Man-machine chart and multiple activity charts: how many machines can one operator run?
Short answer
A man-machine chart draws what an operator and a machine are each doing against one time scale, so idle time on either side shows as a gap. The number of machines one operator can run is n = (l + m) / (l + w): load time plus run time, over load time plus walk time.
A man-machine chart, also called a worker-machine chart or multiple activity chart, puts the operator and the machine in side by side columns on a common time scale and marks each as working or idle. It shows where the operator waits for the machine and where the machine waits for the operator. To find how many machines one operator can run, use n = (l + m) / (l + w), where l is the load and unload time, m is the machine's automatic run time and w is the operator's walking and other time per machine. With l = 1.0, m = 4.0 and w = 0.5 minutes, n = 5.0 / 1.5 = 3.33, so the choice is three or four machines, and cost per piece decides.
Last reviewed:
What is a man-machine chart?
One operator, one lathe: who is busy when
Example numbers- Operator and machine both tied up
- Operator working alone
- Machine running alone
- Idle
Operator
Machine
- OperatorWorking 1.5 min, idle 3.5 min. Busy 30%.
- MachineRunning 4.0 min, stopped to load 1.0 min. Running 80%.
- Output60 / 5.0 = 12 pieces an hour.
A man-machine chart over a 5.0 minute cycle. For the first minute the operator unloads and loads while the machine is stopped. For the next half minute the operator checks and deburrs while the machine cuts. For the last 3.5 minutes the operator is idle while the machine cuts. The operator works 1.5 of 5.0 minutes, 30 percent. The machine runs 4.0 minutes, 80 percent. Output is 12 pieces an hour.
A man-machine chart shows what a person and a machine are each doing, moment by moment, on the same time scale. The operator has one column and the machine has another. Each column is shaded where its subject is working and left blank where it is idle. Read across at any moment and you see both.
It exists because machine-paced work hides waste that a plain time study does not look for. A time study gives the cycle time. The chart shows what fills it. On many machine jobs the operator loads a part, presses start and then stands for most of the cycle. Barnes put it plainly: the machine is idle while the operator loads it, and the worker is idle while the machine runs.
- Operator idle time: the person waiting for the machine to finish. This is the time you can fill with a second machine or other work.
- Machine idle time: the machine waiting for the person. This is lost capacity.
- The cycle: how long one round takes and what sets its length, the machine or the operator.
- Utilization of each: working time divided by cycle time.
Use it whenever people and machines take turns: machining cells, molding presses, test rigs, ovens, packaging machines. It is the wrong tool for purely manual work, where a time study or a two-handed chart says more, and for a fully automatic line nobody tends.
Man-machine chart, worker-machine chart, multiple activity chart: the names
The same drawing goes by several names, and the family has a few members. Multiple activity chart is the general term: any chart that sets two or more subjects against one time scale.
| Chart | Subjects on the chart | Question it answers |
|---|---|---|
| Man-machine chart (worker-machine chart, operator-machine chart) | One operator, one machine | How much of the cycle is each one idle? |
| Multi-machine chart (man and multi-machine chart) | One operator, two or more machines | Can one person run them all, and who waits for whom? |
| Gang process chart (crew chart, multi-man chart) | Several people, with or without a machine | Is the crew the right size, and who is waiting on whom? |
| Standard work combination table | One operator's manual, walking and machine time against takt | Does this operator's work fit inside takt time? |
Newer textbooks say worker-machine chart. Older ones and many plants say man-machine chart. The standard work combination table is Toyota's version of the same idea, with a takt time line added.
This page covers the first two. For crews see timing long-cycle and team work, and for the combination table see the standard work combination table template.
How to draw a man-machine chart
Drawing the chart in seven steps
- 1
Time the elements
- 2
Sort each element into one of three kinds
- 3
Draw a time scale down the page
- 4
Plot the operator
- 5
Plot the machine
- 6
Mark the end of the cycle and total each column
- 7
Question the idle time
- 1
Time the elements
Run a short time study of the operator's elements and note the machine's automatic run time separately. Machine time usually comes straight from the controller or a few timed runs, because it barely varies.
