Comparison · Safety management
JSA vs JHA vs JSRA vs task risk assessment vs HIRA vs SWMS: which document when
Short answer
JSA and JHA are the same method under two names: break a job into steps, find the hazards, set the controls. JSRA is that plus a score. HIRA covers a whole department. A SWMS or method statement is the job document a contractor shows before high-risk work.
JSA (job safety analysis) and JHA (job hazard analysis) are the same method in most workplaces: steps, hazards, controls for one job. A task risk assessment is the same idea under a general name. A JSRA is a JSA with a score on each step from three ratings. A HIRA is a register for a whole department, one line a hazard of each activity. A SWMS or method statement is the job document a contractor writes to say how high-risk work will be done safely, and in Australia the law requires one for high risk construction work. A permit to work authorizes one dangerous job in one place for one period, and a pre-task plan or field level check is the last look at the job on the day. Rules and names differ by country. This is general guidance, not legal advice.
Last reviewed:
The short answer: one table
Safety documents multiply because each country, industry and customer has its own name for the same few ideas. Underneath there are only three questions. How big is the thing being assessed: a plant, a department, a job, or the next ten minutes? Is a number attached? And does the document also authorize work or only describe it? The table sorts the common names by those three.
The same family of documents at four zoom levels
From widest to narrowest: the HIRA register for a department, the JSA, JHA, JSRA or task risk assessment for a job, the permit to work for one job in one place for a set period, and the pre-task plan and field level check for the moment of starting.
| Document | What it covers | What is in it | Scored? | Typical owner and use |
|---|---|---|---|---|
| JSA (job safety analysis) | One job | Steps, hazard at each step, control for each hazard | Sometimes | Supervisor with the crew. Designs the job, briefs the crew, feeds the SOP. See the JSA guide |
| JHA (job hazard analysis) | One job | The same. OSHA's booklet uses this name | Often severity times likelihood | Same as JSA. See the JHA guide |
| Task risk assessment, task hazard analysis | One task | The same idea in general words | Usually | A common name where the site has not adopted JSA or JHA |
| JSRA (job safety risk assessment) | One job | A JSA plus P, G and M/C ratings before and after the fix | Yes, 1 to 27 | A small team with the operators. Ranks the steps and shows the effect of a fix. See the JSRA guide |
| HIRA (hazard identification and risk assessment) | A department or area | A register: every activity, its hazards, controls, score, extra controls, residual risk, owner | Yes | EHS and the area manager. See the HIRA guide |
| SWMS, method statement, RAMS | A piece of planned work, usually by a contractor | The work activities, hazards, controls, the sequence, who is responsible, how it will be monitored | Not by itself | The contractor, before the work. See the SWMS guide |
| AHA (activity hazard analysis) | An activity of a contract | Steps, hazards, controls, equipment and people for the activity | A risk code, in some forms | A contractor, on projects whose owner asks for it |
| Permit to work | One job, in one place, for a set period | Who, what, where, the isolations and conditions, who issues it, who signs it back | No | The issuing authority. See the permit to work guide |
| Pre-task plan, field level check | The job as it is on the day | A short list of what is different today and what to do about it | No | The crew and the person doing the work. See the pre-task plan and the field level check |
| SOP | How a job is done, not only its safety | Sequence, settings, quality checks, safety | No | The process owner. See SOP format |
Names are not standardized across countries and companies. Where your customer or regulator names a document, use their name for it and map it to the content above.
JSA vs JHA: the same method with two names
In most workplaces job safety analysis and job hazard analysis are the same thing. OSHA's own booklet is titled Job Hazard Analysis and uses job safety analysis in its text. The Canadian Centre for Occupational Health and Safety describes the method under the name job safety analysis and says it is also known by other names. Neither draws a line between the two.
