Man-machine chart and multiple activity charts: how many machines can one operator run?

Short answer

A man-machine chart draws what an operator and a machine are each doing against one time scale, so idle time on either side shows as a gap. The number of machines one operator can run is n = (l + m) / (l + w): load time plus run time, over load time plus walk time.

A man-machine chart, also called a worker-machine chart or multiple activity chart, puts the operator and the machine in side by side columns on a common time scale and marks each as working or idle. It shows where the operator waits for the machine and where the machine waits for the operator. To find how many machines one operator can run, use n = (l + m) / (l + w), where l is the load and unload time, m is the machine's automatic run time and w is the operator's walking and other time per machine. With l = 1.0, m = 4.0 and w = 0.5 minutes, n = 5.0 / 1.5 = 3.33, so the choice is three or four machines, and cost per piece decides.

Last reviewed:

What is a man-machine chart?

One operator, one lathe: who is busy when

Example numbers
  • Operator and machine both tied up
  • Operator working alone
  • Machine running alone
  • Idle

Operator

Unload and load
Check, deburr
Idle: waiting for the machine

Machine

Stopped for loading
Cutting on its own
  • OperatorWorking 1.5 min, idle 3.5 min. Busy 30%.
  • MachineRunning 4.0 min, stopped to load 1.0 min. Running 80%.
  • Output60 / 5.0 = 12 pieces an hour.

A man-machine chart over a 5.0 minute cycle. For the first minute the operator unloads and loads while the machine is stopped. For the next half minute the operator checks and deburrs while the machine cuts. For the last 3.5 minutes the operator is idle while the machine cuts. The operator works 1.5 of 5.0 minutes, 30 percent. The machine runs 4.0 minutes, 80 percent. Output is 12 pieces an hour.

The operator waits 3.5 minutes of every 5.0, 70 percent, and the machine is never kept waiting. The room for improvement is all on the operator's side.

A man-machine chart shows what a person and a machine are each doing, moment by moment, on the same time scale. The operator has one column and the machine has another. Each column is shaded where its subject is working and left blank where it is idle. Read across at any moment and you see both.

It exists because machine-paced work hides waste that a plain time study does not look for. A time study gives the cycle time. The chart shows what fills it. On many machine jobs the operator loads a part, presses start and then stands for most of the cycle. Barnes put it plainly: the machine is idle while the operator loads it, and the worker is idle while the machine runs.

  • Operator idle time: the person waiting for the machine to finish. This is the time you can fill with a second machine or other work.
  • Machine idle time: the machine waiting for the person. This is lost capacity.
  • The cycle: how long one round takes and what sets its length, the machine or the operator.
  • Utilization of each: working time divided by cycle time.

Use it whenever people and machines take turns: machining cells, molding presses, test rigs, ovens, packaging machines. It is the wrong tool for purely manual work, where a time study or a two-handed chart says more, and for a fully automatic line nobody tends.

Man-machine chart, worker-machine chart, multiple activity chart: the names

The same drawing goes by several names, and the family has a few members. Multiple activity chart is the general term: any chart that sets two or more subjects against one time scale.

The multiple activity chart family
ChartSubjects on the chartQuestion it answers
Man-machine chart (worker-machine chart, operator-machine chart)One operator, one machineHow much of the cycle is each one idle?
Multi-machine chart (man and multi-machine chart)One operator, two or more machinesCan one person run them all, and who waits for whom?
Gang process chart (crew chart, multi-man chart)Several people, with or without a machineIs the crew the right size, and who is waiting on whom?
Standard work combination tableOne operator's manual, walking and machine time against taktDoes this operator's work fit inside takt time?

Newer textbooks say worker-machine chart. Older ones and many plants say man-machine chart. The standard work combination table is Toyota's version of the same idea, with a takt time line added.

This page covers the first two. For crews see timing long-cycle and team work, and for the combination table see the standard work combination table template.

How to draw a man-machine chart

Drawing the chart in seven steps

  1. 1

    Time the elements

  2. 2

    Sort each element into one of three kinds

  3. 3

    Draw a time scale down the page

  4. 4

    Plot the operator

  5. 5

    Plot the machine

  6. 6

    Mark the end of the cycle and total each column

  7. 7

    Question the idle time

Chart the steady state, and a normal cycle. A tool change or a bin swap belongs in a note, not in the bars.
  1. 1

    Time the elements

    Run a short time study of the operator's elements and note the machine's automatic run time separately. Machine time usually comes straight from the controller or a few timed runs, because it barely varies.

  2. 2

    Sort each element into one of three kinds

    Joint work, where the operator and machine are both tied up, such as loading. Operator-only work, such as inspecting or walking. Machine-only time, when the machine runs with nobody touching it.