- 2
Sort each element into one of three kinds
Joint work, where the operator and machine are both tied up, such as loading. Operator-only work, such as inspecting or walking. Machine-only time, when the machine runs with nobody touching it.
- 3
Draw a time scale down the page
Pick a scale that fits one full cycle, such as one square to 0.1 minute. Draw a column for the operator and one for each machine.
- 4
Plot the operator
Starting at the top of a cycle, block in each operator element for its length and write what it is. Leave the column blank wherever the operator is waiting.
- 5
Plot the machine
Block in loading, running and unloading against the same scale, lined up with the operator elements that cause them. Leave it blank where the machine stands idle.
- 6
Mark the end of the cycle and total each column
The cycle ends when both are back where they started. Add up working and idle time for each column and divide by the cycle time for utilization.
- 7
Question the idle time
Ask what could fill each blank: another machine, inspection, deburring, getting the next part ready. Then redraw the chart for the proposal before changing anything on the floor.
Chart the steady state, not the first cycle after a break. And chart a normal cycle. One-off events such as a tool change or a bin swap belong in a note or in the allowances, not in the bars.
A man-machine chart example: one operator, one lathe
Illustrative example. An operator runs one CNC lathe. Unloading the finished part and loading the next takes 1.0 minute with the machine stopped. The machine then cuts for 4.0 minutes on its own. While it runs, the operator spends 0.5 minute checking and deburring the part just made.
| From | To | Operator | Machine |
|---|---|---|---|
| 0.0 | 1.0 | Unload and load (working) | Being unloaded and loaded (stopped) |
| 1.0 | 1.5 | Check and deburr the last part (working) | Cutting (running) |
| 1.5 | 5.0 | Idle: waiting for the machine | Cutting (running) |
| Totals | 5.0 | Working 1.5, idle 3.5 | Running 4.0, stopped for loading 1.0 |
Operator utilization = 1.5 / 5.0 = 30 percent. Machine running = 4.0 / 5.0 = 80 percent. Output = 60 / 5.0 = 12 pieces an hour.
The operator is idle for 3.5 minutes of every 5.0. That is 70 percent of the shift spent watching a machine that does not need watching. The machine is never kept waiting, so adding a helper would gain nothing. The chart says the room for improvement is all on the operator's side: give this person more machines.
How many machines can one operator run? The formula
When the machines are alike and each needs the operator at regular, predictable times, textbooks call it synchronous servicing. The number of machines one operator can keep running without any of them waiting is:
n = (l + m) / (l + w)
- l is the loading and unloading time per machine, when operator and machine are both tied up.
- m is the machine's automatic running time.
- w is the operator's other time per machine: walking to the next machine, inspecting, deburring.
- The top line, l + m, is the machine's cycle. The bottom line, l + w, is the operator time each machine uses.
This is the notation in Niebel and Freivalds. Other texts write the same thing as n = (a + t) / (a + b), with a for the joint time, t for the machine's own time and b for the operator's own time. For the lathe, l = 1.0, m = 4.0 and w = 0.5:
n = (1.0 + 4.0) / (1.0 + 0.5) = 5.0 / 1.5 = 3.33 machines
Nobody can run a third of a machine, so the answer is a choice between three and four. With three, the operator needs 3 x 1.5 = 4.5 minutes to get round and the machines take 5.0, so the machines set the cycle and the operator has 0.5 minute spare. With four, the operator needs 4 x 1.5 = 6.0 minutes to get round, so the operator sets the cycle and each machine stands finished for 1.0 minute before it is reloaded.
Three lathes against four, one operator
Example numbersThree lathes: cycle 5.0 minutes
Operator round 3 x 1.5 = 4.5 min, so 0.5 min spare. No machine waits.
Operator
Machine 1
Machine 2
Machine 3
Four lathes: cycle 6.0 minutes
Operator round 4 x 1.5 = 6.0 min. Each machine stands finished for 1.0 min.
