Practical guide · Standard work, SOPs and training
Updating standard work after an improvement: re-study, revise, train and audit
Short answer
After an improvement, standard work is updated in six steps: study the current method, trial the change, re-study the new method, revise and reissue the documents, train every operator on every shift, then audit against the new time. Until all six are done, the old standard is still the standard.
An improvement is not finished when the new method works once. Run it as a dated trial beside the posted standard. Time it again over several cycles, with the same element breakdown as the original study. If the new time holds and nothing got worse for quality or safety, reissue the capacity table, the combination table and the chart together under a new revision, take every copy of the old one down and train every shift. Then audit: time a few cycles against the new standard time and ask about any cycle that stands out. Re-study also when the method, the tooling, the volume or the product changes, even if nobody set out to improve anything.
Last reviewed:
The loop: study, change, re-study, revise, train, audit
The loop that keeps standard work true
Example numbersStudy
Time the posted method: 71 s
Change
Trial a new method, dated and signed
Re-study
Time the new method: 63 s
71 s to 63 s
Revision A to B
Audit
Time ten cycles against 63 s
Train
Every operator, every shift, signed off
Revise
Reissue all three documents as revision B
Six steps in a loop: study the posted method at 71 seconds, change it on a dated trial, re-study the new method at 63 seconds, revise the documents, train every operator, then audit against 63 seconds, and back to study.
Standard work is a baseline. The Lean Enterprise Institute's Lean Lexicon describes it, once established and displayed, as the object of continuous improvement through kaizen. So a standard is supposed to be replaced. The risk is in how. Most plants are good at the change and poor at the paperwork that follows, and six months later the chart on the wall describes a job nobody does.
- 1
Study the posted method
Time the job as the current chart describes it, element by element. This is the before. If the floor already differs from the chart, record what is really done and say so.
- 2
Change it as a trial
Try the new method on one shift for a set period. Post a sheet marked TRIAL beside the standard, with an owner and an end date.
- 3
Re-study the new method
Time it again with the same elements and the same rules as the first study, once operators have settled into it. Check quality and safety results for the trial period.
- 4
Revise the documents
Reissue the capacity table, the combination table and the chart together under a new revision. Update any work instruction the change touched. Remove the old copies.
- 5
Train every operator
Teach the new sequence to everyone who runs the job, on every shift, and record it. Include the people who cover breaks and absences.
- 6
Audit against the new time
In the first weeks, time a few cycles against the new standard time and check the sequence and the stock. Then carry on at your normal audit rhythm.
This is PDCA applied to one job. The trial is the do, the re-study is the check, and the reissue is the act. What makes it stick is the fifth and sixth steps, which are the ones that get dropped when the kaizen event ends on a Friday.
Worked example: a 71 second cycle becomes 63
Illustrative numbers. A valve body cell runs to revision A: one operator, four machines, 57 seconds of manual work and 14 of walking, a 71 second cycle against an 80 second takt time. The team sees two things in the study. Deburring and gauging are done at two places on the bench with a reach between them, and the leak tester and the casting rack each sit a step further out than they need to.
| Element | Rev A manual | Rev A walk | Rev B manual | Rev B walk | What changed |
|---|---|---|---|---|---|
| 1. Unload and load the lathe, start it | 9 | 2 | 9 | 2 | Nothing |
| 2. Unload and load the mill, start it | 11 | 2 | 11 | 2 | Nothing |
| 3. Unload and load the drill, start it | 8 | 3 | 8 | 2 | Leak tester moved one step closer |
| 4. Unload and load the leak tester, start it | 7 | 2 | 7 | 2 | Nothing |
| 5. Deburr and gauge the bore | 14 | 2 | 9 | 1 | Deburr tool and gauge on one fixture |
| 6. Pack the part, pick up a casting | 8 | 3 | 8 | 2 | Casting rack moved one step closer |
| Total | 57 | 14 | 52 | 11 | Cycle 71 s to 63 s |
Revision A: 57 + 14 = 71 seconds. Revision B: 52 + 11 = 63 seconds. Takt time is 80 seconds in both.
Revision A and revision B of the combination table
Example numbers- Manual work
- Machine runs alone
- Walking
- Waiting
- Takt time
Revision A
71 s cycle
The posted standard before the kaizen.
