Practical guide · Value stream mapping and flow
Designing a future workstation from a time study
Short answer
Take the element log from a time study, strike out the walking, reaching and holding, and redraw the station so those elements cannot happen. Check the new work content against takt, build it in cardboard, time real cycles on the mock-up, check reach and posture, then build.
A time study tells you where the seconds go. A future workstation is designed by deciding, element by element, which of those seconds should not exist. Classify every element as value-added, necessary or waste. Use ECRS (eliminate, combine, rearrange, simplify) to design each loss out, and write the time you expect for what remains. Compare the new total with takt to decide what work the station should hold. Then build a full-size mock-up from cardboard and tape, run and time at least ten cycles with the operators, check reach and posture, fix what the trial shows, and only then order benches and fixtures. In the example here, one assembly station goes from 58 seconds and 11.8 metres of walking a cycle to 40 seconds and none, while taking on a 5 second task from its neighbour.
Last reviewed:
Why design the station on paper first
From a time study to a station you can build
Example numbers- 1Study
Start from the element log
Ten cycles on video, one row for each element - 2Study
Classify every element
Value-added, necessary or waste - 3Paper
Remove the losses on paper
A layout change and an expected time for each loss - 4Paper
Decide the station's contents from takt
Paper cycle against takt: move work in or out - 5Cardboard
Draw the layout and build it in cardboard
Full size, with the real parts and tools - 6Cardboard
Run the mock-up and time it again
Ten cycles each, compared with paper - 7Cardboard
Check reach and posture
Reach, height and the worst posture - 8Build
Sign off, build, and study it again
Every function signs the layout drawing
Steps 5 to 7 repeat until the mock-up meets takt and passes the posture check.
Most workstations are never designed. A bench is bought, parts arrive in whatever container the supplier uses, a tool gets hung where there was a hook, and the operator works out a method around what is there. A time study of that station measures the result. It does not have to be the end of the story.
The same study is a design brief. Every element in the log has a time and a cause, and most of the causes are things about the layout: a bin too far away, a tool shared with the next bench, a part delivered on the floor. Change those on paper and you can add up a new cycle before spending anything. Then test the paper with cardboard, because paper is always a little optimistic.
The order matters. Changing a drawing costs minutes. Changing a mock-up costs an hour and a roll of tape. Changing a welded bench with air lines and a fixture bolted to it costs weeks, so it rarely happens, and the station stays wrong. This guide follows one station from the study to sign-off. The design principles behind each choice are in the workstation design guide.
The method in eight steps
Plan on two or three working days for one station: half a day with the video and the log, half a day on the paper design, a day on the mock-up and trials. Do it with the operators and the team leader in the room, not for them.
- 1
Start from the element log
Film at least ten cycles and break one cycle into elements with a time for each. If you have no study yet, how to conduct a time study covers it. Add two columns the stopwatch does not give you: distance walked and where the hand had to go.
- 2
Classify every element
Mark each element as value-added (it changes the product in a way the customer pays for), necessary (it adds no value but the job cannot be done without it today) or waste. Be strict: walking, reaching, searching, holding, turning the part over and waiting are waste, however normal they look.
- 3
Remove the losses on paper
Take each waste and necessary element through ECRS: can it be eliminated, combined with another, rearranged in the sequence or simplified? Write the layout change that makes it possible and the time you expect afterward. Leave the value-added times alone unless the method itself changes.
- 4
Decide the station's contents from takt
Add up the paper cycle and compare it with takt time. If the station is now well under takt, pull work in from an overloaded neighbour. If it is still over, move work out or split the station. Settle this before you draw the bench, because the contents decide which parts and tools need space.
- 5
Draw the layout and build it in cardboard
Draw the bench top to scale with the reach arcs on it, then build it full size from cardboard, tape, real bins and the real parts. Set the height with blocks or pallets. Hang the real tool from a string if there is no balancer yet.
- 6
Run the mock-up and time it again
Have two or three operators each run the job on the mock-up until it feels routine, then time at least ten cycles. Compare each element with its paper time. Where the mock-up is slower, find out why and change the cardboard, not the stopwatch.
- 7
Check reach and posture
Measure every pick point from the shoulder and compare it with the reach of your smallest operator. Check the height of the work against each operator's elbow. Score the worst posture that is left with REBA or RULA and compare it with the score before.