Operator
Machine 1
Machine 2
Machine 3
Machine 4
Two multi-machine charts. With three lathes the operator needs 4.5 minutes to get round and the machines take 5.0, so the machines set the cycle and the operator has 0.5 minute spare. With four lathes the operator needs 6.0 minutes, so the operator sets the cycle and each machine stands finished for 1.0 minute before it is reloaded.
| Machines | Cycle, min | Operator idle per cycle, min | Each machine idle per cycle, min | Pieces an hour | Operator busy |
|---|---|---|---|---|---|
| 1 | 5.0 | 3.5 | 0.0 | 12 | 30% |
| 2 | 5.0 | 2.0 | 0.0 | 24 | 60% |
| 3 | 5.0 | 0.5 | 0.0 | 36 | 90% |
| 4 | 6.0 | 0.0 | 1.0 | 40 | 100% |
| 5 | 7.5 | 0.0 | 2.5 | 40 | 100% |
Up to n the cycle is l + m. Above n the cycle is machines x (l + w). Output stops rising at 40 an hour, because the operator can only load one part every 1.5 minutes: 60 / 1.5 = 40.
Three machines or four? Let the cost per piece decide
The lower number wastes a little of the operator. The higher number wastes a little of every machine. Which is cheaper depends on what an operator hour and a machine hour cost. Call the operator rate K1 and the machine rate K2, in the same units as the times. The expected cost of one piece is:
- With the lower number, n1: cost = (l + m) x (K1 + n1 x K2) / n1
- With the higher number, n2: cost = (l + w) x (K1 + n2 x K2)
Both are the same idea: the cost of running the cell for one cycle, divided by the pieces that cycle makes. Take an operator at 30 dollars an hour, 0.50 a minute, and a lathe at 60 dollars an hour, 1.00 a minute. These are example rates.
| Machines | Cost of one cycle | Pieces per cycle | Cost per piece |
|---|---|---|---|
| 1 | 5.0 x (0.50 + 1.00) = 7.50 | 1 | 7.50 |
| 2 | 5.0 x (0.50 + 2.00) = 12.50 | 2 | 6.25 |
| 3 | 5.0 x (0.50 + 3.00) = 17.50 | 3 | 5.83 |
| 4 | 6.0 x (0.50 + 4.00) = 27.00 | 4 | 6.75 |
| 5 | 7.5 x (0.50 + 5.00) = 41.25 | 5 | 8.25 |
Three machines is cheapest at 5.83 a piece. Four makes 40 an hour against 36, but each piece costs 6.75, because four machines each stand idle for a sixth of the cycle.
More machines make more parts, until they do not make them cheaper
Example numbers1 lathe
12 an hour7.50 a piece2 lathes
24 an hour6.25 a piece3 lathesCheapest
36 an hour5.83 a piece4 lathes
40 an hour6.75 a piece5 lathes
40 an hour8.25 a piece- Pieces an hourCost per piece
One operator on one to five lathes makes 12, 24, 36, 40 and 40 pieces an hour. Cost per piece is 7.50, 6.25, 5.83, 6.75 and 8.25 with an operator at 0.50 a minute and a lathe at 1.00 a minute. Three lathes is the cheapest.
Cost per piece is not the only test. If the customer needs 40 an hour and you own four lathes, four may be right this month. If the machines are cheap and labor is dear, the higher number wins more often. Put your own rates in. The machine hour rate calculator helps with K2.
Machine interference: when machines stop at random
The formula above assumes machines call for the operator on a regular beat. Many do not. Winding, weaving, automatic screw machines and packaging lines stop when a thread breaks or a jam happens. If a second machine stops while the operator is busy at the first, it waits. That waiting is machine interference: running time lost because the operator was somewhere else.
Textbooks call this random servicing and estimate it with the binomial distribution. Let p be the share of time one machine is stopped and needs the operator, found by work sampling or from the machine's own log, and q = 1 minus p. The chance that exactly k of n machines are stopped at the same moment is the binomial term: n! / (k! x (n minus k)!) x p to the power k x q to the power (n minus k).
