Skip to content
LeanSuite

Seven wastes vs eight wastes of lean: what changed and what it means on the floor

Short answer

Taiichi Ohno named seven wastes: overproduction, waiting, transportation, processing itself, inventory, motion and defects. Lean writers later added an eighth, non-utilized talent. The seven can be timed on video. The eighth cannot, and it is the one the others usually trace back to.

The seven wastes (muda) come from Taiichi Ohno and the Toyota Production System: overproduction, waiting, transportation, processing itself (over-processing), stock on hand (inventory), movement (motion) and making defective products (defects). The eighth, non-utilized talent, is not in Ohno's list. The Lean Enterprise Institute says it was added later as lean spread beyond Toyota, and the first use is not settled. DOWNTIME (Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing) is the usual way to remember the eight, and TIMWOODS is the same list. Use the seven when you are measuring time and the eight when you are talking about people. On video, seven wastes show up as seconds you can count: walking, waiting, searching, rework. The eighth shows up as skill that is not used and ideas that are not asked for.

Last reviewed:

The answer, in one page

  • Seven wastes: Ohno's list for the Toyota Production System. All seven are things you can see happening in the work.
  • Eight wastes: the seven plus non-utilized talent, added later by lean writers. Writers differ on who first put it in print.
  • Same idea underneath: waste (muda) is work that uses time and resources and adds no value for the customer.
  • Use the seven to measure. A video of a job lets you put minutes against each one.
  • Use the eight to talk about people. Unused talent is the one the operator can tell you about and the stopwatch cannot.
  • Do not argue about the number. A plant that uses seven, eight or ten and looks at the floor beats a plant that debates the list.

This page is the comparison, and the video view of the wastes, which the plant-wide posts do not cover. For the definition and the DOWNTIME mnemonic in a plant setting, see the 8 wastes of lean manufacturing. For examples from real processes, see 8 wastes examples. For a programme to remove them, see eliminate the 8 wastes systematically.

The seven wastes, as Ohno named them

Taiichi Ohno built the Toyota Production System on the removal of waste, and in his book on it he named seven kinds. The Lean Enterprise Institute credits the original seven to him. The names below follow Ohno's wording first, with the common modern name in brackets. The last column is what each one looks like when you watch an operator at work, which is where most of them hide.

The seven wastes of the Toyota Production System and what each looks like on video

  • Overproduction

    What it is
    Making more, or sooner, than the next process needs.
    What you see on the video
    Parts piling up beside the station, an operator working ahead of the schedule, a full tote before the next step is ready.
  • Waiting (time on hand)

    What it is
    Idle time because the next thing is not ready: parts, a machine, a person, a decision.
    What you see on the video
    Standing at the machine watching it run, waiting for material, waiting for an approval, hands empty.
  • Transportation

    What it is
    Moving material or product further or more often than the process needs.
    What you see on the video
    Carrying parts to another area, loading and unloading a cart twice, putting down and picking up again.
  • Processing itself (over-processing)

    What it is
    Work that the customer does not need, or that the process does not need to do.
    What you see on the video
    Polishing a surface nobody sees, a second inspection of the same feature, a form filled in that no one reads.
  • Stock on hand (inventory)

    What it is
    Material held beyond what flow needs: raw, work in process or finished.
    What you see on the video
    Racks and queues at the station, searching through a pile, handling stock that is not being used.
  • Movement (motion)

    What it is
    Movements of the person that do not add value: reach, bend, walk, search.
    What you see on the video
    Walking to a tool crib, reaching across the bench, looking for a gauge, turning to a bin behind them.
  • Making defective products (defects)

    What it is
    Making parts that need to be scrapped, reworked or sorted.
    What you see on the video
    Rework at the bench, a part set aside for repair, a re-weld, extra checks to catch a known fault.
The right-hand line on each card is what to look for when you watch an operator. Almost all of it is a number of seconds. Names follow Ohno's list as it is usually given, with the modern name beside it. Ohno singled out overproduction because it produces the others: inventory to hold it, transport to move it, space and people to handle it.

The pattern in the right-hand column is the useful bit. Almost all of it is something a person is doing, or not doing, with their hands and feet, for a number of seconds. That is why a time study, or a video, is a waste-finding tool as well as a standards tool. Labor losses in manufacturing takes that further and value added vs non value added gives the test for each element.