- 8
Sign off, build, and study it again
Walk the mock-up with production, maintenance, quality, safety and materials, and get each to sign the layout drawing. Build it. In the first week of running, repeat the time study and update the standard work to match.
Steps 5 to 7 are a loop. Expect to go round it two or three times in a day, and count that as the method working.
Step 1 and 2 on a real log: where the 58 seconds go
Illustrative example. Station 3 on a pump line fits a gasket and a cover to a 3 kg housing with four screws. The line has 27,000 seconds of working time a shift and customers take 600 pumps, so takt is 27,000 / 600 = 45 seconds. The time study gives station 3 a cycle of 58 seconds, which is why it runs overtime. Here is one cycle from the video, averaged over ten.
| # | Element | Time (s) | Class | Walking (m) | Motions |
|---|---|---|---|---|---|
| 1 | Walk to the rack, bend, take a housing from the floor tote | 6.0 | Waste | 3.0 | 5 |
| 2 | Set the housing on the bench and hold it | 2.0 | Necessary | 0 | 2 |
| 3 | Reach for a gasket | 3.0 | Waste | 0 | 3 |
| 4 | Fit the gasket | 4.0 | Value-added | 0 | 2 |
| 5 | Reach for a cover | 3.0 | Waste | 0 | 3 |
| 6 | Position the cover | 3.0 | Value-added | 0 | 2 |
| 7 | Pick four screws, one at a time | 8.0 | Waste | 0 | 12 |
| 8 | Start the four screws by hand | 6.0 | Value-added | 0 | 4 |
| 9 | Fetch the driver from the shared hook | 4.0 | Waste | 2.4 | 3 |
| 10 | Drive the four screws | 8.0 | Value-added | 0 | 4 |
| 11 | Take the driver back | 3.0 | Waste | 2.4 | 3 |
| 12 | Inspect and wipe | 3.0 | Necessary | 0 | 2 |
| 13 | Carry the unit to the outbound cart | 5.0 | Waste | 4.0 | 4 |
| Total | 58.0 | 11.8 | 49 |
Motions are counted from the video: each reach, grasp, move, position or release of a hand, and each walk, counts as one. Value-added 21.0 s (36%), necessary 5.0 s (9%), waste 32.0 s (55%).
One cycle at station 3: 58.0 seconds, element by element
Example numbersA strip of one 58.0 second cycle split into 13 elements. Value-added work is 21.0 seconds (36 percent), necessary work 5.0 seconds (9 percent) and waste 32.0 seconds (55 percent).
Read it as a designer. Only 21 of the 58 seconds change the product. The other 37 are the layout talking: a tote on the floor behind the operator, three bins at the back of the bench, one driver shared between two stations and a cart two metres away. At 600 units a shift the walking alone comes to 11.8 x 600 = 7,080 metres, about 7 kilometres a shift for one person who never leaves the station.
Step 3: remove the losses on paper
Go down the log one loss at a time and ask the four ECRS questions in order. Eliminate comes first because an element that no longer exists needs no bin, no fixture and no training. For each loss, write the change to the station and the time you expect once it is made. Take the expected times from somewhere real: a similar motion elsewhere in the same video, a quick trial at a spare bench, or a predetermined time system if your plant uses one.
| Loss in the log | ECRS | Change to the station | Before (s) | Paper (s) |
|---|---|---|---|---|
| Walk, bend and take a housing from a floor tote | Simplify | Gravity flow rack at the left of the bench, pick point at waist height | 6.0 | 1.5 |
| Left hand holds the housing | Eliminate | A nest fixture holds it; the element becomes seating the housing | 2.0 | 1.5 |
| Two separate long reaches for gasket and cover | Combine | Both bins inside the forearm sweep, one each side, picked together with two hands | 6.0 | 2.0 |
| Four trips to a far bin for screws | Simplify | Shallow screw tray in front of the fixture; four taken in one grasp | 8.0 | 2.0 |
| Fetch and return a shared driver | Eliminate | The station gets its own driver on a balancer above the fixture | 7.0 | 1.5 |
| Carry the finished unit to a cart | Eliminate | A chute at bench height to the next station | 5.0 | 1.0 |
| Inspect and wipe | Keep | No change | 3.0 | 3.0 |
| Four value-added elements | Keep | No change to the method | 21.0 | 21.0 |
| Total | 58.0 | 33.5 |
The paper total is a forecast. It becomes a number you can plan with only after the mock-up has been timed.