Some companies draw a line anyway. The usual versions are that a JHA scores the risk and a JSA only lists it, or that a JHA is about the hazards in the job and a JSA about the safe way of doing it. Those are house rules. If your site has one, follow it and write it on the form. If it does not, pick one name and use it everywhere, because two names for one document is how two almost identical forms end up filed for the same job.
The same goes for task risk assessment, task hazard analysis and task-based risk assessment. They are the same method for one task, in general words. What matters is not the title but whether the document has the four things that make it work: a step list written from watching the job, a hazard written as an event and an injury, a control you can check, and signatures from the people who do it.
JSA vs JSRA: the score
A JSRA is a JSA in which every step carries a number. Three ratings from 1 to 3 (probability, gravity, and how weak the existing controls are) are multiplied into a score from 1 to 27, and rated again after the fix. The scoring gives you two things a plain JSA does not: a way to rank the steps, and a before and after number to show a fix worked. It costs you the time to agree the scores and the risk of false precision. See the JSRA guide for the scales and a worked form.
A JHA that scores severity times likelihood on a five-by-five matrix is, in practice, a JSRA with a different scale. The difference is only the scale: five by five against three by three by three, and whether the quality of the current controls gets its own rating. Do not mix the two scales in one plant, and do not compare numbers from one with numbers from the other.
HIRA vs JSA: the zoom level
The difference between a HIRA and a JSA is size. A JSA zooms in on one job and walks through its steps. A HIRA zooms out to a department: it lists every activity done there, maintenance, cleaning and contractor work included, with the hazards, the existing controls, a score and the plan. A JSA does not replace a HIRA, because a department has hazards that are not in any one job, such as forklift routes and noise from the next cell. A HIRA does not replace a JSA, because a one-line entry such as "change the granulator knives" cannot tell the person doing it what to do at step 4. They work together: the HIRA's high-scoring or non-routine activities are the list of jobs that deserve a JSA or a JSRA, and each finished JSA feeds its scores back into the HIRA.
JSA vs SWMS and method statements
A safe work method statement, or SWMS, is an Australian term with a legal meaning. Safe Work Australia's model Code of Practice for construction work says a SWMS must be prepared before high risk construction work starts. The model WHS Regulations define that work (regulation 291) and require the SWMS (regulation 299). Falling more than two metres is one of the listed kinds of work. The SWMS names the high risk activities, the hazards, how the risks will be controlled and how the controls will be checked, and the person doing the work is generally best placed to write it with the workers involved. States and territories adopt the model rules in their own way, and Victoria has its own regulations, so check with your regulator.
In the United Kingdom the idea is similar and the law is different. HSE says method statements are not required by law as such, though they are widely used in construction, and that the law requires a suitable and sufficient risk assessment. Written arrangements for demolition, dismantling and structural alteration work are the exception HSE names. In practice many clients and principal contractors ask for "RAMS", a risk assessment and method statement, before a contractor starts.
So how does a JSA compare? A JSA is an analysis of the job's hazards, written mainly for the people who do it. A SWMS or method statement is the plan for doing the job safely: it includes the sequence, the people, the equipment and the monitoring, and it is shown to someone else (a principal contractor, a regulator, a client) as evidence. A good SWMS is often built from a JSA. A manufacturing plant outside Australia that brings in contractors for roof work, machine installations or shutdown maintenance will often ask for a method statement for exactly that reason.
The United States has its own version for some customers. The US Army Corps of Engineers' safety manual, EM 385-1-1, has contractors prepare an activity hazard analysis before each definable feature of work, and work does not begin until the government representative accepts it. Editions of the manual differ, so read the current one if it is in your contract.
Which document do I need? A decision flow
Start from what you are trying to do and answer the questions in order. The flow is general; where a regulator, a customer or your own safety system names a document, that rules.
