Time study in CNC machining: the cycle, the operator and how many machines

Short answer

A CNC job has two clocks: the machine's and the operator's. Take the machine time from the controller and never rate it. Time what the operator does while the door is open and while the spindle runs. The gap between the two tells you how many machines one person can run.

In machining the cycle time is mostly machine time, and a stopwatch on the operator misses the point. Split the job into three parts: the time the machine is stopped for unloading and loading, the automatic machine cycle, and the work the operator does while the machine runs, such as deburring and gauging. The machine cycle comes from the controller and is not rated. The other two are timed and rated like any manual work. Whatever is left of the machine cycle is idle operator time, and the ratio (load time + machine time) / (load time + operator work per machine) gives the number of machines one operator can serve. Tool changes and setup are spread over the parts they cover.

Last reviewed:

What makes machining different

At an assembly bench the operator is the process: when the hands stop, the work stops. At a CNC machine the program is the process. The operator loads a part, presses cycle start, and for the next few minutes the spindle does the value-adding work with nobody touching it. So a machining time study answers different questions.

  • How long is the machine stopped between cycles? That is the load and unload time, and every second of it is spindle time lost.
  • What does the operator do while the machine cuts? Deburring, gauging and packing are real work that the cycle time hides. Standing and watching is idle time that it hides just as well.
  • How many machines can one person run? The answer comes straight from the first two.
  • What does not happen every cycle? Tool changes, offset corrections, chip clearing, first-piece inspection and setup can add up to more than the loading, and none of them shows in one cycle.
  • Is the machine waiting for the operator? With several machines per person, a finished machine may sit with its door closed until the operator arrives. That is called interference, and it is invisible unless you look for it.

The machining cycle: two timelines, not one

Draw the job as two lanes on one time axis, the machine's and the operator's. This is a man-machine chart, and in machining it is the first thing to draw, before any standard is calculated.

The parts of a CNC job and where each time comes from
Part of the jobWho is busySource of the timeRated?
Unload and load, door open to cycle startOperator and machine togetherVideo or stopwatchYes
Automatic cycle, cycle start to cycle endMachine onlyThe controller's cycle timer or the programNo
Work during the cycle: deburr, gauge, record, packOperator onlyVideo or stopwatchYes
Walk to the next machineOperator onlyVideo or stopwatchYes
Tool change, offset, chip clearingOperator and machine, every so many partsVideo for the time, the tool life counter for how oftenYes
Setup and first-piece approvalSetter, operator, inspector, once per batchA changeover studyUsually not: report the measured time

Machine-controlled time is taken as measured. A performance rating applies only to work whose pace the operator controls.

The third row is the one a cycle time never shows. On a four minute cycle an operator might have 70 seconds of deburring and gauging and 178 seconds of nothing. Both are hidden under the same machine time. The study has to separate them, because the first is work content and the second is capacity for another machine.

One lathe, two lanes: the machine and the operator

Example numbers

Machine

Operator

  • Unload and load, machine stopped40 s
  • Deburr 25, gauge 30, record 15, while the machine cuts70 s
  • Automatic cycle, from the controller, not rated248 s
  • Operator idle178 s (61.8%)

One 288 second cycle. The machine is stopped 40 seconds for loading and cuts for 248 seconds. The operator loads for 40 seconds, then deburrs 25, gauges 30 and records 15, 70 seconds of work in all, and then has 178 seconds with nothing to do.

A cycle time shows only the top lane. The bottom lane shows 70 seconds of real work hidden under the cut and 178 seconds of capacity, which is where a second machine comes from.

Machine time: calculate it or read it

The time for a single cut can be calculated from the cutting data. For turning, in metric units:

  • Spindle speed n = 1000 x cutting speed / (pi x diameter), in revolutions per minute, with cutting speed in metres per minute and diameter in millimetres.
  • Cutting time T = length of cut / (feed per revolution x spindle speed), in minutes, with length in millimetres and feed in millimetres per revolution.
Illustrative: the time for one turning pass
QuantityValue
Length of cut120 mm
Diameter40 mm
Cutting speed200 m/min
Feed0.25 mm/rev
Spindle speed = 1000 x 200 / (3.1416 x 40)1,592 rev/min
Cutting time = 120 / (0.25 x 1,592)0.302 min
Cutting time in seconds18.1 s

The formula gives the time in the cut for one pass. Check that the calculated speed is within the machine's maximum.

