Time study in injection molding and extrusion: the press cycle and the operator loop

Short answer

A molding press sets its own cycle, so the time study is not about output. It is about the operator's loop: take out, degate, check and pack. Convert every task to seconds per shot, compare the total with the machine cycle, and you know how many presses one person can tend.

In injection molding the machine cycle, made of fill, pack and hold, cooling, and mold open, eject and close, fixes the parts per hour. Read it from the press controller. The time study covers what the operator does around it: removing parts, trimming the gate, checking, packing, changing boxes and doing the periodic quality checks. Convert each task to seconds per shot, including the ones done every fifty shots or once an hour, add allowances, and divide by the machine cycle. The result is the share of one operator the press needs. Under half, and one person can tend two presses. Mold changes and material changes are studied separately as changeovers.

Last reviewed:

What makes molding different

A molding press makes a shot every cycle whether anyone is standing at it or not. Working faster does not make more parts, and a time study that sets an output target for the operator misses how the process works. The study has a different job here.

  • The machine sets the rate. Parts per hour is 3,600 divided by the cycle time in seconds, times the number of cavities. The operator cannot change it, except by making it worse.
  • The operator's work is a loop that has to fit inside the cycle. Parts arrive every cycle and must be taken, trimmed, checked and packed before the next ones land. If the loop is longer than the cycle, parts pile up or the press waits.
  • A lot of the work is not every shot. A box fills every fifty shots, a quality check comes round every hour, the resin dryer needs topping up twice a shift. These disappear in a study of ten cycles.
  • The labor question is presses per person. Because the press runs alone, the real output of the study is how much of one operator each press needs.
  • Changeovers are large. A mold change or a color change stops the press for a long time, and in a plant running many part numbers that time rivals the running losses.

The machine cycle: read it, do not time it

One molding cycle has four parts, always in the same order.

The phases of an injection molding cycle and what fixes each one
PhaseWhat happensWhat fixes the time
FillThe screw pushes melt into the closed moldShot size, injection speed, the part and gate design
Pack and holdPressure is held while the gate freezesGate size and the material
CoolingThe part hardens until it can be ejected without distortionWall thickness above all, then the material, mold temperature and cooling channels
Open, eject and closeThe mold opens, the part is pushed or taken out, the mold closesOpening stroke, ejection, and how the part is removed

Cooling is usually the largest phase. In the simple heat-flow model its time rises with the square of the wall thickness, so a wall twice as thick needs roughly four times as long.

One shot: a 24 second cycle

Example numbers
  • Fill1.5 s
  • Pack and hold5.0 s
  • Cooling12.0 s
  • Open, eject, close5.5 s

150

shots an hour (3,600 / 24.0)

600

parts an hour on 4 cavities

1 : 2.25 : 4

relative cooling time at 1x, 1.5x and 2x wall thickness

Fill 1.5 seconds, Pack and hold 5.0 seconds, Cooling 12.0 seconds, Open, eject, close 5.5 seconds. The cycle is 24.0 seconds, 150 shots and 600 parts an hour on four cavities. Cooling is 50% of this cycle. In the simple heat-flow model cooling time rises with the square of the wall thickness.

The controller shows this to a tenth of a second and it should repeat on every shot, so read it and do not time it. Cooling is the largest phase here, and it grows with the square of the wall thickness.

People ask what a typical cycle time is. There is no useful single answer: thin-walled packaging runs in a few seconds and a thick technical part can take a minute or more. What matters for the study is that the cycle is set by the process engineer for part quality, it is displayed on the controller to a tenth of a second, and it should be the same on every shot. So do not put a stopwatch on it. Read it, and check that it holds steady.

The exception: when the operator is inside the cycle

On a press run in semi-automatic mode, the operator opens the gate, removes the part by hand, closes the gate and starts the next cycle. Now a person paces the last phase, and the cycle varies with them. That matters beyond the lost seconds: a mold runs best at a steady rhythm, because every stretched cycle changes how long the melt sits in the barrel and how warm the mold is. A time study of a semi-automatic press should report the spread of the cycle time as well as its average, and the first improvement is usually to take the hand out of the mold with a robot, a sprue picker or a part that drops free.

The operator loop: what a molding operator does

With the press running in automatic and a robot or a chute delivering the shot, the operator's job is everything between the mold and the pallet. It has three layers, and the study has to catch all three.