Which document? Answer in order
Five questions. Whole department: HIRA. Planned contractor high-risk work: method statement or SWMS. Need a score: JSRA. Steps, hazards and controls for one job: JSA or JHA. About to start today: pre-task plan and field level check.
| Situation | Use | Why |
|---|---|---|
| A new line is being set up and the steps are being timed | JSA or JSRA per job, using the time study elements as the steps | The breakdown exists already. See JSA from video |
| A department has never been assessed | HIRA first, then a JSA or JSRA for the top-scoring and non-routine activities | You need the whole list before you pick the jobs |
| A maintenance job is done twice a year | JSA or JSRA written for it, a pre-task plan on the day, and a permit if your rules say so | Non-routine work is where injuries cluster and habit protects nobody |
| A contractor will replace a roof extraction fan | A method statement or SWMS from the contractor, which you review against your own JSA, a permit to work, and a pre-task plan on the day | The contractor writes the plan and you hold the permit and the site rules |
| An operator is about to start a job and the floor is wet | A point-of-work check, and stop-work if the answer is no | The paperwork was written for a dry floor |
| An auditor asks how hazards are identified | The HIRA register and the JSAs behind it | The HIRA shows the system, the JSAs show the detail |
| The job has changed | Update the JSA or JSRA and the SOP, brief the crew again | Use the management of change check |
Permits, pre-task plans and field checks are covered in their own guides. This page only shows where they sit.
One job through all the documents
The easiest way to see the documents together is to follow one job. Take the granulator knife change from the JSA guide, an invented example of a non-routine job done every six weeks. The figure shows where each document appears, from the department register to the last check before the first bolt is touched.
The granulator knife change through the documents
Example numbers- DEPARTMENTHIRA lineMoulding hall register: granulator knife change, non-routine, high score. Flagged for a job analysis.
- JOBJSA or JSRANine steps, a hazard and a control for each, signed by the crew and the approver.
- PROCEDURESOP and trainingThe controls become numbered steps, warnings before the step, and key points in training.
- CONTRACTORMethod statementOnly if an outside crew does the job. They write theirs from the JSA and you review it.
- AUTHORIZATIONPermit to workIssued for this job, this day, naming the lockout and the entry conditions. Signed back at the end.
- ON THE DAYPre-task planWhat is different today? Is the chute pinned? Anyone else in the area?
- AT THE MACHINEField level checkStop if something is not as the sheet says, and tell the supervisor.
Seven documents in order for one non-routine job: a HIRA line, the JSA or JSRA, the SOP and training, a contractor method statement if needed, the permit to work, the pre-task plan and the field level check.
Notice that the documents hand work to each other. The department register decides that the job needs a JSA. The JSA's controls become steps in the SOP. The JSA is the base of the contractor's method statement if one is used. The permit is issued against the job and names the isolations the JSA calls for. And the pre-task plan on the day asks only what is different today. If those handoffs are missing, you have a pile of paper and not a system.
Write the breakdown once
Almost all of these documents start from the same list of steps. The time study has it with seconds against each. The ergonomic score has it with a posture score against each. The JSA, JSRA, SWMS and SOP all need it too. The common failure is that each document is written by a different person from a different walk-through, so the step lists drift apart and nobody can say which one is right.
The fix is to treat the element breakdown as the source and every document as a view of it. Film the job once, break it into elements with the operator, and add columns as you go: seconds, then hazard and control, then posture score. See one study, three outputs. LeanSuite helps with the front of that chain: you film the job on a phone and AI video analysis drafts the time and motion study and the ergonomic study by task element, for a person to review. It does not write a JSA, a JSRA or a method statement, and it is not a permit system; your team writes those from the element list.
Common mistakes
- Arguing over names. If JSA and JHA are the same in your plant, say so in the procedure and move on to the quality of the content.
- Mixing scales. A 12 on a three-factor scale and a 12 on a five-by-five matrix are different things.
- Using a department register in place of a job analysis, or the reverse.
- Writing the contractor's method statement and your own JSA from separate walk-throughs. Review one against the other.
- Letting a permit stand in for a risk assessment. A permit says the job is authorized and the conditions are met. It does not say the job's hazards were thought through.