Station 3 from above, before and after
Example numbersTwo top views at the same scale. Before: the gasket, cover and screw bins sit 60 to 70 centimetres from the shoulder, outside the maximum working area, and the housing tote, the shared driver and the outbound cart each need a walk, 11.8 metres a cycle in total. After: a flow rack, both bins, the screw tray, the driver, a label dispenser and a chute all sit within 40 centimetres, inside the normal working area, with no walking.
Notice what was not done. Nobody asked the operator to fit the gasket faster. The four value-added elements keep their 21 seconds, and all 24.5 seconds of saving come from things the layout used to force on her. That is the argument to make on the floor when people hear the words time study and expect a speed-up.
Notice also that each change is a design requirement with a dimension attached. The flow rack has to put the housing inside the normal working area. The two bins have to sit at equal distances so the hands arrive together. The balancer has to hang where it does not hit the rack. Those details are what the mock-up is for.
Step 4: decide what the station holds from takt
A redesigned station is rarely the right size by accident. Before drawing the bench, compare the paper cycle with takt and decide what work belongs here. The Lean Enterprise Institute's Lean Lexicon describes the aim for each operator as work very nearly equal to takt time but slightly less. How much less is a plant decision. This line plans each station at no more than 90 percent of takt, to leave room for small stops.
| Step | Working | Result |
|---|---|---|
| Takt time | 27,000 s / 600 units | 45.0 s |
| Planned load, 90% of takt | 45.0 x 0.90 | 40.5 s |
| Station 3 today | From the time study | 58.0 s, 13.0 s over takt |
| Station 3 on paper | From the table above | 33.5 s |
| Room under the planned load | 40.5 minus 33.5 | 7.0 s |
| Work moved in | Apply the label, from station 4 | 5.0 s |
| Station 3 paper design | 33.5 + 5.0 | 38.5 s |
Station 4 is over takt today. Moving its 5 second label task here is line balancing done at the design stage.
Sizing the station against takt, on paper
Example numbersThree bars against a takt of 45.0 seconds and a planned load of 40.5 seconds: the time study at 58.0 seconds, the paper design at 33.5 seconds, and the paper design with the label task at 38.5 seconds.
Without this step the team would have built a 33.5 second station on a 45 second line and left 11.5 seconds of every cycle idle, while station 4 stayed overloaded. With it, the label dispenser goes on the layout drawing now, not as a bracket added later. If you are changing several stations at once, do this for the whole line with a yamazumi chart, as the line balancing guide shows.
Steps 5 and 6: mock it up in cardboard and time it again
The cardboard mock-up comes from 3P, the production preparation process. In the Lean Lexicon's description, a cross-functional team develops several alternatives for each process step, judges them against lean criteria, and mocks up the process with simple materials to test it before any equipment is ordered. 3P is normally used for a new product or a whole new line, over several days, and practitioners often ask for as many as seven alternatives for each step. For one existing station you are borrowing its central habit: try the design at full size, with real people, while it is still cheap to be wrong.
- Build at full size. A scale model shows flow. Only full size shows reach, height and whether a gloved hand fits the bin.
- Use the real parts, the real containers and the real tool. Their sizes and weights are what the layout has to cope with.
- Set the work height with blocks, pallets or an adjustable table, and mark it once it feels right for the shortest and tallest operator.
- Tape the reach arcs on the surface before placing anything, then place every-cycle items inside the inner arc.
- Keep a knife and tape at hand. If moving a bin takes more than a minute, people stop suggesting moves.
- Let the operators run it and change it. Their second idea is usually better than the engineer's first.
- Time it only once the motion is routine, and time at least ten cycles for each person.