Illustrative example. One operator tends three automatic machines. Each is stopped waiting for attention 20 percent of the time, so p = 0.2 and q = 0.8.
| Machines stopped at once | Probability | Machines waiting with no operator | Machine-hours lost in an 8 hour shift |
|---|---|---|---|
| 0 | 0.8³ = 0.512 | 0 | 0 |
| 1 | 3 x 0.2 x 0.8² = 0.384 | 0 | 0 |
| 2 | 3 x 0.2² x 0.8 = 0.096 | 1 | 0.096 x 1 x 8 = 0.768 |
| 3 | 0.2³ = 0.008 | 2 | 0.008 x 2 x 8 = 0.128 |
| Total | 1.000 | 0.896 |
0.896 of 24 machine-hours is 3.7 percent lost to interference. The same sum for two machines gives 2.0 percent, for four 5.2 percent and for five 6.6 percent.
Three machines, one operator, random stops
Example numbers0 machines stopped, nobody waits
0.5120.8 x 0.8 x 0.8
1 machine stopped, nobody waits
0.3843 x 0.2 x 0.8 x 0.8
2 machines stopped, 1 waiting with no operator
0.0963 x 0.2 x 0.2 x 0.8, machine-hours lost in 8 h: 0.768
3 machines stopped, 2 waiting with no operator
0.0080.2 x 0.2 x 0.2, machine-hours lost in 8 h: 0.128
0.768 + 0.128 = 0.896 machine-hours of 24 lost, 3.7 percent.
Each machine is stopped waiting for attention 20 percent of the time. The chance that none is stopped is 0.512, one is 0.384, two is 0.096 and all three is 0.008. When two are stopped one waits, and when three are stopped two wait. That loses 0.896 of 24 machine-hours in an 8 hour shift, 3.7 percent.
The loss climbs with every machine added, and at some point the lost output costs more than a second operator. The same cost per piece comparison settles it.
The binomial method is an estimate. It treats stops as independent and ignores the fact that a machine waiting in a queue is not running and so cannot stop again. For larger groups, textbooks point to Wright's formula and Ashcroft's tables, which come from queueing theory, and many engineers now simulate the cell or simply measure it. Use the binomial sum to size the question, not to settle a dispute.
What to do with the idle time the chart shows
The chart is a means to an end. Once the blanks are on paper, work through them in this order.
- Move work inside the machine's running time. Inspection, deburring, packing and getting the next part ready can all be done while the machine cuts. Anything done with the machine stopped lengthens the cycle.
- Shorten l. Loading and unloading tie up both the operator and the machine, so every second saved there counts twice. Quick clamps, part locators and a place for the finished part within reach all help.
- Shorten w. Walking is the usual culprit. Machines in a U with the operator inside cut the walk between them.
- Let the machine stop itself. One operator can only leave a machine that will not make scrap or crash while unattended. Toyota's term is jidoka: the machine detects a problem and stops, so a person does not have to stand guard.
- Give the operator more machines, up to the number the formula and the cost check support.
- If machines wait for the operator, look at the operator's elements first. A second person is the last resort.
Redraw the chart after each change. A before and after pair is the clearest way to show a team, and a manager, what the change buys. How many operators do you need takes the same numbers up to the level of a whole line.
Traps when charting people and machines
- Filling an operator to 100 percent. The table shows four machines keeping the operator fully busy. A person with no slack cannot absorb a jam, a gauge check or a trip to the washroom. Add allowances before you commit to a number.
- Treating attention as idleness. Some machines need watching: a first-off part, a manual feed, a process that drifts. Check before you call it waiting.
- Ignoring walking. A formula that leaves out w says one operator can run more machines than the floor layout allows.
- Using an average for a machine that varies. If run time depends on the part, chart the mix, not one part.
- Forgetting the people. More machines per operator can read as fewer operators. Say early what the plan is for the people freed up, and involve them in the redesign. See time study in a union plant.