The three layers of a molding operator's work and how to bring each to seconds per shot
LayerTypical tasksHow oftenHow to measure
Every shotTake parts from the conveyor, cut or break off the runner, visual check, packEach cycleVideo of twenty or more shots, averaged
Every so many shotsClose and label a full box, palletise, start an empty box, empty the runner binEach box or binTime the task once or twice, divide by the shots between
By the clockDimensional or weight check, record sheet, top up material, clean the mold faceEach hour or shiftTime the task, divide by the shots in that period

Seconds per shot = task time / shots between occurrences. A 45 second box change every 50 shots is 0.9 seconds per shot.

One hour at the press

Example numbers
  • What ten clean cycles show4 min
  • Box change, three in the hour45 s each
  • Hourly weight and dimension check, sheet filled in240 s

In a 60 minute hour there are 150 shots. A box fills every 50 shots, every 20 minutes, and takes 45 seconds to close and replace. The hourly check takes 240 seconds. Ten clean cycles cover only the first 4 minutes and show none of it. Periodic work comes to 2.5 seconds per shot.

A ten-shot study sees 4 minutes of a relaxed operator. The box changes and the hourly check add 2.5 seconds to every shot, and they only show if you film the whole hour.

The second and third layers are why short studies of a press mislead. Ten clean cycles show a relaxed operator with time to spare. Then a box fills, the hourly check falls due and a runner jams in the granulator, all inside the same five minutes. Film a full hour at least once, or use work sampling across a shift, to see what the by-the-clock work really adds up to.

How to study a molding job, step by step

  1. 1

    Read the cycle and the cavities

    Take the cycle time from the controller over twenty shots and note the number of cavities running. Shots per hour = 3,600 / cycle time. Parts per hour = shots per hour x cavities.

  2. 2

    Film the operator for an hour

    Set the camera to cover the conveyor end, the bench and the box. An hour catches a box change and a periodic check. Tell the operator what it is for first.

  3. 3

    Time the every-shot elements

    Average each one over at least twenty shots and rate the pace. These are hand elements of a few seconds each, so time them from the video and not by eye.

  4. 4

    Time the periodic tasks and convert them

    Divide each task time by the number of shots between occurrences. List them even if they look small.

  5. 5

    Add allowances and work out the loading

    Standard seconds per shot = normal seconds per shot x (1 + allowance). Loading = standard seconds per shot / machine cycle.

  6. 6

    Decide the manning

    Add the loading of the presses one person would tend, plus the walk between them. Keep the total comfortably under 100 percent, because jams and alarms are not in the study.

A worked example: a four-cavity housing

Illustrative example. A press runs a four-cavity mold for a small housing. The controller shows a 24.0 second cycle: 1.5 seconds fill, 5.0 pack and hold, 12.0 cooling, and 5.5 to open, eject and close. That is 150 shots and 600 parts an hour. A robot places each shot on a conveyor with the runner attached, and one operator works the end of the conveyor.

Illustrative: the operator loop today, in normal seconds per shot
TaskTask timeHow oftenPer shot
Break four parts off the runner6.0 sEvery shot6.0 s
Visual check of four parts5.0 sEvery shot5.0 s
Pack four parts in the box6.0 sEvery shot6.0 s
Close, label and stack the box, start a new one45 sEvery 50 shots (200 parts)0.9 s
Weigh and measure five parts, fill in the sheet240 sEvery 150 shots (hourly)1.6 s
Normal time per shot19.5 s
Standard time per shot, with a 12 percent allowance21.8 s
Loading against the 24.0 second cycle91%

19.5 x 1.12 = 21.84 seconds. 21.84 / 24.0 = 91 percent. The allowance is illustrative: use your plant's.

At 91 percent the press needs a whole operator, and a tight one. Labor is one hour per 600 parts, or 1.67 hours per thousand.

After two changes

The team makes two changes. The robot's gripper is fitted to cut the runner and drop it in the granulator, so the parts arrive separated. And quality agrees, in the control plan, that the every-shot visual check can become a full check of one shot in five, since the hourly measurement and the process monitoring cover the rest. The operator would now walk between two presses, switching every ten shots.

Illustrative: the operator loop after the changes, per press
TaskPer shot beforePer shot after
Break parts off the runner6.0 s0 s
Visual check5.0 s1.0 s
Pack6.0 s6.0 s
Box change0.9 s0.9 s
Hourly check1.6 s1.6 s
Walk between presses, 8 s every 10 shots0 s0.8 s
Normal time per shot19.5 s10.3 s
Standard time per shot21.8 s11.5 s
Loading per press91%48%

10.3 x 1.12 = 11.54 seconds. 11.54 / 24.0 = 48 percent per press.