Use the formula to estimate a job that has not been programmed yet and to see what a change in feed or speed would save. Do not use it as the cycle time of a running job. A real cycle also has rapid moves, tool indexes, spindle acceleration, dwell and probing, and they can add a large share to the time in the cut. For a running job, read the cycle time from the controller: cycle start to cycle end, averaged over a run of parts. It is exact, it costs nothing, and nobody can argue with it.

The same rule holds for milling and drilling: the formulas differ, the advice does not. Estimate with the formula, measure with the controller.

How to study a CNC job, step by step

  1. 1

    Read the machine cycle from the controller

    Note the cycle time over at least ten parts. If it varies, find out why before going further: a feed override or an optional stop is usually the cause.

  2. 2

    Film the operator for a run of cycles

    Set the camera to see the door, the bench and the gauge. Film at least ten cycles and one tool change. Keep recording between cycles, because the waiting is part of the answer.

  3. 3

    Time the door-open period

    From the end of one cycle to the next cycle start: open, unload, clean the fixture, load, clamp, close, start. This is the load and unload time, l.

  4. 4

    Time the work done while the machine runs

    Deburr, gauge, record, pack, and the walk to the next machine if there is one. This is the operator's independent work per part, w.

  5. 5

    Draw the two lanes

    Plot the machine and the operator on one time axis. Whatever is blank in the operator's lane is idle time.

  6. 6

    Add what does not happen every cycle

    Time a tool change and divide by the parts between changes. Time the setup and divide by the batch size. Add both to the per-part time.

  7. 7

    Decide the number of machines

    Calculate (l + m) / (l + w), round down, and check the result against what a waiting machine and a waiting operator each cost you.

Rate only the manual elements, and apply allowances only to them. The general method for rating and allowances is in standard time.

How many machines can one operator run?

When the machines run the same or similar cycles and are served in a fixed round, the textbook relation is simple. Let l be the load and unload time per machine, m the automatic machine time, and w the operator's other work per machine, including the walk. Then the number of machines one operator can serve without any machine waiting is:

n = (l + m) / (l + w), rounded down to a whole number.

The top line is one machine's full cycle. The bottom line is how much of the operator each machine uses per cycle. Rounded down, the operator has spare time and the machines never wait. Rounded up, the operator is fully loaded and the machines wait.

A worked example: a turned shaft

Illustrative example. A cell turns a steel shaft on CNC lathes. The controller shows a machine cycle of 248 seconds. Video gives 40 seconds to unload and load, and 80 seconds of operator work per part while the machine runs: 25 seconds to deburr, 30 to gauge two diameters, 15 to record and place the part in the tray, and 10 to walk to the next machine. All manual times are normal times, after rating.

Illustrative: one operator on one, two or three lathes
1 machine2 machines3 machines
Operator work per round110 s240 s360 s
Cycle per machine288 s288 s360 s
Operator idle per cycle178 s (61.8%)48 s (16.7%)0 s
Each machine waits per cycle0 s0 s72 s
Parts per hour12.525.030.0
Labor seconds per part288144120
Machine seconds per part288288360

n = (40 + 248) / (40 + 80) = 2.4. On one machine there is no walk, so the operator's work is 110 seconds. With three machines the operator's round of 360 seconds is longer than the machine's 288, so each machine waits 72 seconds for the operator.

One operator on one, two and three lathes

Example numbers

1 machine (12.5 parts an hour, 288 labor s a part)

2 machines (25.0 parts an hour, 144 labor s a part)

3 machines (30.0 parts an hour, 120 labor s a part)

  • Operator working (top lane of each pair)
  • Machine cutting, one machine shown (bottom lane)
  • Machine stopped for loading
  • Idle operator, or a machine waiting for the operator

n = (l + m) / (l + w) = (40 + 248) / (40 + 80) = 2.4, so two machines where none may wait.

1 machine: the operator works 110 seconds of each 288 second round and is idle 178 seconds, each machine waits 0 seconds, 12.5 parts an hour. 2 machines: the operator works 240 seconds of each 288 second round and is idle 48 seconds, each machine waits 0 seconds, 25.0 parts an hour. 3 machines: the operator works 360 seconds of each 360 second round and is idle 0 seconds, each machine waits 72 seconds, 30.0 parts an hour.

At two machines the operator has 48 seconds spare and no machine waits. At three the operator is the bottleneck: each spindle stands 72 seconds in every 360, but the cell makes 20 percent more parts.

The formula says 2.4, so two machines is the answer where no machine may wait. The operator then has 48 seconds spare per cycle, which is the margin that absorbs a tool change or a jammed chip. Three machines makes 20 percent more parts per hour from one person, but each spindle now stands idle for 72 seconds in every 360.