- Safety and ergonomics. More machines means more walking, more lifting and more loading cycles an hour. Check the load on the person, not only the minutes. See ergonomic assessment in manufacturing.
- Charting once. Run times change with tooling, programs and materials. A chart from three years ago describes a different cell.
Templates and tools
- Standard work combination table: manual, walking and machine time for one operator against takt.
- Process capacity sheet: what each machine can make in a shift, with tool changes.
- Time study sheet: to time l and w before you draw the chart.
- Machine hour rate calculator: the K2 in the cost check.
- Standard time: rating and allowances for the operator's elements.
If you film the cell, LeanSuite's time and motion study times each element on a timeline linked to the video and separates operator time from machine time, which is the raw material for a chart like the ones on this page.
Go deeper
This page is the short version. These guides cover each part in full.
- Standard Work Tools: Combination Sheet, Chart and Job BreakdownThe standard work combination table, Toyota's relative of the man-machine chart.
- Jidoka in Lean ManufacturingMachines that stop themselves, which is what lets one operator leave a machine running.
- The Three Elements of Standard WorkTakt time, work sequence and standard in-process stock for a multi-machine cell.
- How to Improve Shop Floor ProductivityWhere operator and machine idle time fit among the other losses on the floor.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Process capacity sheet templateEach machine in a part's routing with manual, auto and tool change time, its capacity per shift, and the step that limits the cell against demand.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Operator staffing calculatorTakt, work content, the operators a line needs, a check of your station plan and the roster with absence cover, from your own demand and element times.
- Machine hour rate calculatorWhat one productive hour of a machine costs, with and without the operator, the cost per part and how utilisation moves the rate.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video, split into value-added, necessary and waste.
See Time and Motion StudyStandardized Work
Standard work documents kept current as the method and the times change.
See Standardized Work
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about man-machine chart
A man-machine chart is a diagram that shows what an operator and a machine are each doing over one work cycle, in side by side columns on a common time scale. Each column is marked as working or idle. It is used to find operator waiting time and machine waiting time, and to decide how many machines one operator can run.
A multiple activity chart records the activities of two or more subjects, people, machines or both, against one time scale so that their working and idle periods can be compared. The man-machine chart is the simplest case, with one operator and one machine. A multi-machine chart has one operator and several machines, and a gang process chart has a crew.
For machines serviced on a regular cycle, n = (l + m) / (l + w), where l is the loading and unloading time, m is the machine's automatic running time and w is the operator's walking and other time per machine. With l = 1.0, m = 4.0 and w = 0.5 minutes, n = 5.0 / 1.5 = 3.33. Compare the cost per piece at three and at four machines.
Machine interference is running time lost when a machine stops and has to wait because its operator is busy at another machine. It appears when one person tends several machines that stop at random. It grows with each machine added. For three machines each stopped 20 percent of the time, a binomial estimate puts the loss at about 3.7 percent of machine time.
Both set an operator's work and a machine's automatic time against a time scale. The man-machine chart gives the operator and each machine a column and is used to find idle time and the number of machines per operator. The standard work combination table follows one operator through manual, walking and machine time, with a line for takt time, and is used to check the work fits inside takt.
Add up the operator's working time in one cycle and divide by the cycle time. In the lathe example the operator works for 1.0 minute loading and 0.5 minute inspecting in a 5.0 minute cycle, so utilization is 1.5 / 5.0 = 30 percent. Machine utilization is worked out the same way: 4.0 minutes running out of 5.0 is 80 percent.
No. A chart shows the bare cycle with no allowances. An operator with every second filled cannot deal with a jam, a quality check or a personal break without a machine standing idle. Add personal, fatigue and delay allowances to the operator's time per machine before using the formula, or choose the lower whole number of machines.
Related guides and tools
- How many operators do you need: work content divided by takt
- Timing long-cycle and team work: crew charts and group timing
- How to conduct a time study: timing the operator's elements
- Standard work: the combination table in context
- Standard work combination table template
- Time and motion study: the family of methods
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.