At station 3 the first trials find three things the paper missed. The flange of the housing catches on the lip of the flow rack, so the lane is widened and the pick still takes a little longer than planned. Picking a gasket and a cover at the same moment is slower than two confident single picks until the bins are tilted toward the hands. And the label needs a second press at one corner. The driver, the chute and the screw tray work as drawn.
| # | Element | Class | Paper (s) | Mock-up (s) | Motions |
|---|---|---|---|---|---|
| 1 | Take a housing from the flow rack | Necessary | 1.5 | 2.0 | 2 |
| 2 | Seat it in the fixture | Necessary | 1.5 | 1.5 | 1 |
| 3 | Pick gasket and cover, one in each hand | Necessary | 2.0 | 2.5 | 2 |
| 4 | Fit the gasket | Value-added | 4.0 | 4.0 | 2 |
| 5 | Position the cover | Value-added | 3.0 | 3.0 | 2 |
| 6 | Take four screws in one grasp | Necessary | 2.0 | 2.0 | 2 |
| 7 | Start the four screws by hand | Value-added | 6.0 | 6.0 | 4 |
| 8 | Pull down the driver on its balancer | Necessary | 1.0 | 1.0 | 1 |
| 9 | Drive the four screws | Value-added | 8.0 | 8.0 | 4 |
| 10 | Release the driver | Necessary | 0.5 | 0.5 | 1 |
| 11 | Inspect and wipe | Necessary | 3.0 | 3.0 | 2 |
| 12 | Apply the label (moved from station 4) | Value-added | 5.0 | 5.5 | 3 |
| 13 | Slide the unit down the chute | Necessary | 1.0 | 1.0 | 1 |
| Total | 38.5 | 40.0 | 27 |
Value-added 26.5 s (66%), necessary 13.5 s (34%), waste 0 s. No walking. The mock-up is 1.5 s slower than paper and 0.5 s inside the 40.5 s planned load.
Paper against the mock-up
Example numbersFour bars against a takt of 45.0 seconds and a planned load of 40.5 seconds: the time study at 58.0 seconds, the paper design at 33.5 and 38.5 seconds, and the timed mock-up at 40.0 seconds.
The mock-up time is the one to plan with. It is a trial on cardboard by people who have done the new method for an hour, so it is still not a standard time. Set that from a fresh study once the real station has run for a week, with the usual rating and allowances.
Some plants run a digital simulation before or in place of the cardboard: a quick human model placed in a 3D layout to check walk paths, heights and reach. It is useful for a first screen of many stations and for equipment too large to mock up. Its weakness is the same as paper's. Review every simulation with the people who do the job, and still let them try the critical stations with their own hands.
Step 7: the ergonomic check
A faster station that hurts people is a failed design, and the mock-up is the cheapest moment to find out. Check three things: reach, height and the worst posture left in the cycle. For reach, measure each pick point on the layout from the point under the shoulder that reaches for it, and compare it with the arm lengths of your smallest operator. The team here uses the 5th percentile figures for women in Bodyspace: 40 cm for the normal working area and 55.5 cm for the maximum.
| Item | Before | After (mock-up) |
|---|---|---|
| Housing | Floor tote behind the operator: a walk and a bend | 38 cm, at waist height |
| Gasket bin | 70 cm | 30 cm |
| Cover bin | 65 cm | 30 cm |
| Screws | 60 cm, four trips | 25 cm, one trip |
| Driver | Shared hook 1.2 m away: a walk | 35 cm, on a balancer |
| Label dispenser | Not at this station | 35 cm |
| Outbound | Cart 2 m away: a walk | 40 cm, to the chute |
Before: three items needed a walk and the other three sat beyond the 55.5 cm maximum reach of a small operator, so every one of them meant a lean. After: all seven are within 40 cm.
The reach check: every pick point against the two limits
Example numbersA scale from 0 to 80 centimetres from the shoulder. The normal working area ends at 40 centimetres and the maximum at 55.5. Before, the three bench items sit at 70, 65, 60 centimetres, beyond the maximum, and 3 more items need a walk. After, all 7 items sit between 25 and 40 centimetres.
For posture, score the worst moment before and after with the same method. Before, that moment was the grip on a housing in the floor tote: trunk bent more than 60 degrees, neck tipped back, arms reaching forward. With REBA that scores 7, the top of the medium band. After, the worst posture is a slight forward lean over the fixture with the head down while driving screws, which scores 3, low. The ergonomic assessment guide shows how those scores are built, and when the job needs a different method such as the NIOSH lifting equation.
