Practical guide · Value stream mapping and flow
Line-side material presentation: getting every part to where the hands already are
Short answer
Line-side material presentation is how each part is offered to the operator at the point of use: where it sits, at what height, in what container, which way up, in what quantity, and how it is refilled. Done well, the hand finds the next part without a step, a bend or a search.
For each part number, make six decisions in this order: position (in front, inside forearm reach, in order of use), height (in the golden zone, heavy parts lowest), container (small enough to pick from without digging), orientation (the way it will be fitted), quantity (an hour or two, on a two-bin or kanban signal) and replenishment (from behind, on a timed route, without interrupting the operator). Start with the parts that are heaviest and picked most often. In the worked example, moving ten part numbers from pallets to a flow rack halves the line-side frontage and cuts walking from 14 m to 4 m a cycle.
Last reviewed:
What is line-side material presentation?
Every assembly job has two halves: getting the part and fitting the part. Only the second adds value. Material presentation is the design of the first half. It covers the last meter of the supply chain, from the rack or container beside the line to the operator's hand.
It sits between two functions, which is why it is often nobody's job. Logistics wants full pallets, few deliveries and standard packaging. Production wants every part within reach of every station. A pallet of 400 brackets beside a station that uses 30 an hour suits the forklift driver and costs the operator a walk and a bend on every cycle, all shift.
You will also see it called parts presentation, materials exposure or line feeding. In World Class Manufacturing plants it is part of the logistics pillar, where each part's position is rated against the operator's strike zone.
Why it matters: walking, reaching and floor space
The clearest published evidence is a study by Finnsgard and colleagues at Chalmers University of Technology, printed in the International Journal of Production Research in 2011. They followed three assembly workstations in a Swedish automotive plant that were redesigned around smaller packaging. After the change the space needed for materials at the stations fell by 67%, non-value-adding work fell by 20% and walking distance fell by 52%. It is one plant and three stations, so treat the percentages as what is possible, not what to promise.
The mechanism is simple geometry. A pallet takes about 1.2 m of line frontage for one part number. A tote 30 cm wide takes a quarter of that, and a flow rack stacks several levels of totes in the same footprint. Shrink the packaging and all the parts for a station fit within a step of where they are used. The walking disappears because the distance does.
- Cycle time. Fetching is part of every manual assembly cycle and is pure waste. Find your own figure by timing the get elements in a time study.
- Ergonomics. Pallets and deep bins put picks at floor level and at arm's length. Small containers in a rack put them in the golden zone.
- Quality. A fixed, labeled address for every part makes a wrong pick visible. A heap of similar brackets does not.
- Flexibility. Short frontage is what lets a station carry more variants, or lets a line be rebalanced without moving racks.
- Inventory. Two hours at the line in place of two shifts frees floor space and shows supply problems sooner.
The six decisions for every part
| Decision | The rule | How to check it |
|---|---|---|
| 1. Position | In front of the operator, inside forearm reach, on the side of the hand that picks it, in the order of use. | Top-down video: do the elbows leave the sides, does the trunk twist, do the feet move? |
| 2. Height | Hands in the golden zone at the pick. Heaviest parts at the lower good level, light ones above. | Tape measure, floor to hands, against the bands for your operators. |
| 3. Container | Small enough that the hand reaches the last part without going over a high edge or digging. Light enough to be handled by one person. | Watch the pick from a nearly empty container, not a full one. |
| 4. Orientation | Presented the way it will be fitted. No unwrapping, untangling, flipping or separating at the station. | Count the hand motions between touching the part and starting to fit it. |
| 5. Quantity | Enough for the replenishment interval plus a margin, usually an hour or two. A signal that is automatic: an empty bin, a card, a light. | Ask how the station tells logistics it needs parts. If the answer is a phone call, there is no signal. |
| 6. Replenishment | From outside the work area, usually from behind the rack, on a timed route. Empties and packaging leave by a marked path. | Watch one delivery. Did the operator stop, step aside or help? |
The order matters. Teams often start with decision 5, sizing kanbans, because it is a calculation. But quantity sets container size, container size sets how many part numbers fit in the good positions, and that decides everything the operator feels. Start from the hand and work outward.