  3. 3

    Draw a time scale down the page

    Pick a scale that fits one full cycle, such as one square to 0.1 minute. Draw a column for the operator and one for each machine.

  4. 4

    Plot the operator

    Starting at the top of a cycle, block in each operator element for its length and write what it is. Leave the column blank wherever the operator is waiting.

  5. 5

    Plot the machine

    Block in loading, running and unloading against the same scale, lined up with the operator elements that cause them. Leave it blank where the machine stands idle.

  6. 6

    Mark the end of the cycle and total each column

    The cycle ends when both are back where they started. Add up working and idle time for each column and divide by the cycle time for utilization.

  7. 7

    Question the idle time

    Ask what could fill each blank: another machine, inspection, deburring, getting the next part ready. Then redraw the chart for the proposal before changing anything on the floor.

Chart the steady state, not the first cycle after a break. And chart a normal cycle. One-off events such as a tool change or a bin swap belong in a note or in the allowances, not in the bars.

A man-machine chart example: one operator, one lathe

Illustrative example. An operator runs one CNC lathe. Unloading the finished part and loading the next takes 1.0 minute with the machine stopped. The machine then cuts for 4.0 minutes on its own. While it runs, the operator spends 0.5 minute checking and deburring the part just made.

Illustrative: the chart for one operator and one lathe, in minutes
FromToOperatorMachine
0.01.0Unload and load (working)Being unloaded and loaded (stopped)
1.01.5Check and deburr the last part (working)Cutting (running)
1.55.0Idle: waiting for the machineCutting (running)
Totals5.0Working 1.5, idle 3.5Running 4.0, stopped for loading 1.0

Operator utilization = 1.5 / 5.0 = 30 percent. Machine running = 4.0 / 5.0 = 80 percent. Output = 60 / 5.0 = 12 pieces an hour.

The operator is idle for 3.5 minutes of every 5.0. That is 70 percent of the shift spent watching a machine that does not need watching. The machine is never kept waiting, so adding a helper would gain nothing. The chart says the room for improvement is all on the operator's side: give this person more machines.

How many machines can one operator run? The formula

When the machines are alike and each needs the operator at regular, predictable times, textbooks call it synchronous servicing. The number of machines one operator can keep running without any of them waiting is:

n = (l + m) / (l + w)

  • l is the loading and unloading time per machine, when operator and machine are both tied up.
  • m is the machine's automatic running time.
  • w is the operator's other time per machine: walking to the next machine, inspecting, deburring.
  • The top line, l + m, is the machine's cycle. The bottom line, l + w, is the operator time each machine uses.

This is the notation in Niebel and Freivalds. Other texts write the same thing as n = (a + t) / (a + b), with a for the joint time, t for the machine's own time and b for the operator's own time. For the lathe, l = 1.0, m = 4.0 and w = 0.5:

n = (1.0 + 4.0) / (1.0 + 0.5) = 5.0 / 1.5 = 3.33 machines

Nobody can run a third of a machine, so the answer is a choice between three and four. With three, the operator needs 3 x 1.5 = 4.5 minutes to get round and the machines take 5.0, so the machines set the cycle and the operator has 0.5 minute spare. With four, the operator needs 4 x 1.5 = 6.0 minutes to get round, so the operator sets the cycle and each machine stands finished for 1.0 minute before it is reloaded.

Three lathes against four, one operator

Example numbers
Load and unload, 1.0Machine runs alone, 4.0Operator walks, 0.5Waiting

Three lathes: cycle 5.0 minutes

Operator round 3 x 1.5 = 4.5 min, so 0.5 min spare. No machine waits.

Operator

Machine 1

Machine 2

Machine 3

Four lathes: cycle 6.0 minutes

Operator round 4 x 1.5 = 6.0 min. Each machine stands finished for 1.0 min.

Operator

Machine 1

Machine 2

Machine 3

Machine 4

Two multi-machine charts. With three lathes the operator needs 4.5 minutes to get round and the machines take 5.0, so the machines set the cycle and the operator has 0.5 minute spare. With four lathes the operator needs 6.0 minutes, so the operator sets the cycle and each machine stands finished for 1.0 minute before it is reloaded.

Three: the machines set the pace and the operator has half a minute to spare. Four: the operator sets the pace and every machine waits a minute. n = 3.33 sits between them.
Illustrative: one operator on one to five lathes (l = 1.0, m = 4.0, w = 0.5 minutes)
MachinesCycle, minOperator idle per cycle, minEach machine idle per cycle, minPieces an hourOperator busy
15.03.50.01230%
25.02.00.02460%
35.00.50.03690%
46.00.01.040100%
57.50.02.540100%

Up to n the cycle is l + m. Above n the cycle is machines x (l + w). Output stops rising at 40 an hour, because the operator can only load one part every 1.5 minutes: 60 / 1.5 = 40.