1. Unload and load the lathe, start itManual 9 s, machine 42 s, walk 2 s
2. Unload and load the mill, start itManual 11 s, machine 55 s, walk 2 s
3. Unload and load the drill, start itManual 8 s, machine 28 s, walk 3 s
4. Unload and load the leak tester, start itManual 7 s, machine 20 s, walk 2 s
5. Deburr and gauge the boreManual 14 s, walk 2 s
6. Pack the part, pick up a castingManual 8 s, walk 3 s
Operator cycleManual 57 s + walk 14 s = 71 s, wait 9 s
Revision B
63 s cycle
Re-studied over ten cycles after two weeks of running the new method.
1. Unload and load the lathe, start itManual 9 s, machine 42 s, walk 2 s
2. Unload and load the mill, start itManual 11 s, machine 55 s, walk 2 s
3. Unload and load the drill, start itManual 8 s, machine 28 s, walk 2 s
Leak tester moved one step closer: walk 3 s to 2 s
4. Unload and load the leak tester, start itManual 7 s, machine 20 s, walk 2 s
5. Deburr and gauge the boreManual 9 s, walk 1 s
Deburr tool and gauge on one fixture: 14 s to 9 s
6. Pack the part, pick up a castingManual 8 s, walk 2 s
Operator cycleManual 52 s + walk 11 s = 63 s, wait 17 s
Two combination tables for the valve body cell with takt time at 80 seconds. Revision A: manual 57 seconds, walking 14 seconds, cycle 71 seconds. Revision B: manual 52 seconds, walking 11 seconds, cycle 63 seconds.
The trial ran for two weeks on day shift. The re-study, over ten cycles in the second week, gave 63 seconds. Rework at the gauge did not rise. So revision B was issued: a new combination table, a new chart with the moved stations and the new walking path, and a changed work instruction for element 5 showing the single fixture. The capacity table was checked and left alone, since no machine time changed.
One more check came from the combination table. The mill needs 11 + 55 = 66 seconds from the operator's arrival to the end of its cycle. With a 63 second cycle, an operator who went straight round would be back before the mill had finished. Here that cannot happen, because the operator works to the 80 second takt time and waits 17 seconds each cycle. But it means the new sheet must show the waiting, and it is a warning for the day takt time drops.
Change control for a posted standard
There should be one live standard for a job at any moment, and everyone should be able to tell which it is. That is all change control means here. It does not need a committee. It needs a few habits.
Change control: one live standard at a time
Example numbers- 1Standard
Revision A posted
71 s cycle. This is what operators are trained on and audited to.
- 2Temporary
Trial sheet beside it
Marked TRIAL, with an owner, a start date and an end date. One shift, two weeks.
- 3Approval
Re-study and approve
63 s over ten cycles, no quality or safety problem. Supervisor, engineer and quality sign.
- 4Standard
Revision B posted
All three documents reissued the same day. Every copy of revision A removed.
A time line of four stages. Revision A is the live standard. A trial sheet marked with an owner and dates runs beside it for two weeks on one shift. The new method is re-studied and approved. Revision B replaces revision A everywhere on the same day.
- A revision letter and a date on every sheet, and the name of who approved it.
- One line saying what changed and why, so the next person can see the history.
- A trial sheet for changes being tested, marked TRIAL, with an owner, a start date and an end date. When the end date passes, it becomes the standard or it comes down.
- All linked documents changed together: the combination table, the chart, the capacity table if machine times or tool changes moved, and any work instruction for a changed element.
- Every old copy removed the day the new one goes up, including the one in the supervisor's binder and the photo on the tablet.
- A training record for each operator against the new revision.
- Approval by the people who carry the risk: usually the supervisor, the engineer and quality, plus safety when the path or the guarding changes.
Two kinds of change need more than this. If the improvement alters a product characteristic, a control plan item or anything a customer has approved, it goes through your quality system's change process before the trial, not after. If it changes how people interact with a machine, the risk assessment is reviewed first. A faster cycle is never a reason to skip either.
Auditing standard work against the standard time
An audit of standard work asks three things, in this order: is the sequence on the chart the one being followed, is the standard in-process stock right, and does the cycle take the time the standard says? The first two can be seen. The third has to be timed.
| Cycle | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
|---|---|---|---|---|---|---|---|---|---|---|
| Seconds | 62 | 64 | 63 | 61 | 66 | 63 | 71 | 62 | 64 | 63 |
| Against standard | minus 1 | plus 1 | 0 | minus 2 | plus 3 | 0 | plus 8 | minus 1 | plus 1 | 0 |
Sum 639 seconds, mean 63.9 seconds. On cycle 7 the operator re-gauged a part that read on the limit.