- Treating the pre-task plan as a pre-printed checklist that everyone ticks the same way every day.
- Not asking the regulator or the customer which document they require, and building the wrong one.
This guide is general information and not legal advice. What your site must have depends on the country, the industry, the contract and the regulator. Ask your safety professional or counsel, and read the rule that applies to you.
Templates and related guides
- Job safety analysis template: the form for JSA and JHA.
- Risk assessment matrix: for a five-by-five score.
- Risk register template: a register in the spirit of the HIRA.
- Job safety analysis guide, JSRA guide and HIRA guide: the three documents in detail.
- Lockout tagout and contractor safety management: where permits and method statements meet the floor.
Go deeper
This page is the short version. These guides cover each part in full.
- Top Five Common Manufacturing HazardsThe hazards that any of these documents has to find.
- 7 Preventable Shop Floor Incidents Most Plants MissIncidents that sit between a department register and a job analysis.
- Building Proactive Safety Culture Instead of Reactive ResponseWhy more paperwork is not the same as more safety.
- Five Ways to Improve Safety on the Shop FloorPractical changes that follow once the documents show the weak controls.
All our articles on this subject are in the safety management topic.
Free templates and tools
- Job safety analysis (JSA) templateJob steps, hazards, risk scored before and after the controls, the hierarchy of controls, PPE and sign-off.
- Risk assessment matrix template (5×5)A color-coded 5 × 5 severity and likelihood matrix, a scoring guide and a risk register.
- Risk register templateOne scored list of operational risks with owners, actions and dates, a heat map and a review log.
- Risk matrix calculatorSeverity times likelihood on a 3 x 3, 4 x 4 or 5 x 5 risk matrix, the band and its action, editable banding, and the score after further controls.
Doing this in LeanSuite
AI Video Analysis
One process video becomes a time and motion study, an ergonomic study, line balancing and more.
See AI Video AnalysisSafety Improvement
Keeps employees alert to hazards and gives leaders the visibility to drive safety improvements.
See Safety Improvement
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about jSA vs JHA vs JSRA
In most workplaces there is none. Job safety analysis and job hazard analysis are two names for the same method: break one job into steps, find the hazard at each step and set a control. OSHA's booklet is titled Job Hazard Analysis and uses job safety analysis in its text. Some companies keep a house rule, such as JHA scores risk and JSA only lists it, so follow yours if you have one.
A JSRA is a JSA that scores each step. The team rates probability, gravity and how weak the controls are, each from 1 to 3, and multiplies them into a score from 1 to 27, before and after the fix. The score ranks the steps and shows whether a fix worked. A JSA without scores lists the same steps, hazards and controls but gives no ranking.
Scope. A HIRA is a register for a whole department: every activity, its hazards, controls, risk score and owner, one line a hazard. A JSA is one job taken step by step. The HIRA tells you which jobs need a JSA. The JSA gives the HIRA its detail and its scores. Neither replaces the other, and a plant that wants both should keep them linked.
Yes. A JSA analyses the hazards of a job, mostly for the people doing it. A SWMS is the plan for doing high-risk work safely, written before the work and shown to others as evidence. In Australia the model WHS Regulations require one for high risk construction work. A SWMS is often built from a JSA. Check your own regulator, because states and territories differ.
A JSA covers what could hurt someone in a job and what stops it. An SOP covers how the whole job is done: sequence, settings, quality checks and safety. The JSA is written first and feeds the SOP, where each control becomes a step or a warning placed before the step it protects. People work from the SOP and use the JSA to design and review the job.
Usually yes. Task risk assessment, task hazard analysis and task-based risk assessment are general names for assessing the hazards of one task, step by step, which is what a JSA does. Sites that have not adopted JSA or JHA use them. Check the content rather than the title: it should have steps from watching the job, hazards written as events, controls you can check and signatures from the crew.
Related guides and tools
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.