Three machines or four? Let the cost per piece decide

The lower number wastes a little of the operator. The higher number wastes a little of every machine. Which is cheaper depends on what an operator hour and a machine hour cost. Call the operator rate K1 and the machine rate K2, in the same units as the times. The expected cost of one piece is:

  • With the lower number, n1: cost = (l + m) x (K1 + n1 x K2) / n1
  • With the higher number, n2: cost = (l + w) x (K1 + n2 x K2)

Both are the same idea: the cost of running the cell for one cycle, divided by the pieces that cycle makes. Take an operator at 30 dollars an hour, 0.50 a minute, and a lathe at 60 dollars an hour, 1.00 a minute. These are example rates.

Illustrative: cost per piece by number of machines (operator 0.50 a minute, machine 1.00 a minute)
MachinesCost of one cyclePieces per cycleCost per piece
15.0 x (0.50 + 1.00) = 7.5017.50
25.0 x (0.50 + 2.00) = 12.5026.25
35.0 x (0.50 + 3.00) = 17.5035.83
46.0 x (0.50 + 4.00) = 27.0046.75
57.5 x (0.50 + 5.00) = 41.2558.25

Three machines is cheapest at 5.83 a piece. Four makes 40 an hour against 36, but each piece costs 6.75, because four machines each stand idle for a sixth of the cycle.

More machines make more parts, until they do not make them cheaper

Example numbers
  • 1 lathe

    12 an hour
    7.50 a piece
  • 2 lathes

    24 an hour
    6.25 a piece
  • 3 lathesCheapest

    36 an hour
    5.83 a piece
  • 4 lathes

    40 an hour
    6.75 a piece
  • 5 lathes

    40 an hour
    8.25 a piece
  • Pieces an hourCost per piece

One operator on one to five lathes makes 12, 24, 36, 40 and 40 pieces an hour. Cost per piece is 7.50, 6.25, 5.83, 6.75 and 8.25 with an operator at 0.50 a minute and a lathe at 1.00 a minute. Three lathes is the cheapest.

Output stops rising at 40 an hour, because the operator can load only one part every 1.5 minutes. Cost per piece bottoms out at three machines, 5.83. Use your own rates.

Cost per piece is not the only test. If the customer needs 40 an hour and you own four lathes, four may be right this month. If the machines are cheap and labor is dear, the higher number wins more often. Put your own rates in. The machine hour rate calculator helps with K2.

Machine interference: when machines stop at random

The formula above assumes machines call for the operator on a regular beat. Many do not. Winding, weaving, automatic screw machines and packaging lines stop when a thread breaks or a jam happens. If a second machine stops while the operator is busy at the first, it waits. That waiting is machine interference: running time lost because the operator was somewhere else.

Textbooks call this random servicing and estimate it with the binomial distribution. Let p be the share of time one machine is stopped and needs the operator, found by work sampling or from the machine's own log, and q = 1 minus p. The chance that exactly k of n machines are stopped at the same moment is the binomial term: n! / (k! x (n minus k)!) x p to the power k x q to the power (n minus k).

Illustrative example. One operator tends three automatic machines. Each is stopped waiting for attention 20 percent of the time, so p = 0.2 and q = 0.8.

Illustrative: three machines, each stopped 20 percent of the time, one operator
Machines stopped at onceProbabilityMachines waiting with no operatorMachine-hours lost in an 8 hour shift
00.8³ = 0.51200
13 x 0.2 x 0.8² = 0.38400
23 x 0.2² x 0.8 = 0.09610.096 x 1 x 8 = 0.768
30.2³ = 0.00820.008 x 2 x 8 = 0.128
Total1.0000.896

0.896 of 24 machine-hours is 3.7 percent lost to interference. The same sum for two machines gives 2.0 percent, for four 5.2 percent and for five 6.6 percent.

Three machines, one operator, random stops

Example numbers
  • 0 machines stopped, nobody waits

    0.512

    0.8 x 0.8 x 0.8

  • 1 machine stopped, nobody waits

    0.384

    3 x 0.2 x 0.8 x 0.8

  • 2 machines stopped, 1 waiting with no operator

    0.096

    3 x 0.2 x 0.2 x 0.8, machine-hours lost in 8 h: 0.768

  • 3 machines stopped, 2 waiting with no operator

    0.008

    0.2 x 0.2 x 0.2, machine-hours lost in 8 h: 0.128

0.768 + 0.128 = 0.896 machine-hours of 24 lost, 3.7 percent.

Each machine is stopped waiting for attention 20 percent of the time. The chance that none is stopped is 0.512, one is 0.384, two is 0.096 and all three is 0.008. When two are stopped one waits, and when three are stopped two wait. That loses 0.896 of 24 machine-hours in an 8 hour shift, 3.7 percent.