A standard work audit: ten cycles against the standard time
Example numbers- Standard time, 63 s
- Takt time, 80 s
- Cycle to ask about
- 62seconds, cycle 1
- 64seconds, cycle 2
- 63seconds, cycle 3
- 61seconds, cycle 4
- 66seconds, cycle 5
- 63seconds, cycle 6
- 71seconds, cycle 7
- 62seconds, cycle 8
- 64seconds, cycle 9
- 63seconds, cycle 10
Ten timed cycles of 62, 64, 63, 61, 66, 63, 71, 62, 64, 63 seconds, drawn as columns against a standard time of 63 seconds and a takt time of 80 seconds. Nine cycles are between 61 and 66 seconds. Cycle 7 took 71 seconds.
- Time whole cycles from a fixed point, such as pressing start on the first machine. Ten is a reasonable handful for a one-minute job. It is a check, not a new study.
- Write down every cycle, not the average. The mean here is 63.9 seconds, which looks like a pass and hides the one cycle worth talking about.
- Ask about the odd cycle on the spot. A re-gauge, a stuck part or a missing tool each point to a different fix.
- If most cycles run slow, the method on the floor has drifted from the chart, or the chart was optimistic. Find out which before you say anything about pace.
- If most cycles run fast, look for a skipped check before you celebrate. If nothing was skipped, the operator has found a better way and the loop starts again.
- Decide your own tolerance and your own frequency, and write them on the audit sheet. They depend on the job, and no table can set them for you.
How the audit is done matters as much as what it finds. Say what you are timing and why before you start. Stand where the operator can see you. Show them the numbers afterwards. The audit is of the standard, and a gap is a question about the job: the layout, the tools, the parts, the training. Use it to judge a person and you will get one careful cycle while you watch and no honest information after that. The standard work audit checklist has the questions on one page.
When to re-study, even without an improvement
A standard goes out of date in four ways. Only one of them is a kaizen. The other three arrive from engineering, purchasing or the customer, often with no word to the person who owns the chart.
| Trigger | Examples | Re-study | Reissue |
|---|---|---|---|
| Method | A kaizen, a new sequence, a moved bench, a combined or split element, a second operator added. | The changed elements and every walk that touches them. | Combination table and chart. Work instruction for a changed element. |
| Tooling or equipment | A new fixture, a faster program, a different tool life, a machine replaced, a guard or sensor added. | Manual and machine time at that machine, and the tool change time and interval. | Capacity table first, then the combination table. The chart if the layout moved. |
| Volume | Customer demand up or down, a shift added or removed, a change in working time. | Nothing needs timing at first. Recalculate takt time and redraw the takt line. | All three if the sequence no longer fits or the staffing changes. The chart always, because takt time is printed on it. |
| Product | A new part number in the cell, an engineering change, a new material, an added check. | Every element the part touches differently. The whole cycle for a new part. | A set of documents per part or part family where the times differ. |
Add a fifth line of your own for time: if nothing has triggered a review for a year, walk the job with the chart anyway.
Volume is the trigger people miss, because nothing in the cell looks different. Suppose demand for the valve body rises from 345 to 400 a shift. Takt time falls from 80 to 27,600 / 400 = 69 seconds. Revision A, at 71 seconds, could not have met it. Revision B at 63 seconds fits with 6 seconds of waiting, and the mill's 66 seconds is now only 3 seconds inside the operator's return. The capacity table says the mill can make 405 a shift against 400 needed. The cell works on paper and has no slack left, which is exactly what the documents are for telling you.
A volume change moves the takt line
Example numbers- Old takt time, 80 s (345 a shift)
- New takt time, 69 s (400 a shift)
Revision A: 71 s2 s over the new takt time. Cannot be run.
Revision B: 63 s6 s inside the new takt time.
Mill, load to finish: 66 sDone 3 s before the operator is back. Capacity 405 a shift against 400.
Demand rises from 345 to 400 pieces a shift, so takt time falls from 80 to 69 seconds. Revision A at 71 seconds no longer fits. Revision B at 63 seconds fits with 6 seconds to spare.
When demand moves by more than one operator's worth of work, the question becomes staffing. How many operators a line needs covers that sum, and line balancing covers sharing the elements out again.