Presentation methods compared
| Method | What it is | Good for | Costs and risks |
|---|---|---|---|
| Bulk at the line | The supplier's pallet, crate or wire basket placed beside the station. | Very large parts, or very high volume of one part number. | Long frontage, picks near the floor, hours or days of stock, forklifts in the work area. |
| Small containers in a flow rack (line stocking) | Totes on gravity lanes, loaded from behind, usually two per part number. | Most small and medium parts with steady use. | Someone has to repack from bulk unless the supplier ships in the tote, and the route has to run on time. |
| Kitting | The parts for one unit, or one batch, picked into a tray or cart that travels with the product. | Many variants, many part numbers per station, little line-side space. | Extra picking labor upstream, and a missing or wrong part in a kit stops the unit. |
| Sequenced delivery | Parts arrive in the order the line will build, one variant after another. | Large, variant-specific parts such as seats, panels or harnesses. | Depends on a stable build sequence. A resequenced line means resorted parts. |
| No-container presentation (minomi) | The part itself is hung, racked or slid to the operator with no box at all. | Medium parts with a shape that can be hung or stacked safely. | Needs purpose-built racks or hangers, and protection for the part surface. |
Most stations mix methods: fasteners in small bins, medium parts in a flow rack, one large part sequenced on a cart.
Kitting against line stocking is the choice people argue about most. Kitting moves the search and the walk from the assembler to a kitter, who does them once for the whole unit in a store laid out for picking. That wins when variants are many and space is short. Line stocking wins when a few part numbers are used at a steady rate, because it adds no handling step. Neither is the lean answer in general. Count the handling in both and choose for each part family.
Rating each pick A, B or C
To see where a station stands, and to show that a change worked, rate every pick. The scale below is our convention, modeled on the reach-zone ratings that World Class Manufacturing logistics teams use. It is not a published standard.
| Rating | The pick is | Typical cause |
|---|---|---|
| A | In the green height band, inside forearm reach, one motion, part ready to fit. | Small container at the point of use, part oriented. |
| B | One thing short of A: amber height, or arm's length, or one extra handling such as a turn or an unwrap. | Right rack, wrong level. Or a good position with poor packaging. |
| C | Red height, or a step or a walk, or two or more extra handlings. | Pallet or deep bin at the line. Part stored at the next station. |
The height bands are the green, amber and red bands of the golden zone guide.
The station's number is the share of picks rated A, counted by picks in a cycle and not by part numbers, so a screw fitted six times counts six times. Track C picks separately. Each one is a walk or a bend that repeats every cycle.
The sums: container quantity and rack frontage
How many parts in a container
With two bins per part number, the operator works from one while the other is being refilled. Each bin has to cover the time until the next delivery, with a margin for a late route.
| Step | Sum | Result |
|---|---|---|
| Use an hour | 45 units an hour, 2 brackets a unit | 90 brackets an hour |
| Replenishment interval | The route passes every hour | 1 hour |
| Use in one interval | 90 x 1 | 90 brackets |
| Margin for a late route | 25% of 90 | 23 brackets, rounded up |
| Quantity per bin | 90 + 23 | 113 brackets |
| At the line when both bins are full | 2 x 113 | 226 brackets, about 2.5 hours |
The 25% margin is an example. Set yours from how late the route really runs. Round the bin quantity to a pack size the supplier or the repack area can fill.
Two-bin quantity for one part, step by step
Example numbersUse an hour
45 units x 2 brackets
90
Use in one interval
90 x 1 hour
90
Margin, 25%, rounded up
25% of 90
23
Quantity per bin
90 + 23
113
Both bins full: 226 brackets at the line, about 2.5 hours. The 25% margin and the one-hour route are examples.
45 units an hour at 2 brackets a unit is 90 an hour. One hour of use is 90, plus a 25 percent margin of 23, so 113 per bin. Two bins hold 226, about 2.5 hours. At 0.35 kilograms each, one bin weighs about 40 kilograms.
Then check the weight. At 0.35 kg a bracket, 113 brackets is about 40 kg, far too heavy for a tote that a person loads by hand. Halve the interval, or split the part across two lanes. The part's weight often sets the container before the arithmetic does. The full method for sizing a pull loop is in the kanban guide.
How many part numbers fit in the good positions
Frontage is the width of line side a part number occupies. Divide the rack width by the container width to get the facings on one level, then multiply by the number of levels in the green band.
| Container | Width | Facings on one level | On two green levels |
|---|---|---|---|
| Pallet | 1.2 m | 2 | 2 (a pallet cannot be stacked into two pick levels) |
| Large tote | 0.6 m | 4 | 8 |
| Standard tote | 0.4 m | 6 | 12 |
| Narrow tote | 0.3 m | 8 | 16 |
One 2.4 m rack level, filled with four container sizes
A 2.4 meter rack level holds 2 pallets, 4 large totes, 6 standard totes, 8 narrow totes. With two green levels the totes double, so a narrow tote rack holds 16 part numbers where a pallet rack holds 2.