Check the height with the people, not the average. The work sits 5 to 10 cm below standing elbow height for light assembly. If the tallest and shortest operators cannot both get there, the bench needs to adjust, and that goes on the drawing before sign-off.
Step 8: sign-off
Sign-off is a walk through the mock-up, not a meeting about it. Each function looks for the thing only it will notice, and signs the layout drawing when it is satisfied.
- Operators from every shift: can I run it at pace, and what still annoys me?
- Team leader: can a new person learn it, and can I see from the aisle whether it is running to standard?
- Materials: can the rack and bins be refilled from outside the station, in the containers we really receive?
- Maintenance: can I reach the fixture, the driver and the air supply to service them?
- Quality: are look-alike parts separated, and is the inspection point lit and in view?
- Safety: reach, height and posture checked, no trip points from platforms or hoses, nothing stored above shoulder height.
- Industrial engineering: mock-up time recorded against takt, work content agreed with the neighbouring stations, drawing dimensioned.
Keep the sign-off sheet with the drawing, the mock-up timings and a photo of the cardboard. When someone asks in a year why the bin is where it is, that is the answer.
Before and after
Here is station 3 on the measures that were written down at the start, with the before column from the time study and the after column from the timed mock-up.
| Measure | Before | After | Change |
|---|---|---|---|
| Cycle time | 58.0 s | 40.0 s | 18.0 s less, with the label task added |
| Against a 45 s takt | 13.0 s over | 5.0 s under | Inside the 40.5 s planned load |
| Walking in one cycle | 11.8 m | 0 m | About 7 km a shift removed |
| Motions in one cycle | 49 | 27 | 22 fewer |
| Longest reach | 70 cm | 40 cm | Every item inside the normal working area |
| Value-added share of the cycle | 36% | 66% | 21.0 s of 58.0, then 26.5 s of 40.0 |
| Worst posture, REBA | 7 (medium) | 3 (low) | No bend to the floor |
| Units in a 27,000 s shift | 465 | 675 | Demand is 600 |
Like for like, without the label task, the mock-up cycle is 34.5 s against 58.0 s.
Station 3, before and after
Example numbersCycle time, with the label task added
- Before
- 58.0 s
- After
- 40.0 s
Takt is 45.0 s
Walking in one cycle
- Before
- 11.8 m
- After
- 0 m
About 7 km a shift removed
Motions in one cycle
- Before
- 49
- After
- 27
Counted from the video
Longest reach
- Before
- 70 cm
- After
- 40 cm
Normal working area ends at 40 cm
Worst posture, REBA score
- Before
- 7 (medium)
- After
- 3 (low)
Medium band to low band
The before column explains the overtime: 27,000 / 58 gives 465 units, 135 short of demand. The after column meets demand with room to spare, takes five seconds of work off station 4, and has cost some cardboard and two days. Whatever the final bench, rack, fixture and balancer cost, the team now knows what they are buying and what it will return.
Common mistakes and limits
- Trusting the paper. Paper times are forecasts. At station 3 the mock-up was 1.5 seconds slower, and on a tight line that is the difference between meeting takt and missing it.
- Designing from one cycle. One cycle hides the part that jams every tenth time. Use the average of ten or more and ask what happened in the slow ones.
- Cutting value-added time first. It is the hardest time to remove and the first thing operators fear. Take out the waste and leave the craft alone.
- Improving the station and ignoring the line. If the next station cannot take the output, the saving turns into a pile of stock or idle time.
- Mocking up at scale, or with stand-in parts. Reach and height problems only show at full size with the real container.
- Leaving the operators out until the unveiling. They know the variants, the bad batches and the reason the last change was undone.
- Skipping the posture check because the cycle is shorter. A faster cycle repeats every motion more often in a shift.
- Treating the mock-up time as the standard. Set the standard from a study of the real station, at a normal pace, with allowances.
The method has edges. It suits manual and semi-manual stations with a repeating cycle. Where a machine sets the cycle, the gain is in loading, unloading and what the operator does while the machine runs. Where the work is long and varied, such as maintenance or one-off builds, a mock-up of one station says little, and work sampling or a spaghetti diagram of the whole area is a better start. And cardboard cannot tell you whether a process is capable: torque, fit and cleanliness still need a real trial.