Checklist: is the update finished?
| Check | Done when |
|---|---|
| Before study on file | Element times for the old method are recorded, with the date and who timed them. |
| Trial was dated | The trial sheet had an owner and an end date, and has now come down. |
| Re-study done | The new method was timed over several cycles with the same elements as the before study. |
| Quality and safety checked | Defects, rework and incidents for the trial period were looked at, and any risk assessment was reviewed. |
| Three checks pass | Slowest machine under takt time, operator cycle at or under takt time, every machine done before the operator returns. |
| Documents reissued together | Capacity table, combination table, chart and affected work instructions carry the same new revision and date. |
| Old copies gone | No copy of the old revision is at the cell, in a binder or on a screen. |
| Everyone trained | Each operator on each shift, and each relief operator, is recorded against the new revision. |
| Standard WIP recounted | The number on the chart matches the marked places in the cell. |
| First audit done | Cycles were timed against the new standard time and the result is on the audit sheet. |
| Saving recorded honestly | The time saved is logged as what it is: capacity freed, or waiting, until output or staffing changes. |
The last line is there for a reason. Eight seconds off a cycle is real, but it is not money until something else changes: more pieces sold, overtime removed, or a person moved to other work. Hard savings vs soft savings explains how to agree that with finance.
Common mistakes
- Changing the floor and not the paper. The chart becomes decoration and audits become arguments.
- Changing the paper and not the floor. A new sheet is posted and one shift never hears about it.
- Skipping the re-study. The claimed saving is an estimate from the kaizen event, and nobody knows the real time.
- Re-studying on day one. Times are slow while operators are learning. Let the method settle before you time it.
- Reissuing one document. The chart says 63 seconds and the combination table in the file still says 71.
- Making the trial permanent by neglect. A TRIAL sheet with last quarter's end date is an uncontrolled standard.
- Auditing with the average. One mean hides the cycles that carry the information.
- Turning the saved seconds into a higher target the next morning. People stop offering improvements, and the loop stops with them.
That last one is the people side of this whole page. Operators find most of the improvements, and they will keep finding them if a better method leads to an easier job and a say in what happens with the time. Agree before the kaizen what a saving will be used for.
Where software helps
The re-study is where the loop usually breaks, because a second stopwatch study feels like doing the work twice. LeanSuite's Time and Motion Study works from video: film the job before and after, let the AI draft the element times for you to check and certify, and keep both studies as records that link back to the footage. Once the method is settled, digital work instructions put the current version in front of the operator at the station, so the old one is not left hanging on a wall. The standard work sheet and the combination table are free LeanSuite templates.
Standardized work software
Keep standard work current in LeanSuite
LeanSuite covers most of the cycle in one platform: working out the standard with Vision AI, keeping it current with SOPs and work instructions, and training and auditing it.
Go deeper
This page is the short version. These guides cover each part in full.
- Auditing Standard Work: Verification and Compliance ChecksMore on the audit: who does it, how often and what to do with the findings.
- Standard Work in Manufacturing: The Complete GuideStandard work as the baseline for improvement, across a whole plant.
- TWI Job Instruction: The Training Method Behind Standard WorkHow to retrain operators on a changed method.
- Standard Work Tools: Combination Sheet, Standardized Work Chart, Job BreakdownThe documents that are reissued in step four.
All our articles on this subject are in the standard work, sops and training topic.
Free templates and tools
- Standard work audit checklist24 checks of a job against its written standard, ten timed cycles, and each gap sorted by cause before anyone acts.
- Standard work combination tableOne operator's manual, machine, walk and wait time on a time chart against takt, with machine cycles and a process capacity sheet.
- Standard work sheet templateTakt time, each element's manual, machine and walk time on a time chart, key points and standard WIP.
- Process capacity sheet templateEach machine in a part's routing with manual, auto and tool change time, its capacity per shift, and the step that limits the cell against demand.
- Time study sheetTime each element over 10 cycles and work out the average, lowest repeatable and standard time. Excel does the sums.
- 4M change management sheet (change point)A shift log of every change to Man, Machine, Material, Method or Design, the extra checks after it and when normal checks resume, with a change point board.
- Training sign-off sheetAn attendance and sign-off record where each person signs they understood, with a competence check and an Excel log.
- Takt time calculatorThe pace a line must hit to meet customer demand, from shift time, breaks and daily demand.
- Kaizen savings calculatorYearly savings, payback in months and first-year ROI of an improvement, from time saved, scrap avoided and its costs.
- Standard time calculatorObserved times, a rating and an allowance in; normal time, standard time, units per hour, pieces per shift and labour cost per unit out, with the working.