Most of the time the operator copes. The loss comes from the rare moments when two or three machines call at once: 0.896 of 24 machine-hours, 3.7 percent.

The loss climbs with every machine added, and at some point the lost output costs more than a second operator. The same cost per piece comparison settles it.

The binomial method is an estimate. It treats stops as independent and ignores the fact that a machine waiting in a queue is not running and so cannot stop again. For larger groups, textbooks point to Wright's formula and Ashcroft's tables, which come from queueing theory, and many engineers now simulate the cell or simply measure it. Use the binomial sum to size the question, not to settle a dispute.

What to do with the idle time the chart shows

The chart is a means to an end. Once the blanks are on paper, work through them in this order.

  • Move work inside the machine's running time. Inspection, deburring, packing and getting the next part ready can all be done while the machine cuts. Anything done with the machine stopped lengthens the cycle.
  • Shorten l. Loading and unloading tie up both the operator and the machine, so every second saved there counts twice. Quick clamps, part locators and a place for the finished part within reach all help.
  • Shorten w. Walking is the usual culprit. Machines in a U with the operator inside cut the walk between them.
  • Let the machine stop itself. One operator can only leave a machine that will not make scrap or crash while unattended. Toyota's term is jidoka: the machine detects a problem and stops, so a person does not have to stand guard.
  • Give the operator more machines, up to the number the formula and the cost check support.
  • If machines wait for the operator, look at the operator's elements first. A second person is the last resort.

Redraw the chart after each change. A before and after pair is the clearest way to show a team, and a manager, what the change buys. How many operators do you need takes the same numbers up to the level of a whole line.

Traps when charting people and machines

  • Filling an operator to 100 percent. The table shows four machines keeping the operator fully busy. A person with no slack cannot absorb a jam, a gauge check or a trip to the washroom. Add allowances before you commit to a number.
  • Treating attention as idleness. Some machines need watching: a first-off part, a manual feed, a process that drifts. Check before you call it waiting.
  • Ignoring walking. A formula that leaves out w says one operator can run more machines than the floor layout allows.
  • Using an average for a machine that varies. If run time depends on the part, chart the mix, not one part.
  • Forgetting the people. More machines per operator can read as fewer operators. Say early what the plan is for the people freed up, and involve them in the redesign. See time study in a union plant.
  • Safety and ergonomics. More machines means more walking, more lifting and more loading cycles an hour. Check the load on the person, not only the minutes. See ergonomic assessment in manufacturing.
  • Charting once. Run times change with tooling, programs and materials. A chart from three years ago describes a different cell.

Templates and tools

If you film the cell, LeanSuite's time and motion study times each element on a timeline linked to the video and separates operator time from machine time, which is the raw material for a chart like the ones on this page.

FAQ

Questions about man-machine chart

  1. A man-machine chart is a diagram that shows what an operator and a machine are each doing over one work cycle, in side by side columns on a common time scale. Each column is marked as working or idle. It is used to find operator waiting time and machine waiting time, and to decide how many machines one operator can run.

  2. A multiple activity chart records the activities of two or more subjects, people, machines or both, against one time scale so that their working and idle periods can be compared. The man-machine chart is the simplest case, with one operator and one machine. A multi-machine chart has one operator and several machines, and a gang process chart has a crew.

  3. For machines serviced on a regular cycle, n = (l + m) / (l + w), where l is the loading and unloading time, m is the machine's automatic running time and w is the operator's walking and other time per machine. With l = 1.0, m = 4.0 and w = 0.5 minutes, n = 5.0 / 1.5 = 3.33. Compare the cost per piece at three and at four machines.

  4. Machine interference is running time lost when a machine stops and has to wait because its operator is busy at another machine. It appears when one person tends several machines that stop at random. It grows with each machine added. For three machines each stopped 20 percent of the time, a binomial estimate puts the loss at about 3.7 percent of machine time.

  5. Both set an operator's work and a machine's automatic time against a time scale. The man-machine chart gives the operator and each machine a column and is used to find idle time and the number of machines per operator. The standard work combination table follows one operator through manual, walking and machine time, with a line for takt time, and is used to check the work fits inside takt.

  6. Add up the operator's working time in one cycle and divide by the cycle time. In the lathe example the operator works for 1.0 minute loading and 0.5 minute inspecting in a 5.0 minute cycle, so utilization is 1.5 / 5.0 = 30 percent. Machine utilization is worked out the same way: 4.0 minutes running out of 5.0 is 80 percent.

  7. No. A chart shows the bare cycle with no allowances. An operator with every second filled cannot deal with a jam, a quality check or a personal break without a machine standing idle. Add personal, fatigue and delay allowances to the operator's time per machine before using the formula, or choose the lower whole number of machines.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.