DOWNTIME: the eight wastes, and the one Ohno did not name

  • DDefects

    Ohno's seven

    Rework, a re-check, a part set aside.

  • OOverproduction

    Ohno's seven

    Working ahead, a full tote nobody needs yet.

  • WWaiting

    Ohno's seven

    Hands empty, standing at a running machine.

  • NNon-utilized talent

    Added later

    Not timeable. Skill unused, ideas not asked for.

  • TTransportation

    Ohno's seven

    Carrying and moving parts and carts.

  • IInventory

    Ohno's seven

    Handling and searching queues of stock.

  • MMotion

    Ohno's seven

    Reach, bend, walk and search.

  • EExtra processing

    Ohno's seven

    Work the customer does not need.

Eight cards spelling DOWNTIME: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing. Seven are in Ohno's original list and can be counted in seconds on video. Non-utilized talent was added later and cannot be timed.

Seven cards are Ohno's and each has something you can count in seconds. The yellow card was added later and has no stopwatch reading.

The eighth waste: non-utilized talent

The eighth waste is the loss of what people could contribute and are not asked for: their ideas, their skill, their judgment, their time spent on work below what they can do. It is usually called non-utilized talent or unused talent, and sometimes underutilized skills or unused employee creativity.

Where it came from

Not from Ohno. The Lean Enterprise Institute says that the original seven were identified by Taiichi Ohno and that the eighth was added later, as lean spread to the rest of the enterprise and around the world. It does not say who. Different writers give different answers, and a good number of readers first meet it in Jeffrey Liker's book on the Toyota Way, where it appears as unused employee creativity. The first use is not settled and this page does not claim to settle it. If a page tells you who added it with certainty, ask for the source.

Why it was added

Respect for people is the other pillar of the Toyota Way, next to continuous improvement. A list of wastes that is all about the process leaves out the person who does the work and who knows what is wrong with it. The addition reminds a team that a talented person kept on routine tasks, or never asked what they think, is a loss, and that waste is not only motion and inventory. It is also a useful bridge to the people side of lean.

Why it is different

  • It cannot be timed. There is no stopwatch reading for an idea nobody asked for.
  • It usually sits behind the others. A person who has never been asked about the walk to the crib will keep walking to it.
  • It is visible in a few ways: a skilled welder moving material, an experienced operator who has never been asked how to improve the job, the same problem raised and ignored again and again, and a suggestion that disappears.
  • The measure is indirect: how many ideas are raised, how many are answered, how long they take, and how many are made.

That last list is a suggestion system problem more than a time study problem. Watching video can still help: an operator who was doing a job well below their skill, or who works around the same fault every cycle and has stopped mentioning it, is on the video if you look.

Seven or eight: which list should you use?

The seven wastes and the eight wastes side by side

  • Seven wastes

    Origin
    Taiichi Ohno and the Toyota Production System.
    What it covers
    Waste in the flow of material and the work of the person.
    Can you time it?
    Yes. Every one has a signature you can count in seconds on a video or a time study.
    Memory aid
    TIMWOOD: Transport, Inventory, Motion, Waiting, Overproduction, Over-processing, Defects.
    Best for
    Time studies, waste walks, value stream maps and any exercise where you will put numbers on waste.
    Risk
    Treats the person as a machine that moves.
  • Eight wastes

    Origin
    The seven plus non-utilized talent, added later by lean writers. First use not settled.
    What it covers
    Adds the waste of not using what the person knows.
    Can you time it?
    Seven of the eight, yes. The eighth, no.
    Memory aid
    DOWNTIME: Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion, Extra processing. TIMWOODS is the same list, with S for skills.
    Best for
    Training, culture work, improvement programmes and any discussion where the people are part of the problem.
    Risk
    Can slide into a vague list that nobody counts.
Count with the seven. Talk with the eight. Some lists add more, such as energy, materials or environmental waste. There is no official list. Choose one for your plant and stay with it.

A sensible rule: count with the seven, discuss with the eight. When you run a waste walk or study a job, use the seven to name each thing you see and put a time against it. When you debrief with the people on the job, add the eighth and ask what they would change. The waste walk and the waste walk checklist do the first half, and the 8 wastes poster is a handy wall reminder of the whole list.

What changes when you look at labor on video

A walk through a plant with a checklist finds waste. A video of one operator for a shift counts it. Once each moment is placed in a class, you can say how much of a day is waiting, how much is walking and how much is rework, in minutes, and the argument moves from "do we have waste" to "which waste first." The table below is an invented shift, classified the way a video study would do it.