This is the whole case for small containers in one table. The same 2.4 m that holds two part numbers on pallets holds sixteen in narrow totes at good heights.
How to redesign material presentation at a station
- 1
Film the station and list every pick
Ten cycles, from above and from the side. For each part number write the picks a cycle, weight, current container, hand height and distance walked. Your plan for every part should hold most of this already.
- 2
Rate every pick A, B or C
Count the share of A picks and list the C picks. Add up the walking in a cycle and the frontage in meters.
- 3
Rank the parts by load and frequency
Weight times picks an hour first, then picks alone. The top of the list gets the best positions.
- 4
Make the six decisions for each part
Position, height, container, orientation, quantity, replenishment. Choose the presentation method for each part family. Do the container and frontage sums.
- 5
Mock it up and let the operator run it
Build the rack from pipe and joint or cardboard at the real heights. Run it for a shift with the real parts. Change what the operator and the material handler tell you is wrong.
- 6
Set the route and the signal
Decide who refills, how often and on what signal, and where empties go. A presentation that the route cannot keep full will be bypassed with a pallet within a week.
- 7
Measure again and update the records
Film ten more cycles. Compare A picks, walking, frontage and cycle time. Update the standard work sheet, the plan for every part and the rack labels.
Worked example: a control panel assembly station
A station builds 45 control panels an hour from ten part numbers, 14 picks a cycle. As found, five part numbers stood on pallets along the line and five sat in supplier boxes on a table.
| Measure | Before | After | Change |
|---|---|---|---|
| Line-side frontage | 7.2 m (five pallets at 1.2 m, a 1.2 m table) | 3.6 m (a 2.4 m flow rack, a 1.2 m cart lane) | 50% less |
| Picks rated A | 3 of 14 (21%) | 11 of 14 (79%) | 8 more |
| Picks rated C | 7 of 14 | 0 of 14 | 7 fewer |
| Walking in a cycle | 14 m | 4 m | 10 m less |
| Walking time in a cycle at 1.22 m/s | 11.5 s | 3.3 s | 8.2 s less |
| Stock at the line | About one shift | About 2 hours |
The walking pace of 1.22 m/s (4 ft/s) is the planning pace used in our spaghetti diagram guide.
Control panel station: material presentation before and after
Example numbersLine-side frontage
Picks in a cycle, rated A, B or C (14 picks)
Green is A, amber is B, red is C. The number is the picks in each rating.
Walking in a cycle (11.5 s before, 3.3 s after)
Frontage fell from 7.2 to 3.6 meters. Of 14 picks in a cycle, A picks rose from 3 to 11 and C picks fell from 7 to 0. Walking in a cycle fell from 14 to 4 meters, 11.5 to 3.3 seconds at 1.22 meters a second.
Nine part numbers moved into narrow totes on the two green levels of a 2.4 m flow rack, loaded from behind on an hourly route with two bins each. The tenth, a large back plate, could not go in a tote. It now arrives on a cart that docks into a marked lane beside the fixture, which is why the frontage is 3.6 m and not 2.4 m. Its pick stays at B, and so do the two picks of a cable that still has to be unwrapped at the station.
At 45 an hour, 8.2 seconds a cycle is a little over six minutes of walking removed from every hour. The honest accounting has a second line. The parts now have to be decanted into totes and delivered every hour, which is new work for logistics. In this case one water spider already passed the station and took it on. Where no route exists, the saving at the station has to be weighed against the cost of starting one.
Keeping it full: routes, signals and records
- A timed route. A water spider, or mizusumashi, runs a fixed loop at a fixed interval, refills what is empty and takes away empties and packaging. The interval is the number every container quantity is built on.
- A signal nobody has to remember. The empty bin behind the full one is the simplest. A kanban card, a returnable tote or an electronic call does the same job.
- Back loading. Lanes filled from the aisle side keep the handler out of the operator's space and give first in, first out for free.
- A way out for empties. Return lanes below or above the green levels, sloping the other way.
- One record. The plan for every part holds each part number's container, quantity, address, route and supplier pack. When a presentation changes, change the record the same day.