The operator loop against the 24 second cycle

Example numbers

Today (21.8 s of 24.0: 91% loaded)

After two changes (11.5 s of 24.0: 48% loaded)

  • Break parts off the runner6.0 to 0.0 s
  • Visual check5.0 to 1.0 s
  • Pack6.0 to 6.0 s
  • Box change0.9 to 0.9 s
  • Hourly check1.6 to 1.6 s
  • Walk between presses0.0 to 0.8 s
  • Allowance, 12 percent (illustrative)

Values beside each task: seconds per shot, today to after.

Standard seconds of operator work per shot against a 24.0 second press cycle. Today 19.5 normal seconds, 21.84 standard, 91% loading. After the robot cuts the runner and the visual check drops to one shot in five, 10.3 normal seconds, 11.54 standard, 48% loading per press.

The press cycle did not change. The loop dropped from 91% to 48% of it, and every gain came from outside the mold.

Two presses would load one operator to 96 percent. On paper that fits. On the floor it does not, because the study contains no jams, no alarms and no short shots, and at 96 percent the first one puts parts on the floor. The better answer here is three presses between two operators: 144 percent of work shared by two people is 72 percent each.

Illustrative: three ways to man the same presses
ManningLoading per operatorParts per operator hourLabor hours per 1,000 parts
One operator per press, today91%6001.67
One operator on two presses96%1,2000.83
Two operators on three presses72%9001.11

Two operators on three presses cuts labor per thousand parts by a third against today, and leaves 28 percent of each operator's time for disturbances.

Three ways to man the same presses

Example numbers

One operator per press, today

91%

600 parts per operator hour, 1.67 labor hours per 1,000 parts

One operator on two presses (No room for a jam)

96%

1,200 parts per operator hour, 0.83 labor hours per 1,000 parts

Two operators on three presses (28 percent left for disturbances)

72%

900 parts per operator hour, 1.11 labor hours per 1,000 parts

Dashed line: 100 percent of one operator. Loading per operator = presses x standard seconds per shot / cycle / operators.

One operator per press, today: 91% loaded, 600 parts per operator hour, 1.67 labor hours per 1,000 parts. One operator on two presses: 96% loaded, 1,200 parts per operator hour, 0.83 labor hours per 1,000 parts. Two operators on three presses: 72% loaded, 900 parts per operator hour, 1.11 labor hours per 1,000 parts.

Two presses on one operator fits on paper at 96 percent and fails on the floor, because the study holds no jams or alarms. Three presses between two people cuts labor per thousand parts by a third and keeps a margin.

Notice what did not change: the press cycle. Every gain came from the loop outside the mold, and the parts per hour of each press stayed at 600.

Mold changes and material changes

A running press loses seconds. A press being changed over loses hours. In the example, a 90 minute mold change costs 900 parts of capacity, and a plant with many part numbers makes several changes a day.

  • Mold change: cool down or drain, disconnect water, hydraulics and ejector, unclamp, lift out, lift in, clamp, reconnect, heat up, run the first shots, approve the first good part.
  • Material or color change: empty the hopper and dryer, purge the barrel until the old material is gone, run until the color is clean. The parts made while purging are scrap, so this changeover costs material as well as time.
  • Insert or version change: swap inserts in the mold without taking it out of the press.

Study a changeover as one long event, from the last good part of the old job to the first approved part of the new one, with a camera on the press and a second person noting who is waiting for what. Then sort every task into internal, done with the press stopped, and external, done while it still runs. Preheated molds, quick couplings on water lines, standard clamp heights and a cart with every tool on it are the classic external moves. The method is SMED, and the order of jobs matters too: running light colors before dark ones shortens the purge, which a changeover matrix captures.

Extrusion: a line that never cycles

An extrusion line has no cycle at all. Profile, pipe or sheet leaves the die continuously, and the output is line speed times weight per metre. There is no shot to count, so the operator's work is measured against length.

  • Find the interval the line imposes. A profile running at 8 metres a minute and cut to 2.5 metre lengths delivers a length every 18.75 seconds. A bundle of ten is due every 187.5 seconds. Those intervals play the part that the press cycle plays in molding.
  • Time the take-off loop against them: lift off, check, stack, strap, label. If the loop for a bundle takes longer than the bundle interval, lengths pile up on the table.
  • Sample the rest. Much of an extrusion crew's time is monitoring, adjusting and responding, which has no cycle. Work sampling across the crew shows where it goes.
  • Study the start-up and the die change as changeovers. A line makes scrap from start-up until the dimensions settle, so the time to first good product is the figure to cut.

Extrusion: the line sets the interval

Example numbers
  1. Line speed

    Output at the die

    8 m/min

  2. One length

    2.5 / 8 x 60

    18.75 s

  3. Bundle of 10

    10 x 18.75

    187.5 s

A profile at 8 metres a minute cut to 2.5 metre lengths delivers a length every 18.75 seconds. A bundle of 10 is due every 187.5 seconds. These intervals play the part of the press cycle: the take-off loop has to fit inside them.