One shift on video, classified

Example numbers
  • Value added, 262 min
  • Necessary, 86 min
  • Waste, 132 min
  • Waiting41
  • Motion33
  • Transportation22
  • Defects and rework14
  • Over-processing12
  • Overproduction7
  • Inventory3

A 480 minute shift: 262 minutes value added, 86 necessary, and 132 minutes of waste. The waste, ranked: Waiting 41, Motion 33, Transportation 22, Defects and rework 14, Over-processing 12, Overproduction 7, Inventory 3 minutes.

Waste is 132 of 480 minutes, 27.5 percent. Waiting and motion are 74 of those 132, so they come first. Overproduction is the textbook headline and here it is 7 minutes.
Illustrative: one 480 minute shift of one operator, classified from video
ClassMinutesShare of shiftWhat it contained
Value added26254.6%Welding, fitting and checking to the drawing.
Necessary, non value added8617.9%Clamping, setup, required inspection, paperwork the contract needs.
Waiting418.5%Waiting for material and for a crane, standing at the machine.
Motion336.9%Walking to the tool crib, searching for gauges, reaching and turning.
Transportation224.6%Carrying parts to the next area, moving carts.
Defects and rework142.9%Re-welding and re-checking.
Over-processing122.5%Grinding beyond the drawing, a second check of the same feature.
Overproduction71.5%Building ahead of the next process.
Inventory30.6%Handling and searching a queue of work in process.
Total480100%Waste is 132 minutes, 27.5% of the shift.

262 + 86 + 132 = 480. Waste is 41 + 33 + 22 + 14 + 12 + 7 + 3 = 132 minutes.

Three things come out that a walk would not give you. First, the order: waiting and motion are 74 of the 132 minutes, so that is where to start, not with overproduction, which is the textbook headline and 7 minutes here. Second, the size: waste is over a quarter of the shift, and a quarter of a shift is worth a conversation with whoever owns the crane and the tool crib. Third, what is missing. The table says nothing about the eighth waste, because there is no way to count it in minutes, and that is not a flaw in the table. It is a reason to ask the operator what they would change.

Counting also stops two arguments. Whether a step is really waste is settled by the three tests in value added vs non value added, not by opinion. And whether a loss is waste or necessary work is settled by what the customer or the contract needs. LeanSuite's time and motion study works from a recording you upload and sorts each element into value added, necessary and waste with the time against it, linked to the frame it came from, and a person reviews the result. Time study from video covers filming.

The pairs people confuse

Wastes that are easy to mix up, the test to separate them and how to record each

  • Often mixed up

    Motion and transportation

    The test: Who is moving? The operator's body is motion. The material moving from place to place is transportation. A person carrying a tray across the plant is both, so split the time or choose by the main cause.

    Record it as

    Motion for reach, walk and search. Transportation for carrying and moving parts.

  • Often mixed up

    Overproduction and inventory

    The test: Overproduction is the act of making too much, too soon. Inventory is the pile that results. The first is the cause, the second the evidence.

    Record it as

    Overproduction for the work done ahead of need. Inventory for the handling of the stock.

  • Often mixed up

    Over-processing and necessary work

    The test: Would the customer, the contract or the next process notice if it were not done? If not, it is over-processing. If a standard or a law requires it, it is necessary, even if no customer asks.

    Record it as

    Over-processing only when nothing requires it. Otherwise necessary non value added.

  • Often mixed up

    Waiting and machine time

    The test: A person standing at a running machine with nothing to do is waiting. A person who is doing other useful work while the machine runs is not.

    Record it as

    Waiting for the person. Machine time for the machine. See man machine charts.

  • Often mixed up

    Defects and rework

    The test: Rework is a defect that was caught and fixed. Scrap is a defect that was not recoverable. Both are the seventh waste.

    Record it as

    Defects, with a note on scrap or rework.

Settle the edge cases once, in writing, and apply the same rule to every element.

Where mura and muri fit

The wastes are muda, one of three words in the Toyota 3M model. Mura is unevenness, and muri is overburden of people or machines. They are linked: uneven demand or workload makes people rush and wait in turn, overload makes errors, and the wastes follow. Counting muda on video without looking at the load will give you symptoms. If one operator waits for forty minutes and then gets hammered for the next hour, you have mura. If the same operator reaches and lifts in a way that hurts, you have muri. Muda, mura and muri has the full model, and ergonomic assessment is the way to look at the overburden side with a score.