Doing this in LeanSuite
Time and Motion Study
Film the station and the AI times every element on a timeline that links to the video. You check it and certify it.
See Time and Motion StudyDigital work instructions
Puts the current work instruction in front of the operator at the station.
See Digital work instructionsStandardized work software
Working out the standard with Vision AI, keeping it current with SOPs and work instructions, and training and auditing it.
See Standardized work software
See it on your own lines
Bring the problem you are working on to a 45-minute demo. Or look around with sample data first, or pilot LeanSuite on your own lines for 90 days, with the setup done by our team.
FAQ
Questions about updating standard work after an improvement
Run the new method as a dated trial, then time it again over several cycles with the same elements as the original study. If the time holds and quality and safety are no worse, reissue the capacity table, combination table and chart under a new revision, remove the old copies, train every shift and audit against the new time.
Whenever one of four things changes: the method, the tooling or equipment, the volume, or the product. A kaizen is a method change. A demand change moves takt time and can put a sound sequence out of date overnight. If nothing has triggered a review for a year, walk the job with the chart anyway.
Stand at the job with the chart and check three things: the sequence being followed matches the chart, the standard in-process stock is right, and the cycle takes the standard time. Time about ten whole cycles, write each one down and ask about any that stands out. Treat a gap as a question about the job, not the person.
Find out whether the floor or the paper is wrong. If cycles run slow, the method has drifted, something is making the job harder or the standard was optimistic. If they run fast, check that no step was skipped. If none was, the operator has found a better method, so trial it, re-study it and reissue the standard.
Usually the supervisor or team leader who owns the job, the engineer who timed it and quality, with safety added when the walking path, the guarding or the handling changes. Changes that affect a product characteristic or a customer-approved process go through the plant's formal change process before any trial.
Because the saving claimed at the end of a kaizen is an estimate. A re-study gives the real element times for the new method, shows which elements changed and which did not, and provides the new standard time that training and audits will use. Wait until operators have settled into the method before timing it.
Related guides and tools
- Standard work: the baseline this page keeps current
- From time study to standard work: revision A of the cell in this example
- Standard work combination table: redrawing the sheet when takt time changes
- Kaizen: where the improvements come from
- PDCA: the cycle behind study, change, check and standardise
- Standard time: the number the audit times against, if you set it with rating and allowances
- How to conduct a time study: the method for the re-study
- Layered process audit: a rhythm for checking standards at every level
- Resistance to change on the shop floor: when the new method is not welcome
More method guides
- The 6 Ms of production
- Poka-yoke
- Model area 90-day plans
- Moving from Excel to one system
- Reducing machine downtime: a worked month
- Andon
- Cycle time vs lead time, worked through
- Root cause analysis
- How many operators a line needs
- Reducing scrap and rework: a worked month
- Unsafe acts and unsafe conditions
- Just culture
- Stop-work authority
- Material review board (MRB)
- Nonconformance and NCRs
- Problem solving methods
- Quad chart
- OEE calculation
- Quality assurance vs quality control
- SOP meaning and format
- Job hazard analysis
- Near miss reporting
- Fishbone diagram
- Pareto chart
- Histogram
- Control chart
- What is a gemba walk
- What is lead time
- What is operational excellence
- How to improve product quality
- Preventive vs predictive maintenance
- Kanban
- FMEA
- PDSA cycle
- Safety moments
- Just-in-time manufacturing
- Kaizen
- 5S
- Total quality management (TQM)
- CAPA (corrective and preventive action)
- Layered process audit (LPA)
- Lean tools
- Lockout tagout (LOTO)
- A3 problem solving
- Preventive maintenance
- APQP
- High reliability organization (HRO)
- Manufacturing KPIs
- Quality metrics
- Practical problem solving
- CMMS
- Risk assessment
- Production efficiency
- Total productive maintenance (TPM)
- Reliability-centered maintenance (RCM)
- Hierarchy of controls
- Personal protective equipment (PPE)
- Emergency action plan
- Safety signs
- Warehouse safety
- ISO 9001
- SIPOC diagram
- Rolling action item list (RAIL)
- Pugh matrix
- Flowchart
- Project charter
- ISO 9001:2026
- Fleet maintenance
- IATF 16949
- AS9100
- ISO 14001
- ISO 45001
- One point lesson
- Standard work
- Meeting cadence
- OSHA penalties and the top 10 cited standards
- OSHA 300A summary