Two or three? It depends on what a waiting machine costs

Rounding down is the safe answer, not always the cheapest. Compare the cost per part of each option, counting a labor second as 1 and a machine second as some ratio of that.

Illustrative: cost per part in labor-second units, by what a machine second costs relative to a labor second
Machine cost relative to labor2 machines3 machinesCheaper
2.0 (an expensive machine, or one that is the bottleneck)7208402 machines
0.52883002 machines
0.2 (an old, paid-off machine with spare capacity)2021923 machines

Cost per part = labor seconds per part + ratio x machine seconds per part. For example 144 + 2.0 x 288 = 720.

Two machines or three: it depends on what a spindle second costs

Example numbers

Machine second costs 0.2: old machine, spare hours

202
192

Machine second costs 0.33: the crossover

240
240

Machine second costs 0.5

288
300

Machine second costs 2.0: bottleneck machine

720
840
  • The cheaper option
  • Top bar of each pair: 2 machines. Bottom bar: 3 machines

Cost per part in labor seconds, counting a machine second as a ratio of a labor second. At 0.20: two machines 202, three machines 192. At 0.33: two machines 240, three machines 240. At 0.50: two machines 288, three machines 300. At 2.00: two machines 720, three machines 840. Three machines is cheaper below a ratio of one third, two machines above it.

Cost per part = labor seconds per part + ratio x machine seconds per part. Below a ratio of 0.33 the spare spindle time is cheap and a third machine pays. Above it, the waiting spindles cost more than the labor saved.

If the lathes are the bottleneck of the plant, a waiting spindle is the most expensive thing in the building and two machines per operator is right. If the machines have spare hours and people are short, three can be. The machine hour rate calculator gives the machine side of the ratio.

One warning. The relation assumes regular cycles served in a fixed order. When machines stop at random, for tool breaks, alarms or bar changes, two can need the operator at once, and one waits. That waiting grows quickly with the number of machines and needs a probability model or a period of observation to estimate. Work sampling of the machines, counting how often one is found waiting for the operator, measures it directly.

Tool changes and setup: the time between the cycles

A standard built from one clean cycle will always be beaten by the real job, because the real job also changes inserts, corrects offsets, clears chips and sets up. Time each of these once, find out how often it happens, and spread it over the parts it covers.

Illustrative: the per-part time on one lathe, with a batch of 150
ItemTimeHow oftenPer part
Unload and load, with a 10 percent allowance44 sEvery part44.0 s
Machine cycle248 sEvery part248.0 s
Insert change and offset check180 sEvery 60 parts3.0 s
Run time per part295.0 s
Setup and first-piece approval45 minOnce per batch of 15018.0 s
Total per part at this batch size313.0 s

295 seconds a part is 12.2 parts an hour while running. At a batch of 50 the setup share triples to 54 seconds a part.

Per-part time on one lathe, two batch sizes

Example numbers

Batch 150

313 s

Batch 50

349 s

  • Unload and load, with allowance44.0 s
  • Machine cycle248.0 s
  • Insert change and offset, 180 s every 60 parts3.0 s
  • Setup and first piece, 45 min over the batch18 s or 54 s

Run time per part is 295 seconds. A 45 minute setup adds 18 seconds a part at a batch of 150, 313 in all, and 54 seconds a part at a batch of 50, 349 in all.

Setup is the one lever that gets three times worse when the batch gets three times smaller. Study it with the whole changeover filmed, not as a footnote to the cycle.

Setup is the largest lever in a shop that runs small batches, and it is studied differently from the cycle. Film the whole changeover from the last good part of the old job to the first approved part of the new one, and split it into what must be done with the machine stopped and what could be done while it runs. That method is SMED. In machining the usual finds are tools preset off the machine, fixtures with common locating points, programs and offsets loaded from a file and not typed in, and a first-piece inspection that does not wait for an inspector to be found.

A process capacity sheet is the lean document that holds exactly this arithmetic: manual time, machine time and tool change time per part, giving the capacity of each machine per shift.

Machine data: what it sees and what it misses

A modern controller, or a monitoring system reading it, records cycle start, cycle end, feed hold, alarms and overrides. For a time study that is a gift, with limits.

  • It gives the machine cycle exactly, for every part, on every shift.
  • It gives the gap between cycles: cycle end to the next cycle start. That gap is the load time plus any time the machine waited for the operator. A gap that is 40 seconds on a good cycle and 110 on average says the machine waits 70 seconds a cycle.
  • It shows feed overrides and optional stops, which explain a cycle that runs longer than the program says.
  • It cannot see the operator. It does not know whether the gap was loading, deburring the last part, a walk to another machine or a conversation. For that you need eyes or a camera.
  • It cannot see the work done during the cycle at all. As far as the controller knows, the operator does not exist while the spindle runs.