With no shot to count, the length and the bundle are the cycle. Time the take-off loop against them, and check it before any increase in line speed, because a faster line shortens both.

Raising line speed shortens every interval, so check the take-off loop before a speed increase and not after.

Ergonomics and the people side

A molding operator repeats a short loop for a whole shift at a pace the press sets. At 150 shots an hour that is over a thousand repetitions of the same reach, pinch and twist in seven and a half hours, and the operator cannot slow down without parts piling up.

  • Hands and wrists: breaking gates, trimming with a knife or cutters, pressing parts into trays.
  • Shoulders and back: reaching into the mold area on a semi-automatic press, bending to boxes on the floor, lifting full boxes to a pallet.
  • Standing: fixed at the conveyor end, often on concrete.
  • Changeovers: clamps, hoses and mold handling in awkward positions around the press. Mold lifting and guarding have their own safety rules, which a time study must never shortcut.

Raise boxes to waist height, bring the conveyor end to the operator, replace hand degating where you can and rotate people between presses with different loops. The methods are in ergonomic assessment in manufacturing and workstation design. This is general practice, not medical or safety advice.

On the people side, the fear is plain: a loading study is how presses per person goes up. Say that openly, show the loading sums to the operators, keep real slack in the answer, and follow any agreement on manning and work measurement. An operator loaded to 96 percent will tell you it does not work, and they will be right.

Mistakes specific to molding and extrusion

Molding and extrusion time study mistakes and what to do in their place
MistakeWhat goes wrongDo this
Setting an output standard for the operatorThe press decides output. The standard measures nothing the operator controls.Measure the operator's loading against the cycle, and the press against its planned cycle.
Studying ten clean shotsBox changes, hourly checks and material handling are missing from the loop.Film an hour, and convert every periodic task to seconds per shot.
Manning to 100 percentThe first jam leaves parts unpacked or stops a press.Leave a real margin, and share odd numbers of presses between operators.
Shortening the cycle from the floorA cooling time cut to help output brings warped or short parts.Leave the cycle to process engineering. Work on the loop and the changeover.
Ignoring cycle spread on semi-automatic pressesThe average looks fine while uneven cycles cause quality drift.Report the range as well as the average, and automate part removal.
Counting cavities that are blocked offA four-cavity mold running three is planned at four.Record the cavities running on the day of the study.
Leaving changeovers out of capacityThe schedule assumes presses run all shift.Time mold and material changes and include them in the available hours.

Templates, tools and related guides

LeanSuite's time and motion study times the operator's loop from a phone video of the conveyor end, and SMED runs a mold change as a timed checklist and splits a filmed changeover into internal and external tasks. The ergonomic study scores the loop's postures from video. For how plants in the sector use the platform, see LeanSuite for plastics and injection molding.

FAQ

Questions about time study in plastics injection molding

  1. There is no single typical figure. Thin-walled parts can cycle in a few seconds and thick technical parts can take a minute or more. The cycle is the sum of fill, pack and hold, cooling, and mold open, eject and close. Cooling is usually the largest part and rises steeply with wall thickness. Read the cycle of a running job from the press controller.

  2. Shots per hour is 3,600 divided by the cycle time in seconds. Parts per hour is shots per hour times the number of cavities running. A 24 second cycle on a four-cavity mold gives 150 shots and 600 parts an hour. For planned output over a shift, take off the time lost to changeovers, stops and scrap.

  3. With the press in automatic, the operator handles what comes out of it: takes parts from the conveyor or the mold, removes the runner, checks the parts, packs them, changes and labels boxes, and does the periodic quality checks and records. The operator also tops up material, clears jams and responds to alarms. Setters or technicians usually do mold changes and process adjustments.

  4. Convert every operator task to standard seconds per shot, including box changes and hourly checks, and divide by the machine cycle. That is the share of one operator the press needs. Add the shares of the presses one person would tend, plus walking, and keep the total well under 100 percent. Two presses at 48 percent each is 96 percent, which is too tight.

  5. The mold closes and the screw injects melt to fill the cavity. Pressure is packed and held while the gate freezes. The part cools in the mold while the screw prepares the next shot. Then the mold opens, the part is ejected or taken out, and the mold closes again. Some sources count clamping and ejection as separate steps.

  6. Film a full change from the last good part to the first approved part. Sort every task into internal, done with the press stopped, and external, done while it runs. Move work to external: preheat the next mold, stage tools and hoses on a cart, prepare material. Then shorten the internal work with quick couplings, standard clamp heights and a set start-up routine.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.