Tools and related guides
- Workstation design: reach zones, working heights, part presentation and the checklist used at sign-off.
- How to conduct a time study: building the element log this method starts from.
- Line balancing: deciding station contents for a whole line against takt.
- Time study sheet: record ten cycles for each element, before and on the mock-up.
- Standard work sheet: the layout drawing with the operator's path, for sign-off.
- Takt time calculator: shifts, breaks and demand in, takt out.
LeanSuite's time and motion study builds the element log from a phone video, splits it into value-added, necessary and waste, and ranks ECRS findings by the seconds they recover. Film the mock-up the same way and you have the before and after from one tool. You review and certify every study.
Go deeper
This page is the short version. These guides cover each part in full.
- Cell Design in JIT: Flow Layout PlanningArranging several redesigned stations into a cell so parts and people flow between them.
- Value-Added vs Non-Value-Added Time in ManufacturingThe rules for classifying each element before you decide what to remove.
- How to Eliminate the 8 Wastes SystematicallyWorking through each kind of waste in order, of which motion and transport are two.
- Yamazumi Chart: What It Is and How to Make One in 7 StepsStacking each station's elements against takt when the redesign covers a whole line.
All our articles on this subject are in the value stream mapping and flow topic.
Free templates and tools
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Spaghetti diagram templateSquared paper to trace every trip, a trip log that turns grid squares into feet, meters and walking time, and a before and after comparison.
- Ergonomic risk assessment checklistScreen a task for 21 ergonomic risk factors, score how long each lasts, and rank tasks so the worst get controls first.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Line balancing calculatorLine efficiency, balance delay and the minimum number of stations from station times and takt.
- Cycle time calculatorCycle time against takt, units per hour, capacity per shift and the gap to daily demand.
Doing this in LeanSuite
Time and Motion Study
Film a station on a phone and get every element timed and split into value-added, necessary and waste.
See Time and Motion StudyLine Balancing
Drop in a video of your line and get a Yamazumi chart, a takt comparison and rebalancing recommendations.
See Line BalancingErgonomic Study
Maps 18 body joints from video, scores REBA and RULA automatically and flags the postures that need a fix.
See Ergonomic Study
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about designing a future workstation
Break the cycle into elements and mark each as value-added, necessary or waste. For every waste element, write the layout change that removes it and the time you expect afterward. Add up the new cycle, compare it with takt and adjust the work content. Then build the layout full size in cardboard, time ten or more cycles on it, check reach and posture, and fix what the trial shows before building.
A cardboard mock-up is a full-size, throwaway model of a workstation or cell built from cardboard, tape and the real parts and tools. Operators run the job on it so that reach, height, sequence and timing can be tested and changed in minutes. It comes from 3P, the production preparation process, and is sometimes called a cardboard city when a whole line is modelled.
3P stands for production preparation process. A cross-functional team designs the production process for a new product, or redesigns one from scratch, by developing several alternatives for each step, judging them against criteria such as takt time and cost, and testing the best with simple full-size mock-ups before any equipment is ordered. It is usually run as an event of several days.
Eliminate, combine, rearrange, simplify. It is the order of questions to ask about each element of a job: can it be removed altogether, joined with another element, moved to a better place in the sequence, or made easier? Eliminate comes first because an element that no longer exists needs no tooling, space or training.
Slightly under it. The Lean Enterprise Institute's Lean Lexicon describes the aim as work for each operator very nearly equal to takt time but slightly less. How much less is a plant decision that depends on how often small stops happen. The example in this guide plans each station at no more than 90 percent of takt, which is that line's own rule, not a standard.
No. A mock-up time is a trial by people who learned the new method an hour ago, on cardboard, usually without a full shift of fatigue or real material problems. Use it to decide whether the design meets takt. Set the standard time from a new time study of the real station after it has run for about a week, with rating and allowances.
Related guides and tools
- Workstation design: reach zones, working heights and part presentation
- How to conduct a time study: the element log this method starts from
- Line balancing: deciding what each station holds against takt
- Ergonomic assessment in manufacturing: scoring the posture check
- New product time study playbook: studying a line before it exists
- Labor losses in manufacturing: the losses a study should expose
- Spaghetti diagram: measuring the walking a layout causes
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Updating standard work after an improvement
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.