How to find and count the wastes on video

From a recording to a ranked list of waste

  1. 1

    Choose the job and tell the operator

  2. 2

    Record a full cycle set or a full shift

  3. 3

    Break the video into elements

  4. 4

    Classify each element

  5. 5

    Add up the minutes by class

  6. 6

    Ask the operator about the top two

Classify every element, add up the minutes by class, then ask the operator about the top two.
  1. 1

    Choose the job and tell the operator

    Pick a station where you suspect waste. Agree the filming with the operator beforehand, as in explaining a time study.

  2. 2

    Record a full cycle set or a full shift

    Enough cycles to see the repeating work, and a long enough run to catch the waits and the odd jobs that happen once an hour.

  3. 3

    Break the video into elements

    Each reach, walk, wait or operation as its own line, with a start and an end. How to break a job into elements shows how.

  4. 4

    Classify each element

    Value added, necessary, or one of the seven wastes. Use the pairs table above for edge cases.

  5. 5

    Add up the minutes by class

    Rank the wastes by time. Check that the classes add up to the observed time.

  6. 6

    Ask the operator about the top two

    Show the clips and ask why. The answer is often a missing part or a badly placed tool, and it is also where the eighth waste turns up.

Limits and honest caveats

  • The classes depend on the judgment of the person who classifies. Write down the rules, apply them to every element and let a second person check a sample.
  • Removing a waste is not always right. A little inventory at a risky supplier, or a check that a customer requires, may be rational. Waste is defined by the customer's needs, not by the list.
  • A count of waste on one operator is not a count for the plant. Study enough jobs and shifts to say something general.
  • Waste in minutes does not equal money saved. If the freed minutes are not used, nothing changes in cost. See hard savings vs soft savings.
  • People are not the eighth waste to be removed. The aim is to use more of what they can do, not less of them. Say so early, because a campaign to find waste in a plant that has seen layoffs will be heard as a campaign to find people. See explaining a time study to a worried operator.

FAQ

Questions about seven wastes vs eight wastes

  1. The seven wastes, from Taiichi Ohno and the Toyota Production System, are overproduction, waiting, transportation, processing itself (over-processing), stock on hand (inventory), movement (motion) and making defective products (defects). Each is work or material that uses time and resources and adds no value for the customer. TIMWOOD is a common way to remember them.

  2. Non-utilized talent: not using what people know, can do and could suggest. It is also called unused talent, underutilized skills or unused employee creativity. It is not in Ohno's original list. The Lean Enterprise Institute says it was added later as lean spread beyond Toyota, and who first wrote it down is not settled.

  3. The eight are the seven plus non-utilized talent. The seven can each be counted in seconds from a time study or video. The eighth cannot be timed and shows in unused skill and ignored ideas. Use the seven to measure and the eight to talk about people. Some lists add more, such as energy or materials, so choose one and stay with it.

  4. Defects, Overproduction, Waiting, Non-utilized talent, Transportation, Inventory, Motion and Extra processing. It is a memory aid for the eight wastes. TIMWOODS is the same list in another order, with S for skills. The seven wastes alone are sometimes remembered as TIMWOOD. Neither is a standard, only a convenience.

  5. That is not settled. The Lean Enterprise Institute says only that it was added later, as lean spread beyond Toyota. Many readers first meet it as unused employee creativity in Jeffrey Liker's book on the Toyota Way, but the first use has not been traced here. Be cautious of any source that names one person with certainty and gives no reference.

  6. Ohno singled out overproduction, because making too much creates the others: stock to hold it, transport to move it, space and people to handle it. On the floor, the biggest waste by time is often waiting or motion. Count the minutes for your own job on video rather than assuming. An illustrative shift here lost more to those two than to overproduction.

  7. For seven of them, film the job, break it into elements, classify each as value added, necessary or one of the wastes, and add up the minutes by class. The eighth, non-utilized talent, cannot be timed. Measure it indirectly: how many ideas are raised, how many are answered and made, and how often skilled people do work below their skill.

Or browse the topics, the full library and the lean glossary.

Rather see it on your own problem?

Bring the problem you are stuck on, and we will show you on a call how LeanSuite handles it.

Pass it on

We want LeanSuite to be the best place on the internet for lean help. If this was useful, send it to someone on your team or in your network who needs it.