- SMART goals examples for manufacturing
- Year-end review for manufacturing plants
- 2027 goals for a manufacturing plant
- Lean manufacturing principles
- Toyota Production System
- 5W1H
- 5 Whys
- Continuous improvement
- Takt time
- DMAIC
- PDCA
- 8D problem solving
- Prioritization matrix
- Gemba walk questions
- 5W1H questions
- Layered process audit questions
- 5S audit questions
- Difficult conversations at work
- How to talk to an employee about poor performance
- How to resolve conflict between employees
- High performer, bad attitude
- How to get employees to follow procedures
- Resistance to change on the shop floor
- Influence without authority for CI, quality and safety people
- Quality vs production: the hold against the ship date
- Hard savings vs soft savings
- How to handle a customer quality complaint call
- 30 60 90 day plan for a manufacturing manager
- First 90 days in a new manufacturing role
- New supervisor training: the first 90 days
- Night shift supervisor
- Engineer to manager in manufacturing
- What to do after a serious workplace accident
- Disagree and commit: disagreeing with your boss in a plant
- How to deliver bad news to your boss
- How to present audit findings to management
- How to get leadership buy-in for continuous improvement
- How to ask for more headcount or resources
- How to ask for a promotion in manufacturing
- PPE compliance
- Language barriers on the shop floor
- Train the trainer in manufacturing
- Contractor safety management
- Return to work after an injury
- Attendance conversation with an employee
- Managing former peers after a promotion
- Managing older or more experienced employees
- Inheriting a team
- How to delegate as a supervisor
- Holding supervisors accountable
- How to tell employees about layoffs or a shift change
- How to deny a raise request or a promotion
- Time and motion study
- How to conduct a time study
- Standard time
- Work sampling
- SMED
- Line balancing
- Yamazumi chart
- Ergonomic assessment in manufacturing
- Spaghetti diagram
- Time study vs motion study vs method study
- Why do a time study
- How to plan a time study
- How to break a job into elements
- How many cycles to time
- Stopwatch time study
- Time study mistakes
- Time study vs work sampling
- Value added vs non value added
- Labor losses in manufacturing
- New product time study playbook
- How to estimate cycle time for a new product
- New product introduction for industrial engineers
- Process planning for a new product
- Planning operators and stations for a new line
- Pilot run and line trial
- Ramp-up plan and the learning curve
- Workstation design
- Designing a future workstation
- Time study and ergonomic study in one pass
- Predetermined motion time systems (PMTS)
- MTM (Methods-Time Measurement)
- MOST and MODAPTS
- Therbligs and motion economy
- RULA assessment
- REBA assessment
- RULA vs REBA
- NIOSH lifting equation
- Production capacity calculation
- Precedence diagram
- Labor efficiency and labor variance
- Labor cost and quoting with time standards
- SMV and SAM in garment manufacturing
- From time study to standard work
- Standard work combination table
- Standard work vs SOP vs work instruction
- Standard WIP
- Time study from video
- Time study app or software
- Man-machine chart
- Timing long-cycle and team work
- Time study in a union plant
- History of time and motion study
- Golden zone (power zone)
- Workstation assessment
- Reach envelope and work area study
- Standing, seated and sit-stand workstations
- Line-side material presentation
- Time study in automotive assembly
- Time study in electronics assembly
- Time study in CNC machining
- Time study in metal fabrication and welding
- Time study in plastics injection molding
- Time study in warehouse operations
- Time study in garment manufacturing
- Time study in maintenance work
- Time study in aerospace assembly and MRO
- Time study in food and beverage manufacturing
- Time study examples
- Historical and machine data as time standards
- Line balancing examples
- How to measure cycle time
- Manpower planning from standard time
- Bottleneck analysis from a time study
- Standard work examples
- U-cells and one-piece flow
- Flow process chart and operation process chart
- Two-handed process chart
- 3P production preparation process
- Plant layout basics
- Design for assembly
- Time study, PFMEA, control plan and work instructions
- Explaining a time study to a worried operator
- The observer effect in time studies
- Time standards and incentive pay
- Seven wastes vs eight wastes
- Job safety analysis (JSA)
- JSRA (job safety risk assessment)
- JSA vs JHA vs JSRA
- Job safety analysis from video
- HIRA (hazard identification and risk assessment)
- Management of change (MOC)
- Safe work method statement (SWMS)
- Permit to work (PTW)
- Pre-task plan (PTP)
- Field level risk assessment (FLRA)
- Safety observation
- Safety walk
Or browse the topics, the full library and the lean glossary.
Rather see it on your own problem?
Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.