The plan for every part template and the water spider route plan cover those records, and the post on mizusumashi describes the role.
Common mistakes and limits
- Moving the waste and calling it removed. Decanting, kitting and hourly routes are real labor. Count them.
- Designing the rack for the full container. The pick that matters is the last part in the tote.
- Good heights, bad depth. A flat shelf lets parts sit 50 cm back. Use sloped lanes.
- Presenting by part number order or by supplier, not by order of use.
- No address labels, so the handler fills by memory and the operator picks by habit.
- Leaving the pallet as a backup beside the new rack. It will be used, and the rack will not.
- Treating it as finished. Every engineering change, new variant or takt change moves the answer. Rate the picks again when the work changes.
Material presentation fixes fetching. It does not fix a badly balanced line, a poor fixture or a hard assembly step. Use line balancing for the first and the workstation assessment for a wider look at the station.
Tools and templates
Use the golden zone height check sheet to band the pick heights and rank parts by load, the material presentation lens of the workstation assessment form to score the station, and the spaghetti diagram template to measure the walking. The reach envelope guide covers position on the bench itself, and workstation design the station as a whole.
The before and after are easiest to prove with a stopwatch on the get elements. LeanSuite's Time and Motion Study takes a phone video of the station and returns element times and the split between value-added work and waste, so the seconds spent fetching are a number and not an impression. It does not design the rack. That is still pipe, joints and an afternoon with the operator.
Go deeper
This page is the short version. These guides cover each part in full.
- Mizusumashi: Water Spider Material Delivery for Pull SystemsThe route and the role that keep a line-side rack full.
- Supermarket Pull System in Lean: How to Size and Run OneThe parts market the route picks from, and how to size it.
- Cell Design for JIT Flow: Step-by-Step Layout PlanningLaying out the cell that the presentation has to serve.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Plan for every part (PFEP) templateOne row per part: supplier, pack, container, usage, lead time and locations, with ABC classes, market and line kanban counts and a lineside space check.
- Water spider route plan (mizusumashi)A water spider's fixed route: stops with arrival times, what is delivered and collected, route time against the cycle, cart load and a trip log.
- Kanban card templateSix production and six withdrawal kanban cards to print and cut out, with loop sizing and a card register.
- Spaghetti diagram templateSquared paper to trace every trip, a trip log that turns grid squares into feet, meters and walking time, and a before and after comparison.
Doing this in LeanSuite
Time and Motion Study
Film a station on a phone and get element times, cycle time and the split of value-added work from waste.
See Time and Motion StudyLine Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line BalancingValue Stream Mapping
Turns video of each process step into a current-state value stream map with cycle times, inventory and lead time.
See Value Stream Mapping
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about line-side material presentation
It is the way parts are offered to an operator at the point of use on a production line: the position, height, container, orientation and quantity of each part, and how it is refilled. Good presentation puts every part within reach at a comfortable height, ready to fit, so the operator spends the cycle assembling and not fetching. It is also called parts presentation or line feeding.
In line stocking, each part number is kept in its own container at the station and the operator picks what the unit needs. In kitting, the parts for one unit are picked beforehand into a tray or cart that travels with the product. Kitting saves line-side space and suits many variants, at the cost of extra picking labor. Line stocking adds no handling step and suits steady, high-use parts.
Enough to cover the time between deliveries, plus a margin for a late delivery. With a two-bin system and an hourly route, each bin holds a little over an hour of parts, so the station carries about two hours when both are full. Check the weight of the full container as well: it has to be light enough for a person to load, which often limits the quantity before the arithmetic does.
A small container takes less frontage, so more part numbers fit within a step of the operator and at good heights. It keeps the pick shallow, so the hand does not dig into a deep box. It also holds less stock, which shows supply problems sooner. In one published study of three redesigned assembly stations, smaller packaging cut line-side space by 67% and walking by 52%.
Minomi is a Japanese term used in lean logistics for presenting parts with no container at all. The part is hung on a hook, stacked on a purpose-built rack or slid down a rail to the operator, so there is no box to open, empty or return. It suits medium-sized parts with a shape that can be handled that way, and it needs racks or hangers designed for the part.
Related guides and tools
- Golden zone: the height band every pick should sit in
- Reach envelope: position on the bench
- Workstation assessment: score the station on four lenses
- Workstation design: the station as a whole
- Kanban: sizing and running the pull signal
- Spaghetti diagram: measure the walking a job contains
- Plan for every part template: one record for each part number
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.