Do not time the first few cycles for the standard.
You see
The operator is faster than you have seen them.
It may mean: Showing what they can do, or wanting the study over.
What to do
Say that you want their ordinary pace and ask if this is what they can keep up for a full shift. Rate the pace, not the person.
You see
They do it a different way to the usual method.
It may mean: Following the written method because someone is watching, or trying the way they think you want.
What to do
Ask why. If the usual way is the one they use every day and it is safe, time that. If the written way is out of date, say so and fix it.
You see
They keep looking at you or the camera.
It may mean: They are uneasy.
What to do
Step back, sit down, let the camera run longer and discard the first part. Thank them and say what you have seen.
You see
They stop and ask what you are writing.
It may mean: Reasonable curiosity, or concern.
What to do
Show them the sheet. Readings made in the open are rarely disputed afterward.
Say when you start and stop timing. Note anything unusual aloud, such as a bad part or a delay, so they know it will be on the record and not held against them. Take a break at the usual time. If the day is plainly not normal, stop and reschedule. A study that has to be redone costs less than a standard that is wrong.
Involve the operator in the method
Coch and French's 1948 study of a pajama factory found that groups who took part in designing a change to their jobs adapted better than a group that was simply told about it. It is one factory and an old study, but the finding matches plant experience. An operator who helped build the study defends it. One who was only watched picks it apart, and often finds a real flaw, because they know the job.
- Build the list of steps with them. Ask them to talk you through the job and use their words for each step.
- Ask what a good day and a bad day look like. The bad day is your list of delays and your list of improvements.
- Agree the method before you time it. If their way differs from the written way, find out why. The written way is often out of date.
- Let them see the sheet or the screen as you go.
- Go through the readings together, step by step, and ask one question: is this what the job really takes?
- Fix something they raised, and tell them it came from them.
If you use video, the operator can watch their own footage and mark where the times look wrong. That is one of the better arguments for video: the times link to the frames, so the argument is about what happened and not about what you remember. Time study from video covers filming with consent. LeanSuite's time and motion study works from a recording you upload and keeps review and sign-off with a person.
How to run the conversations, start to finish
The conversations around one study
- 1
Settle what you can promise
- 2
Tell the people above and beside first
- 3
Meet the operator one to one, a day or two ahead
- 4
Run the study in the open
- 5
Show the readings first
- 6
Tell them what changed
- 1
Settle what you can promise
Purpose, what it will not be used for, headcount, pay, data and video rules. Check with your manager, HR and any union or works council. Remove every promise you cannot keep.
- 2
Tell the people above and beside first
Supervisor and, where there is one, the union steward or committee, before the operator. Nobody should hear about it from the operator.
- 3
Meet the operator one to one, a day or two ahead
At the station or somewhere quiet. Say what, when and why, say the worry out loud, then ask what they are worried about and what you should know about the job.
- 4
Run the study in the open
Tell them when timing starts and stops, say aloud when something is not normal, and let them see the sheet. Stop if the day is not normal.
- 5
Show the readings first
Within a couple of days, before the supervisor or anyone else. Correct what is wrong. If you used video, let them watch the parts in doubt.
- 6
Tell them what changed
The new standard, what it means for them, and what you fixed because of the study. Check a month later that the standard holds.
Closing the loop: results, and what happens next
Most studies end with an engineer going back to a desk. From the operator's side nothing more happens, and silence after a study is read as bad news. The follow up costs very little and it is what people remember.
- Within a few days: the readings, with the operator. Ask them to correct them.
- Within two weeks: the result to the operator, then the crew: the standard, how it was set, what it means and what it does not.
- With it: what was fixed. A part that was always short, a tool in the wrong place, a walk that was removed. Even one is enough, as long as it is real and it came from the study.
- A month later: ask the operator whether the standard is fair now that they have lived with it. Change it only if the job changed.
- If the study found nothing to fix, say that too.
If the study shows the standard is tighter than people were working to, or looser, be as straight about that as about anything else. A standard that is wrong in either direction will be found out. The standard time guide covers how it is built, including rating and allowances, which is where most arguments with operators end up. For follow up in standard work, see from time study to standard work.
When this is not enough
A good conversation does not fix a bad situation. Some things it cannot fix.
- There is a headcount plan and you cannot say so. Do not run the study as if there were not. Raise it with whoever asked for the study.
- Trust is already gone. If a previous study or a rate change burned the crew, expect to spend time and keep small promises before the first one is believed. Start with something small the crew asked for.
- The union has not been told, or the agreement says something you have not read. Stop and start there.
- The operator is under real pressure at home or at work and you are one more thing. Offer another day.
- The job is being studied to set pay-linked standards and nobody has agreed how. See time standards and incentive pay.
- The rules where you are (law, agreement, works council) say more than this page does. Follow them. This page is general guidance and not legal advice.
Go deeper
This page is the short version. These guides cover each part in full.
- Strategies to Engage Factory Floor TeamsPractical ways to bring crews into improvement work, not only study them.
- Lean Leadership: Developing People in ManufacturingThe respect for people half of lean, which a study either shows or contradicts.
- How to Increase Employee Engagement in ManufacturingWhy involvement in decisions about the work matters more than any message about it.
- Communication Breakdowns Costing Manufacturers MillionsWhat goes wrong when the floor hears about a change last.
All our articles on this subject are in the lean leadership and employee engagement topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Video time study filming checklistA pre-shoot checklist and shot log for filming a time study on video: camera, light, people, settings, power and review.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Time study sample size calculatorHow many cycles of an element to time, from your first readings, with the t formula, the ILO formula and the range method.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyAI Video Analysis
Upload a recording and get the steps and their times back, each one linked to the frame it came from so the operator can check it.
See AI Video Analysis
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about explaining a time study to a worried operator
Tell the operator in person a day or two ahead. Say which job, when, for how long and why, and that it is a study of the job and not of the person, but only if that is true. Say who will see the readings and any video and what the result will and will not be used for. Then ask what you should know about the job before you time it.
Because of how studies have been used. They have been tied to piece rates that were cut when people beat them, to speed-ups and to layoffs. A person with a stopwatch also looks like a performance review. Each fear points to a promise you can make, such as no individual times to the supervisor, if you can keep it.
A study measures work, and what the plant does with the result is a separate decision. Say honestly what you know. If you know of no plan to cut people on that job, say so and promise to tell them first if that changes. If you do not know, say that. Never say no jobs will be affected unless you decide it.
Do not say "act normal, I am not here", "this will not affect anyone's job" unless you can promise it, "it is only for information" when it will set a standard, or "we will see who is pulling their weight". Each one is either impossible, unprovable or the fear itself. Say what you will do with the numbers instead.
It depends on your plant's rules, the collective agreement if there is one, and local law, so ask HR. In practice, a study of someone who was pushed into it is a poor study, so ask for a volunteer and accept a refusal. Offer to study another qualified operator or to use video later, with consent.
Stay longer so the pace settles, talk about something else, and do not use the first cycles. Ask whether it is a normal day and note any abnormal pace. Never tell them they are slow. Study the job again on another day if the pace does not settle, and compare early and late cycles in the data.
Yes, first. Show them the readings within a couple of days, before the supervisor or anyone else, and correct what is wrong. Then share the result with the crew and say what was fixed because of the study. Readings made in the open and checked with the operator are rarely disputed afterward.
Related guides and tools
- Time study in a union plant: the committee and crew level
- The observer effect in time studies: why pace changes and how to spot it
- Resistance to change on the shop floor: what objections are telling you
- Difficult conversations at work: how to prepare and what to say
- Time standards and incentive pay: what to watch when a standard drives pay
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.