So use both. Machine data tells you where and when the time is lost. A short video study at that machine and that time of day tells you why. The guide to time study from video covers the filming.

Ergonomics and the people side

Machining is not paced like an assembly line, so the physical load is concentrated in a few moments: lifting parts and chucks into the machine at arm's length, reaching into the enclosure to clamp, handling fixtures and vises at setup, and standing on a hard floor all shift. Check any lift of a heavy part into a chuck with the NIOSH lifting equation calculator, because the reach makes it worse than the weight suggests. The guide to ergonomic assessment in manufacturing covers the methods.

Machinists hear a multi-machine study as a plan to give them more machines for the same pay, and sometimes it is. Be straight about it.

  • Share the two-lane chart with the operator. It shows the hidden work, deburring and gauging, that a cycle time gives them no credit for.
  • Keep slack in the answer. A person loaded to 100 percent on paper cannot respond to a tool break, and the machines pay for it.
  • Fix the walk and the layout before adding a machine. Machines arranged in a U with the doors facing in cut w more than any target does.
  • Follow any agreement in force on work measurement, manning and filming. This is general practice, not labor relations advice.

Mistakes specific to machining

CNC machining time study mistakes and what to do in their place
MistakeWhat goes wrongDo this
Using the program time as the cycle timeLoad, unload and waiting are missing, so every part runs late by the whole door-open time.Measure floor to floor: cycle start to the next cycle start.
Rating the machine cycleA machine time rated at 110 is a time the machine will never make.Take machine time as measured and rate only manual elements.
Calling everything under the cycle idleDeburring and gauging are counted as free time and a third machine is added.Time the operator's work during the cycle before deciding on machines.
Studying one clean cycleTool changes, offsets and chip clearing never appear in the standard.Time each occasional element and spread it over its frequency.
Rounding the machines formula upThe operator is loaded to 100 percent and every disturbance stops a spindle.Round down unless the cost comparison clearly says otherwise.
Ignoring interferenceThree machines with random stops wait for each other far more than the formula says.Sample the machines for waiting, or log the gap between cycles.
Leaving setup out of the part timeSmall batches look as cheap as large ones and the schedule fills with changeovers.Divide setup by the batch size and show it as its own line.

Templates, tools and related guides

LeanSuite's time and motion study times the operator's elements from a phone video of the machine, which gives the load time and the work during the cycle without a stopwatch at the door. SMED runs the changeover as a timed checklist and splits a filmed changeover into internal and external tasks, and AI video analysis lists the other studies the same footage can feed.

FAQ

Questions about time study in CNC machining

  1. For one pass, spindle speed is 1000 x cutting speed / (pi x diameter), and cutting time in minutes is the length of cut / (feed per revolution x spindle speed). A 120 mm pass at 40 mm diameter, 200 m/min and 0.25 mm/rev takes 0.30 minutes, about 18 seconds. A full cycle adds rapid moves, tool indexes and dwell, so for a running job read the cycle time from the controller.

  2. Measure floor to floor: from one cycle start to the next. That includes the automatic machine cycle and the time the machine is stopped for unloading and loading. Average it over at least ten parts. Then add the per-part share of tool changes and setup. In the worked example that is 44 + 248 + 3 = 295 seconds a part while running.

  3. For regular cycles served in a fixed round, divide one machine's full cycle by the operator time each machine needs: (load time + machine time) / (load time + operator work per machine, including the walk). Round down so no machine waits. With 40 seconds to load, a 248 second cycle and 80 seconds of other work, that is 288 / 120 = 2.4, so two machines.

  4. No. A performance rating adjusts for the pace of a person, and the operator does not control the pace of an automatic cycle. Take machine-controlled time as measured from the controller. Rate only the manual elements, such as loading, deburring and gauging, and apply personal and fatigue allowances to those.

  5. Film a whole changeover, from the last good part of one job to the first approved part of the next, and split every task into internal, done with the machine stopped, and external, done while it runs. Move what you can to external: preset tools off the machine, stage fixtures and material, load programs and offsets from a file. Then shorten what is left with common locating points and quick clamps.

  6. Machine interference is the time a machine stands idle because its operator is busy at another machine. It appears when one person serves several machines that need attention at irregular moments. It grows quickly as machines are added, and a formula for regular cycles does not capture it. Measure it by sampling the machines or by logging the gap between cycle end and the next cycle start.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.